Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report -...

147
Colorado Department of Education School Report Auditor - Buena Vista R-31 BVHS/McGinnis MS Apr 10, 2017

Transcript of Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report -...

Page 1: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education

School Report

Auditor - Buena Vista R-31

BVHS/McGinnis MS

Apr 10, 2017

Page 2: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MSExecutive Summary

District: Auditor - Buena Vista R-31

School Name: BVHS/McGinnis MS

Gross Area (SF): 120,838

Number of Buildings: 4

Replacement Value: $28,322,877

Condition Budget: $16,420,911

Total FCI: 0.58

Adequacy Index:

Summary

Condition Budget SummarySystem Group Replacement Cost Requirement Cost SCI

Electrical System $4,082,937 $4,779,216 1.17

Equipment and Furnishings $1,078,487 $945,028 0.88

Exterior Enclosure $3,701,839 $1,711,069 0.46

Fire Protection $21,331 $25,899 1.21

Furnishings $1,078,865 $324,164 0.30

Apr 10, 2017 Page 1

Page 3: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MSSystem Group Replacement Cost Requirement Cost SCI

HVAC System $3,670,753 $1,244,626 0.34

Interior Construction and Conveyance $5,210,379 $3,306,243 0.63

Plumbing System $1,693,129 $1,759,062 1.04

Site $2,791,166 $2,325,609 0.83

Special Construction $1,277,561 $0 0.00

Structure $3,716,428 $0 0.00

Overall - Total $28,322,877 $16,420,916 0.58

Condition Deficiency by System Group

$1,759,062

$4,779,216

$3,306,243

$945,028

$1,244,626 $1,711,069$25,899

$2,325,609

$324,164

$1,759,062

$4,779,216

$3,306,243

$945,028

$1,244,626 $1,711,069$25,899

$2,325,609

$324,164

System GroupSpecial ConstructionPlumbing SystemElectrical SystemStructureInterior Construction and C...Equipment and FurnishingsHVAC SystemExterior EnclosureFire ProtectionSiteFurnishings

Apr 10, 2017 Page 2

Page 4: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Condition Deficiency Priority Building/Site GSF (SF) FCI 1 - Due within 1 Year of Insepction 2 - Due within 2 Years of Inspection 3 - Due within 5 Years of Inspection 4 - Not Time Based

BVHS/McGinnis MS Industrial Arts

8,640 0.62 $0 $0 $917,422 $0

BVHS/McGinnis MS PE Complex

28,120 0.22 $0 $0 $1,471,333 $0

BVHS/McGinnis MS Site

1,000,000 0.83 $0 $0 $2,325,609 $0

BVHS/McGinnis MS Main

82,638 0.68 $501,548 $55,806 $11,149,198 $0

Apr 10, 2017 Page 3

Page 5: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Site Summary

Replacement Value: $2,791,166 Condition Budget: $2,325,610 Total FCI: 0.83

Site Description

The original site was constructed in 1964. There have been no additions to the site. The campus site contains additional improvements including sports fields, storage sheds, bleachers, concession stands, and press box. There is a creek on one side residential on all the other sides.

Site Condition Budget Summary

System Group Replacement Value Requirement Cost SCI

Site $2,791,166 $2,325,609 0.83

Overall - Total $2,791,166 $2,325,609 0.83

Site Condition Budget DetailsUniformat System Description Lifetime Install

YearNext

RenewalReplacement

CostRequirement

CostSCI

G2021 Parking Lot and Roadway Flexible Pavement -Top Course for unpaved parking area

25 1964 2021 $219,672 $136,197 0.62

G2021 Parking Lot and Roadway Flexible Pavement - Intermediate Course 25 1964 2021 $219,672 $136,197 0.62

G2021 Parking Lot and Roadway Flexible Pavement - Base Course 65 1964 2029 $78,824 $0 0.00

G2022 Parking Lot and Roadway Flexible Pavement - Surface Course 25 1964 2021 $241,211 $301,513 1.25

Apr 10, 2017 Page 4

Page 6: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MSUniformat System Description Lifetime Install

YearNext

RenewalReplacement

CostRequirement

CostSCI

G2023 Parking Lot and Roadway - Curbs, Rails and Barriers - Cast-In-Place Concrete

25 1998 2023 $50,211 $0 0.00

G2025 Parking Lot - Traffic Control - Painted Pavement Markings 10 1998 2021 $10,108 $11,624 1.15

G2031 Pedestrian Pavement - Bituminous Asphalt 25 1998 2023 $18,695 $0 0.00

G2031 Pedestrian Pavement - Base Course 75 1964 2039 $31,358 $0 0.00

G2031 Pedestrian Pavement - Concrete 25 1998 2023 $192,172 $0 0.00

G2041 Site Development - Fencing - Chain Link 20 1964 2021 $155,810 $194,762 1.25

G2042 Site Development - Retaining Wall - Concrete 40 1964 2021 $34,199 $42,749 1.25

G2047 Site Development - Football Field - High School or College 25 1964 2021 $316,791 $395,989 1.25

G2047 Site Development - Track and Field -Cinder Track 25 1964 2021 $64,253 $80,316 1.25

G2052 Landscaping - Mulching - Pea Gravel 20 1998 2021 $15,136 $18,920 1.25

G2054 Landscaping - Grass Sodding 25 1998 2023 $78,299 $0 0.00

G2055 Landscaping - Trees 50 1964 2021 $72,708 $90,885 1.25

G2057 Landscaping - Sprinkler System - Commercial 25 1998 2023 $82,954 $0 0.00

G3011 Water Supply - Potable Water Distribution Piping 30 1964 2021 $85,836 $85,836 1.00

G3021 Sanitary Sewer - Waste Water Piping 50 1964 2021 $156,147 $163,954 1.05

G3061 Fuel Distribution - Gas Service Piping - 2" Steel 30 1964 2021 $484,660 $508,893 1.05

G4013 Site Electrical Distribution - Underground Power Distribution - 225kVA Pad Mounted Transformer

30 1964 2021 $118,440 $148,049 1.25

G4013 Site Electrical Distribution - Underground Power Distribution - 225kVA Pad Mounted Transformer - 2010

30 2010 2039 $29,610 $0 0.00

G4021 Site Lighting - Fixtures & Transformers - Parking Lot 20 1998 2021 $7,780 $9,725 1.25

G4022 Site Lighting - Poles - Aluminum 40 1998 2038 $17,242 $0 0.00

G4022 Site Lighting - Poles - Concrete Base 40 1998 2038 $3,213 $0 0.00

G4023 Site Lighting - Wiring Conduits and Ductbanks - Light Fixture Wiring 50 1998 2048 $6,165 $0 0.00

Overall - Total $2,791,166 $2,325,609 0.83

Apr 10, 2017 Page 5

Page 7: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Site Condition DetailsG2021 - Bases and Sub-Bases

Parking Lot and Roadway Flexible Pavement - Intermediate Course

CRV: $219,672

Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 25 years Obs. Yrs. Rem: 5 years

Quantity: 91,000 SF Unit Cost: $2.41

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Parking lot flexible pavement includes a 3" thick bituminous intermediate binder course for large paved areas. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Requirements:

Parking Lot and Roadway Flexible Pavement - Intermediate Course RenewalCost: $136,197 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Bases and Sub-Bases

Action: Parking Lot and Roadway Flexible Pavement - Intermediate Course Renewal

Description:

Auto generated renewal for Parking Lot and Roadway Flexible Pavement - Intermediate Course. System Description: Parking lot flexible pavement includes a 3" thick bituminous intermediate binder course for large paved areas. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

G2021 - Bases and Sub-BasesParking Lot and Roadway Flexible Pavement - Intermediate Course

CRV: $219,672

Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 25 years Obs. Yrs. Rem: 5 years

Quantity: 91,000 SF Unit Cost: $2.41

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Parking lot flexible pavement includes a 3" thick bituminous intermediate binder course for large paved areas. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

No Requirements

Apr 10, 2017 Page 6

Page 8: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Site Condition DetailsG2021 - Bases and Sub-Bases

Parking Lot and Roadway Flexible Pavement -Top Course for unpaved parking area

CRV: $219,672

Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 25 years Obs. Yrs. Rem: 5 years

Quantity: 91,000 SF Unit Cost: $2.41

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Parking lot flexible pavement includes a 3" thick bituminous top course for large paved areas. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Requirements:

Parking Lot and Roadway Flexible Pavement -Top Course for unpaved parking area RenewalCost: $136,197 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Bases and Sub-Bases

Action: Parking Lot and Roadway Flexible Pavement -Top Course for unpaved parking area Renewal

Description:

Auto generated renewal for Parking Lot and Roadway Flexible Pavement -Top Course for unpaved parking area. System Description: Parking lot flexible pavement includes a 3" thick bituminous top course for large paved areas. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

G2021 - Bases and Sub-BasesParking Lot and Roadway Flexible Pavement -Top Course for unpaved parking area

CRV: $219,672

Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 25 years Obs. Yrs. Rem: 5 years

Quantity: 91,000 SF Unit Cost: $2.41

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Parking lot flexible pavement includes a 3" thick bituminous top course for large paved areas. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 7

Page 9: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Site Condition DetailsRequirements:

Parking Lot and Roadway Flexible Pavement - Surface Course RenewalCost: $301,513 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Paving and Surfacing

Action: Parking Lot and Roadway Flexible Pavement - Surface Course Renewal

Description:

Auto generated renewal for Parking Lot and Roadway Flexible Pavement - Surface Course. System Description: Parking lot flexible pavement includes a 2" thick bituminous wearing surface course for large paved areas. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

G2022 - Paving and SurfacingParking Lot and Roadway Flexible Pavement - Surface Course

CRV: $241,211

Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 25 years Obs. Yrs. Rem: 5 years

Quantity: 91,000 SF Unit Cost: $2.65

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Parking lot flexible pavement includes a 2" thick bituminous wearing surface course for large paved areas. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

No Requirements

G2022 - Paving and SurfacingParking Lot and Roadway Flexible Pavement - Surface Course

CRV: $241,211

Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 25 years Obs. Yrs. Rem: 5 years

Quantity: 91,000 SF Unit Cost: $2.65

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Parking lot flexible pavement includes a 2" thick bituminous wearing surface course for large paved areas. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 8

Page 10: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Site Condition DetailsRequirements:

Parking Lot - Traffic Control - Painted Pavement Markings RenewalCost: $11,624 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Markings and Signage

Action: Parking Lot - Traffic Control - Painted Pavement Markings Renewal

Description:

Auto generated renewal for Parking Lot - Traffic Control - Painted Pavement Markings. System Description: Parking lot includes painted pavement markings used to provide guidance and information to drivers and pedestrians. Includes parking space, directional arrows, crosswalk, accessibility and other parking lot graphics. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

G2025 - Markings and SignageParking Lot - Traffic Control - Painted Pavement Markings

CRV: $10,108

Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 10 years Obs. Yrs. Rem: 5 years

Quantity: 195 Each Unit Cost: $51.83

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Parking lot includes painted pavement markings used to provide guidance and information to drivers and pedestrians. Includes parking space, directional arrows, crosswalk, accessibility and other parking lot graphics. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

No Requirements

G2025 - Markings and SignageParking Lot - Traffic Control - Painted Pavement Markings

CRV: $10,108

Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 10 years Obs. Yrs. Rem: 5 years

Quantity: 195 Each Unit Cost: $51.83

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Parking lot includes painted pavement markings used to provide guidance and information to drivers and pedestrians. Includes parking space, directional arrows, crosswalk, accessibility and other parking lot graphics. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

No Requirements

Apr 10, 2017 Page 9

Page 11: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Site Condition DetailsG2031 - Paving and Surfacing

Pedestrian Pavement - Base Course CRV: $31,358Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 75 years Obs. Yrs. Rem: 23 years

Quantity: 25,000 SF Unit Cost: $1.25

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Pedestrian pavement includes a 6" thick gravel base course for sidewalks.

No Requirements

G2031 - Paving and SurfacingPedestrian Pavement - Base Course CRV: $31,358Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 75 years Obs. Yrs. Rem: 23 years

Quantity: 25,000 SF Unit Cost: $1.25

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Pedestrian pavement includes a 6" thick gravel base course for sidewalks.

Requirements:

Site Development - Fencing - Chain Link RenewalCost: $194,762 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Fences and Gates

Action: Site Development - Fencing - Chain Link Renewal

Description:

Auto generated renewal for Site Development - Fencing - Chain Link. System Description: Site development includes 8 ft high chain link fencing with 2" post. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 10

Page 12: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Site Condition DetailsG2042 - Retaining Walls

Site Development - Retaining Wall - Concrete CRV: $34,199Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 40 years Obs. Yrs. Rem: 5 years

Quantity: 200 LF Unit Cost: $171.00

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Site development includes retaining wall 4-ft. high consisting of cast-in-place on concrete footing. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Requirements:

Site Development - Retaining Wall - Concrete RenewalCost: $42,749 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Retaining Walls

Action: Site Development - Retaining Wall - Concrete Renewal

Description:

Auto generated renewal for Site Development - Retaining Wall - Concrete. System Description: Site development includes retaining wall 4-ft. high consisting of cast-in-place on concrete footing. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

G2042 - Retaining WallsSite Development - Retaining Wall - Concrete CRV: $34,199Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 40 years Obs. Yrs. Rem: 5 years

Quantity: 200 LF Unit Cost: $171.00

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Site development includes retaining wall 4-ft. high consisting of cast-in-place on concrete footing. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 11

Page 13: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Site Condition DetailsRequirements:

Site Development - Track and Field -Cinder Track RenewalCost: $80,316 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Playing Fields

Action: Site Development - Track and Field -Cinder Track Renewal

Description:

Auto generated renewal for Site Development - Track and Field -Cinder Track. System Description: Site development includes asphalt base with cinder surface running track 6 lanes and field to include regulation grass, grandstands, scoreboard, lighting and irrigation system. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

G2047 - Playing FieldsSite Development - Track and Field -Cinder Track

CRV: $64,253

Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 25 years Obs. Yrs. Rem: 5 years

Quantity: 1 Each Unit Cost: $64,252.94

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Site development includes asphalt base with cinder surface running track 6 lanes and field to include regulation grass, grandstands, scoreboard, lighting and irrigation system. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 12

Page 14: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Site Condition DetailsRequirements:

Site Development - Football Field - High School or College RenewalCost: $395,989 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Playing Fields

Action: Site Development - Football Field - High School or College Renewal

Description:

Auto generated renewal for Site Development - Football Field - High School or College. System Description: Site development includes football field to include regulation grass, grandstands, scoreboard, lighting and irrigation system. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 13

Page 15: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Site Condition DetailsG2052 - Erosion Control Measures

Landscaping - Mulching - Pea Gravel CRV: $15,136Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 20 years Obs. Yrs. Rem: 5 years

Quantity: 4,000 SF Unit Cost: $3.78

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Landscaping includes erosion control measures applied in a large ground cover format that includes pea gravel over weed barrier. Years remaining have been increased because the system is currently functioning, however the system is approaching the end of its useful life and should be budgeted for replacement.

Requirements:

Landscaping - Mulching - Pea Gravel RenewalCost: $18,920 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Erosion Control Measures

Action: Landscaping - Mulching - Pea Gravel Renewal

Description:

Auto generated renewal for Landscaping - Mulching - Pea Gravel. System Description: Landscaping includes erosion control measures applied in a large ground cover format that includes pea gravel over weed barrier. Years remaining have been increased because the system is currently functioning, however the system is approaching the end of its useful life and should be budgeted for replacement.

G2052 - Erosion Control MeasuresLandscaping - Mulching - Pea Gravel CRV: $15,136Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 20 years Obs. Yrs. Rem: 5 years

Quantity: 4,000 SF Unit Cost: $3.78

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Landscaping includes erosion control measures applied in a large ground cover format that includes pea gravel over weed barrier. Years remaining have been increased because the system is currently functioning, however the system is approaching the end of its useful life and should be budgeted for replacement.

No Requirements

Apr 10, 2017 Page 14

Page 16: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Site Condition DetailsG2055 - Planting

Landscaping - Trees CRV: $72,708Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 50 years Obs. Yrs. Rem: 5 years

Quantity: 50 Each Unit Cost: $1,454.17

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Landscaping includes trees located around the site. Includes prepared bed. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Requirements:

Landscaping - Trees RenewalCost: $90,885 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Planting

Action: Landscaping - Trees Renewal

Description:

Auto generated renewal for Landscaping - Trees. System Description: Landscaping includes trees located around the site. Includes prepared bed. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

G2055 - PlantingLandscaping - Trees CRV: $72,708Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 50 years Obs. Yrs. Rem: 5 years

Quantity: 50 Each Unit Cost: $1,454.17

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Landscaping includes trees located around the site. Includes prepared bed. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 15

Page 17: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Site Condition DetailsNo Requirements

G2057 - Irrigation SystemsLandscaping - Sprinkler System - Commercial CRV: $82,954Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 25 years Obs. Yrs. Rem: 7 years

Quantity: 102,000 SF Unit Cost: $0.81

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Landscaping includes a commercial type irrigation system typical for lawns; estimated 2 inch supply.

Requirements:

Water Supply - Potable Water Distribution Piping RenewalCost: $85,836 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Potable Water Distribution and Storage

Action: Water Supply - Potable Water Distribution Piping Renewal

Description:

Auto generated renewal for Water Supply - Potable Water Distribution Piping. System Description: Water supply includes underground potable water distribution piping with excavation and backfill. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

G2057 - Irrigation SystemsLandscaping - Sprinkler System - Commercial CRV: $82,954Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 25 years Obs. Yrs. Rem: 7 years

Quantity: 102,000 SF Unit Cost: $0.81

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Landscaping includes a commercial type irrigation system typical for lawns; estimated 2 inch supply.

Apr 10, 2017 Page 16

Page 18: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Site Condition DetailsRequirements:

Sanitary Sewer - Waste Water Piping RenewalCost: $163,954 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Piping

Action: Sanitary Sewer - Waste Water Piping Renewal

Description:

Auto generated renewal for Sanitary Sewer - Waste Water Piping. System Description: Sanitary sewer includes underground waste water drainage piping; excludes manholes. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

G3021 - PipingSanitary Sewer - Waste Water Piping CRV: $156,147Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 50 years Obs. Yrs. Rem: 5 years

Quantity: 1,100 LF Unit Cost: $141.95

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Sanitary sewer includes underground waste water drainage piping; excludes manholes. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Requirements:

Fuel Distribution - Gas Service Piping - 2" Steel RenewalCost: $508,893 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Fuel Piping

Action: Fuel Distribution - Gas Service Piping - 2" Steel Renewal

Description:

Auto generated renewal for Fuel Distribution - Gas Service Piping - 2" Steel. System Description: Fuel distribution includes direct buried gas service piping. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 17

Page 19: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Site Condition DetailsG4013 - Underground Power Distribution

Site Electrical Distribution - Underground Power Distribution - 225kVA Pad Mounted Transformer

CRV: $118,440

Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 30 years Obs. Yrs. Rem: 5 years

Quantity: 4 Each Unit Cost: $29,609.88

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Site electrical distribution includes a 220kVA pad mounted transformer rated at 25kV – 208/120V, 3 phase, 4 wire,4 located around site. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Requirements:

Site Electrical Distribution - Underground Power Distribution - 225kVA Pad Mounted Transformer RenewalCost: $148,049 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Underground Power Distribution

Action: Site Electrical Distribution - Underground Power Distribution - 225kVA Pad Mounted Transformer Renewal

Description:

Auto generated renewal for Site Electrical Distribution - Underground Power Distribution - 225kVA Pad Mounted Transformer. System Description: Site electrical distribution includes a 220kVA pad mounted transformer rated at 25kV – 208/120V, 3 phase, 4 wire,4 located around site. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

G4013 - Underground Power DistributionSite Electrical Distribution - Underground Power Distribution - 225kVA Pad Mounted Transformer

CRV: $118,440

Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 30 years Obs. Yrs. Rem: 5 years

Quantity: 4 Each Unit Cost: $29,609.88

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Site electrical distribution includes a 220kVA pad mounted transformer rated at 25kV – 208/120V, 3 phase, 4 wire,4 located around site. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

No Requirements

Apr 10, 2017 Page 18

Page 20: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Site Condition DetailsG4021 - Fixtures and Transformers

Site Lighting - Fixtures & Transformers - Parking Lot

CRV: $7,780

Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 20 years Obs. Yrs. Rem: 5 years

Quantity: 5 Each Unit Cost: $1,556.08

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Site lighting includes 400W HID light fixtures for parking/pathway/roadway lighting. Bracket arms are included. Concrete base, pole and circuitry is excluded. Years remaining have been increased because the system is currently functioning, however the system is approaching the end of its useful life and should be budgeted for replacement.

