Commercial Complex at Village- Kamaspur, Sector-19, Sonipat, Haryana M/s TDI Infrastructure Ltd. 5 FORM 1 I. Basic Information S. No. Item Details 1. Name of the project/s Revision in Environmental Clearance of “Commercial Complex” 2. S. No. in the schedule 8 (a) 3. Proposed capacity/ area/length/ tonnage to be handled/ command area/ lease area/ number of wells to be drilled Total plot area – 26068.25 sq m (8.35 acres) Total Built-up area – 39072.05 sq m (excluding basement) Total Built-up area – 70870.84 sq m (including basement) 4. New/ Expansion/ Modernization New 5. Existing Capacity/ Area etc. Earlier Environmental Clearance has been granted for Group Housing cum Shopping Mall Built-up area as per Environmental Clearance granted: Group Housing – 87459.07 sq m Commercial Complex – 39072.05 sq m Proposed Commercial Complex Existing Plot Area – 26068.25 sq m (8.35 acres) 6. Category of Project i.e. ‘A’ or ‘B’ ‘B’ 7. Does it attract the general condition? If yes, please specify. Not Applicable 8. Does it attract the specific condition? If yes, please specify. Not Applicable 9. Location Sector-19 Plot/ Survey/ Khasra No. Village Kamaspur Tehsil Sonipat District Sonipat State Haryana 10. Nearest railway station/ airport along with distance in kms. Nearest Highways:- NH-1 - 0.8 Km E State Highway 20 - 1.86 Km NW State Highway 11 - 4.06 Km SW Nearest Railway Stations:- Sonipat Railway Station - 6.36 Km SW

Transcript of Commercial Complex at Village- Kamaspur, Sector...

Commercial Complex at Village- Kamaspur, Sector-19, Sonipat, Haryana

M/s TDI Infrastructure Ltd.

5

FORM 1

I. Basic Information

S. No.

Item Details

1. Name of the project/s Revision in Environmental Clearance of “Commercial Complex”

2. S. No. in the schedule 8 (a)

3.

Proposed capacity/ area/length/ tonnage to be handled/ command area/ lease area/ number of wells to be drilled

Total plot area – 26068.25 sq m (8.35 acres) Total Built-up area – 39072.05 sq m (excluding basement) Total Built-up area – 70870.84 sq m (including basement)

4. New/ Expansion/ Modernization New

5. Existing Capacity/ Area etc.

Earlier Environmental Clearance has been granted for Group Housing cum Shopping Mall Built-up area as per Environmental Clearance granted: Group Housing – 87459.07 sq m Commercial Complex – 39072.05 sq m Proposed Commercial Complex Existing Plot Area – 26068.25 sq m (8.35 acres)

6. Category of Project i.e. ‘A’ or ‘B’ ‘B’

7. Does it attract the general condition? If yes, please specify.

Not Applicable

8. Does it attract the specific condition? If yes, please specify.

Not Applicable

9.

Location Sector-19 Plot/ Survey/ Khasra No. Village Kamaspur Tehsil Sonipat District Sonipat State Haryana

10. Nearest railway station/ airport along with distance in kms.

Nearest Highways:- NH-1 - 0.8 Km E State Highway 20 - 1.86 Km NW State Highway 11 - 4.06 Km SW Nearest Railway Stations:- Sonipat Railway Station - 6.36 Km SW

Commercial Complex at Village- Kamaspur, Sector-19, Sonipat, Haryana

M/s TDI Infrastructure Ltd.

6

Sandal Kalan Rly Station - 8.79 Km NW Rajlu Garhi Rly. Station - 11.13 Km NW Harsana Kalan Station - 8.03 Km SW Nearest Airport Indira Gandhi International Airport - 50.36 Km S Safdarjung Airport - 49.23 Km SE

11. Nearest Town, city, District Headquarters along with distance in kms.

Sonipat

12.

Village Panchayats, Zilla Parishad, Municipal Corporation, Local body (complete postal addresses with telephone nos. to be given)

Municipal Corporation of Sonipat

13. Name of the applicant M/s TDI Infrastructure Limited.

14. Registered Address 10, Shaheed Bhagat Singh Marg, Gole Market, New Delhi

15. Address for correspondence: 10, Shaheed Bhagat Singh Marg, Gole Market, New Delhi

Name Om Prakash Dhingra

Designation (Owner/Partner/CEO) Authorized Signatory

Address 10, Shaheed Bhagat Singh Marg, Gole Market, New Delhi

Pin Code 110001

E-mail [email protected]

Mobile No. 9899677022

Telephone No. 011 - 49111111

Fax no. 011 - 49111199

16.

Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet.

The Commercial complex is a part of group housing cum shopping mall. The group housing cum shopping mall has been granted EC vide letter no. 21-555/2007-IA.III dated 08.01.2008. The location on topographical map is enclosed at Annexure-XVIII. Construction of commercial complex will be done on the same land. Hence no alternative sites examined.

Commercial Complex at Village- Kamaspur, Sector-19, Sonipat, Haryana

M/s TDI Infrastructure Ltd.

7

17. Interlinked Projects No it is not an interlinked project

18. Whether separate application of interlinked project has been submitted?

Not Applicable

19. If yes, date of submission Not Applicable 20. If no, reason Not Applicable

21.

Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act,

1980?

(b) The Wildlife (Protection) Act, 1972?

(c) The C.R.Z. Notification, 1991?

Clarification regarding non applicability of forest laws on project site Not Applicable Not Applicable

22. Whether there is any Government Order/ Policy relevant/ relating to the site?

Not Applicable

23. Forest land involved (hectares) No

24.

Whether there is any litigation pending against the project and/ or land in which the project is propose to be set up?

(a) Name of the Court (b) Case No. (c) Orders/ directions of the

Court, if any and its relevance with the proposed project.

No Not applicable Not applicable Not applicable

II. Activity

1. Construction, operation or decommissioning of the Project involving

actions, which will cause physical changes in the locality (topography,

land use, changes in water bodies, etc.)

S. No.

Information/Checklist confirmation

Yes/No

Details thereof (with approximate quantities /rates, wherever possible) with source of information data

Commercial Complex at Village- Kamaspur, Sector-19, Sonipat, Haryana

M/s TDI Infrastructure Ltd.

8

1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan)

No Environmental Clearance has already been granted vide letter no. 21-555/2007-IA.III dated 08.01.2008 for development of Group Housing cum Shopping Mall. The proposed project Commercial Complex is part of the project on which Environmental Clearance has already been granted. Thus there will not be any change in Landuse for the proposed project.

1.2 Clearance of existing land, vegetation and buildings?

No As construction has not been completed for the Built-up area granted as per Earlier Environmental Clearance hence no clearance of existing land is required.

1.3 Creation of new land uses? No Not applicable

1.4 Pre-construction investigations e.g. bore houses, soil testing?

Yes Pre-construction Geo-technical investigations have been carried out.

1.5 Construction works? Yes Construction will be done as per Master plan of Sonipat.

1.6 Demolition works? No No demolition work is required.

1.7 Temporary sites used for construction works or housing of construction workers?

No Workers during construction phase shall be hired from nearby areas and hence there are no need of providing housing. Only temporary shelters will be provided.

1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations

Yes Above ground, the building for proposed project shall be elevated up to maximum height of 19.7 m and excavation was done for 2 level basement.

1.9 Underground works including mining or tunnelling?

No It is Commercial Complex and hence no underground works are required except for excavation of 2 level basement.

1.10 Reclamation works? No No reclamation work will be done 1.11 Dredging? No Not applicable

1.12 Offshore structures? No Not applicable 1.13 Production and manufacturing

processes? No It is Commercial Complex, hence no

production or manufacturing processes shall be carried out.

Commercial Complex at Village- Kamaspur, Sector-19, Sonipat, Haryana

M/s TDI Infrastructure Ltd.

9

1.14 Facilities for storage of goods or materials?

Yes During Construction Phase: Separate raw material yard shall be

made within the project site. Cement will be separately stored

under cover in bales. Sand will be stacked nearby under

tarpaulin cover. Bricks and steel will be laid in open.

During Operation Phase: As the project is a Commercial Complex, the raw material will be food, stationary etc. which will be stored in respective units only.

1.15 Facilities for treatment or disposal of solid waste or liquid effluents?

Yes During Construction phase: Total 150 labourers shall be working during the construction phase and hence the solid waste generation will be approx. 23 kg/day which was disposed off at municipal solid waste site. Approx. 127195 cu m. soil has been excavated for basement development. Which will be used for levelling and back filling. Top soil is preserved and shall be reused for landscaping to the extent possible. The waste water generated shall be discharged to septic tank via soak pit. During Operation Phase: Approx. 1178 Kg/day of municipal solid waste will be generated from Commercial complex after revision. The total waste water generated in the complex shall be 153 KLD which will be treated in STP of 185 KLD capacity. Details of Water Management & Solid Waste Management are given in Environmental Report.

