Combining Old and New Systems in Existing Buildings and Other Retrofit Tales By Paul Jewett CFAA Technician Number 11

Transcript of Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining...

Page 1: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

Combining Old and New Systems in Existing Buildings and Other

Retrofit Tales

By Paul Jewett

CFAA Technician Number 11

Page 2: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

Combining Old and New Systems in Existing Buildings and Other Retrofit Tales

Disclaimer

• In this presentation all the job situations are ones that I have been personally involved with. Therefore: 1. If you have never worked with me, then I am not

talking about you.

2. Do not ask the manufacture of the equipment. In the last 37 years I have worked with almost all the major manufactures sold in Canada at one time or another. So you can only guess.

Page 3: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

Four Important Concepts of this Presentation

1. Definitions for this presentation. – I want us all to talk the same language.

2. Why are they doing this work? – Is it being done for the right reasons? A lot of the

time it is not.

3. Do not assume anything – This is proof that Murphy's Law is correct 99% of the

time.

4. Classic Mistakes – “Those who cannot remember the past are

condemned to repeat it.” -George Santayana

Page 4: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

Definitions for this Presentation

• So what's the difference – retrofit, system replacement, panel replacement, upgrading?

• Retrofit: An act of adding components or accessories to a system that it did not have when manufactured, designed, or installed. (I got this from the Internet.)

• System Replacement: To me, it means replacing all components while keeping its original design and operation.

• Panel Replacement: To me, it means replacing only the panel. All field devices remain (except maybe the EOL’s) and the system operation remains the same.

• Upgrading: To me, this can mean anything from the system’s firmware to anything described above. Sales people like to use the term a lot because it does not have a clear a meaning.

Page 5: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

Why are they doing this Work?

• The first question I like to ask when someone says they want to replace a panel or system is, “Why?”

• These are the top 5 answers I have heard: 1. Intermittent troubles

• What this means to me is “It’s driving us crazy and the boss wants it fixed.” The real question is why is it going into trouble? Is replacing the panel going to stop it?

2. It does funny things when it goes into alarms • What this means to me is “Are we going to be in trouble if we have a

fire?” Sounds like a little more investigation is required.

3. Costing too much money for service • What this means to me is “is it cheaper just to replace it?”

4. Want new features • What this means to me is “I am hiding the truth.”

5. Doing renovations and need to bring it up to code. • What this means to me is “I ‘m doing it because I have to.”

Page 6: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

In Retrofit Do not Assume Anything

My personal top 5 are:

1. Wiring

2. Device Compatibility

3. Documentation from the site

4. Interfacing Control Panels

5. Verbal Information

Page 7: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

Assume Nothing: Wiring Example: Older Two Stage System

• Imagine that you are quoting an older hotel with a two stage system to do a panel replacement.

• You look at the control panel and you check out the annunciator, devices, open a few junction boxes, check out the risers, look at the sprinklers, duct detectors, and all the usual stuff.

• But what are some of the things that people don’t check and make bad assumptions about?

• For example, how about the pull station wiring?

Page 8: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

Assume Nothing: 2 stage Station with NC Key Switch

This style was popular in the 1960’s and early 1970’s. The GA circuit would only activate if there was a 1st stage alarm activated. In several cases I have seen the original panel replaced in the 1980’s, retaining the old wiring design.

Page 9: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

In Retrofit Assume Nothing: The 3 Wire 2 stage Station Configuration

This was very popular up to the late 1970’s and, like the last slide, you can find panels installed into the 1980’s with this style.

Page 10: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

In Retrofit Assume Nothing: The 2 Wire 2 stage Station Configuration

They worked on the principle that the 1st stage increased the current to the alarm threshold and when the GA key was turned it created a dead short and increased the current to the maximum. They sometimes called the circuits counting zones.

Page 11: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

Do not Assume Anything:

Compatibility

• Did you know that sometimes a big name manufacturer doesn’t actually make all its own panels and devices, but buys products and brand names them?

