COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

57
COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP

Transcript of COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

Page 1: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM

2013 WORKSHOP

Page 2: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

WELCOME & INTRODUCTION

JARRETT SIMON DIRECTOR, ENERGY EFFICIENCY

LORETTA BATTLES ADMINISTRATION, COMMERCIAL & INDUSTRIAL

STANDARD OFFER PROGRAMS

YOLANDA SLADE PROGRAM MANAGER, STANDARD OFFER

PROGRAMS

Page 3: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

INTRODUCTIONS (CONT.)

NEXANT TEAM JESSY SHAO DING LI KAI QIU GLEN NICOL

Page 4: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

AGENDA

CENTERPOINT COMMERCIAL ENERGY EFFICIENCY

PROGRAMS

2012 PROGRAM SUMMARY

2013 PROGRAM OUTLINE

2013 PROGRAM HIGHLIGHTS

SUPPLIER DIVERSITY

LIGHTING SPREADSHEET OVERVIEW

Q&A

DATABASE TRAINING (IF APPLICABLE)

Page 5: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

CENTERPOINT ENERGY 2013 COMMERCIAL PROGRAMS

Page 6: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

COMMERCIAL ENERGY EFFICIENCY PROGRAMS

ENERGY SHARE LOAD MANAGEMENT PROGRAM DAVID DZIERSKI –

[email protected] DEMAND RESPONSE PROGRAM FOR COMMERCIALS CUSTOMERS

WITH THE ABILITY TO CURTAIL ENERGY USAGE DURING PEAK PERIODS.

PROGRAM KICK OFF – NOVEMBER 5TH, 2012

SUSTAINABLE SCHOOLS PROGRAM CHERYL BOWMAN –

[email protected] PROGRAM OFFERED TO PUBLIC AND PRIVATE SCHOOLS THAT

PROVIDE EDUCATIONAL MATERIALS AND ACTIVITIES THAT PROMOTE ENVIRONMENTALLY CONSCIOUS BEHAVIOR IN THE STAFF AND STUDENTS RESULTING IN ENERGY SAVINGS AT THE SCHOOL AND IN HOMES.

Page 7: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

COMMERCIAL ENERGY EFFICIENCY PROGRAMS (CONT.)

TEXAS SCORE/CITY SMART PROGRAM CHERYL BOWMAN –

[email protected] OFFERED TO SCHOOL DISTRICTS K-12, HIGHER EDUCATION, CITY AND

COUNTY FACILITIES IN THE CENTERPOINT ELECTRIC DISTRIBUTION TERRITORY. SERVICES INCLUDE PLANNING, FINANCIAL ANALYSIS, AND TECHNICAL SUPPORT.

PROGRAM KICK OFF SCHEDULED THURSDAY, NOVEMBER 29TH. OPEN TO SCHOOL DISTRICTS AND CITY OFFICIALS ONLY.

ADVANCED LIGHTING CALVIN BURNHAM –

[email protected] AWARDS INCENTIVES TO COMMERCIAL CUSTOMERS WHO INSTALL

ADVANCED, HIGH EFFICIENCY LED LIGHTING SYSTEMS FOR PARKING GARAGES, PARKING LOTS, AND OTHER OUTDOOR LIGHTING

Page 8: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

COMMERCIAL ENERGY EFFICIENCY PROGRAMS (CONT.)

RETRO-COMMISSIONING PROGRAM CALVIN BURNHAM –

[email protected] A PROGRAM THAT PROMOTES THE TUNE-UP OF EXISTING

COMMERCIAL AND INDUSTRIAL BUILDINGS BY EVALUATING FACILITY SYSTEMS AND IMPLEMENTING LOW-COST/NO-COST MEASURES.

