COMMERCIAL BIOMASS HEATING SOLUTIONS www.woodco-energy.com

Transcript of COMMERCIAL BIOMASS HEATING SOLUTIONS · biomass projects under the RHI scheme in the UK. Having won...

Page 1: COMMERCIAL BIOMASS HEATING SOLUTIONS · biomass projects under the RHI scheme in the UK. Having won a tender to supply boilers to a fully-funded Energy Supply Contract (ESCO) biomass

COMMERCIAL BIOMASS HEATING SOLUTIONS

www.woodco-energy.com

Page 2: COMMERCIAL BIOMASS HEATING SOLUTIONS · biomass projects under the RHI scheme in the UK. Having won a tender to supply boilers to a fully-funded Energy Supply Contract (ESCO) biomass
Page 3: COMMERCIAL BIOMASS HEATING SOLUTIONS · biomass projects under the RHI scheme in the UK. Having won a tender to supply boilers to a fully-funded Energy Supply Contract (ESCO) biomass

3

Support Scheme for Renewable Heat (SSRH)In 2019, we expect to see significant changes in

the way that business owners choose to heat

their businesses following the introduction of the

Support Scheme for Renewable Heat, or SSRH.

The SSRH is a financial incentive to encourage business owners to move away from fossil fuels, to more sustainable heating. Business owners will be paid a set tariff every year, for 15 years, based on the amount of heat generated – allowing you to make huge savings on heating bills for your farm or business.

Woodco is an Irish manufacturer and supplier of biomass boiler systems. With over 50 years’ industry expertise, we have supplied almost 4,000 boilers worldwide.

Using world-class technology by industry-leading fabricators, all our boilers are made to the highest EU standards. With technical support from our Irish-based biomass experts, you can trust our team to deliver outstanding service every step of the way.

Ger CrosseManaging Director at Woodco Renewable Energy Ltd.

Page 4: COMMERCIAL BIOMASS HEATING SOLUTIONS · biomass projects under the RHI scheme in the UK. Having won a tender to supply boilers to a fully-funded Energy Supply Contract (ESCO) biomass

4

SUPERMAXMULTI FUEL BIOMASS BOILER 60kW – 525kW

Unique Advantages of SUPERMAX ∙ Superhot – can achieve

temperatures up to 93°C ∙ Modulates from 100% to 10% power ∙ 95% efficiency EN303-5 (tested by EU

Test labs, either SZU Test or KIWA)

∙ 100% Enhanced Capital Allowances in Year 1 – registered on SEAI Triple-E Register

∙ All spare parts available within 48 hours from our online portal www.biomasssparesdirect.com

95%Efficiency

Page 5: COMMERCIAL BIOMASS HEATING SOLUTIONS · biomass projects under the RHI scheme in the UK. Having won a tender to supply boilers to a fully-funded Energy Supply Contract (ESCO) biomass

5

1

3

2

4

5

67

Standard Features ∙ Multifuel – burn wood chip,

pellets and/or saw dust ∙ Stainless steel burner with

ceramic lining for longer life ∙ Heat exchanger built from 6mm mild

steel and factory tested to 8 bar pressure ∙ Automatic heat exchanger

cleaning and de-ashing ∙ Remote diagnostics via WiFi/GSM

∙ Available in 3-phase or single-phase power

∙ Available in left- or right-handed burner ∙ Selection of fuel conveyors from 3m to 6m

length for wood chip and wood pellet ∙ 5 year warranty on heat exchanger* ∙ 2 year warranty on electrical components*

Component Supplier

1 Controller Siemens (Germany)

2 Lambda Control/Sensor Bosch (Germany)

3 Motors Lenze (Austria/Germany)

4 Combustion Fan EBM Papst (Germany)

5 Exhaust Fan Ziehl-Abegg (Germany)

6 Sensors Microsonic (Germany)

7 Actuator Belimo (Switzerland)

Quality control and final assembly in Ireland by Woodco.

SUPERHOT (temperatures

up to 93ºC)

* See Warranty terms & conditions.

Page 6: COMMERCIAL BIOMASS HEATING SOLUTIONS · biomass projects under the RHI scheme in the UK. Having won a tender to supply boilers to a fully-funded Energy Supply Contract (ESCO) biomass

6

ECOCABINTHE PLUG ‘N’ PLAY SOLUTION

SUPERMAX boilers can installed and delivered to site in our award-

winning EcoCabin – the plug ‘n’ play pre-packaged plant room solution.

Designed to your specification, the EcoCabin contains the boiler, buffer tank, pumps, flue system and controls and optional fuel store. All EcoCabins are fully pressure tested for leaks and dry-fired before leaving our factory. Plumbed with mappress crimp pipework and lagged with clad to ensure excellent efficiency and premium quality.

Page 7: COMMERCIAL BIOMASS HEATING SOLUTIONS · biomass projects under the RHI scheme in the UK. Having won a tender to supply boilers to a fully-funded Energy Supply Contract (ESCO) biomass

2 5 0 0 0 0,kWh per shed

7

Using Biomass Heating in the Poultry SectorThere are proven advantages to using renewable

heating in the agribusiness sector.

Aside from making significant savings on their heating bills, poultry farmers have also seen many non-financial benefits in switching to biomass heating.

check Drier litter, improving bird feet and reduced bedding costscheck Less CO2 compared to direct fired gas heaterscheck Density – birds spread more evenly over the floorcheck Reduced heating costs – biomass is significantly cheaper than oil or gas. SSRH will enhance savings even further

Case StudyIn 2015, Woodco completed one of the largest biomass projects under the RHI scheme in the UK. Having won a tender to supply boilers to a fully-funded Energy Supply Contract (ESCO) biomass heating systems for one of the UK’s largest poultry producers, we supplied 60 no. EcoCabins to four Moy Park farms in Lincolnshire.

Client Moy Park Location Lincolnshire Equipment 199kW Woodco EcoCabin Average Shed Size 1,355m3

The ESCO Provider Funds the equipment, installation, maintenance and fuel supply for the system

In return, the ESCO provider receives quarterly RHI payments (based on kWh produced) from the UK Government. Similar to SSRH, the RHI is an indexed-linked programme, where biomass equipment owners receive payments over 20 years. In Ireland, payments will be made quarterly over 15 years

The Client Benefits from guaranteed lower heating costs compared to LPG and has no capital outlay

As part of the contract, the client guarantees a minimum of 250,000kWh per shed, p.a.

Potential Benefits of 10 ppm Ammonia Reductionarrow-alt-circle-up 0.045kg increase in body weightarrow-alt-circle-down 1% reduction in mortality rate

arrow-alt-circle-up 6% increase in meat yieldarrow-alt-circle-up 1 point increase in FCRarrow-alt-circle-up 10% drier litter

Page 8: COMMERCIAL BIOMASS HEATING SOLUTIONS · biomass projects under the RHI scheme in the UK. Having won a tender to supply boilers to a fully-funded Energy Supply Contract (ESCO) biomass

IRELANDmap-marker-alt Donaskeigh, Tipperary, Co. Tipperary, E34 RX89, Ireland.

phone +353 627 4007

UKmap-marker-alt Cinnamon House, Cinnamon Park, Crab Lane, Fearnhead, Warrington WA2 OXP.phone +44 161 261 7497

envelope-square [email protected] www.woodco-energy.com