![Page 1: COLOR SCHEDULE PART 1 GENERAL 1.01SECTION · PDF fileA. Color and sheen are of prime importance for all aspects of this project. ... SST-1 Difiniti Bonito 3cm PLASTIC LAMINATE (PL):](https://reader031.fdocuments.in/reader031/viewer/2022030509/5ab915a17f8b9ad5338d9568/html5/thumbnails/1.jpg)
(16126)© COPYRIGHT 2017 HOLLAND BASHAM ARCHITECTS
09 0600-1
SECTION 09 0600COLOR SCHEDULE
PART 1 GENERAL1.01 SECTION INCLUDES
A. The extent of interior surfaces to be painted or otherwise finished.1.02 RELATED REQUIREMENTS
A. Drawings and general provisions of the Contract, including General and SupplementaryConditions and Division 1 Specification sections, apply to this Section.
1.03 PRICE AND PAYMENT PROCEDURESA. Alternates: See Section 01 2300 - Alternates, for product alternatives affecting this section.
1.04 DESIGN REQUIREMENTSA. Color and sheen are of prime importance for all aspects of this project. For items not
specifically noted herein, contact the Architect.1.05 SUBMITTALS
A. See Section 01 3000 - Administrative Requirements, for submittal procedures.B. Submit all finish products listed below at the same time for simultaneous review of entire finish
palette.PART 2 PRODUCTS2.01 LIST OF FINISHES
A. Project Number - Project Name: J Development - 70th & OakB. Issue Date: 08-28-2017CONCRETE SEALED (CS):
See Section 03 3000 - Cast-in-Place Concrete for Chemical Hardener.
SIMULATED STONE (SST):
MANUFACTURER COLOR THICKNESSSST-1 Difiniti Bonito 3cm
PLASTIC LAMINATE (PL):
MANUFACTURER COLOR FINISHPL-1 Formica Pecan Woodline 5883-58 MattePL-2 Nevamar Cool Chic VA7002-T TexturedPL-3 Pionite Folkstone Gray SG24 SuedePL-4 Wilsonart Ebony Recon 7997-38 Fine Velvet
SOLID SURFACE MATERIAL (SSM):
MANUFACTURER COLOR FINISH THICKNESSSSM-1 Hi-Macs T017 Andromeda Matte 3/4"
WOOD (WD):
SPECIES FINISHWD-1 MDF P-2
![Page 2: COLOR SCHEDULE PART 1 GENERAL 1.01SECTION · PDF fileA. Color and sheen are of prime importance for all aspects of this project. ... SST-1 Difiniti Bonito 3cm PLASTIC LAMINATE (PL):](https://reader031.fdocuments.in/reader031/viewer/2022030509/5ab915a17f8b9ad5338d9568/html5/thumbnails/2.jpg)
(16126)© COPYRIGHT 2017 HOLLAND BASHAM ARCHITECTS
09 0600-2
CERAMIC MOSAIC TILE (CMT):
MANUFACTURER STYLE/COLOR/FINISH SIZECMT-1(Alternate)
Roca (Premier Tile) Glazed Grey Mosaic PennyRound ROUFCC117-12M
12x12
CERAMIC TILE (CT):
MANUFACTURER STYLE/COLOR/FINISH SIZECT-1 Daltile Annapolis/Bevel Wall Tile/ Sail
AP066x16
CT-2 Daltile Annapolis/Bevel Wall Tile/ BlackAP09
6x16
PORCELAIN TILE (PT):
MANUFACTURER STYLE/COLOR/FINISH SIZEPT-1 Emser Tile Hangar/Smoke 12" x 23"
PORCELAIN TILE BASE (PT-1B):
MANUFACTURER STYLE/COLOR/FINISH SIZEPT-1B Emser Tile Hangar/Smoke 6" x 23"
GROUT (G):
MANUFACTURER COLOR LOCATIONG-1 Laticrete 89 Smoke Grey CMT-1 and CT-1G-2 Laticrete 60 Dusty Grey CT-2 and PT-1
ACOUSTIC PANEL CEILING (APC):
MANUFACTURER STYLE COLOR SIZEAPC-1 Armstrong Ultima Tegular 1951 White 24"x24"x3/4"GRID-1 Armstrong Suprafine White 9/16"
VINYL COMPOSITION TILE (VCT):
MANUFACTURER STYLE COLOR SIZEVCT-1 Mannington
CommercialEssentials VCT Stone Gray 102 12" x 12"
VINYL TILE (VT):