• Don’t be fooled by the paint and name on the outside. Check the inside (like on PC boards and the back of the detectors) to get information.

Just because a detector has a manufacturer’s name on it does not mean that it is compatible with all its panels.

Page 12: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

Do not Assume Anything: Compatibility Example

• A senior’s retirement home required a control panel replacement. In the tender it stated that the contractor was responsible for ensuring the panel was ULC listed with all the field devices.

• The smoke detectors were conventional and a lot them had been replaced over the years with what appeared to be identical models.

Page 13: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

Do not Assume Anything: Compatibility Example

• Actually, they were identical except that they were brand named for a different manufacturer and that meant they were not ULC listed for the panel installed.

• Well, I think you can guess the rest of the story. The detectors were worth more money than the panel.

Page 14: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

Do not Assume Anything:

Documentation From The Site The Scenario:

• A large high rise hotel with an addressable system was having a system replacement. Existing wire was to be reused, and the new system was from a different manufacturer – so all input devices had to be replaced.

• All was well, except in the main floor area, which

seemed to go into alarm every couple of days at all different times for no apparent reason.

• There had been no history of alarm problems with this

floor before the change, and wiring had been checked for capacitance and resistance between conductors .

Page 15: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

Do not Assume Anything: Documentation From The Site

By the process of disconnecting the circuit at different points it was determined that the problem was between the Lobby and the Rear Corridor. At this point we started cutting holes in to the ceiling.

Page 16: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

Documentation From The Site

In all of the inspection reports found going back at least 5 years there was no detector listed in this location. Solving the problem took approximately 100 hours.

Page 17: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

Interfacing Control Panels

Existing System was a standard conventional system installed in the 1980’s

Main Lobby Annunciator • Stainless Steel

backlit design • Mounted by

security desk

Page 18: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

New small outbuilding panel was added from the same manufacturer and was connected to main annunciator.

Interfacing Control Panels

Simple interconnect, right? What could go wrong?

Shortly after the new panel was installed they started to have intermittent ground faults and some mystery alarm. Funny things were happening. After a few years they replaced both systems.

Too bad no one would believe me when I told them the problem was because the two systems commons were interconnected at the annunciator, causing the problems.

Page 19: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

Gas Releasing Panel Interconnection

The most common configuration method is to have the releasing panel with just a relay interconnection to the fire alarm panel.

Page 20: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

Gas Releasing Panel Interconnection

In this case the someone decided they did not need the local signaling because a building horn was already installed in the room.

Page 21: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

Do not Assume Anything: Gas Releasing Panel Interconnection

• So what happens when the service tech comes in to do the annual inspection and bypasses the fire alarm signals?

• Murphy’s Law tells us that’s when they were also scheduled to service the air conditioning units in the releasing area –and yes the system went off –without any warning to the people in the room.

Page 22: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

Do Not Assume Anything: Verbal Communication

• A high-rise hotel system installed in the late 1970’s had only corridor speakers. The owner decided to update the rooms floor by floor over a period of several years.

• They decided to install suite speakers to keep up to date. Before starting, the electrical contractor asked a fire alarm tech who was in the building at the time if it was OK.

• So no modification was done to the panel and no one consulted the manufacturer.

Page 23: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

Do Not Assume Anything: Verbal Communication

• As the tech completed each floor it was verified by a local service company and accepted by the AHJ.

• However, it only took about 5 floors to notice that the volume level was decreasing greatly and soon the amplifiers were overloaded and cutting out.

• So who is at fault if they had a fire and the signals didn’t work?

Page 24: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

Do Not Assume Anything: Verbal Communication

So who is at fault if they had a fire and the signals didn’t work?

–The hotel –The service company who verified the

speakers –The tech who told them it would be OK

(whose name no one remembers) –The electrical contractor

Page 25: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

Did you know…

• Most old stand-alone EVC systems had no Ground fault detection?

• In fact, some old audio systems recommended that the common negative of the power supply be connected to ground?

• You could get a big surprise if you planned on reusing the wire.

