Combining Advanced Mobility Management with Clean Fleets
Transcript of Combining Advanced Mobility Management with Clean Fleets
1
Gustaf Landahl
EU koordinator
Combining Advanced MobilityManagement with Clean Fleets
S t o c k h o l m
G r a z
Lille P r a g u e
P é c s
G d y n i a
B u c h a r e s t
B e r l i n
G ö t e b o r g
R o t t e r d a mB r i s t o lB r e m e n
N a n t e s
K a u n a sA a l b o r g
R o m eB a r c e l o n a
C o r k
W i n c h e s t e r
• Testing radical strategiesfor Clean UrbanTransport
• Combined initiative• 45 M€ support• 4 projects in 19 cities
2
Objectives and measures
Advanced mobility
Clean vehicles and fuels
Public transport
Goods logistics
Access restrictions
CO2 reduction by 75 000 tonnes/year = 5%
Nox reduction by 900 tonnes/year
Save 850 TJ/year
Reduced congestion
Setting examples
MobilityMode of goods transport
0
500
1000
1500
2000
2500
3000
3500
1970 1980 1990 1995 1997 1998 1999
1000
mio
tkm Sea
Piplines
Inland waterwaysRail
Road
Mode of person transport
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
1970 1980 1990 1995 1996 1997 1998 1999
1000
mio
pkm Air
Railway
Tram & MetroBuses and coachesPassenger cars
3
Environmentu Traffic mov.: 8 %
u Particulates: 50-75%
u Nitrogen oxides: 50 %
u Noise: dominates maximums
0
500
1000
1500
1860 1880 1900 1920 1940 1960 1980 2000 2020 2040 2060
exajoules
SurpriseGeoth.SolarBiomassWindNuclearHydroGasOil & NGLCoalTrad Bio.
2% p.a.
Copyright- Shell International Petroleum
Energy
4
Stockholm
Graz
Lille Prag
Pécs
4 years5 Cities17 Partners12 work-packages50 measures40 M€ cost10,5 M€ EU support
Access restrictions§ Environmental
restriction zones
§ Environmentallyoriented Parking zones(Graz, Pecs, Stockholm)
5
Developing the Environmentalzone in Stockholm
u Diesel powered, heavy trucks and bussesweighing more than 3.5 tonnes are
u banned from defined inner city area, unless they
u comply with certain environmentalregulations (environmental classes)
Marking vehiclesu Visible sticker on
windscreenu Enforcement by the
Policeu Cities are entitled
to chargeapplications
6
Widening theWidening the Enviromental Enviromental zone of Praguezone of PragueWP 5: 5.5 WP 5: 5.5 Widening of the Enviromental zoneWidening of the Enviromental zone
Advanced mobilityn Visitors web for optimal trip planning (Stockholm)
n Integration of traffic management systems(Stockholm)
n B&R information on the net (Stockholm)
n 3 bus priority lanes (Lille)
n 9 Improved intermodal links (Graz, Lille)
n 2500 P&R parking places (Lille)
n Several IT-based transport information systems andtraffic management systems
7
An example of exchange pole in Lille
New Forms of Vehicle Use in Graz
New services and services for special customer groups(City, StVG, AMOR)
Increasing car occupancy (City, Province)
Site level Mobility Management (City, AMOR)
Partners: City, AMOR, StVG, Province
8
The urban mobility plan of LilleUrban Mobility Plan
¥ reducing the use of cars in towns
¥ developing collective passenger transport means
¥ developing travel by bicycle or on foot
¥ better organisation for the transport and delivery of goods
To double the number of public transport passengers in 15years
100 Million in 2000 ê 200 Million in 2015
a rise of 30% by the end of TRENDSETTER
Public transportn 60 High customer friendly bus and tram stops (Graz)n Bus priority signal systems (Prague)n More adaptive signal control in a bus priority system (Stockholm)n Smart card systems for integrated ticketing (Stockholm, Lille)n 3 bus priority lanes (Lille)n 2 Bus priority signal systems (Stockholm, Prague)
9
Goods logisticsn Material logistic centre -to optimise freight deliveries at
construction siten Accessible information to advance logistic planningn 1 Logistic Centre including 8 clean vehicles (Euro 4
standard)n 2 IT based logistic management systems
Cotransportation ofmaterial
• Less trucks on construction sites
• Each contractor gets a few largerdeliveries than a lot of smaller
• Competing contractors cotransport their materials andsaves money.
The Hammarby Logistics centre
10
Goods logistics at a building siten Hammarby logistikcentern 2 IT based logistic controlsystems
Cotransportation ofmaterial
• Less trucks on construction sites
• Each contractor gets a few largerdeliveries than a lot of smaller
• Competing contractors cotransport their materials andsaves money.
Improved goods-logistics
11
Clean vehicles and fuelsn 5 biogas refuse trucks
n 110 biogas buses (Lille,Stockholm)
n 107 bio-diesel buses (Graz)n 4 electric-hybrid buses (Pecs)n Coordinated procurements:
n biogas goods deliveryvehicles
n electric-hybrid vans
§ 3 new biogas refuelling stations(Stockholm, Lille)
§ 320 new clean vehicles (biogas, electric,electric-hybrid, ethanol) in city fleets(Stockholm, Lille)
§ 120 taxis converted to biodiesel (Graz)§ 355 new biogas lorries and 200 electric-
hybrid lorries (Stockholm)§ 300 substituted clean vehicles in
company fleets (Stockholm)
Clean vehicles and fuels
12
Expected results
The EuropeanCommission
Other CitiesOur Cities