Requirements:

Site Lighting - Fixtures & Transformers - Parking Lot RenewalCost: $9,725 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Fixtures and Transformers

Action: Site Lighting - Fixtures & Transformers - Parking Lot Renewal

Description:

Auto generated renewal for Site Lighting - Fixtures & Transformers - Parking Lot. System Description: Site lighting includes 400W HID light fixtures for parking/pathway/roadway lighting. Bracket arms are included. Concrete base, pole and circuitry is excluded. Years remaining have been increased because the system is currently functioning, however the system is approaching the end of its useful life and should be budgeted for replacement.

G4021 - Fixtures and TransformersSite Lighting - Fixtures & Transformers - Parking Lot

CRV: $7,780

Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 20 years Obs. Yrs. Rem: 5 years

Quantity: 5 Each Unit Cost: $1,556.08

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Site lighting includes 400W HID light fixtures for parking/pathway/roadway lighting. Bracket arms are included. Concrete base, pole and circuitry is excluded. Years remaining have been increased because the system is currently functioning, however the system is approaching the end of its useful life and should be budgeted for replacement.

No Requirements

Apr 10, 2017 Page 19

Page 21: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Site Condition DetailsG4022 - Poles

Site Lighting - Poles - Aluminum CRV: $17,242Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 40 years Obs. Yrs. Rem: 22 years

Quantity: 5 Each Unit Cost: $3,448.48

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Site lighting includes aluminum light poles, 30 feet in height. Light fixtures, bracket arms and circuitry are excluded.

No Requirements

G4022 - PolesSite Lighting - Poles - Aluminum CRV: $17,242Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 40 years Obs. Yrs. Rem: 22 years

Quantity: 5 Each Unit Cost: $3,448.48

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Site lighting includes aluminum light poles, 30 feet in height. Light fixtures, bracket arms and circuitry are excluded.

No Requirements

Apr 10, 2017 Page 20

Page 22: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Summary

Name:BVHS/McGinnis

MS Industrial Arts

Year Constructed: 1990 Size (SF): 8,640

Replacement Value: $1,469,622 Condition Budget: $917,421 Total FCI: 0.62

Building DescriptionThe Buena Vista Industrial Arts, metal and wood shop, is a 1-story building located in Buena Vista, Colorado. There have

Apr 10, 2017 Page 21

Page 23: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MSbeen no additions and no renovations.

Building Condition Budget Summary

System Group Replacement Value Requirement Cost SCI

Structure $321,935 $0 0.00

Exterior Enclosure $313,733 $191,734 0.61

HVAC System $202,818 $249,939 1.23

Plumbing System $111,416 $103,043 0.92

Interior Construction and Conveyance $332,901 $139,182 0.42

Fire Protection $0 $0 0.00

Electrical System $186,819 $233,524 1.25

Overall - Total $1,469,622 $917,422 0.62

Building Condition Budget Details

Uniformat System Description Lifetime Install Year

Next Renewal

Replacement Cost

Requirement Cost

SCI

A Grade Beams 75 1990 2065 $55,295 $0 0.00

A Structural Slab on Grade 75 1990 2065 $108,088 $0 0.00

A Foundation Wall and Footings 75 1990 2065 $63,605 $0 0.00

B10 Single-Story - Steel Framed Roof on Columns 75 1990 2065 $94,947 $0 0.00

B2010 CMU Block Walls - Painted 75 1990 2065 $141,505 $0 0.00

B2010 Wood Shingle Siding 50 1990 2040 $17,057 $0 0.00

B2030 Door Assembly - 3 x 7 30 1990 2020 $11,078 $13,847 1.25

B2030 Overhead Sectional Doors 30 1990 2020 $32,394 $40,493 1.25

B30 Gutters and Downspouts - Aluminum 25 1990 2021 $6,238 $7,798 1.25

B30 Single-Ply Membrane - Fully Adhered 25 1990 2019 $103,677 $129,596 1.25

B3022 Roof Hatch 40 1990 2030 $1,784 $0 0.00

C1010 Interior Windows 50 1990 2040 $8,731 $0 0.00

C1010 CMU Block Walls 50 1990 2040 $113,827 $0 0.00

C1020 Swinging Doors - 3 x 7 HM 50 1990 2040 $85,044 $0 0.00

C1030 Restroom Accessories 25 1990 2021 $11,658 $14,573 1.25

C1030 Toilet Partitions 40 1990 2030 $13,953 $0 0.00

C3010 Painted Finish 10 1990 2021 $25,560 $31,950 1.25

C3020 VCT 10 1990 2021 $5,545 $6,931 1.25

C3020 Concrete - Painted 5 1990 2021 $9,888 $12,360 1.25

C3030 ACT System 20 1990 2021 $49,407 $61,759 1.25

C3030 GWB Taped and Finished 30 1990 2020 $9,287 $11,609 1.25

Apr 10, 2017 Page 22

Page 24: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MSUniformat System Description Lifetime Install

YearNext

RenewalReplacement

CostRequirement

CostSCI

D2010 Custodial/Utility Sinks 30 1990 2020 $3,577 $4,472 1.25

D2010 Water Coolers - Wall-Mounted 20 1990 2021 $1,883 $1,977 1.05

D2010 Restroom Fixtures 30 1990 2020 $27,286 $34,108 1.25

D2020 Water Dist Complete 30 1990 2020 $32,603 $36,516 1.12

D2020 Water Heater - Gas 15 1990 2021 $20,776 $25,970 1.25

D2030 Sanitary Waste - Gravity Disch 50 1990 2040 $25,290 $0 0.00

D3012 Natural Gas Service to Bldg - 2" 40 1990 2030 $2,866 $0 0.00

D3040 Exhaust System - Commercial 15 1990 2021 $65,185 $81,482 1.25

D3040 Exhaust System - Restroom w/Roof Fan 20 1990 2021 $4,686 $5,857 1.25

D3050 Rooftop Unit with Gas Heat 15 1990 2021 $103,931 $129,913 1.25

D3060 DDC System 20 1990 2021 $26,150 $32,687 1.25

D40 Wet Sprinkler System - Building Lacks Sprinkler Stystem 150 1990 2166 $0 $0 0.00

D5012 Main Electrical Service - 800A 208Y/120V 30 1990 2020 $56,344 $70,430 1.25

D5012 Distribution Equipment, Panelboards, and Feeders - 800A 208Y/120V

30 1990 2020 $47,532 $59,415 1.25

D5020 Lighting - Exterior - HID Wall Packs 20 1990 2021 $5,234 $6,542 1.25

D5021 Branch Wiring - Equipment & Devices 30 1990 2020 $24,105 $30,131 1.25

D5022 Lighting Fixtures 20 1990 2021 $40,780 $50,975 1.25

D5092 Emergency Battery Pack Lights/Exit Signs 10 2006 2021 $7,389 $9,237 1.25

D5092 Exit Signs 10 2006 2021 $5,435 $6,794 1.25

Overall - Total $1,469,622 $917,422 0.62

Condition Deficiency by System Group

$233,524

$103,043

$139,182

$191,734 $249,939

$233,524

$103,043

$139,182

$191,734 $249,939

System GroupElectrical SystemPlumbing SystemInterior Construction and C...Exterior EnclosureHVAC System

Apr 10, 2017 Page 23

Page 25: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsA - Substructure

Grade Beams CRV: $55,295Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 75 years Obs. Yrs. Rem: 49 years

Quantity: 400 LF Unit Cost: $138.24

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The substructure includes grade beams with a span of 30-feet and 40-inches deep.

No Requirements

A - SubstructureFoundation Wall and Footings CRV: $63,605Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 75 years Obs. Yrs. Rem: 49 years

Quantity: 370 LF Unit Cost: $171.91

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Basic foundation for building without basement - to include strip footing, 4-ft foundation wall and damp proofing. Also included are underdrains.

No Requirements

A - SubstructureStructural Slab on Grade CRV: $108,088Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 75 years Obs. Yrs. Rem: 49 years

Quantity: 8,640 SF Unit Cost: $12.51

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The building substructure includes a structural slab on grade.

No Requirements

Apr 10, 2017 Page 24

Page 26: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsB10 - Superstructure

Single-Story - Steel Framed Roof on Columns CRV: $94,947Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 75 years Obs. Yrs. Rem: 49 years

Quantity: 8,400 SF Unit Cost: $11.30

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Single-story steel framed building with steel columns and steel joist roof structure. Exterior walls are covered under a separate System

No Requirements

B2010 - Exterior WallsCMU Block Walls - Painted CRV: $141,505Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 75 years Obs. Yrs. Rem: 49 years

Quantity: 7,000 SF Unit Cost: $20.21

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The exterior walls are of painted concrete block.

No Requirements

B2010 - Exterior WallsWood Shingle Siding CRV: $17,057Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 50 years Obs. Yrs. Rem: 24 years

Quantity: 1,200 SF Unit Cost: $14.21

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The exterior walls are of wood shingles and wood stud exterior wall framing.

No Requirements

Apr 10, 2017 Page 25

Page 27: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsB2030 - Exterior Doors

Overhead Sectional Doors CRV: $32,394Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 30 years Obs. Yrs. Rem: 4 years

Quantity: 4 Each Unit Cost: $8,098.50

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Exterior openings include overhead rolling doors with manual operation. System is approaching the end of its life cycle and should be budgeted for replacement.

Requirements:

Overhead Sectional Doors RenewalCost: $40,493 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/20 Prime Sys: Exterior Doors

Action: Overhead Sectional Doors Renewal

Description:

Auto generated renewal for Overhead Sectional Doors. System Description: Exterior openings include overhead rolling doors with manual operation. System is approaching the end of its life cycle and should be budgeted for replacement.

B2030 - Exterior DoorsDoor Assembly - 3 x 7 CRV: $11,078Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 30 years Obs. Yrs. Rem: 4 years

Quantity: 4 Each Unit Cost: $2,769.44

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Exterior doors include 3 x 7 steel door and steel frame with hinges, lockset (lever), exit hardware and closer. Includes painted door and painted frame. System is approaching the end of its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 26

Page 28: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

Door Assembly - 3 x 7 RenewalCost: $13,847 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/20 Prime Sys: Exterior Doors

Action: Door Assembly - 3 x 7 Renewal

Description:

Auto generated renewal for Door Assembly - 3 x 7. System Description: Exterior doors include 3 x 7 steel door and steel frame with hinges, lockset (lever), exit hardware and closer. Includes painted door and painted frame. System is approaching the end of its life cycle and should be budgeted for replacement.

B30 - RoofingSingle-Ply Membrane - Fully Adhered CRV: $103,677Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 25 years Obs. Yrs. Rem: 3 years

Quantity: 8,640 SF Unit Cost: $12.00

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The roof covering is of a single-ply fully adhered membrane with insulation. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Requirements:

Single-Ply Membrane - Fully Adhered RenewalCost: $129,596 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/19 Prime Sys: Roofing

Action: Single-Ply Membrane - Fully Adhered Renewal

Description:

Auto generated renewal for Single-Ply Membrane - Fully Adhered. System Description: The roof covering is of a single-ply fully adhered membrane with insulation. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 27

Page 29: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsB30 - Roofing

Gutters and Downspouts - Aluminum CRV: $6,238Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 25 years Obs. Yrs. Rem: 5 years

Quantity: 600 LF Unit Cost: $10.40

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Rain water is removed from the roof by perimeter aluminum gutters, scuppers and downspouts which discharge to the surrounding property. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Requirements:

Gutters and Downspouts - Aluminum RenewalCost: $7,798 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Roofing

Action: Gutters and Downspouts - Aluminum Renewal

Description:

Auto generated renewal for Gutters and Downspouts - Aluminum. System Description: Rain water is removed from the roof by perimeter aluminum gutters, scuppers and downspouts which discharge to the surrounding property. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

B3022 - Roof HatchesRoof Hatch CRV: $1,784Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 40 years Obs. Yrs. Rem: 14 years

Quantity: 1 Each Unit Cost: $1,784.41

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Roof hatch with insulated curb.

No Requirements

Apr 10, 2017 Page 28

Page 30: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsC1010 - Partitions

Interior Windows CRV: $8,731Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 50 years Obs. Yrs. Rem: 24 years

Quantity: 95 SF Unit Cost: $91.91

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Building interior includes windows.

No Requirements

C1010 - PartitionsCMU Block Walls CRV: $113,827Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 50 years Obs. Yrs. Rem: 24 years

Quantity: 8,000 SF Unit Cost: $14.23

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Interior walls are of 8-in. hollow concrete block, light and regular weight, with no finish. Wall finishes will be addressed in a separate system.

No Requirements

C1020 - Interior DoorsSwinging Doors - 3 x 7 HM CRV: $85,044Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 50 years Obs. Yrs. Rem: 24 years

Quantity: 14 Each Unit Cost: $6,074.58

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Interior doors include rated 3 x 7 steel door and steel frame with hinges, lockset (lever), panic hardware and closer. Includes painted door and painted frame.

No Requirements

Apr 10, 2017 Page 29

Page 31: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsC1030 - Fittings

Restroom Accessories CRV: $11,658Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 25 years Obs. Yrs. Rem: 5 years

Quantity: 8,640 SF Unit Cost: $1.35

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The restroom accessories include mirror, grab bars, paper towel dispenser, toilet paper holder and soap dispenser. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Requirements:

Restroom Accessories RenewalCost: $14,573 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Fittings

Action: Restroom Accessories Renewal

Description:

Auto generated renewal for Restroom Accessories. System Description: The restroom accessories include mirror, grab bars, paper towel dispenser, toilet paper holder and soap dispenser. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

C1030 - FittingsToilet Partitions CRV: $13,953Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 40 years Obs. Yrs. Rem: 14 years

Quantity: 8,640 SF Unit Cost: $1.61

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Restrooms are equipped with ceiling-hung partitions.

No Requirements

Apr 10, 2017 Page 30

Page 32: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsC3010 - Wall Finishes

Painted Finish CRV: $25,560Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 10 years Obs. Yrs. Rem: 5 years

Quantity: 25,000 SF Unit Cost: $1.02

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Interior wall finishes include standard paint finish. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Requirements:

Painted Finish RenewalCost: $31,950 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Wall Finishes

Action: Painted Finish Renewal

Description:

Auto generated renewal for Painted Finish. System Description: Interior wall finishes include standard paint finish. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

C3020 - Floor FinishesVCT CRV: $5,545Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 10 years Obs. Yrs. Rem: 5 years

Quantity: 1,000 SF Unit Cost: $5.55

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Floor finishes include areas of standard VCT flooring and related base. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 31

Page 33: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

VCT RenewalCost: $6,931 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Floor Finishes

Action: VCT Renewal

Description:

Auto generated renewal for VCT. System Description: Floor finishes include areas of standard VCT flooring and related base. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

C3020 - Floor FinishesConcrete - Painted CRV: $9,888Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 5 years Obs. Yrs. Rem: 5 years

Quantity: 7,640 SF Unit Cost: $1.29

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Typical painted concrete with an abrasive textured additive to prevent slipping. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Requirements:

Concrete - Painted RenewalCost: $12,360 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Floor Finishes

Action: Concrete - Painted Renewal

Description:

Auto generated renewal for Concrete - Painted. System Description: Typical painted concrete with an abrasive textured additive to prevent slipping. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 32

Page 34: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsC3030 - Ceiling Finishes

GWB Taped and Finished CRV: $9,287Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 30 years Obs. Yrs. Rem: 4 years

Quantity: 2,000 SF Unit Cost: $4.64

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

GWB ceiling system over 8-ft above floor taped, finished and painted with primer and 2 finish coats. Ceiling on suspension system or fastened to metal or wood furring. System is approaching the end of its life cycle and should be budgeted for replacements.

Requirements:

GWB Taped and Finished RenewalCost: $11,609 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/20 Prime Sys: Ceiling Finishes

Action: GWB Taped and Finished Renewal

Description:

Auto generated renewal for GWB Taped and Finished. System Description: GWB ceiling system over 8-ft above floor taped, finished and painted with primer and 2 finish coats. Ceiling on suspension system or fastened to metal or wood furring. System is approaching the end of its life cycle and should be budgeted for replacements.

C3030 - Ceiling FinishesACT System CRV: $49,407Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 20 years Obs. Yrs. Rem: 5 years

Quantity: 6,640 SF Unit Cost: $7.44

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Standard suspended ACT ceiling system with 2 x 4 regular tiles in 9/16-in. grids. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 33

Page 35: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

ACT System RenewalCost: $61,759 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Ceiling Finishes

Action: ACT System Renewal

Description:

Auto generated renewal for ACT System. System Description: Standard suspended ACT ceiling system with 2 x 4 regular tiles in 9/16-in. grids. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

D2010 - Plumbing FixturesWater Coolers - Wall-Mounted CRV: $1,883Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 20 years Obs. Yrs. Rem: 5 years

Quantity: 8,640 SF Unit Cost: $0.22

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Plumbing fixtures include floor-mounted water coolers. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Requirements:

Water Coolers - Wall-Mounted RenewalCost: $1,977 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Plumbing Fixtures

Action: Water Coolers - Wall-Mounted Renewal

Description:

Auto generated renewal for Water Coolers - Wall-Mounted. System Description: Plumbing fixtures include floor-mounted water coolers. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 34

Page 36: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsD2010 - Plumbing Fixtures

Restroom Fixtures CRV: $27,286Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 30 years Obs. Yrs. Rem: 4 years

Quantity: 8,640 SF Unit Cost: $3.16

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The restroom fixtures include vitreous china urinals and water closets, vitreous china or molded lavatories and showers. The system is approaching the end of its life cycle and should be budgeted for replacement.

Requirements:

Restroom Fixtures RenewalCost: $34,108 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/20 Prime Sys: Plumbing Fixtures

Action: Restroom Fixtures Renewal

Description:

Auto generated renewal for Restroom Fixtures. System Description: The restroom fixtures include vitreous china urinals and water closets, vitreous china or molded lavatories and showers. The system is approaching the end of its life cycle and should be budgeted for replacement.

D2010 - Plumbing FixturesCustodial/Utility Sinks CRV: $3,577Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 30 years Obs. Yrs. Rem: 4 years

Quantity: 8,640 SF Unit Cost: $0.41

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The plumbing fixtures include custodial/utility sinks. The system is approaching the end of its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 35

Page 37: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

Custodial/Utility Sinks RenewalCost: $4,472 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/20 Prime Sys: Plumbing Fixtures

Action: Custodial/Utility Sinks Renewal

Description:

Auto generated renewal for Custodial/Utility Sinks. System Description: The plumbing fixtures include custodial/utility sinks. The system is approaching the end of its life cycle and should be budgeted for replacement.

D2020 - Domestic Water DistributionWater Heater - Gas CRV: $20,776Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 15 years Obs. Yrs. Rem: 5 years

Quantity: 8,640 SF Unit Cost: $2.40

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The domestic hot water is provided by a gas-fired, 155 MBH, commercial-grade water heater, with recirculation pump. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 36

Page 38: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

Water Heater - Gas RenewalCost: $25,970 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Domestic Water Distribution

Action: Water Heater - Gas Renewal

Description:

Auto generated renewal for Water Heater - Gas. System Description: The domestic hot water is provided by a gas-fired, 155 MBH, commercial-grade water heater, with recirculation pump. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

D2020 - Domestic Water DistributionWater Dist Complete CRV: $32,603Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 30 years Obs. Yrs. Rem: 4 years

Quantity: 8,640 SF Unit Cost: $3.77

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The building domestic water distribution system includes a one inch main line, water meter, rpz backflow preventer, with rough ins included. The system is approaching its life cycle and should be budgeted for replacement.

Requirements:

Water Dist Complete RenewalCost: $36,516 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/20 Prime Sys: Domestic Water Distribution

Action: Water Dist Complete Renewal

Description:

Auto generated renewal for Water Dist Complete. System Description: The building domestic water distribution system includes a one inch main line, water meter, rpz backflow preventer, with rough ins included. The system is approaching its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 37

Page 39: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsD2030 - Sanitary Waste

Sanitary Waste - Gravity Disch CRV: $25,290Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 50 years Obs. Yrs. Rem: 24 years

Quantity: 8,640 SF Unit Cost: $2.93

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The building includes a sanitary waste system, of cast iron piping, with gravity discharge to the municipal system.

