Colorado State University Classroom Technology Spring 2011
-
Upload
alisa-obrien -
Category
Documents
-
view
38 -
download
0
description
Transcript of Colorado State University Classroom Technology Spring 2011
![Page 1: Colorado State University Classroom Technology Spring 2011](https://reader034.fdocuments.in/reader034/viewer/2022051401/56812e3d550346895d93b874/html5/thumbnails/1.jpg)
Colorado State UniversityClassroom Technology
Spring 2011
Presentation to the UTFAB Tuesday, March 1, 2011 By – Douglas Satterfield Classroom Support Services-
ACNS, [email protected], ext.1-6038
![Page 2: Colorado State University Classroom Technology Spring 2011](https://reader034.fdocuments.in/reader034/viewer/2022051401/56812e3d550346895d93b874/html5/thumbnails/2.jpg)
Classroom Technology Spring Update 2011
NEW UTFAB FUNDED SMART CLASSROOMS FOR FY 2011
BUILDING ROOM Capacity UTFAB Supported Classroom Technology
1 Eddy 9 32 FY 2011 March 20112 Eddy 11 32 FY 2011 March 20113 Eddy 106 30 FY 2011 Completed 4 Eddy 109 30 FY 2011 Completed 5 Education 236 32 FY 2011 Completed 6 Pathology 109 55 FY 2011 Completed 7 CHEMISTRY B301 28 FY 2011 Spring 20118 Gifford 312 30 FY 2011 Spring 2011
CLASSROOM REMODELS FOR FY2011 BUILDING ROOM Capacity UTFAB Supported Classroom Technolgy FY11
1 EDDY 113 32 FY 2011 Completed 2 EDDY 114 32 FY 2011 Completed 3 EDDY 115 32 FY 2011 Completed 4 EDDY 116 32 FY 2011 Completed 5 EDDY 117 32 FY 2011 Completed
![Page 3: Colorado State University Classroom Technology Spring 2011](https://reader034.fdocuments.in/reader034/viewer/2022051401/56812e3d550346895d93b874/html5/thumbnails/3.jpg)
Classroom Technology Spring Update 2011
REFRESH ROOMS FOR FY2011
BUILDING ROOM Completion / Date
1 ENGINEERING D102 Spring / Summer 2011
2 MILITARY SCIENCE 201Spring / Summer 2011
3 ENGINEERING E206Spring / Summer 2011
4 ENGINEERING E104Spring / Summer 2011
5 CLARK C359Spring / Summer 2011
6 Rockwell 165Spring / Summer 2011
![Page 4: Colorado State University Classroom Technology Spring 2011](https://reader034.fdocuments.in/reader034/viewer/2022051401/56812e3d550346895d93b874/html5/thumbnails/4.jpg)
UFFAB Remodel &UTFAB - Technology
Eddy 113 – 117Winter Break 2011
![Page 5: Colorado State University Classroom Technology Spring 2011](https://reader034.fdocuments.in/reader034/viewer/2022051401/56812e3d550346895d93b874/html5/thumbnails/5.jpg)
Outdated projector – Eddy 117
![Page 6: Colorado State University Classroom Technology Spring 2011](https://reader034.fdocuments.in/reader034/viewer/2022051401/56812e3d550346895d93b874/html5/thumbnails/6.jpg)
Outdated Central Control system that controlled Eddy 113 - 117
![Page 7: Colorado State University Classroom Technology Spring 2011](https://reader034.fdocuments.in/reader034/viewer/2022051401/56812e3d550346895d93b874/html5/thumbnails/7.jpg)
Outdated Room Button panels used in Eddy 113 - 117
![Page 8: Colorado State University Classroom Technology Spring 2011](https://reader034.fdocuments.in/reader034/viewer/2022051401/56812e3d550346895d93b874/html5/thumbnails/8.jpg)
Outdated Lecterns in Eddy 113 - 117
![Page 9: Colorado State University Classroom Technology Spring 2011](https://reader034.fdocuments.in/reader034/viewer/2022051401/56812e3d550346895d93b874/html5/thumbnails/9.jpg)