MANUFACTURER STYLE COLOR SIZEVT-1 Shaw Terrain II 12 mil Grove 6"x48"VT-2 Shaw Terrain II 12 mil Timber 6"x28"VT-3 Interface Level Set A00401 Distressed
Walnut25cm x 1m
![Page 3: COLOR SCHEDULE PART 1 GENERAL 1.01SECTION · PDF fileA. Color and sheen are of prime importance for all aspects of this project. ... SST-1 Difiniti Bonito 3cm PLASTIC LAMINATE (PL):](https://reader031.fdocuments.in/reader031/viewer/2022030509/5ab915a17f8b9ad5338d9568/html5/thumbnails/3.jpg)
(16126)© COPYRIGHT 2017 HOLLAND BASHAM ARCHITECTS
09 0600-3
RUBBER FLOORING (RF):
MANUFACTURER STYLE COLOR SIZERF-1 Ecore Commerical
FlooringEcofit 806 Bed Rock 48" x 25'
SHEET VINYL (SV):
MANUFACTURER STYLE COLORSV-1 Mohawk Smartflex Midnight Mist
RESILIENT BASE (RB):
MANUFACTURER COLOR SIZERB-1 Johnsonite TA4 Gateway WG 6" H RB-2(Alternate)
Johnsonite MW-XX-S4, 08 Icicle 6" H MillworkWallbase Monument
Note: 4"H at casework toekicks
WOOD BASE (WB):
SPECIES FINISH SIZEWB-1 MDF P-3 3/4"x6"WB-2 MDF P-2 3/4"x6"
Note: 4"H at casework toekicksTRANSITION STRIP (TRS):
MANUFACTURER STYLE COLOR LOCATIONTRS-1 Daltile Annapolis
JollyS-1/212J
SAIL AP06 CT-1
TRS-2 Daltile AnnapolisJollyS-1/212J
BLACK AP09 CT-2
TRS-3 Schluter Systems Schiene AnodizedAluminum
CPT/WMT to PT
TRS-4 Johnsonite CTA-XX-A TA4 GatewayWG
CPT to VCT, CPT to RF
Note: Contractor to verify material heights prior to ordering.
RESILIENT STAIR ACCESSORIES (RSA):
MANUFACTURER STYLE COLORRSA-1 Johnsonite 10" Vinyl Stair Stringer (VS) TA4 Gateway WG
CARPET (CPT):
MANUFACTURER STYLE COLOR SIZECPT-1 Shaw Floors EA633 Perfect
Moment00595 Mocah Latte 12' width,
Broadloom
![Page 4: COLOR SCHEDULE PART 1 GENERAL 1.01SECTION · PDF fileA. Color and sheen are of prime importance for all aspects of this project. ... SST-1 Difiniti Bonito 3cm PLASTIC LAMINATE (PL):](https://reader031.fdocuments.in/reader031/viewer/2022030509/5ab915a17f8b9ad5338d9568/html5/thumbnails/4.jpg)
(16126)© COPYRIGHT 2017 HOLLAND BASHAM ARCHITECTS
09 0600-4
CPT-2 Interface Ground-GlobalChange Collection,#1472502500
105542 EveningDusk
50cm x 50cm
CPT-3 Interface Shading- GlobalChange Collection,#142690AK00
105518 EveningDusk
25cm x 1m
CPT-4 Interface Progression III-Global ChangeCollection,#147240AK00
105536 EveningDusk
25cm x1m
WALK-OFF MAT (WMT):
MANUFACTURER STYLE COLOR SIZEWMT-1 Shaw Contract
Group5T031 Welcome IITile
31500 Ebony 24x24
WMT-2 Shaw ContractGroup
60745 Welcome IIBroadloom
31500 Ebony 12' width,Broadloom
PAINT (P):
MANUFACTURER COLORP-1 Sherwin Williams SW 7672 Knitting NeedlesP-2 Sherwin Williams SW 7069 Iron OreP-3 Sherwin Williams SW 7005 Pure WhiteP-4 Sherwin Williams SW 7673 Pewter CastP-5 Sherwin Williams SW 6251 OuterspaceP-6 Sherwin Williams SW 6349 PennywiseP-7 TBDP-8 TBD
HIGH-PERFORMANCE COATINGS (HPC):
MANUFACTURER COLORHPC-1 Tenemec Sherwin Williams SW 7673
Pewter CastHPC-2 Tenemec Sherwin Williams SW 7069 Iron
Ore
CORNER GUARD (CG):
MANUFACTURER MODEL COLORCG-1 Inpro 150BN, .080", 4'H Castle 0256
FIBERGLASS REINFORCED PLASTIC (FRP):
MANUFACTURER COLORFRP-1 Crane Composites Sandstone Texture, Morning Mist
(636)
Note: Provide harmonizing trim pieces as required.