Page 9: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

HEALTHCARE MARKET TRANSFORMATION PROGRAM TARGETING MID TO SMALL HEALTHCARE FACILITIES PROGRAM OFFERINGS:

– CASH INCENTIVES FOR IMPLEMENTATION OF ELIGIBLE ENERGY CONSERVATION MEASURES

– SERVICES FOR ELIGIBLE CUSTOMERS, INCLUDE: SAVINGS CALCULATIONS, ASSISTANCE WITH MEASUREMENT & VERIFICATION, ENERGY ASSESSMENTS, RECOMMENDATIONS FOR OPERATIONAL IMPROVEMENTS, ETC.

1ST YEAR ENROLLMENT BEGINS JANUARY 2013 PROGRAM MANAGER:

CHERYL BOWMAN, 713-207-5631 - [email protected]

Page 10: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

2012 PROGRAM SUMMARY

Page 11: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

2012 PROGRAM SUMMARY $6.2 M ORIGINAL BUDGET

SOLD OUT MARCH 2012 WAITING PROJECTS FROM 2011 INCREASED INCENTIVE LEVEL AGGRESSIVE MARKETING EFFORTS

9 MW GOAL

EOY TOTALS $6.3 M INCENTIVES RESERVED 12.5 MW REDUCTION 139 PROJECTS SUBMITTED 1 WAIT LIST PROJECTS – NOT ACTIVATED 94 COMPLETED PROJECTS 16 CANCELLED PROJECTS

Page 12: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

MEASURE DISTRIBUTIONRetrofit/New Construction - % Dis-tribution

1%

38%

2%5%

52%

2%Measure Type - % KW Savings

Building Auto-mationChillerDX UnitsLEDLightingVFDWindow Film

Page 13: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

CONSTRUCTION TYPERetrofit/New Construction - % KW Savings Distribution

12%

88%

Retrofit/New Construction - % In-centives Distribution

New

Retro

Page 14: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

SAVINGS METHODOLOGY

73%

3%

24%

M&V Methodology - % Incentives Distribution

Deemed

Full

Simplified

Page 15: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

CUSTOMER TYPE

4%

54%

1%3%

4%

17%

4%13%

Customer Type - % Incentives Distribution

City/Government

Commercial

Data Center

Educational

Health Care

Industrial

Lodging

Retail

Page 16: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

2012 PROGRAM CONCERNS PROVIDE PROJECT ID NUMBER WITH ALL CORRESPONDENCE

SUBMIT PA PRIOR TO CONTRACT AWARDED

REQUEST FOR PRE INSPECTIONS PRIOR TO PA SUBMITTAL

CONDUCT INSTALLATION PRIOR TO PA SUBMITTAL AND

APPROVAL

PROJECT DURATION LONGER THAN 3-6 MONTHS

AGGREGATED PROJECTS WITH LESS THAN 20 KW SAVINGS

CONTRIBUTION

USE REPLACED LIGHTING OR COOLING EQUIPMENT IN

OTHER FACILITIES

Page 17: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

2013 PROGRAM OVERVIEW

Page 18: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

STANDARD OFFER PROGRAM OPEN TO ALL ELIGIBLE PROVIDERS

WITHIN THE CNP TERRITORY TRANSMISSION CLASS (>69KV) ARE

EXCLUDED FIRST COME, FIRST SERVE ONE YEAR PAYOUT PAYMENTS TIED TO VERIFIED SAVINGS STANDARDIZED TERMS FOR ALL

PARTICIPANTS RETROFIT AND NEW CONSTRUCTION

MEASURES

Page 19: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

PROGRAM ROLE

RESPONSIBILITIES

PROGRAM ADMINISTRATOR

OVERSEE THAT PROGRAMS FOLLOW PUCT RULES ADJUST PROGRAM BUDGET AS NEEDEDENTER STANDARD AGREEMENTS WITH THE PROJECT SPONSORREVIEW, APPROVE OR REJECT PROGRAM APPLICATIONSVERIFY AND INSPECT THAT MEASURES MEET INTENDED PURPOSEADMINISTER INCENTIVE DOLLARS