No Requirements

D3012 - Gas Supply SystemNatural Gas Service to Bldg - 2" CRV: $2,866Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 40 years Obs. Yrs. Rem: 14 years

Quantity: 1 Each Unit Cost: $2,866.47

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The building includes a natural gas supply to Rooftop Units.

No Requirements

D3040 - Distribution SystemsExhaust System - Restroom w/Roof Fan CRV: $4,686Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 20 years Obs. Yrs. Rem: 5 years

Quantity: 8,640 SF Unit Cost: $0.54

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

HVAC ventilation system includes roof-mounted restroom exhaust fans with ducting. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 38

Page 40: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

Exhaust System - Restroom w/Roof Fan RenewalCost: $5,857 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Distribution Systems

Action: Exhaust System - Restroom w/Roof Fan Renewal

Description:

Auto generated renewal for Exhaust System - Restroom w/Roof Fan. System Description: HVAC ventilation system includes roof-mounted restroom exhaust fans with ducting. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

D3040 - Distribution SystemsExhaust System - Commercial CRV: $65,185Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 15 years Obs. Yrs. Rem: 5 years

Quantity: 4,000 SF Unit Cost: $16.30

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The HVAC ventilation system includes a dedicated, high velocity exhaust system for welding stations and wood working shop. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Requirements:

Exhaust System - Commercial RenewalCost: $81,482 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Distribution Systems

Action: Exhaust System - Commercial Renewal

Description:

Auto generated renewal for Exhaust System - Commercial. System Description: The HVAC ventilation system includes a dedicated, high velocity exhaust system for welding stations and wood working shop. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 39

Page 41: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsD3050 - Terminal and Package Units

Rooftop Unit with Gas Heat CRV: $103,931Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 15 years Obs. Yrs. Rem: 5 years

Quantity: 8,640 SF Unit Cost: $12.03

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The HVAC system includes a packaged rooftop unit with gas heating. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Requirements:

Rooftop Unit with Gas Heat RenewalCost: $129,913 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Terminal and Package Units

Action: Rooftop Unit with Gas Heat Renewal

Description:

Auto generated renewal for Rooftop Unit with Gas Heat. System Description: The HVAC system includes a packaged rooftop unit with gas heating. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

D3060 - Controls and InstrumentationDDC System CRV: $26,150Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 20 years Obs. Yrs. Rem: 5 years

Quantity: 8,640 SF Unit Cost: $3.03

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

HVAC controls include a DDC system for system optimization, basic pc control, moderate sensor types and quantities. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 40

Page 42: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

DDC System RenewalCost: $32,687 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Controls and Instrumentation

Action: DDC System Renewal

Description:

Auto generated renewal for DDC System. System Description: HVAC controls include a DDC system for system optimization, basic pc control, moderate sensor types and quantities. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

D40 - Fire ProtectionWet Sprinkler System - Building Lacks Sprinkler Stystem

CRV: $0

Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 150 years Obs. Yrs. Rem: 150 years

Quantity: 0 SF Unit Cost: $9.52

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The fire protection systems include an ordinary hazard wet fire sprinkler system with backflow protection, standpipes, and fire pump.

No Requirements

D5012 - Low Tension Service and Dist.Distribution Equipment, Panelboards, and Feeders - 800A 208Y/120V

CRV: $47,532

Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 30 years Obs. Yrs. Rem: 4 years

Quantity: 8,640 SF Unit Cost: $5.50

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The electrical distribution system for this building includes an average concentration of panelboards, feeders, and associated equipment. The system is approaching the end of its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 41

Page 43: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

Distribution Equipment, Panelboards, and Feeders - 800A 208Y/120V RenewalCost: $59,415 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/20 Prime Sys: Low Tension Service and Dist.

Action: Distribution Equipment, Panelboards, and Feeders - 800A 208Y/120V Renewal

Description:

Auto generated renewal for Distribution Equipment, Panelboards, and Feeders - 800A 208Y/120V. System Description: The electrical distribution system for this building includes an average concentration of panelboards, feeders, and associated equipment. The system is approaching the end of its life cycle and should be budgeted for replacement.

D5012 - Low Tension Service and Dist.Main Electrical Service - 800A 208Y/120V CRV: $56,344Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 30 years Obs. Yrs. Rem: 4 years

Quantity: 1 Each Unit Cost: $56,343.84

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The building includes a typical electrical service, which includes incoming feeders, main panel, and metering. The system is approaching the end of its life cycle and should be budgeted for replacement.

Requirements:

Main Electrical Service - 800A 208Y/120V RenewalCost: $70,430 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/20 Prime Sys: Low Tension Service and Dist.

Action: Main Electrical Service - 800A 208Y/120V Renewal

Description:

Auto generated renewal for Main Electrical Service - 800A 208Y/120V. System Description: The building includes a typical electrical service, which includes incoming feeders, main panel, and metering. The system is approaching the end of its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 42

Page 44: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsD5020 - Lighting and Branch Wiring

Lighting - Exterior - HID Wall Packs CRV: $5,234Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 20 years Obs. Yrs. Rem: 5 years

Quantity: 9 Each Unit Cost: $581.52

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Exterior lighting consists of HID wall pack units. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Requirements:

Lighting - Exterior - HID Wall Packs RenewalCost: $6,542 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Lighting and Branch Wiring

Action: Lighting - Exterior - HID Wall Packs Renewal

Description:

Auto generated renewal for Lighting - Exterior - HID Wall Packs. System Description: Exterior lighting consists of HID wall pack units. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

D5021 - Branch Wiring DevicesBranch Wiring - Equipment & Devices CRV: $24,105Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 30 years Obs. Yrs. Rem: 4 years

Quantity: 8,640 SF Unit Cost: $2.79

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Branch wiring for this building includes a average concentration of interior and exterior branch wiring, devices, and utilization equipment. The system is approaching the end of its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 43

Page 45: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

Branch Wiring - Equipment & Devices RenewalCost: $30,131 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/20 Prime Sys: Branch Wiring Devices

Action: Branch Wiring - Equipment & Devices Renewal

Description:

Auto generated renewal for Branch Wiring - Equipment & Devices. System Description: Branch wiring for this building includes a average concentration of interior and exterior branch wiring, devices, and utilization equipment. The system is approaching the end of its life cycle and should be budgeted for replacement.

D5022 - Lighting EquipmentLighting Fixtures CRV: $40,780Current Age: 27 years Year Installed: 1990

Exp. Use. Life: 20 years Obs. Yrs. Rem: 5 years

Quantity: 8,640 SF Unit Cost: $4.72

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The building includes a average density lighting system. Lighting system includes lighting fixtures, lamps, conduit and wire. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Requirements:

Lighting Fixtures RenewalCost: $50,975 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Lighting Equipment

Action: Lighting Fixtures Renewal

Description:

Auto generated renewal for Lighting Fixtures. System Description: The building includes a average density lighting system. Lighting system includes lighting fixtures, lamps, conduit and wire. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 44

Page 46: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsD5092 - Emergency Light and Power Systems

Exit Signs CRV: $5,435Current Age: 11 years Year Installed: 2006

Exp. Use. Life: 10 years Obs. Yrs. Rem: 5 years

Quantity: 8,640 SF Unit Cost: $0.63

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The emergency lighting system includes the installation of Exit signs. Installation includes: single and double sided Exit signs, conduit, wire, boxes, conduit bends, connections and circuit breakers. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Requirements:

Exit Signs RenewalCost: $6,794 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Emergency Light and Power Systems

Action: Exit Signs Renewal

Description:

Auto generated renewal for Exit Signs. System Description: The emergency lighting system includes the installation of Exit signs. Installation includes: single and double sided Exit signs, conduit, wire, boxes, conduit bends, connections and circuit breakers. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

D5092 - Emergency Light and Power SystemsEmergency Battery Pack Lights/Exit Signs CRV: $7,389Current Age: 11 years Year Installed: 2006

Exp. Use. Life: 10 years Obs. Yrs. Rem: 5 years

Quantity: 8,640 SF Unit Cost: $0.86

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The emergency lighting system includes self-contained battery packs and lights. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 45

Page 47: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

Emergency Battery Pack Lights/Exit Signs RenewalCost: $9,237 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Emergency Light and Power Systems

Action: Emergency Battery Pack Lights/Exit Signs Renewal

Description:

Auto generated renewal for Emergency Battery Pack Lights/Exit Signs. System Description: The emergency lighting system includes self-contained battery packs and lights. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 46

Page 48: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Summary

Name: BVHS/McGinnis MS Main Year Constructed: 1964 Size (SF): 82,638

Replacement Value: $17,237,597 Condition Budget: $11,706,548 Total FCI: 0.68

Building Description

The Buena Vista High School/McGinnis Middle School is a 1-story building located in Buena Vista, CO. The building was constructed in 1964 and there was an addition in 1998. There have been some renovations done. The School has residential

Apr 10, 2017 Page 47

Page 49: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MSneighborhoods on two sides of it, a small creek on another and railroad tracks in front of it.

Building Condition Budget Summary

System Group Replacement Value Requirement Cost SCI

Furnishings $425,483 $324,164 0.76

Electrical System $3,368,924 $3,886,698 1.15

HVAC System $2,583,051 $972,041 0.38

Exterior Enclosure $2,569,700 $1,391,375 0.54

Structure $2,815,815 $0 0.00

Interior Construction and Conveyance $3,248,029 $2,865,133 0.88

Equipment and Furnishings $1,078,487 $945,028 0.88

Fire Protection $21,331 $25,899 1.21

Plumbing System $1,126,776 $1,296,214 1.15

Overall - Total $17,237,597 $11,706,552 0.68

Building Condition Budget Details

Uniformat System Description Lifetime Install Year

Next Renewal

Replacement Cost

Requirement Cost

SCI

A Concrete Footings 75 1964 2039 $189,083 $0 0.00

A Foundation Wall and Footings - No Basement 75 1964 2039 $429,763 $0 0.00

A Structural Slab on Grade 75 1964 2039 $864,930 $0 0.00

A Structural Slab on Grade - 1998 75 1998 2073 $168,888 $0 0.00

A Concrete Footings -1998 75 1998 2073 $36,921 $0 0.00

A Foundation Wall and Footings - No Basement -1998 75 1998 2073 $156,434 $0 0.00

B10 Single-Story - Steel Framed Roof on Columns - 1998 75 1998 2073 $152,593 $0 0.00

B10 Single-Story - Steel Framed Roof on Columns 75 1964 2039 $781,481 $0 0.00

B1014 Accessible Ramp - Exterior Concrete 50 1998 2048 $35,723 $0 0.00

B2010 Solid Brick Walls 75 1964 2039 $892,285 $0 0.00

B2010 CMU Block Walls - Split Face 75 1998 2073 $80,860 $0 0.00

B2010 Metal Paneled Walls 60 1964 2024 $66,797 $0 0.00

B2013 Metal Wall Louvers 50 1998 2048 $58,140 $0 0.00

B2020 Aluminum Windows - 1998 30 1998 2028 $52,370 $0 0.00

B2020 Aluminum Windows 30 1964 2021 $151,872 $189,840 1.25

B2030 Door Assembly - 3 x 7 - 1998 30 1998 2028 $141,241 $0 0.00

B2030 Automatic Openers - 1998 30 1998 2028 $15,857 $0 0.00

B30 Metal Roofing - 1998 50 1998 2048 $123,057 $0 0.00

B30 Metal Roofing - 1996 50 1996 2020 $467,617 $584,522 1.25

Apr 10, 2017 Page 48

Page 50: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MSUniformat System Description Lifetime Install

YearNext

RenewalReplacement

CostRequirement

CostSCI

B30 Gutters and Downspouts - 1998 25 1998 2023 $25,993 $0 0.00

B30 Metal Roofing 50 1964 2020 $467,617 $584,522 1.25

B30 Gutters and Downspouts 25 1964 2021 $25,993 $32,491 1.25

C1010 CMU Block Walls - Plain 50 1964 2021 $355,710 $220,540 0.62

C1010 Solid Brick Inteiror Walls 75 1964 2039 $637,347 $0 0.00

C1010 Windows - 1998 50 1998 2048 $18,381 $0 0.00

C1010 GWB Walls 50 1964 2021 $43,026 $26,676 0.62

C1020 Swinging Doors - 3 x 7 Wd - 1998 50 1998 2048 $83,084 $0 0.00

C1020 Swinging Doors - 3 x 7 Wd 50 1964 2021 $276,945 $346,181 1.25

C1030 Toilet Partitions 40 1964 2021 $117,308 $146,635 1.25

C1030 Restroom Accessories 25 1964 2021 $111,507 $139,384 1.25

C1030 Toilet Partitions - 1998 40 1998 2037 $16,150 $0 0.00

C3010 Ceramic Tile 25 1964 2021 $14,189 $17,737 1.25

C3010 Painted Finish 10 1998 2021 $61,344 $76,680 1.25

C3020 VCT Flooring 10 1964 2021 $110,902 $138,628 1.25

C3020 Wood Flooring 25 1964 2021 $136,203 $170,254 1.25

C3020 Wood Flooring 25 1964 2021 $239,181 $298,977 1.25

C3020 Carpeting - Broadloom 10 1998 2021 $276,732 $345,915 1.25

C3020 VCT Flooring - 1998 10 1998 2021 $110,902 $138,628 1.25

C3030 ACT System 20 1964 2021 $332,142 $415,178 1.25

C3030 Tectum Panel System 25 1964 2021 $197,323 $246,654 1.25

C3030 ACT System - 1998 20 1998 2018 $44,645 $55,806 1.25

C3030 GWB Taped and Finished 30 1964 2021 $65,008 $81,260 1.25

D2010 Restroom Fixtures 30 1964 2021 $260,982 $326,228 1.25

D2010 Water Fountain - Wall-Mounted 20 1964 2021 $18,013 $18,913 1.05

D2010 Laboratory Sinks 30 1998 2028 $14,977 $0 0.00

D2010 Custodial/Utility Sinks 30 1964 2021 $34,214 $42,768 1.25

D2010 Restroom Fixtures - Group Locker Room Showers 30 1964 2021 $46,159 $57,699 1.25

D2020 Water Dist Complete 30 1964 2021 $311,837 $349,258 1.12

D2020 Water Heater - Gas 15 1998 2021 $198,717 $248,396 1.25

D2030 Sanitary Waste - Gravity Disch - 1998 50 1998 2048 $39,515 $0 0.00

D2030 Sanitary Waste - Gravity Disch 50 1964 2021 $202,362 $252,952 1.25

D3012 Natural Gas Service to Bldg - 2" Feed 40 1964 2021 $5,733 $7,166 1.25

D3020 Boiler HW - Gas-Fired w/Redundancy 30 1998 2028 $915,542 $0 0.00

D3040 Exhaust System - Restroom w/Roof Fan 20 1964 2021 $37,497 $46,871 1.25

D3040 Central AHU - Const Volume w/Distribution - 1998 25 1998 2023 $854,939 $0 0.00

Apr 10, 2017 Page 49

Page 51: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MSUniformat System Description Lifetime Install

YearNext

RenewalReplacement

CostRequirement

CostSCI

D3040 Perimeter Heat System - Hydronic Fin Tube 18 1964 2021 $47,236 $52,904 1.12

D3040 Exhaust System - Kitchen - Commercial 15 1964 2021 $24,844 $31,055 1.25

D3040 Central AHU - Const Volume w/Distribution 25 1964 2017 $401,239 $501,548 1.25

D3040 Exhaust System - Restroom w/Roof Fan - 1998 20 1998 2021 $7,322 $9,152 1.25

D3050 Unit Heaters - Hot Water 25 1964 2021 $15,694 $17,578 1.12

D3060 Pneumatic Controls 20 1964 2021 $273,007 $305,767 1.12

D40 Fire Extinguishers - Dry Chem w/Cabinet 30 1964 2021 $3,825 $4,017 1.05

D40 Kitchen Hood Suppression 20 1995 2021 $17,506 $21,882 1.25

D5012 Distribution Equipment, Panelboards, and Feeders - 800A 208Y/120V - 1998

30 1998 2028 $74,269 $0 0.00

D5012 Distribution Equipment, Panelboards, and Feeders - 800A 208Y/120V

30 1964 2021 $380,357 $475,447 1.25

D5012 Main Electrical Service - 800A 208Y/120V 30 1964 2021 $112,688 $140,860 1.25

D5020 Lighting - Exterior - HID Wall Packs 20 1964 2021 $19,190 $23,988 1.25

D5021 Branch Wiring - Equipment & Devices 30 1964 2021 $192,887 $241,109 1.25

D5021 Branch Wiring - Equipment & Devices - 1998 30 1998 2028 $37,663 $0 0.00

D5022 Lighting Fixtures 20 1964 2021 $326,326 $407,908 1.25

D5022 Indoor Sports Arena Lighting – High Bay HID 20 1964 2021 $74,537 $93,172 1.25

D5022 Lighting Fixtures - 1998 20 1998 2021 $63,719 $79,649 1.25

D5031 Scoreboard Single-Sided 15 1964 2021 $9,926 $12,408 1.25

D5032 Intercom System 10 1964 2021 $178,264 $222,831 1.25

D5033 Telephone System 10 1998 2021 $403,848 $428,079 1.06

D5036 Clock System 10 1964 2021 $222,600 $278,250 1.25

D5037 Fire Alarm System 10 1998 2021 $582,554 $728,193 1.25

D5039 D5039 - LAN System 15 1998 2021 $567,432 $601,478 1.06

D5092 Exit Signs 10 2006 2021 $51,985 $64,981 1.25

D5092 Emergency Battery Pack Lights 10 2006 2021 $70,676 $88,345 1.25

E Theater Curtains 25 1964 2021 $51,229 $64,036 1.25

E Food Service Counter 25 1964 2021 $51,998 $64,998 1.25

E Kitchen Equipment 20 1964 2021 $48,174 $60,217 1.25

E Fixed Casework - 1998 25 1998 2023 $322,465 $0 0.00

E Fixed Casework 25 1964 2021 $604,622 $755,777 1.25

E2010 Bleachers - Gymnasium 40 1964 2021 $217,794 $272,242 1.25

E2010 Student Lockers 35 1964 2021 $207,689 $51,922 0.25

Overall - Total $17,237,597 $11,706,552 0.68

Apr 10, 2017 Page 50

Page 52: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Condition Deficiency by System Group

$3,886,698

$1,296,214

$2,865,133

$945,028 $972,041

$1,391,375

$25,899$324,164

$3,886,698

$1,296,214

$2,865,133

$945,028 $972,041

$1,391,375

$25,899$324,164

System GroupElectrical SystemPlumbing SystemInterior Construction and C...Equipment and FurnishingsHVAC SystemExterior EnclosureFire ProtectionFurnishings

Apr 10, 2017 Page 51

Page 53: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsA - Substructure

Concrete Footings CRV: $189,083Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 75 years Obs. Yrs. Rem: 23 years

Quantity: 69,138 SF Unit Cost: $2.73

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Concrete column footings.

No Requirements

A - SubstructureFoundation Wall and Footings - No Basement CRV: $429,763Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 75 years Obs. Yrs. Rem: 23 years

Quantity: 2,500 LF Unit Cost: $171.91

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Basic foundation for building without basement - to include strip footing, 4-ft foundation wall and damp proofing. Also included are underdrains.

No Requirements

A - SubstructureStructural Slab on Grade CRV: $864,930Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 75 years Obs. Yrs. Rem: 23 years

Quantity: 69,138 SF Unit Cost: $12.51

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The building substructure includes a structural slab on grade.

No Requirements

Apr 10, 2017 Page 52

Page 54: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsA - Substructure

Concrete Footings -1998 CRV: $36,921Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 75 years Obs. Yrs. Rem: 57 years

Quantity: 13,500 SF Unit Cost: $2.73

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Concrete column footings.

No Requirements

A - SubstructureFoundation Wall and Footings - No Basement -1998

CRV: $156,434

Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 75 years Obs. Yrs. Rem: 57 years

Quantity: 910 LF Unit Cost: $171.91

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Basic foundation for building without basement - to include strip footing, 4-ft foundation wall and damp proofing. Also included are underdrains.