Commercial Complex at Village- Kamaspur, Sector-19, Sonipat, Haryana

M/s TDI Infrastructure Ltd.

10

1.16 Facilities for long term housing of operational workers?

No During Construction phase: The workers during construction phase shall be hired from nearby areas and hence there will not need of providing long term housing. Only temporary shelters shall be provided. During Operation Phase: As this is a Commercial Complex, housing of operational workers will not require.

1.17

New road, rail or sea traffic during construction or operation?

No No new road, rail or sea traffic shall be proposed. Existing transportation facilities will be used during construction or operation phase.

1.18

New road, rail, air, waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc.?

No No new road, rail, or sea traffic is proposed. The transportation measures already existing near site are as follows:

Nearest Highways:- NH-1 - 0.8 Km E State Highway 20 - 1.86 Km NW State Highway 11 - 4.06 Km SW Nearest Railway Stations:- Sonipat Railway Station - 6.36 Km SW Sandal Kalan Rly Station - 8.79 Km NW Rajlu Garhi Rly. Station - 11.13 Km NW Harsana Kalan Station - 8.03 Km SW Nearest Airport Indira Gandhi International Airport - 50.36 Km S Safdarjung Airport - 49.23 Km SE

1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements?

No No closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements will be made.

1.20 New or diverted transmission lines or pipelines?

No No such closure or diversion of transmission lines will required.

Commercial Complex at Village- Kamaspur, Sector-19, Sonipat, Haryana

M/s TDI Infrastructure Ltd.

11

1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers?

No No impoundment, damming, culverting, realignment or other changes to the hydrology of surface water courses will required.

1.22 Stream crossings? No No stream crossing.

1.23 Abstraction or transfers of water from ground or surface waters?

No No abstraction or transfer of water from ground or surface will be done

During construction phase: Water will be taken from treated water of STP of nearby area/HUDA STP. During operational phase: The ultimate source of water will be through Municipal Supply to be arranged by HUDA.

1.24 Changes in water bodies or the land surface affecting drainage or run-off?

No There will be no change in water bodies or the land surface effective drainage or run-off.

1.25 Transport of personnel or materials for construction, operation or decommissioning?

Yes During Construction phase: Materials during construction phase shall be transported by truck, trolley etc. During Operation Phase: Car, two-wheeler, etc. will be used.

1.26 Long-term dismantling or decommissioning or restoration works?

No Not Applicable

1.27 Ongoing activity during decommissioning which could have an impact on the environment?

No Not Applicable

1.28 Influx of people to an area in either temporarily or permanently?

No During Construction phase: Temporary influx of people in the form of labours shall be envisaged. Approx. 150 no. of local labours shall be employed. During Operation Phase: As this is a Commercial Complex total number of staff & visitors will be approx. 6000 and visitors in multiplex will be approx. 1850.

1.29 Introduction of alien species? No Not Applicable

Commercial Complex at Village- Kamaspur, Sector-19, Sonipat, Haryana

M/s TDI Infrastructure Ltd.

12

1.30 Loss of native species or genetic diversity?

No No tree exists at the site. However, by planting native plants within the project, it will give positive impacts.

1.31 Any other actions? No Not Applicable

2. Use of Natural resources for construction or operation of the Project (such

as land, water, materials or energy, especially any resources which are non-

renewable or in short supply):

S. No.

Information/checklist confirmation

Yes/No

Details thereof (with approximate quantities /rates, wherever possible) with source of information data

2.1 Land especially undeveloped or agricultural land (ha)

Yes Plot Area measuring 26068.25 sqm of undeveloped land is used for development of Commercial Complex.

2.2 Water (expected source & competing users) unit: KLD

Yes Source & Quantity During Construction phase:

Water during construction phase shall be from tanker water supplier which supply treated water from STP of nearby area. Source & Quantity During Operation Phase: The ultimate source of water will be through Municipal Supply to be arranged by HUDA. Total water requirement of the project will be 246 KLD out of which 122 KLD will be fresh water. Rest of the 123 KLD water requirement will be fulfilled by treated water. Detailed water Management & water Balance are given in Environment Report.

2.3 Minerals (MT) No Not applicable

2.4 Construction material – stone, aggregates, sand / soil (expected source – MT)

Yes The major materials required for construction of the project shall be steel, tiles, glass, cement, agate, bricks,

Commercial Complex at Village- Kamaspur, Sector-19, Sonipat, Haryana

M/s TDI Infrastructure Ltd.