Eddy 113 – 117 before remodel
![Page 10: Colorado State University Classroom Technology Spring 2011](https://reader034.fdocuments.in/reader034/viewer/2022051401/56812e3d550346895d93b874/html5/thumbnails/10.jpg)
Eddy 113 – 117 after remodel
![Page 11: Colorado State University Classroom Technology Spring 2011](https://reader034.fdocuments.in/reader034/viewer/2022051401/56812e3d550346895d93b874/html5/thumbnails/11.jpg)
Eddy 113 – 117 New Style Update Lecterns
![Page 12: Colorado State University Classroom Technology Spring 2011](https://reader034.fdocuments.in/reader034/viewer/2022051401/56812e3d550346895d93b874/html5/thumbnails/12.jpg)
Eddy 113 – 117 New Lecture Capture Cameras for Speech Communications Classes
![Page 13: Colorado State University Classroom Technology Spring 2011](https://reader034.fdocuments.in/reader034/viewer/2022051401/56812e3d550346895d93b874/html5/thumbnails/13.jpg)
Eddy 113 – 117 New Modular Lectern Including locking drawer for Laptops Laptops are used for presentations and recordings
![Page 14: Colorado State University Classroom Technology Spring 2011](https://reader034.fdocuments.in/reader034/viewer/2022051401/56812e3d550346895d93b874/html5/thumbnails/14.jpg)
![Page 15: Colorado State University Classroom Technology Spring 2011](https://reader034.fdocuments.in/reader034/viewer/2022051401/56812e3d550346895d93b874/html5/thumbnails/15.jpg)
New Smart ClassroomAnimal Science 200
![Page 16: Colorado State University Classroom Technology Spring 2011](https://reader034.fdocuments.in/reader034/viewer/2022051401/56812e3d550346895d93b874/html5/thumbnails/16.jpg)
Animal Science 200 Short throw Projector Technology – Throw Distance = 36” = Image 80” wide
![Page 17: Colorado State University Classroom Technology Spring 2011](https://reader034.fdocuments.in/reader034/viewer/2022051401/56812e3d550346895d93b874/html5/thumbnails/17.jpg)
UTFAB Spring 2011
• 159 General Assignment Classrooms
• Currently 145 G.A. Rooms are Smart Classroom
• 14 GA Rooms are left needing to be Technology Equipped
• 4 more rooms to be completed during this year – FY11 UTFAB Funded
Classroom Technology 2011
Current Technology Equipped - Smart Classrooms
1 Eddy 9 32 FY 2011 UTFAB March 20112 Eddy 11 32 FY 2011 UTFAB March 20113 CHEMISTRY B301 28 FY 2011 UTFAB Spring 20114 Gifford 312 30 FY 2011 UTFAB Spring 2011
![Page 18: Colorado State University Classroom Technology Spring 2011](https://reader034.fdocuments.in/reader034/viewer/2022051401/56812e3d550346895d93b874/html5/thumbnails/18.jpg)
A Look Ahead FY- 2012
BUILDING Room FUNDING / Completion
Animal Science 205 UFFAB / Aug. 2011
Education * 1 UFFAB / Sept. 2011
Education* 2 UFFAB / Sept. 2011
Education 8 UFFAB / Nov. 2011
Microbiology A 114 UFFAB / 2012
Natural Resources 106 UFFAB / May 2012
Natural Resources 112 UFFAB / 2012
Natural Resources 115 UFFAB / 2012
CLARK C140 Undecided – 12 seats
Eddy 110 Undecided – 10 seats
Remaining New Classroom Builds - UFFAB10
![Page 19: Colorado State University Classroom Technology Spring 2011](https://reader034.fdocuments.in/reader034/viewer/2022051401/56812e3d550346895d93b874/html5/thumbnails/19.jpg)
A Look Ahead FY- 2012
Classroom Technology Refreshes
New Standard Crestron Touch Panel and Control System
New Projectors Brighter Wider 16:10 image and screen