Page 26: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

Classic Mistakes

• My personal top 4 are:

1. Not getting it in writing.

2. Not asking the right question before you get the job.

3. Not pretesting equipment.

4. Not having a backup plan.

Page 27: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

Classic Mistakes: Not Getting it in Writing

• The Situation: – The Hotel was built in the early 1970’s and the system

installed consisted of a fire alarm with Bells for signaling and combined emergency paging / music / ballroom audio system.

– In the early 1990’s they decided to upgrade the audio system for music and ballrooms, but do so completely destroyed the emergency paging. The provincial fire marshal’s office came for his annual inspection and wrote them up to fix or replace it.

Page 28: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

Classic Mistakes: Not Getting it in Writing

– After a short tendering period the hotel issued a one paragraph P.O. for replacement.

– So when we started the project we called the local fire hall and explained what had happened and what we where doing.

– We did not even make any notes of the date or who we were talking to.

Page 29: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

Classic Mistakes: Not Getting it in Writing

• Six months later we were close to finishing, when one night, an alarm occurred. The fire department responded and noticed the paging system had a sign saying it was not operational. The captain ordered the hotel to put on a fire watch until it was replaced.

• The result was that we got back-charged by the

hotel for all the fire watch expenses – even though the fire alarm was still fully operational. It was a lot of money.

Page 30: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

Classic Mistakes: Not Asking the Right Questions before Starting Work

My personal top 3 are:

1. What if we find unrelated wiring installed inside the conduit? Who will be responsible for removing it?

2. Problems with shutdowns and interconnects between buildings. (You only find out after you start disconnecting wires from the panel.)

3. Drilling time. If you’ve worked in a hotel you know what I mean. Sometimes you only get 2 to 3 hours a day –if you are lucky.

Page 31: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

Classic Mistakes: Not Pretesting Equipment

• Years ago I was an installation project manager for a

telephone exchange building project in the Caribbean. Before the equipment was to be shipped I requested that I come and test the panel personally to make sure there were no problems.

• The manufacturer told me because it was big (5 full size

tubs) it was going to be a lot of work, and was not necessary anyhow, because they pretest all the components.

• I insisted – and they set up a date for me to check it out.

Page 32: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

Classic Mistakes: Not Pretesting Equipment

• When I arrived at the factory they were just finishing

up the connects. • When they connected the AC power the system started

to blow up transistors like popcorn. • Turned out that they tested all the modules but not the

connecting cables. • If I had not tested it before I left and connected the

power to it after it was installed in the Caribbean, I’m darn sure everyone would have blamed it on me!

Page 33: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

Classic Mistakes: Not Pretesting Equipment

• So if you’ve ever wondered what happens when you mix up the negative and positive on one of these connectors –now you know.

Page 34: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

Classic Mistakes: No Backup Plan

I got a call on a Friday afternoon at about 4:00 from a tech who I taught in class. He was doing a retrofit on an 8 story building and had a problem.

Existing Conventional System

Page 35: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

Classic Mistakes: No Backup Plan

What he was attempting to do was a retrofit from a conventional to an addressable system –in one day.

PS: I know his use of isolators is questionable

Page 36: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

Classic Mistakes: No Backup Plan

His plan was working fine. He started on the 8th floor and things were going well. But when he got to the 5th floor the system reported missing devices on the 8th .

Page 37: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

Classic Mistakes: No Backup Plan

• The problem was simple. He kept adding more and more wire to the addressable circuit until he exceeded the maximum capacitance for the circuit.

• The correction was to add an additional addressable circuit. • The problem was it was now 4:00 on a Friday and he couldn’t

get one until Monday morning. • This meant that he would have to put a fire watch on for the

weekend and have his crew come back on Monday to finish. (maybe).

• He had no plan “B”.

Page 38: Combining Old and New Systems in Existing Buildings and .... CFAA Presentation fina… · Combining Old and New Systems in Existing Buildings and Other Retrofit Tales Disclaimer •In

Questions?

Hope You Enjoyed The Presentation