No Requirements

Apr 10, 2017 Page 53

Page 55: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsA - Substructure

Structural Slab on Grade - 1998 CRV: $168,888Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 75 years Obs. Yrs. Rem: 57 years

Quantity: 13,500 SF Unit Cost: $12.51

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The building substructure includes a structural slab on grade.

No Requirements

B10 - SuperstructureSingle-Story - Steel Framed Roof on Columns CRV: $781,481Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 75 years Obs. Yrs. Rem: 23 years

Quantity: 69,138 SF Unit Cost: $11.30

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Single-story steel framed building with steel columns and steel joist roof structure.

No Requirements

B10 - SuperstructureSingle-Story - Steel Framed Roof on Columns - 1998

CRV: $152,593

Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 75 years Obs. Yrs. Rem: 57 years

Quantity: 13,500 SF Unit Cost: $11.30

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Single-story steel framed building with steel columns and steel joist roof structure.

No Requirements

Apr 10, 2017 Page 54

Page 56: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsB1014 - Ramps

Accessible Ramp - Exterior Concrete CRV: $35,723Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 50 years Obs. Yrs. Rem: 32 years

Quantity: 40 LF Unit Cost: $893.08

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Concrete in place, handicapped ramp w/cheek walls & rails both sides, 5' wide.

No Requirements

B2010 - Exterior WallsMetal Paneled Walls CRV: $66,797Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 60 years Obs. Yrs. Rem: 8 years

Quantity: 6,000 SF Unit Cost: $11.13

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The exterior wall finishes are of metal siding such as corrugated materials.

No Requirements

B2010 - Exterior WallsCMU Block Walls - Split Face CRV: $80,860Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 75 years Obs. Yrs. Rem: 57 years

Quantity: 4,000 SF Unit Cost: $20.21

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The exterior walls are split face block.

No Requirements

Apr 10, 2017 Page 55

Page 57: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsB2010 - Exterior Walls

Solid Brick Walls CRV: $892,285Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 75 years Obs. Yrs. Rem: 23 years

Quantity: 14,000 SF Unit Cost: $63.73

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The exterior walls consist of solid brick construction.

No Requirements

B2013 - Exterior Louvers, Screens, and FencingMetal Wall Louvers CRV: $58,140Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 50 years Obs. Yrs. Rem: 32 years

Quantity: 650 SF Unit Cost: $89.45

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Metal louvers at the exterior of mechanical rooms and penthouses, both for appearance and ventilation.

No Requirements

B2020 - Exterior WindowsAluminum Windows CRV: $151,872Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 30 years Obs. Yrs. Rem: 5 years

Quantity: 1,450 SF Unit Cost: $104.74

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The building includes aluminum framed exterior units with insulating glass. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 56

Page 58: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

Aluminum Windows RenewalCost: $189,840 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Exterior Windows

Action: Aluminum Windows Renewal

Description:

Auto generated renewal for Aluminum Windows. System Description: The building includes aluminum framed exterior units with insulating glass. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

B2020 - Exterior WindowsAluminum Windows - 1998 CRV: $52,370Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 30 years Obs. Yrs. Rem: 12 years

Quantity: 500 SF Unit Cost: $104.74

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The building includes aluminum framed exterior units with insulating glass.

No Requirements

Apr 10, 2017 Page 57

Page 59: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsB2030 - Exterior Doors

Door Assembly - 3 x 7 - 1998 CRV: $141,241Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 30 years Obs. Yrs. Rem: 12 years

Quantity: 51 Each Unit Cost: $2,769.44

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Exterior doors include 3 x 7 steel door and steel frame with hinges, lockset, exit hardware and closer. Includes painted door and painted frame.

No Requirements

B2030 - Exterior DoorsAutomatic Openers - 1998 CRV: $15,857Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 30 years Obs. Yrs. Rem: 12 years

Quantity: 2 Each Unit Cost: $7,928.70

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Automatic openers, commercial, electronic door opener, for single swing door, per opening, incl. motion sensor, 12V control box, motor, handicap actuator buttons and wiring.

No Requirements

Apr 10, 2017 Page 58

Page 60: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsB30 - Roofing

Metal Roofing CRV: $467,617Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 50 years Obs. Yrs. Rem: 4 years

Quantity: 38,000 SF Unit Cost: $12.31

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The roof covering consists of a preformed metal roofing system. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

Metal Roofing RenewalCost: $584,522 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/20 Prime Sys: Roofing

Action: Metal Roofing Renewal

Description:

Auto generated renewal for Metal Roofing. System Description: The roof covering consists of a preformed metal roofing system. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

B30 - RoofingGutters and Downspouts - 1998 CRV: $25,993Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 25 years Obs. Yrs. Rem: 7 years

Quantity: 2,500 LF Unit Cost: $10.40

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Rain water is removed from the roof by perimeter aluminum gutters, scuppers and downspouts which discharge to the surrounding property.

No Requirements

Apr 10, 2017 Page 59

Page 61: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsB30 - Roofing

Gutters and Downspouts CRV: $25,993Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 25 years Obs. Yrs. Rem: 5 years

Quantity: 2,500 LF Unit Cost: $10.40

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Rain water is removed from the roof by perimeter aluminum gutters, scuppers and downspouts which discharge to the surrounding property. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

Gutters and Downspouts RenewalCost: $32,491 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Roofing

Action: Gutters and Downspouts Renewal

Description:

Auto generated renewal for Gutters and Downspouts. System Description: Rain water is removed from the roof by perimeter aluminum gutters, scuppers and downspouts which discharge to the surrounding property. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

B30 - RoofingMetal Roofing - 1996 CRV: $467,617Current Age: 21 years Year Installed: 1996

Exp. Use. Life: 50 years Obs. Yrs. Rem: 4 years

Quantity: 38,000 SF Unit Cost: $12.31

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The roof covering consists of a preformed metal roofing system. Shortened the life cycle of the system due to the poor quality of the material and the poor quality of the installation.

Apr 10, 2017 Page 60

Page 62: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

Metal Roofing - 1996 RenewalCost: $584,522 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/20 Prime Sys: Roofing

Action: Metal Roofing - 1996 Renewal

Description:

Auto generated renewal for Metal Roofing - 1996. System Description: The roof covering consists of a preformed metal roofing system. Shortened the life cycle of the system due to the poor quality of the material and the poor quality of the installation.

B30 - RoofingMetal Roofing - 1998 CRV: $123,057Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 50 years Obs. Yrs. Rem: 32 years

Quantity: 10,000 SF Unit Cost: $12.31

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The roof covering consists of a preformed metal roofing system.

No Requirements

C1010 - PartitionsWindows - 1998 CRV: $18,381Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 50 years Obs. Yrs. Rem: 32 years

Quantity: 200 SF Unit Cost: $91.91

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Building interior includes windows and storefront partitions.

No Requirements

Apr 10, 2017 Page 61

Page 63: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsC1010 - Partitions

Solid Brick Inteiror Walls CRV: $637,347Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 75 years Obs. Yrs. Rem: 23 years

Quantity: 10,000 SF Unit Cost: $63.73

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The interior walls consist of solid brick construction.

No Requirements

C1010 - PartitionsGWB Walls CRV: $43,026Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 50 years Obs. Yrs. Rem: 5 years

Quantity: 10,000 SF Unit Cost: $4.30

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The building interior includes GWB partitions, taped and finished, but not painted. Wall finishes will be addressed in a separate system. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

GWB Walls RenewalCost: $26,676 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Partitions

Action: GWB Walls Renewal

Description:

Auto generated renewal for GWB Walls. System Description: The building interior includes GWB partitions, taped and finished, but not painted. Wall finishes will be addressed in a separate system. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 62

Page 64: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsC1010 - Partitions

CMU Block Walls - Plain CRV: $355,710Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 50 years Obs. Yrs. Rem: 5 years

Quantity: 25,000 SF Unit Cost: $14.23

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Interior walls are of 8-in. hollow concrete block, light and regular weight, with no finish. Wall finishes will be addressed in a separate system. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

CMU Block Walls - Plain RenewalCost: $220,540 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Partitions

Action: CMU Block Walls - Plain Renewal

Description:

Auto generated renewal for CMU Block Walls - Plain. System Description: Interior walls are of 8-in. hollow concrete block, light and regular weight, with no finish. Wall finishes will be addressed in a separate system. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

C1020 - Interior DoorsSwinging Doors - 3 x 7 Wd CRV: $276,945Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 50 years Obs. Yrs. Rem: 5 years

Quantity: 90 Each Unit Cost: $3,077.17

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Interior doors include rated 3 x 7 wood door and steel frame, hinges, lockset, panic hardware and closer. Includes finished door and frame. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 63

Page 65: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

Swinging Doors - 3 x 7 Wd RenewalCost: $346,181 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Interior Doors

Action: Swinging Doors - 3 x 7 Wd Renewal

Description:

Auto generated renewal for Swinging Doors - 3 x 7 Wd. System Description: Interior doors include rated 3 x 7 wood door and steel frame, hinges, lockset, panic hardware and closer. Includes finished door and frame. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

C1020 - Interior DoorsSwinging Doors - 3 x 7 Wd - 1998 CRV: $83,084Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 50 years Obs. Yrs. Rem: 32 years

Quantity: 27 Each Unit Cost: $3,077.17

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Interior doors include rated 3 x 7 wood door and steel frame with hinges, lockset, panic hardware and closer. Includes finished door and frame.

No Requirements

C1030 - FittingsRestroom Accessories CRV: $111,507Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 25 years Obs. Yrs. Rem: 5 years

Quantity: 82,638 SF Unit Cost: $1.35

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The restroom accessories include mirror, grab bars, paper towel dispenser and disposal, toilet paper holder and soap dispenser. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 64

Page 66: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

Restroom Accessories RenewalCost: $139,384 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Fittings

Action: Restroom Accessories Renewal

Description:

Auto generated renewal for Restroom Accessories. System Description: The restroom accessories include mirror, grab bars, paper towel dispenser and disposal, toilet paper holder and soap dispenser. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

C1030 - FittingsToilet Partitions CRV: $117,308Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 40 years Obs. Yrs. Rem: 5 years

Quantity: 72,638 SF Unit Cost: $1.61

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Restrooms are equipped with wall-hung partitions. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 65

Page 67: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

Toilet Partitions RenewalCost: $146,635 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Fittings

Action: Toilet Partitions Renewal

Description:

Auto generated renewal for Toilet Partitions. System Description: Restrooms are equipped with wall-hung partitions. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

C1030 - FittingsToilet Partitions - 1998 CRV: $16,150Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 40 years Obs. Yrs. Rem: 21 years

Quantity: 10,000 SF Unit Cost: $1.61

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Restrooms are equipped with wall-hung partitions.

No Requirements

Apr 10, 2017 Page 66

Page 68: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsC3010 - Wall Finishes

Ceramic Tile CRV: $14,189Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 25 years Obs. Yrs. Rem: 5 years

Quantity: 1,000 SF Unit Cost: $14.19

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Building wall coverings include 4-in. x 4-in. thin set ceramic decorator tiles. Tile job includes wainscot with bullnose trim. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

Ceramic Tile RenewalCost: $17,737 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Wall Finishes

Action: Ceramic Tile Renewal

Description:

Auto generated renewal for Ceramic Tile. System Description: Building wall coverings include 4-in. x 4-in. thin set ceramic decorator tiles. Tile job includes wainscot with bullnose trim. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

C3010 - Wall FinishesPainted Finish CRV: $61,344Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 10 years Obs. Yrs. Rem: 5 years

Quantity: 60,000 SF Unit Cost: $1.02

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Interior wall finishes include standard paint finish. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 67

Page 69: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

Painted Finish RenewalCost: $76,680 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Wall Finishes

Action: Painted Finish Renewal

Description:

Auto generated renewal for Painted Finish. System Description: Interior wall finishes include standard paint finish. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

C3020 - Floor FinishesCarpeting - Broadloom CRV: $276,732Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 10 years Obs. Yrs. Rem: 5 years

Quantity: 28,638 SF Unit Cost: $9.66

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Floor finishes include carpeting and base in classrooms and hallways. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

Carpeting - Broadloom RenewalCost: $345,915 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Floor Finishes

Action: Carpeting - Broadloom Renewal

Description:

Auto generated renewal for Carpeting - Broadloom. System Description: Floor finishes include carpeting and base in classrooms and hallways. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 68

Page 70: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsC3020 - Floor Finishes

Wood Flooring CRV: $239,181Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 25 years Obs. Yrs. Rem: 5 years

Quantity: 7,000 SF Unit Cost: $34.17

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Floor finishes include finished wood strip flooring and finished wood base. Assumed on concrete over sleepers. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

Wood Flooring RenewalCost: $298,977 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Floor Finishes

Action: Wood Flooring Renewal

Description:

Auto generated renewal for Wood Flooring. System Description: Floor finishes include finished wood strip flooring and finished wood base. Assumed on concrete over sleepers. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 69

Page 71: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsC3020 - Floor Finishes

VCT Flooring CRV: $110,902Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 10 years Obs. Yrs. Rem: 5 years

Quantity: 20,000 SF Unit Cost: $5.55

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Floor finishes include areas of VCT flooring and related base. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 70

Page 72: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

VCT Flooring RenewalCost: $138,628 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Floor Finishes

Action: VCT Flooring Renewal

Description:

Auto generated renewal for VCT Flooring. System Description: Floor finishes include areas of VCT flooring and related base. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

C3020 - Floor FinishesWood Flooring CRV: $136,203Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 25 years Obs. Yrs. Rem: 5 years

Quantity: 7,000 SF Unit Cost: $19.46

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Floor finishes include pine strip flooring. Includes finished wood base. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 71

Page 73: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

Wood Flooring RenewalCost: $170,254 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Floor Finishes

Action: Wood Flooring Renewal

Description:

Auto generated renewal for Wood Flooring. System Description: Floor finishes include pine strip flooring. Includes finished wood base. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

C3020 - Floor FinishesVCT Flooring - 1998 CRV: $110,902Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 10 years Obs. Yrs. Rem: 5 years

Quantity: 20,000 SF Unit Cost: $5.55

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Floor finishes include areas of standard VCT flooring and related base. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

VCT Flooring - 1998 RenewalCost: $138,628 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Floor Finishes

Action: VCT Flooring - 1998 Renewal

Description:

Auto generated renewal for VCT Flooring - 1998. System Description: Floor finishes include areas of standard VCT flooring and related base. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 72

Page 74: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsC3030 - Ceiling Finishes

GWB Taped and Finished CRV: $65,008Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 30 years Obs. Yrs. Rem: 5 years

Quantity: 14,000 SF Unit Cost: $4.64

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

GWB ceiling system taped, finished and painted with primer and 2 finish coats. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

GWB Taped and Finished RenewalCost: $81,260 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Ceiling Finishes

Action: GWB Taped and Finished Renewal

Description:

Auto generated renewal for GWB Taped and Finished. System Description: GWB ceiling system taped, finished and painted with primer and 2 finish coats. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

C3030 - Ceiling FinishesACT System CRV: $332,142Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 20 years Obs. Yrs. Rem: 5 years

Quantity: 44,638 SF Unit Cost: $7.44

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Ceiling finishes included suspended ACT system with 2 x 4 tiles in 9/16-in. grids. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 73

Page 75: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

ACT System RenewalCost: $415,178 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Ceiling Finishes

Action: ACT System Renewal

Description:

Auto generated renewal for ACT System. System Description: Ceiling finishes included suspended ACT system with 2 x 4 tiles in 9/16-in. grids. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

C3030 - Ceiling FinishesACT System - 1998 CRV: $44,645Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 20 years Obs. Yrs. Rem: 2 years

Quantity: 6,000 SF Unit Cost: $7.44

Insp. Date: 11/20/16 Inspector: Roger Doris

System Description:

Ceiling finishes included suspended ACT system with 2 x 4 tiles in 9/16-in. grids. System is approaching the end of its life and should be budgeted for replacement.

Requirements:

ACT System - 1998 RenewalCost: $55,806 Priority: 2 - Due within 2 Years of Inspection

Action Date: 11/20/18 Prime Sys: Ceiling Finishes

Action: ACT System - 1998 Renewal

Description:

Auto generated renewal for ACT System - 1998. System Description: Ceiling finishes included suspended ACT system with 2 x 4 tiles in 9/16-in. grids. System is approaching the end of its life and should be budgeted for replacement.

Apr 10, 2017 Page 74

Page 76: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsC3030 - Ceiling Finishes

Tectum Panel System CRV: $197,323Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 25 years Obs. Yrs. Rem: 5 years

Quantity: 18,000 SF Unit Cost: $10.96

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Tectum ceiling system with acoustical insulation pads. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

Tectum Panel System RenewalCost: $246,654 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Ceiling Finishes

Action: Tectum Panel System Renewal

Description:

Auto generated renewal for Tectum Panel System. System Description: Tectum ceiling system with acoustical insulation pads. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

D2010 - Plumbing FixturesLaboratory Sinks CRV: $14,977Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 30 years Obs. Yrs. Rem: 12 years

Quantity: 2,000 SF Unit Cost: $7.49

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The building plumbing fixtures include stainless steel, chemical-resistant laboratory sinks.

No Requirements

Apr 10, 2017 Page 75

Page 77: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsD2010 - Plumbing Fixtures

Restroom Fixtures - Group Locker Room Showers

CRV: $46,159

Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 30 years Obs. Yrs. Rem: 5 years

Quantity: 2 Each Unit Cost: $23,079.53

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The restroom fixtures include shower heads and controls in a single shower room. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

Restroom Fixtures - Group Locker Room Showers RenewalCost: $57,699 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Plumbing Fixtures

Action: Restroom Fixtures - Group Locker Room Showers Renewal

Description:

Auto generated renewal for Restroom Fixtures - Group Locker Room Showers. System Description: The restroom fixtures include shower heads and controls in a single shower room. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

D2010 - Plumbing FixturesWater Fountain - Wall-Mounted CRV: $18,013Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 20 years Obs. Yrs. Rem: 5 years

Quantity: 82,638 SF Unit Cost: $0.22

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Plumbing fixtures include wall-mounted water fountains. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 76

Page 78: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

Water Fountain - Wall-Mounted RenewalCost: $18,913 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Plumbing Fixtures

Action: Water Fountain - Wall-Mounted Renewal

Description:

Auto generated renewal for Water Fountain - Wall-Mounted. System Description: Plumbing fixtures include wall-mounted water fountains. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

D2010 - Plumbing FixturesRestroom Fixtures CRV: $260,982Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 30 years Obs. Yrs. Rem: 5 years

Quantity: 82,638 SF Unit Cost: $3.16

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The restroom fixtures include urinals, water closets, lavatories and showers. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

Restroom Fixtures RenewalCost: $326,228 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Plumbing Fixtures

Action: Restroom Fixtures Renewal

Description:

Auto generated renewal for Restroom Fixtures. System Description: The restroom fixtures include urinals, water closets, lavatories and showers. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 77

Page 79: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsD2010 - Plumbing Fixtures

Custodial/Utility Sinks CRV: $34,214Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 30 years Obs. Yrs. Rem: 5 years

Quantity: 82,638 SF Unit Cost: $0.41

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The plumbing fixtures include custodial/utility sinks. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

Custodial/Utility Sinks RenewalCost: $42,768 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Plumbing Fixtures

Action: Custodial/Utility Sinks Renewal

Description:

Auto generated renewal for Custodial/Utility Sinks. System Description: The plumbing fixtures include custodial/utility sinks. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

D2020 - Domestic Water DistributionWater Heater - Gas CRV: $198,717Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 15 years Obs. Yrs. Rem: 5 years

Quantity: 82,638 SF Unit Cost: $2.40

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The domestic hot water is provided by a gas-fired, 155 MBH, commercial-grade water heater, with recirculation pump. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 78

Page 80: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

Water Heater - Gas RenewalCost: $248,396 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Domestic Water Distribution

Action: Water Heater - Gas Renewal

Description:

Auto generated renewal for Water Heater - Gas. System Description: The domestic hot water is provided by a gas-fired, 155 MBH, commercial-grade water heater, with recirculation pump. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

D2020 - Domestic Water DistributionWater Dist Complete CRV: $311,837Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 30 years Obs. Yrs. Rem: 5 years

Quantity: 82,638 SF Unit Cost: $3.77

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The building domestic water distribution system includes a four inch main line, water meter, rpz backflow preventer, with rough ins included. This System does not include a water heater. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

Water Dist Complete RenewalCost: $349,258 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Domestic Water Distribution

Action: Water Dist Complete Renewal

Description:

Auto generated renewal for Water Dist Complete. System Description: The building domestic water distribution system includes a four inch main line, water meter, rpz backflow preventer, with rough ins included. This System does not include a water heater. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 79

Page 81: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsD2030 - Sanitary Waste

Sanitary Waste - Gravity Disch CRV: $202,362Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 50 years Obs. Yrs. Rem: 5 years

Quantity: 69,135 SF Unit Cost: $2.93

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The building includes a sanitary waste system, of cast iron piping, with gravity discharge to the municipal system. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

Sanitary Waste - Gravity Disch RenewalCost: $252,952 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Sanitary Waste

Action: Sanitary Waste - Gravity Disch Renewal

Description:

Auto generated renewal for Sanitary Waste - Gravity Disch. System Description: The building includes a sanitary waste system, of cast iron piping, with gravity discharge to the municipal system. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

D2030 - Sanitary WasteSanitary Waste - Gravity Disch - 1998 CRV: $39,515Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 50 years Obs. Yrs. Rem: 32 years

Quantity: 13,500 SF Unit Cost: $2.93

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The building includes a sanitary waste system, of cast iron piping, with gravity discharge to the municipal system.