High quality – High resolution Document Cameras
Up scaling DVD/VCR Combo Units – higher resolution videos
Aux video inputs including HDMI
New System Switcher with 5 digital input (3 HDMI / 2 DVI)
![Page 20: Colorado State University Classroom Technology Spring 2011](https://reader034.fdocuments.in/reader034/viewer/2022051401/56812e3d550346895d93b874/html5/thumbnails/20.jpg)
Upgrading Benefits to Standard Crestron Touch Panel and Control System
1. Reliability – less failure and lower maintenance 2. Easier to read and use - Standard CSU control layout from Class to Class 3. Graphical interface – ability to upgraded as technology changes 4. Network connection to control system for system upgrades and maintenance
Classroom Technology 2011 / 2012
Classroom Technology Refresh Equipment Overview
![Page 21: Colorado State University Classroom Technology Spring 2011](https://reader034.fdocuments.in/reader034/viewer/2022051401/56812e3d550346895d93b874/html5/thumbnails/21.jpg)
Bright Wide 16:10 image and screen
1. Reliability – less failure and lower maintenance – Longer Filter Life 2. Larger Brighter image - Easier to read – better classroom presentation 3. Higher resolution – matches the resolution of the PC / Laptop image 4. Life cycle of a classroom projector is typically around 5 years at best 5. Technology continues to improve while cost are dropping – bang for the buck 6. Longer lasting long term use with new technology projectors – DLP new LCD
Panels
Classroom Technology 2011 / 2012
Classroom Technology Refresh Equipment Overview
4:3 16:10
Projector Upgrade Benefits
![Page 22: Colorado State University Classroom Technology Spring 2011](https://reader034.fdocuments.in/reader034/viewer/2022051401/56812e3d550346895d93b874/html5/thumbnails/22.jpg)
“Degradation most typically occurs in the blue channel, and it can cause color shifts and reduced contrast. When this happens the LCD panel needs to be replaced. To eliminate this as a potential problem for users, the next generation LCD projectors will feature LCD panels made with inorganic compounds that are not susceptible to degradation over time.”
Projector Upgrade Benefits
Newer Technology Projectors have Inorganic LCD Panels vs Organic Panels
![Page 23: Colorado State University Classroom Technology Spring 2011](https://reader034.fdocuments.in/reader034/viewer/2022051401/56812e3d550346895d93b874/html5/thumbnails/23.jpg)
New High quality – High resolution Document Cameras
Smaller Footprint – less obtrusive Higher Resolution – detail image quality – Digital output Easy to use – folds easily went not in use Highly reliable units – very low failure rate High Classroom demand for Doc Cams
Classroom Technology 2011 / 2012
Classroom Technology Refresh Equipment Overview
![Page 24: Colorado State University Classroom Technology Spring 2011](https://reader034.fdocuments.in/reader034/viewer/2022051401/56812e3d550346895d93b874/html5/thumbnails/24.jpg)
Benefits to Upgrading to new Digital Signals and Sources –
1. HDMI and Display Port found in Newer Laptops – Mac and PC
2. Clearer crisper images – for DVD / VCR Videos - Laptops and PC graphics and Text - Digital Doc Cam images
Upgrade requires new Media Presentation Source Switcher
Classroom Technology 2011 / 2012
