Comal County Chip Sealing
June 26, 2007
Chip sealing is the application of a bituminous binder immediately followed by the application of an aggregate. The aggregate is then rolled to embed it into the binder.
Binder Application
Aggregate Application
Rolled
Advantages of Chip Sealing
• Improved Skid Resistance
• Cost Effective Treatments
• Good Durability (Typically 5-7 Years)
• Ease of Construction
• Chip Seal = 1 Mile/Day
• Asphalt = 1 Mile/Week
Disadvantages of Chip Sealing
• Flying Chips – Broken windshields and vehicle damage
• Noise Considerations – Chip seals can be noisy to travel on
• Weather Considerations – Must be constructed during warm, dry weather during daytime only
• Pedestrian – Not good for roller-blading & skateboarding
Materials
Binders must provide good adhesion,
or stickiness
Aggregates must have following characteristics:• Single-sized, if possible• Clean• Angular (not rounded)• Aggregates must be damp for emulsion use
Construction Process
Surface Preparation
• Crack Sealing or Filling of Cracks
• Patching Deteriorated Areas
• Cleaning or Brooming Any Loose Material
• Removing Pavement Markers and Delineators
Construction Process
Binder Application
• Uniformly Apply the Binder Over the Surface at a Designed Rate
• Pavement Surface Temperature Should be 55ºF and Rising
• Humidity Should be 50% or Lower
• Most Important Step in Process
Construction Process
Aggregate Application
• Should Follow the Binder Application by no more than 90 Seconds
• Should be no more than 100 Feet Behind Distributor Truck
Construction Process
Aggregate Application
• Should Follow the Binder Application by no more than 90 Seconds
• Should be no more than 100 Feet Behind Distributor Truck
Construction ProcessRolling
• Initial Rolling by Pneumatic Roller or Steel Rollers
• Compaction by Traffic Finishes the Process
• Should be Done During Hotter Weather
• Should Follow Aggregate Spreading by no more than 500 Feet
• Minimum of Two Rollers Should be Used to Cover the Full Width of the Chip Spreader
Construction ProcessBrooming
• After Chip Seal, Excess Aggregate Must be Broomed Off
• Within 2 to 4 Hours after Sealing
Possible Problems
• Bleeding – Too much binder leading to “leaking” of emulsion
• Traffic Control – Ensure that vehicles do not drive on binder application
• “Shelling” – Aggregate not applied in a timely manner. Binder sets. Aggregate does not stay in place.
Comal County Canyon Lake
Spillway Canyon
June 26, 2007
1998 Storm Totals
Storm Total for 1998
Storm Total for 2002
Structural Flood Control Measures in Comal County
Canyon Reservoir
Structural Flood Control Measures in Comal County
Emergency Spillway
Structural Flood Control Measures in Comal County