![Page 5: COLOR SCHEDULE PART 1 GENERAL 1.01SECTION · PDF fileA. Color and sheen are of prime importance for all aspects of this project. ... SST-1 Difiniti Bonito 3cm PLASTIC LAMINATE (PL):](https://reader031.fdocuments.in/reader031/viewer/2022030509/5ab915a17f8b9ad5338d9568/html5/thumbnails/5.jpg)
(16126)© COPYRIGHT 2017 HOLLAND BASHAM ARCHITECTS
09 0600-5
ROLLER SHADES (RS):
MANUFACTURER STYLE COLORRS-1 Mechoshade Soho Collection 1600 Series (3%
Open)1612Thompson(Charcoal)
HORIZONTAL LOUVER BLINDS (HLB):
MANUFACTURER STYLE COLORHLB-1 SWF Contract Graber Lake Forest 2" Faux
WoodMarshmallow 5742
RESIDENTIAL CASEWORK (RC):
MANUFACTURER SPECIES/ DOOR STYLE COLORRC-1 Saco Maple/ Square Edge Profile, Flush
OverlayColor Match SmartCabinetry Slate
RC-1(Alternate)
Smart Cabinetry Maple/ Square Edge Profile, FlushOverlay
Slate
RC-2 Saco Maple/ Square Edge Profile, FlushOverlay
Color Match SmartCabinetry Coffee
RC-2(Alternate)
Smart Cabintery Maple/ Square Edge Profile, FlushOverlay
Coffee
RC-3 Saco Maple/ Square Edge Profile, FlushOverlay
White
RC-3(Alternate)
Smart Cabinetry Maple/ Square Edge Profile, FlushOverlay
Color Match SacoWhite
PART 3 EXECUTION3.01 INSTALLATION, CLEANING, AND PROTECTION
A. See individual specification sections for requirements.3.02 SCHEDULES
A. See Room Finish and Door Schedule on the Drawings.END OF SECTION
![Page 6: COLOR SCHEDULE PART 1 GENERAL 1.01SECTION · PDF fileA. Color and sheen are of prime importance for all aspects of this project. ... SST-1 Difiniti Bonito 3cm PLASTIC LAMINATE (PL):](https://reader031.fdocuments.in/reader031/viewer/2022030509/5ab915a17f8b9ad5338d9568/html5/thumbnails/6.jpg)
UP
CO
CO
CO
J
O
K
N
X5
X6
XF
XH
XL
XM
6 7 10
X10
X11
X9
X8
X7
MAINTENANCE
102
ELEVATORLOBBY
101
STAIR 2
S201
GARAGE
110
1
MA
TC
H L
INE
AR
EA
-C
AR
EA
-B
AR
EA
-C
AR
EA
-B
AREA - AAREA - B
AREA - AAREA - B
MATCH LINE
7
7
MATERIAL KEY
EXTENTS OF CARPET (CPT-2)INSTALLATION: ASHLAR
EXTENTS OF CARPET (CPT-3)INSTALLATION: ASHLAR
EXTENTS OF CARPET (CPT-4)INSTALLATION: ASHLAR
EXTENTS OF PORCELAIN TILE (PT-1)INSTALLATION: ASHLAR 1/3 OFFSET
EXTENTS OF LUXURY VINYL TILE (VT-3) INSTALLATION: ASHLAR
EXTENTS OF RUBBER FLOORING (RF-1)
EXTENTS OF WALK-OFF MAT (WMT-1)INSTALLATION: ASHLAR
EXTENTS OF SEALED CONCRETE (CS-1)
EXTENTS OF VINYL COMPOSITION TILE (VCT-1)
ARROW INDICATES FLOORING DIRECTION
1. PROVIDE SELF-LEVELING CONCRETE FLOOR UNDERLAYMENT AS REQUIRED TO ACHIEVE A SMOOTH AND LEVEL SUBSTRATE FOR FLOOR FINISHES.