PROJECT SPONSOR

IDENTIFY PROJECT OPPORTUNITIES• ACCURATELY IDENTIFIES ENERGY EFFICIENCY MEASURES TO BE

INSTALLED• MARKETING

VERIFY CUSTOMER ELIGIBILITY• CUSTOMER IN CNP ELECTRIC SERVICE TERRITORY• CUSTOMER DOES NOT RECEIVE TRANSMISSION CLASS SERVICE

(CLASSIFIED AS INDUSTRIAL)INSTALL AND DOCUMENT ENERGY SAVINGS

CUSTOMERCONTRACT WITH PROJECT SPONSORALLOW CNP TO CONDUCT ON-SITE INSPECTIONSINSTALL AND DOCUMENT ENERGY SAVINGS

PROGRAM PARTICIPANTS ROLES

Page 20: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

PROJECT SPONSOR REQUIREMENTS

PROJECT SPONSORS MUST HAVE:

ALL APPROPRIATE

LICENSES/CERTIFICATIONS

EVIDENCE OF TECHNICAL AND MANAGERIAL

CAPABILITIES AND EXPERIENCE

EVIDENCE OF FINANCIAL CAPABILITY

ADEQUATE INSURANCE

REFERENCES

Page 21: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

PROJECT SPONSOR

MAY BE: NATIONAL OR LOCAL ENERGY SERVICE

COMPANIES (ESCOS) NATIONAL OR LOCAL COMPANIES THAT PROVIDE

ENERGY-RELATED SERVICES OR PRODUCTS LOCAL CONTRACTORS COMMERCIAL PROPERTY DEVELOPERS DESIGN/BUILD FIRMS ARCHITECTURAL AND ENGINEERING FIRMS INDIVIDUAL COMMERCIAL CUSTOMERS

Page 22: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

CUSTOMER MAY BE:

ANY NON-RESIDENTIAL CUSTOMER TAKING SERVICE AT A METERED POINT OF DELIVERY AT A DISTRIBUTION VOLTAGE (<69KVA)

NON-PROFIT GOVERNMENT ENTITY EDUCATIONAL INSTITUTION

MUST ALLOW PRE AND POST INSPECTION AT CUSTOMER SITE

Page 23: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

PROJECT ELIGIBILITY

WITHIN CENTERPOINT ENERGY ELECTRIC SERVICE TERRITORY PROVIDE ESI NUMBER, BEGINNING 100890

COMPLETE SPONSOR APPLICATION AND 5% DEPOSIT REQUIRED TO SUBMIT APPLICATION

SPREADSHEET UPLOADS MUST BE COMPLETE WITHIN THE SPONSOR APPLICATION

Page 24: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

PROJECT ELIGIBILITY (cont.)

LARGE COMMERCIAL MINIMUM REDUCTION OF 20KW AND/OR 120,000KWH FOR

SINGLE SITE PROJECT MINIMUM REDUCTION OF 50KW AND/OR 300,000KWH FOR

AGGREGATED SITES PROJECT CUST MUST HAVE MINIMUM LOAD OF 100 KW AT PEAK,

AGGREGATE CUST MUST REACH 250KW SMALL COMMERCIAL

MAY NOT HAVE MORE THAN 100KW PEAK DEMAND AT A SINGLE SITE

MAY NOT HAVE MORE THAN 250KW AGGREGATE PEAK DEMAND

ALLOWS UP TO 20KW AND/OR 120,000KWH REDUCTION AT NON-RESIDENTIAL SITE

Page 25: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

AGGREGATING PROJECTS SIMILAR PROJECTS SHOULD:

HAVE SAME PROJECT SPONSOR

INCORPORATE SAME MEASURES

HAVE LIKE OCCUPANCY SCHEDULES

HAVE SAME FUNCTIONAL USE

HAVE SAME ENERGY CONSUMPTION PATTERNS

COMMON MEASUREMENT &

VERIFICATION PLAN

Page 26: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

MEASURE ELIGIBILITY PRODUCES MEASURABLE PEAK DEMAND AND/OR ENERGY

SAVINGS

10 YEARS PERSISTENCE

PEAK DEMAND IS DEFINED AS

JUNE 1 THROUGH SEPTEMBER 30, M – F, 1PM – 7PM

DECEMBER 1 THROUGH FEBURARY 28, M – F, 6AM – 10AM and

6PM – 10PM

EXCLUDING WEEKENDS AND FEDERAL HOLIDAYS

PERMANENTLY INSTALLED (NO PLUG LOAD)