13

flooring tiles / stones, sanitary and hardware items, electrical fittings, etc.

2.5 Forests and timber (source – MT) Yes Plywood for doors & windows shall be used which shall be procured from local market.

2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW)

Yes Source of Electricity - UHBVN After Expansion Total Electrical load – 5096 KW After Expansion D.G. sets for power back up- 4 x 630 KVA, 2 x 750 KVA & 2 x 1010 KVA

2.7 Any other natural resources (use appropriate standard units)

No Not applicable

3. Use, storage, transport, handling or production of substances or materials,

which could be harmful to human health or the environment or raise

concerns about actual or perceived risks to human health.

S. No.

Information/Checklist confirmation

Yes/No

Details thereof (with approximate quantities/rates, wherever possible) with source of information data

3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies)

Yes No storage of hazardous substances (as per MSIHC rules) will be done however, used oil from DG sets will be generated. Proper management of Used oil shall be taken care of. Details are given in Environment Report.

3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases)

No Suitable drainage and waste management measures shall be adopted in the construction phase and same will be maintained in operational phase which will restrict stagnation of water or accumulation of water. This will effectively restrict the reproduction and growth of disease vectors.

3.3 Affect the welfare of people e.g. by changing living conditions?

Yes During Construction phase: This project will be provided employment to about 150 local labours during construction phase.

Commercial Complex at Village- Kamaspur, Sector-19, Sonipat, Haryana

M/s TDI Infrastructure Ltd.

14

During Operation Phase: As it is Commercial complex, there shall be several services required which will generate direct & indirect employment for the people of nearby area.

3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc.,

No No vulnerable group of people will be affected by the project.

3.5 Any other causes No None

4. Production of solid wastes during construction or operation or

decommissioning (MT/month)

S. No.

Information/Checklist confirmation

Yes/No

Details thereof (with approximate quantities/rates, wherever possible) with source of information data

4.1 Spoil, overburden or mine wastes.

No Not applicable

4.2 Municipal waste (domestic and or commercial wastes)

Yes During Construction phase: Solid waste during construction phase shall be 15 kg/day which shall be disposed off at municipal solid waste site. During Operation Phase: Approx. 1178 Kg/day of solid waste shall be generated from the complex during operational phase. Detailed Solid Waste Management is given in Environment Report.

4.3 Hazardous wastes (as per Hazardous Waste Management Rules)

Yes During Construction phase: Used oil whenever generated from the DG sets will be kept in leak proof containers in an isolated area and will be sent to approved recycler. During Operation Phase: 64 Lt/day used oil generated from diesel generators will be carefully stored in HDPE drums in isolated covered facility. The used oil will be

Commercial Complex at Village- Kamaspur, Sector-19, Sonipat, Haryana

M/s TDI Infrastructure Ltd.

15

sold to vendors authorized by Central Pollution Control Board for the treatment of the same. Suitable care will be taken so that spills/leaks of used oil from storage could be avoided.

4.4 Other industrial process wastes No Not Applicable 4.5 Surplus product No Not applicable 4.6 Sewage sludge or other sludge

from effluent treatment Yes About 10 Kg/day of dried sludge will

be generated from STP within complex during operation phase and this sludge will be passed through filter press where it will be dewatered/ dried to form a cake and then will be used as manure in green areas. The unused sludge shall be given to farmers or nursery.

4.7 Construction or demolition wastes

Yes Construction waste shall be used for flooring & Back filling in roads etc.

4.8 Redundant machinery or equipment

No Not applicable

4.9 Contaminated soils or other materials

No Not applicable

4.10 Agricultural wastes No Not applicable

4.11 Other solid wastes

No During Construction phase: No E-waste shall be generated. During Operation Phase: 1178 Kg/month of solid waste shall be generated. It shall be given to approved recycler of SPCB. Battery waste shall be generated from inverters & UPS which shall be disposed off as per the Batteries (Management & Handling) Rules, 2001.

Commercial Complex at Village- Kamaspur, Sector-19, Sonipat, Haryana

M/s TDI Infrastructure Ltd.

16

5. Release of pollutants or any hazardous, toxic or noxious substances to air

(Kg/hr)

S. No.

Information/Checklist confirmation

Yes/No

Details thereof (with approximate quantities/rates, wherever possible) with source of information data

5.1 Emissions from combustion of fossil fuels from stationary or mobile sources

Yes During Construction phase: DG sets of capacity 62.5 KVA will be installed acoustically enclosed with adequate stack height.