No Requirements

Apr 10, 2017 Page 80

Page 82: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsD3012 - Gas Supply System

Natural Gas Service to Bldg - 2" Feed CRV: $5,733Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 40 years Obs. Yrs. Rem: 5 years

Quantity: 2 Each Unit Cost: $2,866.47

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The building includes a natural gas supply to boilers or kitchen. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

Natural Gas Service to Bldg - 2" Feed RenewalCost: $7,166 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Gas Supply System

Action: Natural Gas Service to Bldg - 2" Feed Renewal

Description:

Auto generated renewal for Natural Gas Service to Bldg - 2" Feed. System Description: The building includes a natural gas supply to boilers or kitchen. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

D3020 - Heat Generating SystemsBoiler HW - Gas-Fired w/Redundancy CRV: $915,542Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 30 years Obs. Yrs. Rem: 12 years

Quantity: 82,638 SF Unit Cost: $11.08

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Heat is provided by a gas-fired hot water boiler. Full redundancy is included.

No Requirements

Apr 10, 2017 Page 81

Page 83: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsD3040 - Distribution Systems

Exhaust System - Kitchen - Commercial CRV: $24,844Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 15 years Obs. Yrs. Rem: 5 years

Quantity: 2,000 SF Unit Cost: $12.42

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The ventilation system includes a kitchen exhaust system, with welded duct and insulation. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

Exhaust System - Kitchen - Commercial RenewalCost: $31,055 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Distribution Systems

Action: Exhaust System - Kitchen - Commercial Renewal

Description:

Auto generated renewal for Exhaust System - Kitchen - Commercial. System Description: The ventilation system includes a kitchen exhaust system, with welded duct and insulation. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

D3040 - Distribution SystemsCentral AHU - Const Volume w/Distribution CRV: $401,239Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 25 years Obs. Yrs. Rem: 1 years

Quantity: 24,000 SF Unit Cost: $16.72

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The HVAC system includes constant volume air handling units, distribution ductwork, diffusers and plenum return. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and due to Radon concerns should be budgeted for replacement.

Apr 10, 2017 Page 82

Page 84: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

Central AHU - Const Volume w/Distribution RenewalCost: $501,548 Priority: 1 - Due within 1 Year of Insepction

Action Date: 10/20/17 Prime Sys: Distribution Systems

Action: Central AHU - Const Volume w/Distribution Renewal

Description:

Auto generated renewal for Central AHU - Const Volume w/Distribution. System Description: The HVAC system includes constant volume air handling units, distribution ductwork, diffusers and plenum return. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and due to Radon concerns should be budgeted for replacement.

D3040 - Distribution SystemsPerimeter Heat System - Hydronic Fin Tube CRV: $47,236Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 18 years Obs. Yrs. Rem: 5 years

Quantity: 4,000 SF Unit Cost: $11.81

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

HVAC distribution includes a two-pipe system of heating hot water, with perimeter units. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

Perimeter Heat System - Hydronic Fin Tube RenewalCost: $52,904 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Distribution Systems

Action: Perimeter Heat System - Hydronic Fin Tube Renewal

Description:

Auto generated renewal for Perimeter Heat System - Hydronic Fin Tube. System Description: HVAC distribution includes a two-pipe system of heating hot water, with perimeter units. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 83

Page 85: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsD3040 - Distribution Systems

Exhaust System - Restroom w/Roof Fan CRV: $37,497Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 20 years Obs. Yrs. Rem: 5 years

Quantity: 69,138 SF Unit Cost: $0.54

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

HVAC ventilation system includes roof-mounted restroom exhaust fans with ducting. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

Exhaust System - Restroom w/Roof Fan RenewalCost: $46,871 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Distribution Systems

Action: Exhaust System - Restroom w/Roof Fan Renewal

Description:

Auto generated renewal for Exhaust System - Restroom w/Roof Fan. System Description: HVAC ventilation system includes roof-mounted restroom exhaust fans with ducting. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

D3040 - Distribution SystemsCentral AHU - Const Volume w/Distribution - 1998

CRV: $854,939

Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 25 years Obs. Yrs. Rem: 7 years

Quantity: 51,138 SF Unit Cost: $16.72

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The HVAC system includes constant volume air handling units, distribution ductwork, diffusers and plenum return.

No Requirements

Apr 10, 2017 Page 84

Page 86: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsD3040 - Distribution Systems

Exhaust System - Restroom w/Roof Fan - 1998 CRV: $7,322Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 20 years Obs. Yrs. Rem: 5 years

Quantity: 13,500 SF Unit Cost: $0.54

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

HVAC ventilation system includes roof-mounted restroom exhaust fans with ducting. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

Exhaust System - Restroom w/Roof Fan - 1998 RenewalCost: $9,152 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Distribution Systems

Action: Exhaust System - Restroom w/Roof Fan - 1998 Renewal

Description:

Auto generated renewal for Exhaust System - Restroom w/Roof Fan - 1998. System Description: HVAC ventilation system includes roof-mounted restroom exhaust fans with ducting. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

D3050 - Terminal and Package UnitsUnit Heaters - Hot Water CRV: $15,694Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 25 years Obs. Yrs. Rem: 5 years

Quantity: 7,500 SF Unit Cost: $2.09

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Heating is provided by suspended, forced hot water unit heaters. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 85

Page 87: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

Unit Heaters - Hot Water RenewalCost: $17,578 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Terminal and Package Units

Action: Unit Heaters - Hot Water Renewal

Description:

Auto generated renewal for Unit Heaters - Hot Water. System Description: Heating is provided by suspended, forced hot water unit heaters. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

D3060 - Controls and InstrumentationPneumatic Controls CRV: $273,007Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 20 years Obs. Yrs. Rem: 5 years

Quantity: 40,000 SF Unit Cost: $6.83

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The building includes pneumatic HVAC control system with air supply, moderate controls, moderate sensor types and quantities. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 86

Page 88: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

Pneumatic Controls RenewalCost: $305,767 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Controls and Instrumentation

Action: Pneumatic Controls Renewal

Description:

Auto generated renewal for Pneumatic Controls. System Description: The building includes pneumatic HVAC control system with air supply, moderate controls, moderate sensor types and quantities. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

D40 - Fire ProtectionFire Extinguishers - Dry Chem w/Cabinet CRV: $3,825Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 30 years Obs. Yrs. Rem: 5 years

Quantity: 82,638 SF Unit Cost: $0.05

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Handheld type dry chemical fire extinguishers are located throughout the building. Includes cabinets. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 87

Page 89: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

Fire Extinguishers - Dry Chem w/Cabinet RenewalCost: $4,017 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Fire Protection

Action: Fire Extinguishers - Dry Chem w/Cabinet Renewal

Description:

Auto generated renewal for Fire Extinguishers - Dry Chem w/Cabinet. System Description: Handheld type dry chemical fire extinguishers are located throughout the building. Includes cabinets. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

D40 - Fire ProtectionKitchen Hood Suppression CRV: $17,506Current Age: 22 years Year Installed: 1995

Exp. Use. Life: 20 years Obs. Yrs. Rem: 5 years

Quantity: 2 Each Unit Cost: $9,725.37

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

System includes a R-102 chemical fire suppression system for a typical commercial kitchen. Fire suppression includes fusible links, manual pull stations, 3 gallon tanks, nozzles, and control panels. Hood not included. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

Kitchen Hood Suppression RenewalCost: $21,882 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Fire Protection

Action: Kitchen Hood Suppression Renewal

Description:

Auto generated renewal for Kitchen Hood Suppression. System Description: System includes a R-102 chemical fire suppression system for a typical commercial kitchen. Fire suppression includes fusible links, manual pull stations, 3 gallon tanks, nozzles, and control panels. Hood not included. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 88

Page 90: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsD5012 - Low Tension Service and Dist.

Distribution Equipment, Panelboards, and Feeders - 800A 208Y/120V

CRV: $380,357

Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 30 years Obs. Yrs. Rem: 5 years

Quantity: 69,138 SF Unit Cost: $5.50

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The electrical distribution system for this building includes an average concentration of panelboards, feeders, and associated equipment. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

Distribution Equipment, Panelboards, and Feeders - 800A 208Y/120V RenewalCost: $475,447 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Low Tension Service and Dist.

Action: Distribution Equipment, Panelboards, and Feeders - 800A 208Y/120V Renewal

Description:

Auto generated renewal for Distribution Equipment, Panelboards, and Feeders - 800A 208Y/120V. System Description: The electrical distribution system for this building includes an average concentration of panelboards, feeders, and associated equipment. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

D5012 - Low Tension Service and Dist.Distribution Equipment, Panelboards, and Feeders - 800A 208Y/120V - 1998

CRV: $74,269

Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 30 years Obs. Yrs. Rem: 12 years

Quantity: 13,500 SF Unit Cost: $5.50

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The electrical distribution system for this building includes an average concentration of panelboards, feeders, and associated equipment.

No Requirements

Apr 10, 2017 Page 89

Page 91: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsD5012 - Low Tension Service and Dist.

Main Electrical Service - 800A 208Y/120V CRV: $112,688Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 30 years Obs. Yrs. Rem: 5 years

Quantity: 2 Each Unit Cost: $56,343.84

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The building includes a typical electrical service, which includes incoming feeders, main panel, and metering. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

Main Electrical Service - 800A 208Y/120V RenewalCost: $140,860 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Low Tension Service and Dist.

Action: Main Electrical Service - 800A 208Y/120V Renewal

Description:

Auto generated renewal for Main Electrical Service - 800A 208Y/120V. System Description: The building includes a typical electrical service, which includes incoming feeders, main panel, and metering. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 90

Page 92: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsD5020 - Lighting and Branch Wiring

Lighting - Exterior - HID Wall Packs CRV: $19,190Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 20 years Obs. Yrs. Rem: 5 years

Quantity: 33 Each Unit Cost: $581.52

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Exterior lighting consists of HID wall pack units. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

Lighting - Exterior - HID Wall Packs RenewalCost: $23,988 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Lighting and Branch Wiring

Action: Lighting - Exterior - HID Wall Packs Renewal

Description:

Auto generated renewal for Lighting - Exterior - HID Wall Packs. System Description: Exterior lighting consists of HID wall pack units. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 91

Page 93: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsD5021 - Branch Wiring Devices

Branch Wiring - Equipment & Devices CRV: $192,887Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 30 years Obs. Yrs. Rem: 5 years

Quantity: 69,138 SF Unit Cost: $2.79

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Branch wiring for this building includes interior and exterior branch wiring, devices, and utilization equipment. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

Branch Wiring - Equipment & Devices RenewalCost: $241,109 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Branch Wiring Devices

Action: Branch Wiring - Equipment & Devices Renewal

Description:

Auto generated renewal for Branch Wiring - Equipment & Devices. System Description: Branch wiring for this building includes interior and exterior branch wiring, devices, and utilization equipment. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

D5021 - Branch Wiring DevicesBranch Wiring - Equipment & Devices - 1998 CRV: $37,663Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 30 years Obs. Yrs. Rem: 12 years

Quantity: 13,500 SF Unit Cost: $2.79

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Branch wiring for this building includes interior and exterior branch wiring, devices, and utilization equipment.

No Requirements

Apr 10, 2017 Page 92

Page 94: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsD5022 - Lighting Equipment

Indoor Sports Arena Lighting – High Bay HID CRV: $74,537Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 20 years Obs. Yrs. Rem: 5 years

Quantity: 20 Each Unit Cost: $3,726.87

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The school indoors sport area includes a High Bay lighting system. System includes high bay HID fixtures, controls and feeders. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

Indoor Sports Arena Lighting – High Bay HID RenewalCost: $93,172 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Lighting Equipment

Action: Indoor Sports Arena Lighting – High Bay HID Renewal

Description:

Auto generated renewal for Indoor Sports Arena Lighting – High Bay HID. System Description: The school indoors sport area includes a High Bay lighting system. System includes high bay HID fixtures, controls and feeders. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 93

Page 95: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsD5022 - Lighting Equipment

Lighting Fixtures CRV: $326,326Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 20 years Obs. Yrs. Rem: 5 years

Quantity: 69,138 SF Unit Cost: $4.72

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The building includes a lighting system. Lighting system includes lighting fixtures, lamps, conduit and wire. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

Lighting Fixtures RenewalCost: $407,908 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Lighting Equipment

Action: Lighting Fixtures Renewal

Description:

Auto generated renewal for Lighting Fixtures. System Description: The building includes a lighting system. Lighting system includes lighting fixtures, lamps, conduit and wire. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 94

Page 96: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsD5022 - Lighting Equipment

Lighting Fixtures - 1998 CRV: $63,719Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 20 years Obs. Yrs. Rem: 5 years

Quantity: 13,500 SF Unit Cost: $4.72

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The building includes a lighting system. Lighting system includes lighting fixtures, lamps, conduit and wire. Extend life cycle due to how well the system is wearing, but it is getting to the end of its life cycle and should be budgeted for replacement.

Requirements:

Lighting Fixtures - 1998 RenewalCost: $79,649 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Lighting Equipment

Action: Lighting Fixtures - 1998 Renewal

Description:

Auto generated renewal for Lighting Fixtures - 1998. System Description: The building includes a lighting system. Lighting system includes lighting fixtures, lamps, conduit and wire. Extend life cycle due to how well the system is wearing, but it is getting to the end of its life cycle and should be budgeted for replacement.

D5031 - Public Address and Music SystemsScoreboard Single-Sided CRV: $9,926Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 15 years Obs. Yrs. Rem: 5 years

Quantity: 2 Each Unit Cost: $4,963.06

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The building has a scoreboard system. This system includes a wall-hung scoreboard. The scoreboard also includes LED scoring system, LED clocking system, as well as PA and sound capabilities. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 95

Page 97: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

Scoreboard Single-Sided RenewalCost: $12,408 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Public Address and Music Systems

Action: Scoreboard Single-Sided Renewal

Description:

Auto generated renewal for Scoreboard Single-Sided. System Description: The building has a scoreboard system. This system includes a wall-hung scoreboard. The scoreboard also includes LED scoring system, LED clocking system, as well as PA and sound capabilities. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

D5032 - Intercommunication and Paging SystemIntercom System CRV: $178,264Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 10 years Obs. Yrs. Rem: 5 years

Quantity: 120,000 SF Unit Cost: $1.49

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The building includes an intercom system for the entire campus. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

Intercom System RenewalCost: $222,831 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Intercommunication and Paging System

Action: Intercom System Renewal

Description:

Auto generated renewal for Intercom System. System Description: The building includes an intercom system for the entire campus. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 96

Page 98: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsD5033 - Telephone Systems

Telephone System CRV: $403,848Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 10 years Obs. Yrs. Rem: 5 years

Quantity: 120,000 SF Unit Cost: $3.37

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The building includes a telephone system for the entire campus. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

Telephone System RenewalCost: $428,079 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Telephone Systems

Action: Telephone System Renewal

Description:

Auto generated renewal for Telephone System. System Description: The building includes a telephone system for the entire campus. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

D5036 - Clock and Program SystemsClock System CRV: $222,600Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 10 years Obs. Yrs. Rem: 5 years

Quantity: 2 Each Unit Cost: $111,300.10

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Centralized automatic clock system. Clock system includes head end equipment, single and double sided clocks, conduit, wire, and fittings. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 97

Page 99: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

Clock System RenewalCost: $278,250 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Clock and Program Systems

Action: Clock System Renewal

Description:

Auto generated renewal for Clock System. System Description: Centralized automatic clock system. Clock system includes head end equipment, single and double sided clocks, conduit, wire, and fittings. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

D5037 - Fire Alarm SystemsFire Alarm System CRV: $582,554Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 10 years Obs. Yrs. Rem: 5 years

Quantity: 120,000 SF Unit Cost: $4.85

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

This building includes an average density fire alarm system. The fire alarm system includes: head end equipment, pull stations at all exit doors, audio/visual strobes, visual strobes, smokes in some rooms, conduit, wire and connections. The square footage includes the whole campus. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

Fire Alarm System RenewalCost: $728,193 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Fire Alarm Systems

Action: Fire Alarm System Renewal

Description:

Auto generated renewal for Fire Alarm System. System Description: This building includes an average density fire alarm system. The fire alarm system includes: head end equipment, pull stations at all exit doors, audio/visual strobes, visual strobes, smokes in some rooms, conduit, wire and connections. The square footage includes the whole campus. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 98

Page 100: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsD5039 - Local Area Networks

D5039 - LAN System CRV: $567,432Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 15 years Obs. Yrs. Rem: 5 years

Quantity: 120,000 SF Unit Cost: $4.73

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Building includes a local area network system. The square footage includes the entire campus. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

D5039 - LAN System RenewalCost: $601,478 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Local Area Networks

Action: D5039 - LAN System Renewal

Description:

Auto generated renewal for D5039 - LAN System. System Description: Building includes a local area network system. The square footage includes the entire campus. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

D5092 - Emergency Light and Power SystemsExit Signs CRV: $51,985Current Age: 11 years Year Installed: 2006

Exp. Use. Life: 10 years Obs. Yrs. Rem: 5 years

Quantity: 82,638 SF Unit Cost: $0.63

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The emergency lighting system includes the installation of Exit signs. Installation includes: single and double sided Exit signs, conduit, wire, boxes, conduit bends, connections and circuit breakers. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 99

Page 101: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

Exit Signs RenewalCost: $64,981 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Emergency Light and Power Systems

Action: Exit Signs Renewal

Description:

Auto generated renewal for Exit Signs. System Description: The emergency lighting system includes the installation of Exit signs. Installation includes: single and double sided Exit signs, conduit, wire, boxes, conduit bends, connections and circuit breakers. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

D5092 - Emergency Light and Power SystemsEmergency Battery Pack Lights CRV: $70,676Current Age: 11 years Year Installed: 2006

Exp. Use. Life: 10 years Obs. Yrs. Rem: 5 years

Quantity: 82,638 SF Unit Cost: $0.86

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The emergency lighting system includes self-contained battery packs and lights. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

Emergency Battery Pack Lights RenewalCost: $88,345 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Emergency Light and Power Systems

Action: Emergency Battery Pack Lights Renewal

Description:

Auto generated renewal for Emergency Battery Pack Lights. System Description: The emergency lighting system includes self-contained battery packs and lights. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 100

Page 102: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsE - Equipment and Furnishings

Fixed Casework CRV: $604,622Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 25 years Obs. Yrs. Rem: 5 years

Quantity: 1,500 LF Unit Cost: $403.08

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Building includes average plastic laminate casework including wall and undercounter cabinets and countertops, without appliances. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

Fixed Casework RenewalCost: $755,777 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Equipment and Furnishings

Action: Fixed Casework Renewal

Description:

Auto generated renewal for Fixed Casework. System Description: Building includes average plastic laminate casework including wall and undercounter cabinets and countertops, without appliances. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

E - Equipment and FurnishingsFood Service Counter CRV: $51,998Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 25 years Obs. Yrs. Rem: 5 years

Quantity: 20 LF Unit Cost: $2,599.91

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Furnishings include food service tables, straight counters and curved counters. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 101

Page 103: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

Food Service Counter RenewalCost: $64,998 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Equipment and Furnishings

Action: Food Service Counter Renewal

Description:

Auto generated renewal for Food Service Counter. System Description: Furnishings include food service tables, straight counters and curved counters. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

E - Equipment and FurnishingsTheater Curtains CRV: $51,229Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 25 years Obs. Yrs. Rem: 5 years

Quantity: 1,500 SF Unit Cost: $34.15

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Equipment and furnishings include theater curtains. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

Theater Curtains RenewalCost: $64,036 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Equipment and Furnishings

Action: Theater Curtains Renewal

Description:

Auto generated renewal for Theater Curtains. System Description: Equipment and furnishings include theater curtains. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 102

Page 104: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsE - Equipment and Furnishings

Fixed Casework - 1998 CRV: $322,465Current Age: 19 years Year Installed: 1998

Exp. Use. Life: 25 years Obs. Yrs. Rem: 7 years

Quantity: 800 LF Unit Cost: $403.08

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Building includes average plastic laminate casework including wall and undercounter cabinets and countertops, without appliances.