EXCEEDS MINIMUM EFFICIENCY STANDARDS

Page 27: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

EXAMPLES OF ELIGIBLE MEASURES CHILLER REPLACEMENT

PACKAGED COOLING UNIT REPLACEMENT

LIGHTING RETROFITS

LAMP AND BALLAST

MOTOR EFFICIENCY MEASURES

WINDOW FILM APPLICATIONS

ROOFING APPLICATIONS

INDUSTRIAL PROCESS MEASURES

Page 28: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

INELIGIBLE MEASURES

FUEL SWITCHING TO ELECTRIC

MEASURES THAT REQUIRE NO CAPITAL INVESTMENT

MEASURES THAT DO NOT HAVE 10 YEARS PERSISTENCE

MEASURES THAT RECEIVE INCENTIVES IN OTHER CNP

PROGRAMS

REDUNDANT EQUIPMENT (IE BACKUP CHILLERS)

LAMP REPLACEMENTS WITHOUT THE BALLAST

REMOVABLE MEASURES (IE PLUG LOAD, VENDING MACHINES)

O&M MEASURES (IE AIR FILTERS)

Page 29: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

PROGRAM PROCESS

SECURE AN APPLICABLE PROJECT

REGISTER AS A PROJECT SPONSOR

COMPLETE CONTRACT DOCUMENTATION, IF NEW SPONSOR

SUBMIT PROJECT APPLICATION

SIGN STANDARD AGREEMENT

SIGN PROJECT AUTHORIZATION FORM

INSTALL PROJECT

SUBMIT INSTALLATION REPORT

CONDUCT MEASUREMENT & VERIFICATION

SUBMIT SAVINGS REPORT

Page 30: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

APPLICATION DEPOSIT APPLICATION DEPOSIT IS 5% OF

REQUESTED INCENTIVE DEPOSIT MUST BE SUBMITTED BEFORE

PROJECT APPLICATION CAN BE SUBMITTED DEPOSIT IS FULLY REFUNDABLE

PERCENT OF ESTIMATED INCENTIVE PAYMENT

RECEIVED

PERCENT OF DEPOSIT

REFUNDED75%+ 100%

50%-74.9% 50%0%-49.9% 0%

Page 31: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

APPLICATION SUBMITTALS THE FOLLOWING INFORMATION MUST BE

SUBMITTED AS PART OF THE APPLICATION PROCESS: PROJECT INFORMATION PROJECT DESCRIPTION SITE INFORMATION SAVINGS CALCULATION ESTIMATED COMPLETION SCHEDULE QUALIFICATION SET

REFERS TO PROJECT SPONSOR

SPONSOR CONTACT SHOULD THE PRIMARY CONTACT CHANGE,

PROJECT SPONSOR SHOULD UPDATE

Page 32: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

APPLICATION SUBMITTALS (cont.)

DOCUMENTS MUST BE PROVIDED AS PART OF THE APPLICATION PROCESS:

LIGHTING

CUT SHEET OF THE NEW LIGHTING FIXTURE INDICATING LAMP TYPE, LAMP WATTAGE, BALLAST TYPE AND BALLAST FACTOR

DISPOSAL RECORDS OF THE REMOVED EXISTING LIGHTING FIXTURES IF FLORESCENT LAMP WAS REMOVED

LIGHTING LAYOUT INDICATING SQUARE FOOTAGE OF THE FACILITY

CERTIFICATE OF LED FIXTURE INDICATING IT IS ENERGY STAR OR NEEP APPROVED PRODUCT

COOLING

MANUFACTURER’S EQUIPMENT SPECIFICATION SHEET OF THE NEW COOLING EQUIPMENT PERFORMANCE AT ARI STANDARD CONDITIONS

CUT SHEET OF THE NEW ROOFING OR WINDOWS MATERIAL INDICATING THE INSULATION EFFICIENCY

Page 33: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

APPLICATION SUBMITTALS (cont.)