During Operation Phase: The only source of emission from combustion of fuel will be DG set of 4 x 630 KVA, 2 x 750 KVA & 2 x 1010 KVA. Hence, to avoid the emissions stack height of 6 m above roof level for each D.G. Sets shall be provided to reduce the air emissions meeting all the norms prescribed by CPCB.

5.2 Emissions from production processes

No Not applicable

5.3 Emissions from materials handling including storage or transport

Yes Dust will be generated during construction, from the movement of transport vehicles & other construction activities. The effect is restricted to construction phase only. Water sprinklers will be used for dust suppression. Material will be stored under Tarpaulin cover.

Commercial Complex at Village- Kamaspur, Sector-19, Sonipat, Haryana

M/s TDI Infrastructure Ltd.

17

5.4 Emissions from construction activities including plant and equipment

Yes RMC will be used for the project. Dust & emissions likely to be generated during construction activities which will be reduced by sprinkling of water in a specific time interval & timely maintenance schedule for machinery. Also the machines will be shut down during idle period.

5.5 Dust or odours from handling of materials including construction materials, sewage and waste

Yes During loading & unloading of construction material dust will be generated during construction phase. Water will be sprinkled and tarpaulin cover will be provided over stored raw material to reduce dust emission. Mobile Toilets during construction phase will be provided & waste water will disposed off in septic tank followed by soak pits.

5.6 Emissions from incineration of waste.

No Not applicable.

5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris).

No Not applicable

5.8 Emissions from any other sources.

No None

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

S. No.

Information/Checklist confirmation

Yes/No

Details thereof (with approximate quantities/rates, wherever possible) with source of information data with source of information data

6.1 From operation of equipment e.g. engines, ventilation plant, crushers

No During Construction phase: DG sets of capacity 62.5 KVA shall be installed & will be acoustically enclosed. The equipment such as mixer machines, bulldozers, cranes, compactors & excavators will be used which will be highest standard of reputed make and adhere to international standards. Hence an insignificant impact due to

Commercial Complex at Village- Kamaspur, Sector-19, Sonipat, Haryana

M/s TDI Infrastructure Ltd.

18

construction machinery is envisaged. Further, the construction activities will be restricted to day time only and timely maintenance of machinery are ensured. During Operation Phase: Source of noise in the operational phase will be D.G. Set of capacity 4 x 630 KVA, 2 x 750 KVA & 2 x 1010 KVA. The D.G. Set shall be bought acoustically enclosed & shall be installed with anti-vibration pads and will be used during Power failure only. They may generate noise level maximum upto 75 dB (A).

6.2 From industrial or similar processes

No Not applicable

6.3 From construction or demolition Yes Due to the various activities there will be short-term noise impacts in the immediate vicinity of the project site. These will be restricted to day time only. It will be estimated that during the construction period the average noise level was be 80-100 dB (A) during peak construction hours. However, embankment will be done to further prevent the noise pollution.

6.4 From blasting or piling No No blasting or piling will be done.

6.5 From construction or operational traffic

Yes Some amount of noise (70 – 75 dB (A) will be generated from vehicular movement in the construction and operational phase. Plantation around the boundary wall will be done to reduce noise from traffic.

6.6 From lighting or cooling systems No Not Applicable

6.7 From any other sources No None

Commercial Complex at Village- Kamaspur, Sector-19, Sonipat, Haryana

M/s TDI Infrastructure Ltd.

19

7. Risks of contamination of land or water from releases of pollutants into

the ground or into sewers, surface waters, groundwater, coastal waters or

the sea:

S. No.

Information/Checklist confirmation

Yes/No

Details thereof (with approximate quantities/rates, wherever possible) with source of information data

7.1 From handling, storage, use or spillage of hazardous materials

No The hazardous waste generated will be Used oil only and it was stored in HDPE drums and kept in covered rooms under lock and key and will be sold to authorized vendors only. Special care will be taken to prevent leakages and spills.

7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge)

No During operational phase STP of 185 KLD capacity will be installed for treating the waste water & Total 123 KLD of treated water will be reused in flushing, gardening, & HVAC cooling.

7.3 By deposition of pollutants emitted to air into the land or into water

No None

7.4 From any other sources No Not applicable

7.5 Is there a risk of long term build-up of pollutants in the environment from these sources?

No Not applicable

8. Risk of accidents during construction or operation of the Project, which

could affect human health or the environment.