2. WHERE FLOOR FINISHES DIFFER IN COLOR AND/OR MATERIAL BETWEEN ROOMS, LOCATE THE JOINT BELOW THE CENTERLINE OF THE (CLOSED) DOOR. PROVIDE TRANSITION STRIPS BETWEEN FLOORS OF DIFFERENT MATERIALS. SEE COLOR SCHEDULE, SECTION 09 0600, FOR TRANSITION STRIP (TRS) TYPES AND LOCATIONS.
3. PAINT ALL ELECTRICAL PANELS AND ACCESS DOORS THROUGHOUT EXTENTS OF CONSTRUCTION TO MATCH ADJACENT WALL OR CEILING COLOR, UNLESS NOTED OTHERWISE.
4. OWNER FURNISHED EQUIPMENT SHOWN DASHED ON PLAN, UNLESS NOTED OTHERWISE.
GENERAL FINISH NOTES
SHEET:
DATE:
PROJECT:
119 SOUTH 49TH AVENUE
OMAHA, NEBRASKA 68132
(402)551-0800
C COPYRIGHT 2017
C:\
Use
rs\jsta
r\D
ocum
ents
\16
12
6_J-D
evelo
pm
ent_
R1
7_JS
tar.
rvt
8/2
4/2
017
9:3
9:3
0 A
M
A1.31B
J DEVELOPMENTCOMPANY
THE CENTERLINEAPARTMENTS
FIRST LEVEL FINISH PLAN- AREA B
16126
28 AUGUST 2017
PRELIMIN
ARY
NOT FOR C
ONSTRUCTIO
N
No. Description Date
0' 2' 4' 8' 16'