ADDITIONAL DOCUMENTS MUST BE PROVIDED AS PART OF THE APPLICATION PROCESS IF INSTALLATION IS COMPLETED PRIOR TO PRE INSPECTION

LIGHTING

PHOTOS OF THE EXISTING LIGHTING FIXTURES INDICATING THE LAMP AND BALLAST TYPE

DISPOSAL RECORDS INDICATING THE QUANTITY OF THE DISPOSED LAMPS AND BALLASTS

DATED SALES RECEIPT/INVOICE

COOLING

PHOTOS OF THE EXISTING COOLING EQUIPMENT, SHOWING THE NAMEPLATE AND SERIAL #

MEP DESIGN OR MECHANICAL SCHEMATIC OF THE EXISTING SYSTEM

DATED SALES RECEIPT/INVOICE

Page 34: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

WAITLIST

IN ORDER OF WHEN THE DEPOSIT WAS

SUBMITTED

WHEN INCENTIVES ARE AVAILABLE, PROJECTS

ON WAITLIST WILL BE ACTIVATED IN ORDER

INSTALLATION MAY NOT BEGIN UNTIL THE

PROJECT IS ACTIVATED AND APPROVED

Page 35: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

M&V APPROACHES

DEEMED SAVINGS

SIMPLIFIED M&V

FULL M&V

BASED ON DATA FROM PAST DSM PROGRAMS AND INDUSTRY DATA

BASED ON ENGINEERING CALCULATIONS USING TYPICAL EQUIPMENT CHARACTERISTICS FOR PARTICULAR APPLICATIONS

REQUIRED FOR ALL MEASURES NOT MEETING CRITERIA FOR DEEMED OR SIMPLIFIED M&V

NO METERING REQUIRED REDUCE NEED FOR CERTAIN TYPES OF FIELD MONITORING BY USING STIPULATED VALUES FOR OPERATING HOURS, EQUIPMENT EFFICIENCES, ETC.

USE MORE RIGOROUS APPLICATION OF END-USE METERING, REGRESSION ANALYSIS, OR COMPUTER SIMULATIONS

MAY INVOLVE SPOT OR SHORT-TERM METERING AND SOMETIMES SIMPLE, LONG-TERM MONITORING

GENERAL GUIDELINES AVAILABLE, BUT NEED TO BE ADAPTED TO SPECIFIC MEASURE

Page 36: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

INVOICING AND PAYMENT PERFORMANCE PAYMENT

BASED ON VERIFIED SAVINGS AND APPROVED SAVINGS REPORT

DEEMED METHOD 100% PAYMENT AFTER INSTALLATION REPORT

M&V METHOD 40% AFTER INSTALLATION REPORT 60% AFTER SAVINGS REPORT

Page 37: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

RETROFIT APPLICATIONS BASELINE

EQUIPMENT TYPE

APPLICABLE BASELINE STANDARD

LIGHTING TABLE OF STANDARD FIXTURE WATTAGES (BASED ON EISA 2007, EPACT 2005 AND PUCT RULE)

COOLING EQUIPMENT

ASHRAE 90.1 EFFICIENCY STANDARD OF THE YEAR WHEN REPLACED SYSTEM IS MANUFACTURED

MOTORS ASHRAE 90.1M – 1995

BUILDING ENVELOPE IECC 2003

Page 38: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

NEW CONSTRUCTION BASELINE

EQUIPMENT TYPE

APPLICABLE BASELINE STANDARD

LIGHTING EISA 2004, ENERGY STAR® OR DLC

COOLING EQUIPMENT

FEDERAL STANDARD OR 2008 CITY OF HOUSTON COMMERCIAL ENERGY CONSERVATION CODE

MOTORS

BUILDING ENVELOPE

Page 39: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

PROGRAM RESOURCES http://www.centerpointefficiency.com:

PROGRAM ANNOUNCEMENTS PROGRAM MANUAL WORKSHOP PRESENTATION SERVICE AREA MAP PROJECT AUTHORIZATION FORM HOST CUSTOMER AGREEMENT SPEADSHEET APPLICATIONS ACTIVE PROJECT SPONSOR LISTING INFORMATION ON AVAILABLE FUNDING PROGRAM CONTACTS AND LINKS

Page 40: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

2013 PROGRAM HIGHLIGHTS

Page 41: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

PROGRAM GOALS/BUDGET

2013 SAVINGS GOAL 2013 INCENTIVE

BUDGET

13 MW $7 MILLION ONE PROJECT SPONSOR MAY RESERVE UP TO

20% OF THE PROGRAM BUDGET

Page 42: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

PROGRAM TIMELINE DECEMBER 3RD, 2012 DATABASE OPENS FOR

APPLICATIONS DEPOSIT CHECKS MAY BE ACCEPTED

DECEMBER 18TH, 2012 APPLICATION SUBMITTAL DAY BEGINS AT 10AM, FIRST COME, FIRST SERVE DEPOSIT CHECK MUST BE SUBMITTED BEFORE THIS DATE IN

ORDER TO BE ELIGIBLE FOR SUBMITTAL

DECEMBER 1ST, 2013 PROJECTS INSTALLATION MUST BE COMPLETE COMPLETE DATABASE APPLICATIONS, POST INSPECTIONS TO

FOLLOW

DECEMBER 30TH, CLOSE OUT 2013 PROGRAM ALL PENDING PROJECTS SHOULD BE IN PAYMENT

PROCESS

Page 43: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

CHANGES CONTINUING FOR 2013 LED PROJECTS SHALL REQUIRE AT LEAST ONE OF THE

FOLLOWING PROVIDED BY PROJECT SPONSORS: ENERGY STAR © QUALIFIED DESIGN LIGHT CONSORTIUM QUALIFIED PRODUCTS LISTING PREVIOUSLY UTILITIES REVIEWED AND APPROVED LED PRODUCT

STANDARD T8 BECOMES MINIMUM EFFICIENCY REQUIREMENT FOR NEW LIGHTING FIXTURE

VARIOUS INCENTIVE RATE BY MEASURE TYPE Relamping is allowed with discounted incentive rate (30% of the

non-LED lighting incentives) CUT SHEETS, SQUARE FOOTAGE & ALL PERTINENT

DOCUMENTS ARE DUE AT THE TIME OF PROJECT SUBMITTAL RECYCLE CERTIFICATES OF LAMPS REQUIRED ON ALL

LIGHTING PROJECTS

Page 44: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

2013 INCENTIVE RATESMEASURE TYPE $/KW $/KWH

LIGHTING – FLOURESCENT, HID, CFL

120 .04

LIGHTING – LED 210 .08

COOLING – DX UNITS 240 .09

COOLING – CHILLER 260 .11

MOTOR 235 .09

VFD 180 .07

WINDOW FILM 200 .08

WINDOW REPLACEMENT 210 .08

ROOFING 240 .09

OTHER MEASURES 175 .06

Page 45: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

NEW CHANGES PROJECT APPLICATION REQUIREMENT

REVIEW PROCESS BEGINS ONLY UNTIL ALL REQUIRED DOCUMENTS SUBMITTED. INCENTIVES ARE NOT SECURE AT THIS MOMENT.