No Requirements

E - Equipment and FurnishingsKitchen Equipment CRV: $48,174Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 20 years Obs. Yrs. Rem: 5 years

Quantity: 1 Each Unit Cost: $48,173.57

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Equipment and furnishings includes kitchen equipment. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

Kitchen Equipment RenewalCost: $60,217 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Equipment and Furnishings

Action: Kitchen Equipment Renewal

Description:

Auto generated renewal for Kitchen Equipment. System Description: Equipment and furnishings includes kitchen equipment. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 103

Page 105: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsE2010 - Fixed Furnishings

Bleachers - Gymnasium CRV: $217,794Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 40 years Obs. Yrs. Rem: 5 years

Quantity: 400 Each Unit Cost: $544.48

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Stationary wood bleachers in the gymnasium. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Requirements:

Bleachers - Gymnasium RenewalCost: $272,242 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Fixed Furnishings

Action: Bleachers - Gymnasium Renewal

Description:

Auto generated renewal for Bleachers - Gymnasium. System Description: Stationary wood bleachers in the gymnasium. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

E2010 - Fixed FurnishingsStudent Lockers CRV: $207,689Current Age: 53 years Year Installed: 1964

Exp. Use. Life: 35 years Obs. Yrs. Rem: 5 years

Quantity: 500 LF Unit Cost: $415.38

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Fixed furnishings include student lockers. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 104

Page 106: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

Student Lockers RenewalCost: $51,922 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Fixed Furnishings

Action: Student Lockers Renewal

Description:

Auto generated renewal for Student Lockers. System Description: Fixed furnishings include student lockers. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 105

Page 107: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Summary

Name:BVHS/McGinnis

MS PE Complex

Year Constructed: 1977 Size (SF): 28,120

Replacement Value: $6,726,650 Condition Budget: $1,471,332 Total FCI: 0.22

Building DescriptionThe Buena Vista PE Complex, is a 2-story building with no basement, located in Buena Vista, Colorado. There have been no

Apr 10, 2017 Page 106

Page 108: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MSadditions. The boilers were updated in 2010, a new gym floor and bleachers were installed in 2000 and new exit signs were installed in 2006.

Building Condition Budget Summary

System Group Replacement Value Requirement Cost SCI

Interior Construction and Conveyance $1,629,450 $301,928 0.19

Electrical System $527,195 $658,994 1.25

Exterior Enclosure $818,406 $127,960 0.16

HVAC System $884,883 $22,646 0.03

Furnishings $653,382 $0 0.00

Fire Protection $0 $0 0.00

Plumbing System $454,937 $359,805 0.79

Special Construction $1,198,052 $0 0.00

Structure $560,346 $0 0.00

Overall - Total $6,726,650 $1,471,333 0.22

Building Condition Budget Details

Uniformat System Description Lifetime Install Year

Next Renewal

Replacement Cost

Requirement Cost

SCI

A Foundation Wall and Footings - No Basement 75 1977 2052 $171,905 $0 0.00

A Structural Slab on Grade 75 1977 2052 $250,204 $0 0.00

A Grade Beams 75 1977 2052 $138,237 $0 0.00

B10 Multi-Story - Steel 75 2016 2052 $1,198,052 $0 0.00

B2010 Metal Paneled Walls 60 1977 2037 $445,312 $0 0.00

B2020 Aluminum Windows 30 1977 2021 $26,185 $32,731 1.25

B2030 Door Assembly 3x7 30 1977 2021 $55,389 $69,236 1.25

B30 Gutters and Downspouts - Aluminum 25 1977 2021 $20,794 $25,993 1.25

B30 Metal Roofing 50 1977 2027 $270,726 $0 0.00

C1010 CMU Block Walls 50 1977 2027 $711,420 $0 0.00

C1020 Swinging Doors 50 1977 2027 $224,760 $0 0.00

C1030 Toilet Partitions 40 1977 2021 $45,413 $56,766 1.25

C1030 Restroom Accessories 25 1977 2021 $37,944 $47,430 1.25

C20 Stairs 75 1977 2052 $35,633 $0 0.00

C3010 Painted Finish 10 1977 2021 $51,120 $63,900 1.25

C3020 VCT 10 1977 2021 $27,726 $34,657 1.25

C3020 Concrete 5 1977 2021 $25,884 $32,355 1.25

C3020 Wood Flooring 25 2000 2024 $341,688 $0 0.00

Apr 10, 2017 Page 107

Page 109: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MSUniformat System Description Lifetime Install

YearNext

RenewalReplacement

CostRequirement

CostSCI

C3030 ACT System - 1977 20 1977 2021 $37,204 $46,505 1.25

C3030 ACT System-1999 20 1999 2024 $74,408 $0 0.00

C3030 GWB Taped and Finished 30 1977 2021 $16,252 $20,315 1.25

D2010 Restroom Fixtures 30 1977 2021 $88,807 $111,009 1.25

D2010 Restroom Fixtures - Group Locker Room Showers 30 1977 2021 $92,318 $115,398 1.25

D2010 Water Coolers 20 2005 2025 $6,129 $0 0.00

D2010 Custodial/Utility Sinks 30 1977 2021 $11,642 $14,553 1.25

D2020 Water Dist Complete 30 1977 2021 $106,112 $118,845 1.12

D2020 Water Heater 15 2010 2025 $67,619 $0 0.00

D2030 Sanitary Waste - Gravity Disch 50 1977 2027 $82,309 $0 0.00

D3012 Natural Gas Service to Bldg - 2" Feed 40 1977 2021 $2,866 $3,583 1.25

D3020 Boiler HW - Gas-Fired w/Redundancy 30 2010 2040 $311,540 $0 0.00

D3040 Exhaust System - Restroom w/Roof Fan 20 1977 2021 $15,251 $19,063 1.25

D3040 Central AHU - Const Volume w/Distribution 25 2010 2035 $470,118 $0 0.00

D3060 DDC System 20 2010 2030 $85,108 $0 0.00

D40 Wet Sprinkler System - Building Lacks Sprinkler Stystem 150 1977 2166 $0 $0 0.00

D5012 Main Electrical Service - 200A 208Y/120V 30 1977 2021 $11,995 $14,993 1.25

D5012 Distribution Equipment, Panelboards, and Feeders - 400A 208Y/120V

30 1977 2021 $118,192 $147,739 1.25

D5021 Branch Wiring - Equipment & Devices 30 1977 2021 $78,452 $98,065 1.25

D5022 Indoor Sports Arena Lighting 20 2000 2020 $134,167 $167,709 1.25

D5022 Lighting Fixtures 20 1977 2021 $132,724 $165,906 1.25

D5031 Scoreboard Single-Sided 15 2000 2021 $9,926 $12,408 1.25

D5092 Exit Signs 10 2006 2021 $17,689 $22,112 1.25

D5092 Emergency Battery Pack Lights and Emergency Lights 10 2006 2021 $24,049 $30,062 1.25

E2010 Bleachers - Gymnasium 40 2010 2050 $653,382 $0 0.00

Overall - Total $6,726,650 $1,471,333 0.22

Apr 10, 2017 Page 108

Page 110: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Condition Deficiency by System Group

$658,994

$359,805

$301,928

$127,960

$22,646

$658,994

$359,805

$301,928

$127,960

$22,646

System GroupElectrical SystemPlumbing SystemInterior Construction and C...Exterior EnclosureHVAC System

Apr 10, 2017 Page 109

Page 111: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsA - Substructure

Grade Beams CRV: $138,237Current Age: 40 years Year Installed: 1977

Exp. Use. Life: 75 years Obs. Yrs. Rem: 36 years

Quantity: 1,000 LF Unit Cost: $138.24

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The substructure includes grade beams with a span of 30-feet and 40-inches deep.

No Requirements

A - SubstructureFoundation Wall and Footings - No Basement CRV: $171,905Current Age: 40 years Year Installed: 1977

Exp. Use. Life: 75 years Obs. Yrs. Rem: 36 years

Quantity: 1,000 LF Unit Cost: $171.91

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Basic foundation for building without basement - to include strip footing, 4-ft foundation wall and damp proofing. Also included are underdrains.

No Requirements

A - SubstructureStructural Slab on Grade CRV: $250,204Current Age: 40 years Year Installed: 1977

Exp. Use. Life: 75 years Obs. Yrs. Rem: 36 years

Quantity: 20,000 SF Unit Cost: $12.51

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The building substructure includes a structural slab on grade.

No Requirements

Apr 10, 2017 Page 110

Page 112: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsB10 - Superstructure

Multi-Story - Steel CRV: $1,198,052Current Age: 1 years Year Installed: 2016

Exp. Use. Life: 75 years Obs. Yrs. Rem: 36 years

Quantity: 28,120 SF Unit Cost: $42.60

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Multi-story steel building includes steel columns, beams, floor pans, and roof structure.

No Requirements

B2010 - Exterior WallsMetal Paneled Walls CRV: $445,312Current Age: 40 years Year Installed: 1977

Exp. Use. Life: 60 years Obs. Yrs. Rem: 21 years

Quantity: 40,000 SF Unit Cost: $11.13

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The exterior wall finishes are of metal siding such as corrugated materials.

No Requirements

Apr 10, 2017 Page 111

Page 113: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsB2020 - Exterior Windows

Aluminum Windows CRV: $26,185Current Age: 40 years Year Installed: 1977

Exp. Use. Life: 30 years Obs. Yrs. Rem: 5 years

Quantity: 250 SF Unit Cost: $104.74

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The building includes aluminum framed exterior units with insulating glass. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Requirements:

Aluminum Windows RenewalCost: $32,731 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Exterior Windows

Action: Aluminum Windows Renewal

Description:

Auto generated renewal for Aluminum Windows. System Description: The building includes aluminum framed exterior units with insulating glass. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

B2030 - Exterior DoorsDoor Assembly 3x7 CRV: $55,389Current Age: 40 years Year Installed: 1977

Exp. Use. Life: 30 years Obs. Yrs. Rem: 5 years

Quantity: 20 Each Unit Cost: $2,769.44

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Exterior doors include 3 x 7 steel door and steel frame with hinges, lockset (lever), exit hardware and closer. Includes painted door and painted frame. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 112

Page 114: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

Door Assembly 3x7 RenewalCost: $69,236 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Exterior Doors

Action: Door Assembly 3x7 Renewal

Description:

Auto generated renewal for Door Assembly 3x7. System Description: Exterior doors include 3 x 7 steel door and steel frame with hinges, lockset (lever), exit hardware and closer. Includes painted door and painted frame. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

B30 - RoofingMetal Roofing CRV: $270,726Current Age: 40 years Year Installed: 1977

Exp. Use. Life: 50 years Obs. Yrs. Rem: 11 years

Quantity: 22,000 SF Unit Cost: $12.31

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The roof covering consists of a preformed metal roofing system, such as corrugated steel or aluminum.

No Requirements

B30 - RoofingGutters and Downspouts - Aluminum CRV: $20,794Current Age: 40 years Year Installed: 1977

Exp. Use. Life: 25 years Obs. Yrs. Rem: 5 years

Quantity: 2,000 LF Unit Cost: $10.40

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Rain water is removed from the roof by perimeter aluminum gutters, scuppers and downspouts which discharge to the surrounding property. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 113

Page 115: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

Gutters and Downspouts - Aluminum RenewalCost: $25,993 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Roofing

Action: Gutters and Downspouts - Aluminum Renewal

Description:

Auto generated renewal for Gutters and Downspouts - Aluminum. System Description: Rain water is removed from the roof by perimeter aluminum gutters, scuppers and downspouts which discharge to the surrounding property. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

C1010 - PartitionsCMU Block Walls CRV: $711,420Current Age: 40 years Year Installed: 1977

Exp. Use. Life: 50 years Obs. Yrs. Rem: 11 years

Quantity: 50,000 SF Unit Cost: $14.23

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Interior walls are of 8-in. hollow concrete block, light and regular weight, with no finish. Wall finishes will be addressed in a separate system.

No Requirements

C1020 - Interior DoorsSwinging Doors CRV: $224,760Current Age: 40 years Year Installed: 1977

Exp. Use. Life: 50 years Obs. Yrs. Rem: 11 years

Quantity: 37 Each Unit Cost: $6,074.58

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Interior doors include rated 3 x 7 steel door and steel frame with hinges, lockset (lever), panic hardware and closer. Includes painted door and painted frame.

No Requirements

Apr 10, 2017 Page 114

Page 116: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsC1030 - Fittings

Restroom Accessories CRV: $37,944Current Age: 40 years Year Installed: 1977

Exp. Use. Life: 25 years Obs. Yrs. Rem: 5 years

Quantity: 28,120 SF Unit Cost: $1.35

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The restroom accessories include mirror, grab bars, paper towel dispenser and toilet paper holder and soap dispenser. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Requirements:

Restroom Accessories RenewalCost: $47,430 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Fittings

Action: Restroom Accessories Renewal

Description:

Auto generated renewal for Restroom Accessories. System Description: The restroom accessories include mirror, grab bars, paper towel dispenser and toilet paper holder and soap dispenser. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

C1030 - FittingsToilet Partitions CRV: $45,413Current Age: 40 years Year Installed: 1977

Exp. Use. Life: 40 years Obs. Yrs. Rem: 5 years

Quantity: 28,120 SF Unit Cost: $1.61

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Restrooms are equipped with ceiling and wall-hung partitions. Years remaining have been increased because the system is currently functioning, however the system is approaching the end of its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 115

Page 117: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

Toilet Partitions RenewalCost: $56,766 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Fittings

Action: Toilet Partitions Renewal

Description:

Auto generated renewal for Toilet Partitions. System Description: Restrooms are equipped with ceiling and wall-hung partitions. Years remaining have been increased because the system is currently functioning, however the system is approaching the end of its useful life and should be budgeted for replacement.

C20 - StairsStairs CRV: $35,633Current Age: 40 years Year Installed: 1977

Exp. Use. Life: 75 years Obs. Yrs. Rem: 36 years

Quantity: 2 Each Unit Cost: $17,816.71

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The interior stairs include 12 risers per flight with landing and 2 flights per story. Approximately 28 LF of center rail plus 28 feet of wall rail per flight included in cost estimate.

No Requirements

C3010 - Wall FinishesPainted Finish CRV: $51,120Current Age: 40 years Year Installed: 1977

Exp. Use. Life: 10 years Obs. Yrs. Rem: 5 years

Quantity: 50,000 SF Unit Cost: $1.02

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Interior wall finishes include standard paint finish. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

Apr 10, 2017 Page 116

Page 118: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

Painted Finish RenewalCost: $63,900 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Wall Finishes

Action: Painted Finish Renewal

Description:

Auto generated renewal for Painted Finish. System Description: Interior wall finishes include standard paint finish. Extended life cycle because the system is still functioning, but the entire system is beyond its life cycle and should be budgeted for replacement.

C3020 - Floor FinishesWood Flooring CRV: $341,688Current Age: 17 years Year Installed: 2000

Exp. Use. Life: 25 years Obs. Yrs. Rem: 8 years

Quantity: 10,000 SF Unit Cost: $34.17

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Floor finishes include oak strip gym floors. Assumed on concrete over sleepers. Includes finished wood base.

No Requirements

C3020 - Floor FinishesVCT CRV: $27,726Current Age: 40 years Year Installed: 1977

Exp. Use. Life: 10 years Obs. Yrs. Rem: 5 years

Quantity: 5,000 SF Unit Cost: $5.55

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Floor finishes include areas of standard VCT flooring and related base. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 117

Page 119: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

VCT RenewalCost: $34,657 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Floor Finishes

Action: VCT Renewal

Description:

Auto generated renewal for VCT. System Description: Floor finishes include areas of standard VCT flooring and related base. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

C3020 - Floor FinishesConcrete CRV: $25,884Current Age: 40 years Year Installed: 1977

Exp. Use. Life: 5 years Obs. Yrs. Rem: 5 years

Quantity: 20,000 SF Unit Cost: $1.29

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Typical painted concrete with an abrasive textured additive to prevent slipping. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Requirements:

Concrete RenewalCost: $32,355 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Floor Finishes

Action: Concrete Renewal

Description:

Auto generated renewal for Concrete. System Description: Typical painted concrete with an abrasive textured additive to prevent slipping. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 118

Page 120: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsC3030 - Ceiling Finishes

GWB Taped and Finished CRV: $16,252Current Age: 40 years Year Installed: 1977

Exp. Use. Life: 30 years Obs. Yrs. Rem: 5 years

Quantity: 3,500 SF Unit Cost: $4.64

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

GWB ceiling system over 8-ft above floor taped, finished and painted with primer and 2 finish coats. Ceiling on suspension system or fastened to metal or wood furring. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Requirements:

GWB Taped and Finished RenewalCost: $20,315 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Ceiling Finishes

Action: GWB Taped and Finished Renewal

Description:

Auto generated renewal for GWB Taped and Finished. System Description: GWB ceiling system over 8-ft above floor taped, finished and painted with primer and 2 finish coats. Ceiling on suspension system or fastened to metal or wood furring. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

C3030 - Ceiling FinishesACT System-1999 CRV: $74,408Current Age: 18 years Year Installed: 1999

Exp. Use. Life: 20 years Obs. Yrs. Rem: 8 years

Quantity: 10,000 SF Unit Cost: $7.44

Insp. Date: 10/25/16 Inspector: Roger Doris

System Description:

Standard suspended ACT ceiling system with 2 x 2 regular tiles in 9/16-in. grids. Extended life cycle due to how well the system is wearing.

No Requirements

Apr 10, 2017 Page 119

Page 121: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsC3030 - Ceiling Finishes

ACT System - 1977 CRV: $37,204Current Age: 40 years Year Installed: 1977

Exp. Use. Life: 20 years Obs. Yrs. Rem: 5 years

Quantity: 5,000 SF Unit Cost: $7.44

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Standard suspended ACT ceiling system with 2 x 2 regular tiles in 9/16-in. grids. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Requirements:

ACT System - 1977 RenewalCost: $46,505 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Ceiling Finishes

Action: ACT System - 1977 Renewal

Description:

Auto generated renewal for ACT System - 1977. System Description: Standard suspended ACT ceiling system with 2 x 2 regular tiles in 9/16-in. grids. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

D2010 - Plumbing FixturesRestroom Fixtures - Group Locker Room Showers

CRV: $92,318

Current Age: 40 years Year Installed: 1977

Exp. Use. Life: 30 years Obs. Yrs. Rem: 5 years

Quantity: 4 Each Unit Cost: $23,079.53

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The restroom fixtures include shower heads and controls in a single shower room. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 120

Page 122: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

Restroom Fixtures - Group Locker Room Showers RenewalCost: $115,398 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Plumbing Fixtures

Action: Restroom Fixtures - Group Locker Room Showers Renewal

Description:

Auto generated renewal for Restroom Fixtures - Group Locker Room Showers. System Description: The restroom fixtures include shower heads and controls in a single shower room. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

D2010 - Plumbing FixturesWater Coolers CRV: $6,129Current Age: 12 years Year Installed: 2005

Exp. Use. Life: 20 years Obs. Yrs. Rem: 9 years

Quantity: 28,120 SF Unit Cost: $0.22

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Plumbing fixtures include wall-mounted water coolers.

