Comal County Chip Sealing June 26, 2007.

38
Comal County Chip Sealing June 26, 2007

Transcript of Comal County Chip Sealing June 26, 2007.

Page 1: Comal County Chip Sealing June 26, 2007.

Comal County Chip Sealing

June 26, 2007

Page 2: Comal County Chip Sealing June 26, 2007.
Page 3: Comal County Chip Sealing June 26, 2007.
Page 4: Comal County Chip Sealing June 26, 2007.
Page 5: Comal County Chip Sealing June 26, 2007.
Page 6: Comal County Chip Sealing June 26, 2007.
Page 7: Comal County Chip Sealing June 26, 2007.
Page 8: Comal County Chip Sealing June 26, 2007.
Page 9: Comal County Chip Sealing June 26, 2007.
Page 10: Comal County Chip Sealing June 26, 2007.
Page 11: Comal County Chip Sealing June 26, 2007.
Page 12: Comal County Chip Sealing June 26, 2007.
Page 13: Comal County Chip Sealing June 26, 2007.
Page 14: Comal County Chip Sealing June 26, 2007.
Page 15: Comal County Chip Sealing June 26, 2007.
Page 16: Comal County Chip Sealing June 26, 2007.
Page 17: Comal County Chip Sealing June 26, 2007.

Chip sealing is the application of a bituminous binder immediately followed by the application of an aggregate. The aggregate is then rolled to embed it into the binder.

Binder Application

Aggregate Application

Rolled

Page 18: Comal County Chip Sealing June 26, 2007.

Advantages of Chip Sealing

• Improved Skid Resistance

• Cost Effective Treatments

• Good Durability (Typically 5-7 Years)

• Ease of Construction

• Chip Seal = 1 Mile/Day

• Asphalt = 1 Mile/Week

Page 19: Comal County Chip Sealing June 26, 2007.

Disadvantages of Chip Sealing

• Flying Chips – Broken windshields and vehicle damage

• Noise Considerations – Chip seals can be noisy to travel on

• Weather Considerations – Must be constructed during warm, dry weather during daytime only

• Pedestrian – Not good for roller-blading & skateboarding

Page 20: Comal County Chip Sealing June 26, 2007.

Materials

Binders must provide good adhesion,

or stickiness

Aggregates must have following characteristics:• Single-sized, if possible• Clean• Angular (not rounded)• Aggregates must be damp for emulsion use

Page 21: Comal County Chip Sealing June 26, 2007.

Construction Process

Surface Preparation

• Crack Sealing or Filling of Cracks

• Patching Deteriorated Areas

• Cleaning or Brooming Any Loose Material

• Removing Pavement Markers and Delineators

Page 22: Comal County Chip Sealing June 26, 2007.

Construction Process

Binder Application

• Uniformly Apply the Binder Over the Surface at a Designed Rate

• Pavement Surface Temperature Should be 55ºF and Rising

• Humidity Should be 50% or Lower

• Most Important Step in Process

Page 23: Comal County Chip Sealing June 26, 2007.
Page 24: Comal County Chip Sealing June 26, 2007.

Construction Process

Aggregate Application

• Should Follow the Binder Application by no more than 90 Seconds

• Should be no more than 100 Feet Behind Distributor Truck

Page 25: Comal County Chip Sealing June 26, 2007.

Construction Process

Aggregate Application

• Should Follow the Binder Application by no more than 90 Seconds

• Should be no more than 100 Feet Behind Distributor Truck

Page 26: Comal County Chip Sealing June 26, 2007.

Construction ProcessRolling

• Initial Rolling by Pneumatic Roller or Steel Rollers

• Compaction by Traffic Finishes the Process

• Should be Done During Hotter Weather

• Should Follow Aggregate Spreading by no more than 500 Feet

• Minimum of Two Rollers Should be Used to Cover the Full Width of the Chip Spreader

Page 27: Comal County Chip Sealing June 26, 2007.
Page 28: Comal County Chip Sealing June 26, 2007.

Construction ProcessBrooming

• After Chip Seal, Excess Aggregate Must be Broomed Off

• Within 2 to 4 Hours after Sealing

Page 29: Comal County Chip Sealing June 26, 2007.
Page 30: Comal County Chip Sealing June 26, 2007.

Possible Problems

• Bleeding – Too much binder leading to “leaking” of emulsion

• Traffic Control – Ensure that vehicles do not drive on binder application

• “Shelling” – Aggregate not applied in a timely manner. Binder sets. Aggregate does not stay in place.

Page 31: Comal County Chip Sealing June 26, 2007.
Page 32: Comal County Chip Sealing June 26, 2007.

Comal County Canyon Lake

Spillway Canyon

June 26, 2007

Page 33: Comal County Chip Sealing June 26, 2007.

1998 Storm Totals

Storm Total for 1998

Page 34: Comal County Chip Sealing June 26, 2007.

Storm Total for 2002

Page 35: Comal County Chip Sealing June 26, 2007.

Structural Flood Control Measures in Comal County

Canyon Reservoir

Page 36: Comal County Chip Sealing June 26, 2007.

Structural Flood Control Measures in Comal County

Emergency Spillway

Page 37: Comal County Chip Sealing June 26, 2007.

Structural Flood Control Measures in Comal County

x

Page 38: Comal County Chip Sealing June 26, 2007.