Classroom Technology Refresh Equipment Overview
• Five switchers in one enclosure:- 3x1 HDMI switcher- 2x1 DVI switcher- 2x1 VGA/HDTV component video switcher- 2x1 composite video switcher- 9x1 analog stereo audio switcher
![Page 25: Colorado State University Classroom Technology Spring 2011](https://reader034.fdocuments.in/reader034/viewer/2022051401/56812e3d550346895d93b874/html5/thumbnails/25.jpg)
Classroom Technology 2011/ 2012
Smart Classroom - Technology Refresh Request Overview
PROPOSED REFRESH ROOMS FOR FY2012
BUILDING ROOM # VIDEO PROJ MAKE MODEL PURCH DATE Control System Switcher Doc Cam DVD Player Proposed Funding
x 1,000
1 AYLESWORTH C108 HITACHI * CP-X445 10-Oct-06 Crestron - OK MPS 112 No Yes 5.775
2 CLARK C238 HITACHI * CP-X445 14-Feb-06 AMX w CP4 MPS 112 No Yes 8.25
3 CLARK C251 HITACHI * CP-X1200 03-Apr-06 AMX w CP4 Extron 5Cr Samsung Yes 8.25
4 CLARK C146 HITACHI * CP-X445 27-Nov-06 Crestron - OK MPS 112 No Yes 10.55
5 ENGINEERING E202 EPSON * 821P 10-Nov-05 AMX w MSP32 INLINE Samsung No 10.55
6 ENGINEERING E103 HITACHI CP-X445 07-Aug-07 AMX w MSP32 INLINE Samsung No 10.55
7 ENGINEERING E203 HITACHI * CP-X445 10-Aug-07 AMX w MSP32 INLINE Samsung No 10.55
8 ENGINEERING B004 HITACHI * CP-X445 02-Nov-07 AMX w MSP32 None No No 8.25
9 GUGGENHEIM 107 HITACHI * CP-X1250 02-Jun-06 AMX - AXU-CG10 Extron 7SC Samsung No 8.25
10 MICROBIOLOGY A108 HITACHI * CP-X445 15-Oct-07 AMX w CP4 None Avervsion Yes 4.55
11 MICROBIOLOGY A113 HITACHI * CP-X445 03-Jan-06 AMX w CP4 MPS 112 No Yes 5.775
12 MRBSC 111 HITACHI * CP-X445 15-Mar-07 AMX w MSP32 INLINE Samsung No 10.55
13 ROCKWELL 39 HITACHI * CP-X605 10-Aug-06 AMX / AXU-MTP Extron Sys 8 No No 8
14 ROCKWELL 36 HITACHI * CP-X1200 10-Aug-06 AMX / AXU-MTP Extron Sys 8 No No 8
15 ROCKWELL 167 HITACHI * CP-X1200 10-Aug-06 AMX / AXU-MTP Extron Sys 8 No No 8
16 ROCKWELL 170 SANYO PRO EXTRA 01-Jun-03 AMX / AXU-MTP Extron Sys 8 No No 8
17 ROCKWELL 172 HITACHI * CP-X1250 10-Aug-06 AMX / AXU-MTP Extron Sys 8 No No 8
18 WAGAR 132 HITACHI * CP-X445 01-Aug-06 AMX w CP4 MPS 112 No Yes 5.775
19 WAGAR 107B HITACHI * CP-X445 11-Aug-06 AMX w CP4 MPS 112 Yes Wolf Yes 5.775
20 WAGAR 133 HITACHI * CP-X1200 15-Mar-07 AMX w MSP32 MPS 112 No No 5.775
$159,175.00
![Page 26: Colorado State University Classroom Technology Spring 2011](https://reader034.fdocuments.in/reader034/viewer/2022051401/56812e3d550346895d93b874/html5/thumbnails/26.jpg)
UTFAB Funding Criteria
1. Benefit as many students as possible
Almost all students at CSU will benefit.
2. Ability to effectively utilize the fee
Your decision.
3. GA Rooms Not funded by Colleges CFT
It is not.
4. Adherence to budget and accountability
Your decision.
5. Potential for direct student use Absolutely.
6. Effort, thought & clarity in the plan
Your decision.
7. Quantitative usage data A lot.
8. Financial co-sponsorship 1:1 match in infrastructure $$$, plus CRB and UFFAB upgrades.
9. Central/distributed balance Not applicable here.
10. Cost/benefit ratio Your decision.
![Page 27: Colorado State University Classroom Technology Spring 2011](https://reader034.fdocuments.in/reader034/viewer/2022051401/56812e3d550346895d93b874/html5/thumbnails/27.jpg)
UTFAB Spring 2011
Classroom Technology 2011/ 2012
Thank You for your continued Support
Any Questions?