No Requirements

D2010 - Plumbing FixturesRestroom Fixtures CRV: $88,807Current Age: 40 years Year Installed: 1977

Exp. Use. Life: 30 years Obs. Yrs. Rem: 5 years

Quantity: 28,120 SF Unit Cost: $3.16

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The restroom fixtures include vitreous china urinals and water closets, vitreous china or molded lavatories and showers. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 121

Page 123: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

Restroom Fixtures RenewalCost: $111,009 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Plumbing Fixtures

Action: Restroom Fixtures Renewal

Description:

Auto generated renewal for Restroom Fixtures. System Description: The restroom fixtures include vitreous china urinals and water closets, vitreous china or molded lavatories and showers. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

D2010 - Plumbing FixturesCustodial/Utility Sinks CRV: $11,642Current Age: 40 years Year Installed: 1977

Exp. Use. Life: 30 years Obs. Yrs. Rem: 5 years

Quantity: 28,120 SF Unit Cost: $0.41

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The plumbing fixtures include custodial/utility sinks. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Requirements:

Custodial/Utility Sinks RenewalCost: $14,553 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Plumbing Fixtures

Action: Custodial/Utility Sinks Renewal

Description:

Auto generated renewal for Custodial/Utility Sinks. System Description: The plumbing fixtures include custodial/utility sinks. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 122

Page 124: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsD2020 - Domestic Water Distribution

Water Heater CRV: $67,619Current Age: 7 years Year Installed: 2010

Exp. Use. Life: 15 years Obs. Yrs. Rem: 9 years

Quantity: 28,120 SF Unit Cost: $2.40

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The domestic hot water is provided by a gas-fired, 155 MBH, commercial-grade water heater, with recirculation pump.

No Requirements

D2020 - Domestic Water DistributionWater Dist Complete CRV: $106,112Current Age: 40 years Year Installed: 1977

Exp. Use. Life: 30 years Obs. Yrs. Rem: 5 years

Quantity: 28,120 SF Unit Cost: $3.77

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The building domestic water distribution system includes a four inch main line, water meter, rpz backflow preventer, with rough ins included. This System does not include a water heater. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Requirements:

Water Dist Complete RenewalCost: $118,845 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Domestic Water Distribution

Action: Water Dist Complete Renewal

Description:

Auto generated renewal for Water Dist Complete. System Description: The building domestic water distribution system includes a four inch main line, water meter, rpz backflow preventer, with rough ins included. This System does not include a water heater. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 123

Page 125: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsD2030 - Sanitary Waste

Sanitary Waste - Gravity Disch CRV: $82,309Current Age: 40 years Year Installed: 1977

Exp. Use. Life: 50 years Obs. Yrs. Rem: 11 years

Quantity: 28,120 SF Unit Cost: $2.93

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The building includes a sanitary waste system, of cast iron piping, with gravity discharge to the municipal system.

No Requirements

D3012 - Gas Supply SystemNatural Gas Service to Bldg - 2" Feed CRV: $2,866Current Age: 40 years Year Installed: 1977

Exp. Use. Life: 40 years Obs. Yrs. Rem: 5 years

Quantity: 1 Each Unit Cost: $2,866.47

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The building includes a natural gas supply to boilers, absorption chillers or kitchen. Years remaining have been increased because the system is currently functioning, however the system is approaching the end of its useful life and should be budgeted for replacement.

Requirements:

Natural Gas Service to Bldg - 2" Feed RenewalCost: $3,583 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Gas Supply System

Action: Natural Gas Service to Bldg - 2" Feed Renewal

Description:

Auto generated renewal for Natural Gas Service to Bldg - 2" Feed. System Description: The building includes a natural gas supply to boilers, absorption chillers or kitchen. Years remaining have been increased because the system is currently functioning, however the system is approaching the end of its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 124

Page 126: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsD3020 - Heat Generating Systems

Boiler HW - Gas-Fired w/Redundancy CRV: $311,540Current Age: 7 years Year Installed: 2010

Exp. Use. Life: 30 years Obs. Yrs. Rem: 24 years

Quantity: 28,120 SF Unit Cost: $11.08

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Heat is provided by a gas-fired hot water boiler. Full redundancy is included.

No Requirements

D3040 - Distribution SystemsCentral AHU - Const Volume w/Distribution CRV: $470,118Current Age: 7 years Year Installed: 2010

Exp. Use. Life: 25 years Obs. Yrs. Rem: 19 years

Quantity: 28,120 SF Unit Cost: $16.72

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The HVAC system includes constant volume air handling units, distribution ductwork, diffusers and plenum return.

No Requirements

D3040 - Distribution SystemsExhaust System - Restroom w/Roof Fan CRV: $15,251Current Age: 40 years Year Installed: 1977

Exp. Use. Life: 20 years Obs. Yrs. Rem: 5 years

Quantity: 28,120 SF Unit Cost: $0.54

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

HVAC ventilation system includes roof-mounted restroom exhaust fans with ducting. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 125

Page 127: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

Exhaust System - Restroom w/Roof Fan RenewalCost: $19,063 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Distribution Systems

Action: Exhaust System - Restroom w/Roof Fan Renewal

Description:

Auto generated renewal for Exhaust System - Restroom w/Roof Fan. System Description: HVAC ventilation system includes roof-mounted restroom exhaust fans with ducting. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

D3060 - Controls and InstrumentationDDC System CRV: $85,108Current Age: 7 years Year Installed: 2010

Exp. Use. Life: 20 years Obs. Yrs. Rem: 14 years

Quantity: 28,120 SF Unit Cost: $3.03

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

HVAC controls include average DDC system for system optimization, basic pc control, moderate sensor types and quantities.

No Requirements

D40 - Fire ProtectionWet Sprinkler System - Building Lacks Sprinkler Stystem

CRV: $0

Current Age: 40 years Year Installed: 1977

Exp. Use. Life: 150 years Obs. Yrs. Rem: 150 years

Quantity: 0 SF Unit Cost: $9.52

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The fire protection systems include an ordinary hazard wet fire sprinkler system with backflow protection, standpipes, and fire pump.

No Requirements

Apr 10, 2017 Page 126

Page 128: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsD5012 - Low Tension Service and Dist.

Distribution Equipment, Panelboards, and Feeders - 400A 208Y/120V

CRV: $118,192

Current Age: 40 years Year Installed: 1977

Exp. Use. Life: 30 years Obs. Yrs. Rem: 5 years

Quantity: 28,120 SF Unit Cost: $4.20

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The electrical distribution system for this building includes panelboards, feeders, and associated equipment. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Requirements:

Distribution Equipment, Panelboards, and Feeders - 400A 208Y/120V RenewalCost: $147,739 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Low Tension Service and Dist.

Action: Distribution Equipment, Panelboards, and Feeders - 400A 208Y/120V Renewal

Description:

Auto generated renewal for Distribution Equipment, Panelboards, and Feeders - 400A 208Y/120V. System Description: The electrical distribution system for this building includes panelboards, feeders, and associated equipment. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

D5012 - Low Tension Service and Dist.Main Electrical Service - 200A 208Y/120V CRV: $11,995Current Age: 40 years Year Installed: 1977

Exp. Use. Life: 30 years Obs. Yrs. Rem: 5 years

Quantity: 1 Each Unit Cost: $11,994.57

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The building includes a typical electrical service, which includes incoming feeders, main panel, and metering. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 127

Page 129: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

Main Electrical Service - 200A 208Y/120V RenewalCost: $14,993 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Low Tension Service and Dist.

Action: Main Electrical Service - 200A 208Y/120V Renewal

Description:

Auto generated renewal for Main Electrical Service - 200A 208Y/120V. System Description: The building includes a typical electrical service, which includes incoming feeders, main panel, and metering. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

D5021 - Branch Wiring DevicesBranch Wiring - Equipment & Devices CRV: $78,452Current Age: 40 years Year Installed: 1977

Exp. Use. Life: 30 years Obs. Yrs. Rem: 5 years

Quantity: 28,120 SF Unit Cost: $2.79

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Branch wiring for this building includes a concentration of interior and exterior branch wiring, devices, and utilization equipment. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Requirements:

Branch Wiring - Equipment & Devices RenewalCost: $98,065 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Branch Wiring Devices

Action: Branch Wiring - Equipment & Devices Renewal

Description:

Auto generated renewal for Branch Wiring - Equipment & Devices. System Description: Branch wiring for this building includes a concentration of interior and exterior branch wiring, devices, and utilization equipment. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 128

Page 130: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsD5022 - Lighting Equipment

Indoor Sports Arena Lighting CRV: $134,167Current Age: 17 years Year Installed: 2000

Exp. Use. Life: 20 years Obs. Yrs. Rem: 4 years

Quantity: 36 Each Unit Cost: $3,726.87

Insp. Date: 10/25/16 Inspector: Roger Doris

System Description:

The school indoors sport area includes a High Bay lighting system. System includes high bay HID fixtures, controls and feeders. This system is approaching the end of its useful life and should be budgeted for replacement.

Requirements:

Indoor Sports Arena Lighting RenewalCost: $167,709 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/25/20 Prime Sys: Lighting Equipment

Action: Indoor Sports Arena Lighting Renewal

Description:

Auto generated renewal for Indoor Sports Arena Lighting. System Description: The school indoors sport area includes a High Bay lighting system. System includes high bay HID fixtures, controls and feeders. This system is approaching the end of its useful life and should be budgeted for replacement.

D5022 - Lighting EquipmentLighting Fixtures CRV: $132,724Current Age: 40 years Year Installed: 1977

Exp. Use. Life: 20 years Obs. Yrs. Rem: 5 years

Quantity: 28,120 SF Unit Cost: $4.72

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The building includes a lighting system. Lighting system includes lighting fixtures, lamps, conduit and wire. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 129

Page 131: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

Lighting Fixtures RenewalCost: $165,906 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Lighting Equipment

Action: Lighting Fixtures Renewal

Description:

Auto generated renewal for Lighting Fixtures. System Description: The building includes a lighting system. Lighting system includes lighting fixtures, lamps, conduit and wire. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

D5031 - Public Address and Music SystemsScoreboard Single-Sided CRV: $9,926Current Age: 17 years Year Installed: 2000

Exp. Use. Life: 15 years Obs. Yrs. Rem: 5 years

Quantity: 2 Each Unit Cost: $4,963.06

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The building has a scoreboard system. This system includes a wall-hung scoreboard. The scoreboard also includes LED scoring system, LED clocking system, as well as PA and sound capabilities. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Requirements:

Scoreboard Single-Sided RenewalCost: $12,408 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Public Address and Music Systems

Action: Scoreboard Single-Sided Renewal

Description:

Auto generated renewal for Scoreboard Single-Sided. System Description: The building has a scoreboard system. This system includes a wall-hung scoreboard. The scoreboard also includes LED scoring system, LED clocking system, as well as PA and sound capabilities. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 130

Page 132: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsD5092 - Emergency Light and Power Systems

Exit Signs CRV: $17,689Current Age: 11 years Year Installed: 2006

Exp. Use. Life: 10 years Obs. Yrs. Rem: 5 years

Quantity: 28,120 SF Unit Cost: $0.63

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The emergency lighting system includes the installation of Exit signs. Installation includes: single and double sided Exit signs, conduit, wire, boxes, conduit bends, connections and circuit breakers. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Requirements:

Exit Signs RenewalCost: $22,112 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Emergency Light and Power Systems

Action: Exit Signs Renewal

Description:

Auto generated renewal for Exit Signs. System Description: The emergency lighting system includes the installation of Exit signs. Installation includes: single and double sided Exit signs, conduit, wire, boxes, conduit bends, connections and circuit breakers. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

D5092 - Emergency Light and Power SystemsEmergency Battery Pack Lights and Emergency Lights

CRV: $24,049

Current Age: 11 years Year Installed: 2006

Exp. Use. Life: 10 years Obs. Yrs. Rem: 5 years

Quantity: 28,120 SF Unit Cost: $0.86

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

The emergency lighting system includes self-contained battery packs and lights. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

Apr 10, 2017 Page 131

Page 133: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsRequirements:

Emergency Battery Pack Lights and Emergency Lights RenewalCost: $30,062 Priority: 3 - Due within 5 Years of Inspection

Action Date: 10/20/21 Prime Sys: Emergency Light and Power Systems

Action: Emergency Battery Pack Lights and Emergency Lights Renewal

Description:

Auto generated renewal for Emergency Battery Pack Lights and Emergency Lights. System Description: The emergency lighting system includes self-contained battery packs and lights. Years remaining have been increased because the system is currently functioning, however the system is beyond its useful life and should be budgeted for replacement.

E2010 - Fixed FurnishingsBleachers - Gymnasium CRV: $653,382Current Age: 7 years Year Installed: 2010

Exp. Use. Life: 40 years Obs. Yrs. Rem: 34 years

Quantity: 1,200 Each Unit Cost: $544.48

Insp. Date: 10/20/16 Inspector: Roger Doris

System Description:

Telescoping bleachers in the gymnasium.

No Requirements

Apr 10, 2017 Page 132

Page 134: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Summary

Name: MS Modular Year Constructed: 2007 Size (SF): 1,440

Replacement Value: $97,841 Condition Budget: $0 Total FCI: 0.00

Building Description

The modular classroom is a pre-fabricated, re-locatable metal frame building with wood siding.

Apr 10, 2017 Page 133

Page 135: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition Budget Summary

System Group Replacement Value Requirement Cost SCI

Structure $18,332 $0 0.00

Special Construction $79,509 $0 0.00

Overall - Total $97,841 $0 0.00

Building Condition Budget Details

Uniformat System Description Lifetime Install Year Next Renewal Replacement Cost Requirement Cost SCI

A Foundation Wall and Footings 75 2007 2082 $13,752 $0 0.00

B1014 Accessible Ramp - Exterior 20 2007 2027 $4,580 $0 0.00

F1010 Modular Office Trailer 30 2007 2036 $79,509 $0 0.00

Overall - Total $97,841 $0 0.00

Condition Deficiency by System GroupSystem Group

Apr 10, 2017 Page 134

Page 136: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MS

Building Condition DetailsA - Substructure

Foundation Wall and Footings CRV: $13,752Current Age: 10 years Year Installed: 2007

Exp. Use. Life: 75 years Obs. Yrs. Rem: 66 years

Quantity: 80 LF Unit Cost: $171.91

Insp. Date: 10/20/16 Inspector: Josh Jones

System Description:

The modular appears to be set on a foundation.

No Requirements

B1014 - RampsAccessible Ramp - Exterior CRV: $4,580Current Age: 10 years Year Installed: 2007

Exp. Use. Life: 20 years Obs. Yrs. Rem: 11 years

Quantity: 50 LF Unit Cost: $91.59

Insp. Date: 10/20/16 Inspector: Josh Jones

System Description:

Wooden exterior ramp including railings. Ramp width is 4 feet.

No Requirements

F1010 - Special StructuresModular Office Trailer CRV: $79,509Current Age: 10 years Year Installed: 2007

Exp. Use. Life: 30 years Obs. Yrs. Rem: 20 years

Quantity: 1 Each Unit Cost: $79,509.29

Insp. Date: 10/20/16 Inspector: Josh Jones

System Description:

The system is for a complete modular trailer including support structure and interior walls and doors. Also included are interior ceiling, floor and wall finishes as well as plumbing fixtures, lighting, power wiring, heating and air conditioning.

No Requirements

Apr 10, 2017 Page 135

Page 137: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MSAdequacy AssessmentTask Description Score Comments

001.0-Are athletic fields approved by the Colorado High School Activities Association?

002.0-Do practice fields meet the school's program requirements? If not comment on deficiencies

003.0-How many lanes/what type of street/highway (arterial, collector, etc.) is the school located on?

003.1-If score is 3 or less for question 3, is there a traffic light or dedicated turn lanes into the school?

004.0-Is the location removed from undesirable business industry traffic and hazards such as: waste disposal; gas wells; railroad tracks; major highways; liquor stores; adult establishments; landfills; waste water treatment plants; chemical plants; other?

005.0-Is there a bus loading and unloading zone with appropriate signage as recommended in the CDE Construction Guidelines 4.1.15.2?

CDE Construction Guidelines 4.1.15.2: When possible, provide a dedicated bus staging and unloading area located away from students, staff, and visitor parking.

006.0-Is there an onsite parent drop off and pick up area with appropriate signage as recommended in the CDE Construction Guidelines 4.1.15.3?

CDE Construction Guidelines 4.1.15.3: Provide an adequate driveway zone for stacking cars on site for parent drop-off/pick-up zones. Drop-off area design should not require backward movement by vehicles, and be one-way in a counterclockwise direction where students are loaded and unloaded directly to the curb/sidewalk. Students should not have to load or unload where they have to cross a vehicle path before entering the building. It is recommended all loading areas have “No Parking” signs posted.

007.0-Are there staff and visitor parking?

007.1-What is the surface of the staff and visitor parking area? Are parking stalls marked?

007.2-Are there marked ADA parking stalls?

008.0-Is there student parking?

008.1-What is the surface of the student parking area? Are parking stalls marked?

008.2-Are there marked ADA parking stalls?

009.0-Is the service delivery area separated from pedestrian traffic, play fields and playgrounds as recommended in the CDE Construction Guidelines 4.1.15.5?

CDE Construction Guidelines 4.1.15.5: Building service loading areas and docks should be independent from other traffic and pedestrian crosswalks. If possible, loading areas shall be located away from school pedestrian entries.

010.0-Are there hard surface walkways that provide circulation around the school?

010.1-Is there a well-marked pedestrian path to the main entry as recommended in the CDE Construction Guidelines 4.1.15.4?

CDE Construction Guidelines 4.1.15.4: Provide well-maintained sidewalks and a designated safe path leading to the school entrance(s).

010.2-Is there permanent site way-finding signage for vehicles and pedestrians and does it direct users appropriately?

Apr 10, 2017 Page 136

Page 138: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MSAdequacy AssessmentTask Description Score Comments

010.3-Are there curb cuts at assessable paths of travel?

011.0-Is there an area for bicycle storage as recommended in the CDE Construction Guidelines 4.1.15.6?

CDE Construction Guidelines 4.1.15.6: Facilities should provide bicycle access and storage if appropriate.

012.0-Are parking areas lit?

012.1-Are school entries lit?

012.2-Are school perimeters lit?

013.0-Does water drain positively away from the school?

013.1-How does the school manage storm water and treatment?

014.0-Are the propane tanks protected and where are they located?

015.0-Is the natural gas service protected?

016.0-Is the site served by a private well or a public water system? (INFO ONLY)

016.1-Are there any concerns over the domestic water in the facility? Please describe in comment section.

016.2-Has the water been tested for lead? If so what were the results? (list test info in comment section i.e. date tested, tested by, etc.)

017.0-Is the site served by a private septic or public waste water system? (INFO ONLY)

018.0-How far away is the nearest fire hydrant from the school building? How many hydrants are serving the site?

019.0-Does the landscaping provide for line of sight for the occupants and local law enforcement? Does it restrict unauthorized access to windows, roofs or other areas?

020.0-Is landscaping watered (play fields, ornamental, all, etc.)? If it is watered, how (by hand, timer, smart system, etc.)? (INFO ONLY)

021.0-Is the site fenced?

021.1-Are ingress and egress gates provided with locking capability?

021.2-Does the fencing system NOT impede the line of sight for either occupants or emergency responders?

021.3-Do gates allow for emergency egress?

022.0-Does the district/school have a backup generator?

022.1-How is the backup generator powered? (INFO ONLY)

023.0-Does the school currently take advantage of passive solar, wind, natural ventilation green roofs, etc.?

024.0-Is major electrical service equipment (Including transformers switchgear and disconnects) located outside? (INFO ONLY)

024.1-Does the electrical system in its existing configuration, from the transformer to the panel, have room for additional electrical capacity?

025.0-Is the school roof controlled for restricted access?

026.0-Is the main entry protected? Describe how, bollards etc.

Apr 10, 2017 Page 137

Page 139: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MSAdequacy AssessmentTask Description Score Comments

027.0-How many exterior points of entry are there? (INFO ONLY)

027.1-Are exterior doors numbered inside and out for communicating with emergency responders?

028.0-What are exterior walls insulated with?

029.0-What types of windows are in the facility?

030.0-Is water draining positively from the roof with no signs of ponding?

030.1-When does/did the warranty of your roof covering expire date)? (INFO ONLY)

031.0-Do the foundation or basement walls have any observable cracks?

032.0-Is the school constructed on a slab on grade? (INFO ONLY)

032.1-Does the slab on grade show signs of heaving or cracking?

033.0-Are there any observable cracks or other areas of failure?