S. No.

Information/Checklist confirmation

Yes/No

Details thereof (with approximate quantities/rates, wherever possible) with source of information data

8.1 From explosions, spillages, fires etc. from storage, handling, use or production of hazardous substances

No During Construction Phase: All appropriate measures will be taken to avoid accidents. During Operational Phase: Proper Disaster management & fire-fighting system will be installed at site.

Commercial Complex at Village- Kamaspur, Sector-19, Sonipat, Haryana

M/s TDI Infrastructure Ltd.

20

8.2 From any other causes No During Construction Phase: All the labours will be provided with suitable personal protective equipment (PPE) as required under the health & safety norms. Training and awareness about the safety norms will be provided to all supervisors and labours involved in construction activity

8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc.)?

No The area under study falls in Seismic zone-IV, according to the Indian Standard Seismic Zoning Map. Suitable seismic coefficients in horizontal and vertical directions respectively, will be adopted while designing the structure.

9. Factors which should be considered (such as consequential development)

which could lead to environmental effects or the potential for cumulative

impacts with other existing or planned activities in the locality.

S. No.

Information/Checklist confirmation

Yes/No

Details thereof (with approximate quantities/rates, wherever possible) with source of information data

9.1 Lead to development of supporting facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.:

Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.)

Housing development Extractive industries Supply industries Other

Yes No No No No No

Infrastructure like Roads, power network already exist in the area. STP of 185 KLD will be installed for the treatment of wastewater. Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable

9.2 Lead to after-use of the site, which could have an impact on the environment.

No Not Applicable

Commercial Complex at Village- Kamaspur, Sector-19, Sonipat, Haryana

M/s TDI Infrastructure Ltd.

21

9.3 Set a precedent for later developments

Yes It will attract people to develop organized Commercial Complex.

9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects

No No impact

III. Environmental Sensitivity

S. No.

Areas Name/

Identity

Aerial distance (within 15 km.) from Proposed project location boundary

1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value

None

None

2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests

Water Sources

Yamuna River

9.02 Km NE

3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration

None

None

4 Inland, coastal, marine or underground waters.

None None

5 State, National boundaries Delhi Boundary

U.P.boundary

14.12 Km S 8.36 Km NE

6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas

Nearest Highways:- NH-1 State Highway 20 State Highway 11

0.8 Km E 1.86 Km NW

Commercial Complex at Village- Kamaspur, Sector-19, Sonipat, Haryana

M/s TDI Infrastructure Ltd.

22

Nearest Railway Stations:- Sonipat Railway Station Sandal Kalan Rly Station Rajlu Garhi Rly. Station Harsana Kalan Station Nearest Airport Indira Gandhi InternationalAirport Safdarjung Airport

4.06 Km SW 6.36 Km SW 8.79 Km NW 11.13 Km NW 8.03 Km SW 50.36 Km S 49.23 Km SE

7 Defense installations None None

8 Densely populated or built-up area Rewali 1.62 KmW

9 Areas occupied by sensitive man-made land uses (hospitals, school,

places of worship, community

facilities)

Hospital Nidan Hospital Murthal Road Batra Hospital Sector-14 SarohaChildren’s Hospital Sector-15 Post Office Post Office Sector-15 Post Office Sector-12 Rai Post Office Sector-37 Places of Worship Braham Kumari Temple Sector-19 Ardhnarishwar Temple Sector-19 Shiv Temple Sector-16 School Swarnaprastha Public School Sector-19 Sofia Convent School, Murthal Khas Shreejee International School, Sonipat-Murthal Road Banks Indusind Bank Sector-15 ICICI Bank Sector-15

1.95 Km NW 4.10 Km SW 4.32 Km W 4.32 Km W 4.42 Km SW 7.76 Km SE 0.70 Km NW 0.48 Km SE 2.38 Km W 0.31 Km SW 1.70 Km N 2.19 Km NW 3.78 Km SW 3.78 Km SW 4.63 Km SW

Commercial Complex at Village- Kamaspur, Sector-19, Sonipat, Haryana

M/s TDI Infrastructure Ltd.

23

Syndicate Bank Sector-14

10 Areas containing important, high quality or scarce resources

(Ground water resources, surface

resources, forestry, agriculture,

fisheries, tourism, minerals)

None

None

11 Areas already subjected to pollution or environmental damage. (Those

where existing legal environmental

standards are exceeded)

None None

12 Areas susceptible to natural hazard which could cause the project to present environmental problems

(Earthquakes, subsidence,

landslides, erosion, flooding or

extreme or adverse climatic

conditions)

Natural.

The project area falls in seismic zone –IV. There is no previous record of flooding in last 10 years in the area.