Columbia University’s Advanced Concepts Data Center Pilot

10
Columbia University’s Advanced Concepts Data Center Pilot June 17, 2011

description

Columbia University’s Advanced Concepts Data Center Pilot. June 17, 2011. Wattnode meters. Campus Level. power panel. CRAC unit. Data Center: 200 Level. Flexim meters. chilled water pipes. Mechanical Room: 100 Level. Main IT power feed (ATS4). server rack. - PowerPoint PPT Presentation

Transcript of Columbia University’s Advanced Concepts Data Center Pilot

Page 1: Columbia University’s  Advanced Concepts Data Center Pilot

Columbia University’s Advanced Concepts Data Center Pilot

June 17, 2011

Page 2: Columbia University’s  Advanced Concepts Data Center Pilot

Mechanical Room: 100 Level

Data Center: 200 Level

Campus Level

server rackRaritan Power Distribution Units (PDUs)

and Uninterruptible Power Supplies (UPSs)

Wattnode meters

chilled water pipes

Main IT power feed (ATS4)

power panel

CRAC unit

Flexim meters

Page 3: Columbia University’s  Advanced Concepts Data Center Pilot

Documented Improvements

3

• Verified server energy efficiency improvements from January 2010 to March 2011: Increased load shows overlap between old and replacement equipment, followed by decreases when old equipment has been removed

• Successful experiment with replacement of 30 old servers with newer, presumably more efficient models led to funding of an ongoing annual $500K project to aggressively consolidate and virtualize most servers over the next three years, and to maintain a steady state three-year refresh cycle

Page 4: Columbia University’s  Advanced Concepts Data Center Pilot

Compute Performance

4

Estimated server compute performance has increased approximately 20% while energy demand has been reduced 5%

Page 5: Columbia University’s  Advanced Concepts Data Center Pilot

Storage Energy

5

An enterprise storage refresh project also leveraged our newly green data center approach to (a) require the bidding vendors to document their energy efficiency as one of the selection criteria, and, (b) implement a new overhead cable distribution system to begin the (lengthy) process of removing under floor airflow blockages.

OLD Storage NEW Storage

Page 6: Columbia University’s  Advanced Concepts Data Center Pilot

Carbon Footprint Reduction

6

Average IT Power Demand Load Reduction 14.34 kWAnnual kWh reduction due to IT equip (24h, 365d) 125,601 kWhTotal Facility Power Demand Reduction (PUE of 2.07) 29.68 kWTotal Annual kWh reduction 260,030 kWhEstimated Annual Cost Savings ($.185 per kWh) $48,106Total Facility Carbon Footprint Reduction 99.3 Metric Tons of CO2 Equivalent* *Calculated using 0.00038180 MTCE/kWh

Server Consolidation and Storage Refresh Projects

• 88 machines installed• 120 machines retired• Net decrease of 32 hardware devices

Page 7: Columbia University’s  Advanced Concepts Data Center Pilot

CUIT’s Power Usage Effectiveness (PUE)

7

Extensive instrumentation for real-time measurements of electrical and cooling loads has enabled us to measure and calculate our Power Usage Effectiveness in real time, and to confirm seasonal variations in PUE thanks to use of air- and water-side economizing

7/27/10 - Chilled Water Outage

Page 8: Columbia University’s  Advanced Concepts Data Center Pilot

CUIT’s Power Usage Effectiveness (PUE)

8

Extensive instrumentation for real-time measurements of electrical and cooling loads has enabled us to measure and calculate our Power Usage Effectiveness in real time, and to confirm seasonal variations in PUE thanks to use of air- and water-side economizing

7/27/10 - Chilled Water Outage

Page 9: Columbia University’s  Advanced Concepts Data Center Pilot

9

CUIT’s Power Usage Effectiveness (PUE)

Seasonal variation identifiessummer and winter PUE

PUE varies by seasonal variations and use of freeWinter free cooling

IT load steadily decreasing; has little noticeable impacton PUE

Page 10: Columbia University’s  Advanced Concepts Data Center Pilot

NYSERDAThis work is supported in part by the New York State Energy Research and Development Authority (NYSERDA agreement number 11145).  NYSERDA has not reviewed the information contained herein, and the opinions expressed do not necessarily reflect those of NYSERDA or the State of New York.

10

External, Faculty and Internal advisory committees

Departments of Statistics and Astronomy & Astrophysics

Columbia University Facilities

CUIT Data Center Facilities and Operations, Network Operations and Engineering, Systems Operations and Engineering, Research Computing Services, Classroom & Desktop Engineering, and the Project Management Office

Office of the Executive Vice President for Research

Thanks