034.0-Are there expansion joints for expansion and contraction of building materials? (INFO ONLY)

035.0-Is the facility leased or owned? (INFO ONLY)

036.0-What type of fuel is the school heated with? (INFO ONLY)

037.0-What type of electrical power is serving the building? (INFO ONLY)

039.0-Is there an updated copy of the Asbestos Management Plan on file?

040.0-Is the school used jointly with the community? (INFO ONLY)

040.1-How many hours/day and days/year is the school available for the community to use? (INFO ONLY)

040.2-Does the school ensure these user groups have an emergency plan with emergency contacts?

040.3-Does the school have staff on duty during these times?

041.0-Does the school have an evacuation plan for staff or students who are unable to self-evacuate?

042.0-Does the school have emergency exiting lighting on an independent electrical service?

043.0-Is there an unobstructed path of egress as recommended in the CDE Construction Guidelines section 4.1.9?

CDE Construction Guidelines section 4.1.9: Means of egress. A continuous and unobstructed path of vertical and horizontal egress travel from any occupied portion of a building or structure to a public way. A means of egress consists of three separate and distinct parts: the exit access, the exit and the exit discharge. Reference 2015 International Building Code, Chapter 2, Definitions. A building code analysis shall be conducted to determine all code requirements.

043.2-Do corridors terminate at an exit or a stairway leading to an exit?

Apr 10, 2017 Page 138

Page 140: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MSAdequacy AssessmentTask Description Score Comments

043.3-Does the path of egress appear accessible for the disabled? Code 402.2 Components.  Accessible routes shall consist of one or more of the following components: walking surfaces with a running slope not steeper than 1:20, doorways, ramps, curb ramps excluding the flared sides, elevators, and platform lifts.  All components of an accessible route shall comply with the applicable requirements of Chapter 4 ADA Design Requirements for Accessible Entrances & Exits.

044.0-What are the measurements of the risers, treads, and stair widths? (INFO ONLY)

045.0-Do classroom doors open as to not obstruct the path of egress?

045.1-Does classroom door hardware support lockdowns, while still allowing egress?

Code Section 1008.1.8. Egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. International Building Code (IBC), 2006 edition, and the International Fire Code (IFC),2006 Edition: 3

045.2-Is door hardware lever (not orbital)?

046.0-Does the school have a copy of their annual fire inspection report on file? If so is it free of any noted deficiencies?

047.0-Is the school provided with a sprinkler system?

048.0-Was the fire alarm system inspected within the last year?

048.1-Is there any noted deficiencies in the last inspection report? If yes please describe

048.2-Is the alarm monitored?

048.3-Describe the type of fire alarm system.

049.0-Is there a basement? (INFO ONLY)

050.0-What is the ceiling/floor assembly constructed of? (INFO ONLY)

051.0-Are there any concerns over the air quality in the facility? Please describe in comment section.

052.0-Has the air been tested for carbon dioxide (CO2)? If so what were the results? (list test info in comment section i.e. date tested, tested by, etc.)

052.1-Has the air been tested for carbon monoxide (CO) near combustion equipment? If so what are the results? (list test info in comment section i.e. date tested, tested by, etc.)

053.0-Does administration routinely use extension cords and multiple outlet receptacles to make up for lack of wall/floor outlets?

054.0-What type of lighting does the school have? (INFO ONLY)

054.1-Does the school utilize energy efficient light fixtures?

055.0-Are there any noticeable odors in the school?

056.0-Does the school have adequate plumbing to meet the program

Apr 10, 2017 Page 139

Page 141: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MSAdequacy AssessmentTask Description Score Comments

requirments?

056.2-Are plumbing fixtures equipped with low flow water saving devices?

059.0-Is there an event alert notification system as recommended in the CDE Construction Guidelines 4.1.11.10?

CDE Construction Guidelines 4.1.11.10: Event alerting and notification (EAN) system. An EAN system that utilizes an intercom / phone system with communication devices located in all classrooms and throughout the school to provide efficient inter-school communications, and communication with local fire, police, and medical agencies during emergency situations.

060.2-Is the facility equipped with automated controlled access as recommended in the CDE Construction Guidelines 4.1.11.3?

CDE Construction Guidelines 4.1.11.3: Automated Locking Mechanisms. Use of automated locking mechanisms (electronic access control) should be considered for exterior doors identified for entry and select interior doors associated with the main entry vestibule.

060.3-Is the facility equipped with door lock/intrusion detection as recommended in the CDE Construction Guidelines 4.1.11.6? Are these systems tied into an emergency power supply?

CDE Construction Guidelines 4.1.11.6: A system shall be put in place to identify, alarm, and notify authorities in the case of unauthorized entry.

062.0-Are hazardous materials safely managed as recommended in the CDE Construction Guidelines section 4.1.10?

CDE Construction Guidelines section 4.1.10: Facilities with safely managed hazardous materials. Potential hazardous materials in building components, which are identified in the Asbestos Hazard Emergency Response Act (AHERA) report, may include: asbestos, radon, lead, lamps and devices containing mercury. Additional hazardous materials may include: science chemicals, cleaning chemicals, blood-borne pathogens, acid neutralization tank for science departments, and bulk fuel storage (UST/AST) management that may be stored by the occupant.

063.0-Is there an emergency nurse's station with a dedicated bathroom and secure area to store student medications?

063.1-Are medications stored in a manner that allows them to be easily transported in the event of an evacuation?

064.0-Does the school have daylight with views in all learning areas?

065.0-Does the school have acoustical materials to reduce ambient noise levels and minimize transfer of noise between classrooms, corridors and other learning areas?

065.1-Are corridor walls insulated for sound?

065.2-Are interior walls other than corridors insulated for sound?

065.3-Is ceiling/floor assembly insulated for sound?

065.4-Is the ceiling/roof assembly insulated?

066.0-Does the school have preschool classrooms as needed for the school program and as recommended in the CDE Construction

Construction Guidelines section 4.3.2.1: Facilities with preschools shall comply with Rules

Apr 10, 2017 Page 140

Page 142: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MSAdequacy AssessmentTask Description Score Comments

Guidelines section 4.3.2.1? Regulating Child Care Centers (Less Than 24-Hour Care) 12 CCR 2509-8 and shall comply with the Colorado Department of Public Health and Safety’s Regulations Governing Child Care, 6 CCR 1010-7.

066.1-Is the preschool space near the other academic programs and an adjacent restroom? Does the space provide convenient access from parent drop-off areas? Are spaces isolated from the "noisy" spaces of the school (e.g. P.E., music, kitchen, etc.)?

066.2-Does the preschool space have adequate casework (cabinets and bookshelves), appropriate storage, sinks, whiteboards, lighting, and technology equipment? Is some of the flooring a "wet area"?

067.0-Does the school have kindergarten classrooms as needed for the school program and as recommended in the CDE Construction Guidelines section 4.3?

CDE Construction Guidelines section 4.3: Kindergarten Classrooms shall have a minimum classroom size of 675 SF or 38 SF per pupil, whichever is greater.

067.1-Are the kinder spaces near the other academic programs and an adjacent restroom? Do the spaces provide convenient access from parent drop-off areas? Are the spaces isolated from the "noisy" spaces of the school (e.g. P.E., music, kitchen, etc.)?

067.2-Do the kindergarten spaces have adequate casework (cabinets and bookshelves), appropriate storage, sinks, whiteboards, lighting, and technology equipment? Is some of the flooring a "wet area"?

068.0-Does the school have special education spaces (including testing rooms, offices, etc.) as needed for the school program and as recommended in the CDE Construction Guidelines section 4.3.2.2.?

CDE Construction Guidelines section 4.3.2.2.: Special education classrooms. Special Education classrooms and facilities meeting or exceeding the accessibility and adaptive needs of the current and reasonably anticipated student population, in accordance with Section 504 and Title II of the Americans with Disabilities Act, the Exceptional Children’s Educational Act, and Individuals with Disabilities Education Act. The Special Education area shall be based upon a use occupancy of up to 30 students with a minimum classroom size of 675 SF. Special Ed space allocation shall consist of 37 SF per pupil for elementary schools, middle schools, high schools and K - 12 schools. See CDE Construction Guidelines Section 4.3 for more details.

068.1-Are the special education spaces near the media center, computer rooms, and general classrooms? Are testing rooms, offices, etc. near the programs they serve? Are they acoustically isolated from noisy spaces?

068.2-Do the special education spaces (including testing rooms, offices, etc.) have adequate casework and appropriate storage (cabinets and bookshelves), sinks, whiteboards, and technology equipment?

069.0-Does the school have general classrooms as needed for the school program and as recommended in the CDE Construction Guidelines 4.3?

CDE Construction Guidelines 4.3: The Core Classroom area shall be based upon a use occupancy of up to 30 students with a minimum classroom size of 675 SF. See CDE Construction Guidelines Section 4.3 for more details.

Apr 10, 2017 Page 141

Page 143: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MSAdequacy AssessmentTask Description Score Comments

K = 38 SF/Pupil 1-3 = 32 SF/Pupil 4-6 = 30 SF/Pupil 7-12 = 28 SF/Pupil Montessori = 40 SF/Pupil Expeditionary = 36 SF/Pupil

069.1-Are the general classrooms near the media ctr., computer rooms, and support spaces? Are they acoustically isolated from noisy spaces & are acoustics internally appropriate (e.g. gyms, kitchens, music)?

069.2-Do the general classroom spaces have adequate casework and appropriate storage (cabinets and bookshelves), sinks, whiteboards, and technology equipment?

070.0-Does the special program space (including, Title 1, Speech, PT/OT, ESL, etc.) meet school expectations and requirements?

070.1-Is the special program space located as an integral part of the facility (near media center, computer rooms, gen. classrooms)? Are therapy rooms, testing rooms, offices are near programs they serve? Are they acoustically isolated from noisy spaces?

070.2-Does the special program space have adequate casework and appropriate storage (cabinets and bookshelves), whiteboards, and technology equipment?

071.0-Does the school have a computer lab as described in the CDE Construction Guidelines 4.3?

CDE Construction Guidelines 4.3: The Computer and Technical Education area shall be based upon a use occupancy of up to 30 students with a minimum classroom size of 675 SF. Space allocation shall consist of 30 SF per pupil for elementary schools and 32 SF per pupil for middle schools, high schools and K - 12 schools. See CDE Construction Guidelines Section 4.3 for more details.

071.1-Are the computer lab spaces near the other academic programs? Are the spaces isolated from the "noisy" spaces of the school (e.g. P.E., music, kitchen, etc.)?

071.2-Do the computer lab spaces have adequate casework (cabinets and bookshelves), appropriate storage, sinks, whiteboards, lighting, and technology equipment?

072.0-Does the school have Career and Technical Education (CTE)/VoAg spaces as described in the CDE Construction Guidelines 4.3?

CDE Construction Guidelines 4.3: Elementary schools and middle schools do not CDE typically have a Vocational Agriculture program. High school and K - 12 school Vocational Agriculture space allocation shall consist of 60 SF per pupil with a minimum classroom size of 675 SF. See CDE Construction Guidelines Section 4.3 for more details.

072.1-Are the CTE spaces near the other academic programs? Are the spaces isolated from the "noisy" spaces of the school (e.g. P.E., music, kitchen, etc.)?

072.2-Do the CTE spaces have adequate casework (cabinets and bookshelves), appropriate storage, sinks, whiteboards, lighting, and technology equipment?

073.0-Does the school have a library/multimedia center (LMC) as CDE Construction Guidelines 4.3: The Media

Apr 10, 2017 Page 142

Page 144: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MSAdequacy AssessmentTask Description Score Comments

described in the CDE Construction Guidelines 4.3? Center for elementary schools shall have a minimum classroom size of 1200 SF. A minimum classroom size of 2400 SF for middle schools and 3600 SF for high schools and K - 12 schools. See CDE Construction Guidelines Section 4.3 for more details.

073.1-Are the LMC spaces (including office, work rooms, conference room, etc.) near the academic programs they serve? Are the spaces acoustically isolated from the noisy spaces of the school (e.g. gyms, kitchens, music, shops, etc.)?

073.2-Do the LMC spaces (including office, work rooms, conference room, etc.) have adequate casework and appropriate storage (cabinets and bookshelves), sinks, counter-tops for production, equipment storage, and technology equipment?

074.0-Does the school have a Music room as described in the CDE Construction Guidelines 4.3?

CDE Construction Guidelines 4.3: Music Room space allocation shall consist of 35 SF per pupil for elementary schools, middle schools, high schools and K - 12 schools. See CDE Construction Guidelines Section 4.3 for more details.

074.1-Is the music space isolated from the other "noisy" programs (gyms. kitchen etc.)? Is the space acoustically isolated from the quiet academic spaces of the school?

074.2-Does the music space have adequate casework (cabinets and bookshelves), appropriate storage, whiteboards, and technology equipment?

075.0-Does the school have an art room as described in the CDE Construction Guidelines 4.3?

CDE Construction Guidelines 4.3: Art Room space allocation shall consist of 35 SF per pupil for elementary schools, 40 SF per pupil for middle schools and 45 SF per pupil for high schools and K - 12 schools. See CDE Construction Guidelines Section 4.3 for more details.

075.1-Are the art spaces near the other academic programs? Are the spaces isolated from the "noisy" spaces of the school (e.g. P.E., music, kitchen, etc.)?

075.2-Do the art spaces have adequate casework (cabinets and bookshelves), appropriate storage, sinks & clay traps, whiteboards, drying racks, lighting, and technology equipment? Are finish materials smooth, cleanable and nonabsorbent?

076.0-Does the school have a performing arts/auditorium support area as described in the CDE Construction Guidelines 4.3?

CDE Construction Guidelines 4.3: See CDE Construciton Guidelines section 4.3 for details. Auditorium SF is sized for 1/3 of General enrollment. Basis is 9 SF per seat (1/3 of enrollment) plus stage (stage size varies: 1,000 to 1,800), stage size includes a small amount of storage or similar support. i.e. for an 800 student HS: 800/3 = 266.666 * 9 SF = 2,400 SF + 1,800 stage = 4,200 SF TOTAL A "Gymatorium" basis shall consist of a minimum 50'x60' play area (3000 SF) and a

Apr 10, 2017 Page 143

Page 145: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MSAdequacy AssessmentTask Description Score Comments

minimum 1000 SF platform stage with a minimum 400 SF storage area. This totals a 4400 SF Gymatorium for an ES or MS. See CDE Construction Guidelines Section 4.3 for more details.

076.1-Are the performing arts/auditorium spaces near each other (e.g. music, drama, etc.)? Do spaces provide convenient public and after-hours access plus separation from other spaces in the building?

076.2-Do the performing arts/auditorium spaces have adequate casework and appropriate storage, water fountains, fixed equipment and technology equipment?

077.0-Does the school have adequate gym facilities as described in the CDE Construction Guidelines 4.3?

CDE Construction Guidelines 4.3: Elementary schools shall provide 3,000 SF area with a 50' x 60' standard. Middle schools shall provide 5,400 SF area with a 60' x 90' standard. High schools and K - 12 schools shall provide 7,300 SF area with a 70' x 104' standard. See CDE Construction Guidelines Section 4.3 for more details.

077.1-Are gym spaces near the other "noisy" programs (music, kitchen, etc.)? Are spaces acoustically isolated from the quiet academic spaces and provide convenient public & after-school access and separation from other spaces?

077.2-Do the gym spaces have adequate casework and cabinets and appropriate storage, water fountains and fixed equipment (backboards, etc.)?

078.0-Does the school have a science Labs as described in the CDE Construction Guidelines 4.3?

CDE Construction Guidelines 4.3: The Science Laboratory area shall be based upon a minimum classroom size of 675 SF. Science Laboratory space allocation shall consist of 38 SF per pupil for elementary schools, 40 SF per pupil for middle schools and 44 SF per pupil for high schools and K - 12 schools. See CDE Construction Guidelines Section 4.3 for more details.

078.1-Are the science spaces near the other academic programs? Are the science spaces isolated from the "noisy" spaces of the school (e.g. P.E., music, kitchen, etc.)?

078.2-Do the science spaces have adequate casework (cabinets and bookshelves), appropriate storage, sinks, whiteboards, lighting, and technology equipment? Is the flooring a hard surface such as VCT or tile?

079.0-Does the school have instructor/support areas as described in the CDE Construction Guidelines 4.3?

CDE Construction Guidelines 4.3: Instructor / Support Areas shall consist of 120 SF for a typical sized office and 150 SF for a large office. Work rooms shall consist of 250 SF to accommodate several individuals with Team Planning Conference rooms consisting of 240 SF for 12 - 16 occupants and Small Group Instruction rooms consisting of 320 SF for 16 occupants.

079.1-Are the instructor/support spaces located near the main entrance, have sight lines of the school entrance, and are they near

Apr 10, 2017 Page 144

Page 146: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - BVHS/McGinnis MSAdequacy AssessmentTask Description Score Comments

instructional areas?

079.2-Do the instructor/support spaces have adequate and appropriate storage, utilities, technology equipment and fixed equipment?

080.0-Do student restrooms appear to be adequate in number and location?

080.1-Are student restroom fixtures age-appropriate?

080.2-Are student restroom toilet partitions, urinal privacy partitions, towel dispensers, and soap dispensers in place and functional?

081.0-How is the school connected to the internet?

081.1-Does the school have wireless internet access throughout?

082.0-Is there a school wide telephone system?

083.1-Is there adequate electrical in the kitchen area?

083.2-Is the cafeteria sized appropriately?

083.3-Is the food prep area sized appropriately?

083.4-Are food supplies protected against purposeful contamination?

083.5-Is the gym and cafeteria a shared space? (INFO ONLY)

Apr 10, 2017 Page 145

Page 147: Colorado Department of Education · 2019-01-29 · Colorado Department of Education School Report - BVHS/McGinnis MS Uniformat System Description Lifetime Install Year Next Renewal

Colorado Department of Education School Report - GlossaryGross Area (SF)

Asset size is the total area in a building for all floors to the outer surface of exterior walls. GSF (Gross Square Foot) is the standard figure used in defining construction costs for facilities.

Replacement Value

Asset Replacement Value (RV) is the total amount of expenditure required to construct a replacement facility to the current building codes, design criteria, and materials. The RV for a single Asset can be based on the sum of the System replacement costs, or it can be a custom cost. The RV may include or exclude overhead costs.

Condition Budget

The budget amount set aside to remediate current needs associated with the Asset.

Total FCI Facility Condition Index (FCI) is an industry-standard metric that objectively measures the current condition of a facility, allowing comparison both within and among institutions. To determine FCI for any given set of assets, the total cost of remedying deferred maintenance requirements is divided by the current replacement value. Generally, the higher the FCI, the poorer the condition of the facility.

Adequacy Index

A metric that objectively measures the current Adequacy of a school, allowing comparison to other schools. It is based on a set of questions that measure each school’s compliance with a set of standards.

System Group

A grouping of the building’s or site’s construction components into a common name. For example, “Interior Construction and Conveyance” include all the building construction components relating to the wall partitions, elevators, interior half walls, etc.

System Condition Index (SCI)

The System Condition Index (SCI) measures the relative condition of the systems within an Asset. SCI uses costs from all requirements that are included in FCI in order to measure the relative health of a system and facilitate comparison within a single Asset. SCI follows the same configuration settings as FCI. Each system in an asset is measured against the total cost of maintenance requirements with a matching System.

Priority Priority is the timing that a deficiency (project) should be scheduled for correction. Uniformat II Category

A Uniformat II Category is an element of the Uniform Classification System for organizing preliminary construction information into a standardized classification structure. These elements are common to most buildings and usually perform a given function regardless of the design specification, construction method, or materials used. There are four levels of classifications.

Lifetime Lifetime is the number of years a System is expected to be useful (its "useful life") before Renewal is required.Next Renewal

This is the year that a System is expected to require renewal funding (its renewal cost), either based on its age or based on its observed condition.

Exp. Use. Life See the definition for Lifetime.Insp. Date Date of inspection of the system or deficiency (requirement).Obs. Yrs. Rem

Based on the inspector’s observation of a system, number of remaining years before the next renewal (whole replacement) is entered in this field.

Action An Action is a strategy for correcting a Requirement that includes the scope of work to be done and an itemized estimate of its cost (line items).

Action Date This is the recommended date to address the issues noted in an Action. Prime System

The Prime System is the primary Uniformat II Category that a Requirement affects. You can assign a Prime System to a Requirement on the Requirement record.

Apr 10, 2017 Page 146