MODIFY PA WITHIN14 CALENDAR DAYS FROM PA SUBMITTED WILL NOT AFFECT DEPOSIT

MINIMUM SAVINGS REQUIREMENT 20KW AND/OR 120,000KWH FOR SINGLE SITE 50KW AND/OR 300,000KWH FOR AGGREGATED SITES

LAST YEAR TO INCENTIVIZE T12 RETROFITS UPDATED DEEMED FACTORS

LIGHTING – UPDATED HVAC INTERACTIVE FACTORS COOLING – UPDATED DEMAND AND ENERGY COEFFCIENTS

UPDATED BASELINE EFFICIENCY STANDARD COOLING – APPLICABLE ASHRAE 90.1EFFICIENCY LEVEL ACCORDING TO

YEAR OF MANUFACTURE OF THE REPLACED SYSTEM

Page 46: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

GETTING STARTED REGISTER AS PROJECT SPONSOR IN ENERTREK

VIA DATABASE CHECK WEBSITE AT

WWW.CENTERPOINTEFFICIENCY.COM FOR LATEST INFORMATION

SEND HARD COPY OF APPLICABLE FORMS AND DEPOSIT TO:

CENTERPOINT ENERGYATTENTION: YOLANDA SLADE1111 LOUISIANA, 9TH FLOORHOUSTON, TX 77002

Page 47: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

SUBMIT DAY

DECEMBER 18, 2012 @ 10:00 AM, CENTRAL TIME

**IN ORDER TO SUBMIT YOUR PROJECT, CNP MUST

HAVE YOUR DEPOSIT BEFORE DECEMBER 18, 2012!**

Page 48: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

SUPPLIER DIVERSITY

Page 49: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

SUPPLIER DIVERSITY POLICY STATEMENT

CENTERPOINT ENERGY, INC. RECOGNIZES THE IMPORTANCE OF MINORITY AND WOMEN-OWNED BUSINESS ENTERPRISES (MWBE) TO THE ECONOMIES OF THE NATION, THE STATE, AND THE COMMUNITIES IT SERVES, AS WELL AS THE CORPORATION ITSELF.

THEREFORE, WE ARE COMMITTED TO PURSUING BUSINESS RELATIONSHIPS WITH SUCH ENTERPRISES AND USING INNOVATIVE APPROACHES DESIGNED TO CONTINUALLY IMPROVE BUSINESS OPPORTUNITIES.

Page 50: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

SUPPLIER DIVERSITY

CENTERPOINT ENERGY JEWEL SMITH, MANAGER OF SUPPLIER DIVERSITY (713)207- 6951; [email protected]

STEVE DUKES, SUPPLIER DIVERSITY COORDINATOR

(713)207- 3388; [email protected]

HOUSTON MINORITY BUSINESS COUNCIL

CONSTANCE JONES (713)271–7805; WWW.HMBC.ORG

WOMEN’S BUSINESS ENTERPRISE ALLIANCE

APRIL DAY (713)681–9232; [email protected]

Page 51: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

2013 LIGHTING WORKBOOK OVERVIEW

Page 52: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

2013 LIGHTING WORKBOOK

CHANGES INELIGIBLE FIXTURES

STANDARD 4’ T8’SNEED “CEE” DESIGNATION TO QUALIFY

SCREW IN CFL’SALL T12ALL INCANDESCENTALL MERCURY VAPORALL HIGH PRESSURE SODIUMSTANDARD METAL HALIDE

Page 53: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

2013 LIGHTING WORKBOOK

ENHANCEMENTS RE-LAMP

LAMP REPLACEMENT ONLY REMOVE A LINE DETECT INELIGIBLE FIXTURES

Page 54: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

2013 LIGHTING WORKBOOK

ENHANCEMENTS CENTRAL WATTAGE TABLE ADDITIONS SCREW IN CFL’S

150 WATT 65 WATT

T5HO 54 WATT 51 WATT 49 WATT 24 WATT

Page 55: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

2013 LIGHTING WORKBOOK

ENHANCEMENTS FIXTURE BUILDER

EASY TO ENTER CUSTOM FIXTURES

STANDARDIZES NAMING CONVENTION

TRIGGERS CORRECT INCENTIVE IN WORKBOOK

Page 56: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

QUESTIONS?

Page 57: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.

CONTACT INFORMATIONYOLANDA SLADE

PHONE: 713-207-7762 EMAIL – [email protected]

LORETTA BATTLES PHONE: 713-207-3543 EMAIL – [email protected]

WEBSITE: WWW.CENTERPOINTEFFICIENCY.COM