A1.31B
1 FIRST LEVEL FINISH PLAN - AREA B
KEYED FINISH NOTESTAG USED FOR THIS SCHEDULE
1 ALIGN
2 EXTENTS OF FIBER REINFORCED PLASTIC (FRP-1) ABOVE BASE,UP TO 4' A.F.F.
3 EXTENTS OF ACCENT PAINT (P-5)
4 EXTENTS OF ACCENT PAINT (P-6)
5 NOT USED
6 MIRROR (MR-1) WITH ACCENT PAINT (P-6) ABOVE. SEE INTERIORELEVATION SHEET A8.02
7 CORNER GUARDS (CG-1)
8 EXTENTS OF WALL TILE (CT-1), SEE INTERIOR ELEVATIONS, A8SERIES.
9 EXTENTS OF WALL TILE (CT-2), SEE INTERIOR ELEVATIONS, A8SERIES.
10 EXTENTS OF MDF WAINSCOT W/ ACCENT PAINT (P-4) ABOVE.SEE INTERIOR ELEVATIONS, A8 SERIES.
11 EXTENTS OF MDF WAINSCOT W/ ACCENT PAINT (P-5) ABOVE.SEE INTERIOR ELEVATIONS, A8 SERIES.
12 EXTENTS OF MDF WAINSCOT W/ ACCENT PAINT (P-6) ABOVE.SEE INTERIOR ELEVATIONS, A8 SERIES.
![Page 7: COLOR SCHEDULE PART 1 GENERAL 1.01SECTION · PDF fileA. Color and sheen are of prime importance for all aspects of this project. ... SST-1 Difiniti Bonito 3cm PLASTIC LAMINATE (PL):](https://reader031.fdocuments.in/reader031/viewer/2022030509/5ab915a17f8b9ad5338d9568/html5/thumbnails/7.jpg)
DNUP
CO
CO
CO
J
L
M
O
X1
X2
X5
X6
XF
XI
XJ
XM
6 7
XD
XE
XG
XK
XN
XO
X10
X11
X7
GARAGE
210
OFFICE
205
STOR
206
CONF
207
LEASINGOFFICE
203
STAIR 2
S202
ELEVATORLOBBY
204
WOMEN
208
MEN
209
VESTIBULE
201
202
UNIT B-1
221
UNIT A-6
223
UNIT C-1
222
UNIT A-2AANSI
224
UNIT B-2
226
UNIT B-4
225
UNIT C-3
228
UNIT A-1
227
UNIT B-3
229
CORRIDOR
260
MA
TC
H L
INE
AR
EA
-C
AR
EA
-B
AR
EA
-C
AR
EA
-B
AREA - AAREA - B
AREA - AAREA - B
MATCH LINE
9
4
10
10
10
10
10
10
11
11
11
3
3
8
8
12
12
11
12
12
1211
11
11
9'-2"
12'-4" 1
'-0"
1
1'-0"
2'-2"
1
1
7
7
1. SEE A1.31B FOR GENERAL FINISH NOTES.
GENERAL FINISH NOTES
1. SEE A1.31B FOR KEYED FLOOR FINISH NOTES.
KEYED FLOOR FINISH NOTES
1. SEE A1.31B FOR THE MATERIAL KEY LEGEND.
MATERIAL KEY
SHEET:
DATE:
PROJECT:
119 SOUTH 49TH AVENUE
OMAHA, NEBRASKA 68132
(402)551-0800
C COPYRIGHT 2017
C:\
Use
rs\jsta
r\D
ocum
ents
\16
12
6_J-D
evelo
pm
ent_
R1
7_JS
tar.
rvt
8/2
4/2
017
9:3
9:3
5 A
M
A1.32B
J DEVELOPMENTCOMPANY
THE CENTERLINEAPARTMENTS
SECOND LEVEL FINISHPLAN - AREA B
16126
28 AUGUST 2017
PRELIMIN
ARY
NOT FOR C
ONSTRUCTIO
N
No. Description Date
0' 2' 4' 8' 16'
A1.32B
1 SECOND LEVEL FINISH PLAN - AREA B
![Page 8: COLOR SCHEDULE PART 1 GENERAL 1.01SECTION · PDF fileA. Color and sheen are of prime importance for all aspects of this project. ... SST-1 Difiniti Bonito 3cm PLASTIC LAMINATE (PL):](https://reader031.fdocuments.in/reader031/viewer/2022030509/5ab915a17f8b9ad5338d9568/html5/thumbnails/8.jpg)
DN
A
C
D
F
X1 X3 X4 X6
91
XF
XC
XA
CLUBHOUSE
662
FITNESS
670
YOGA
671
TRASH
657
STAIR 1
S106
CORRIDOR
656
UNIT B-1
604
UNIT A-3
606
UNIT B-3
603 MEN
661
WOMEN
660
CORRIDOR
654
UNIT B-3
605
UNIT C-2
607
UNIT B-3AANSI
608
UTILITY
655
UNIT B-7
609
UNIT B-3
611
UNIT A-6
610
UNIT C-1
612
CORRIDOR
651
ROOFACCESS
658
2
2
5
6
5
6
7
7
AREA - AAREA - B
AREA - AAREA - B
MATCH LINE
2
4
4
11
11
3
1111
1212
12
12
12
12
11
11
11
12
STOR
66311
11
6
77
1
1
STOR
664
1. SEE A1.31B FOR GENERAL FINISH NOTES.
GENERAL FINISH NOTES
1. SEE A1.31B FOR KEYED FLOOR FINISH NOTES.
KEYED FLOOR FINISH NOTES
1. SEE A1.31B FOR THE MATERIAL KEY LEGEND.
MATERIAL KEY
SHEET:
DATE:
PROJECT:
119 SOUTH 49TH AVENUE
OMAHA, NEBRASKA 68132
(402)551-0800
C COPYRIGHT 2017
C:\
Use
rs\jsta
r\D
ocum
ents
\16
12
6_J-D
evelo
pm
ent_
R1
7_JS
tar.
rvt
8/2
4/2
017
9:3
9:3
9 A
M
A1.36A
J DEVELOPMENTCOMPANY
THE CENTERLINEAPARTMENTS
SIXTH LEVEL FINISH PLAN- AREA A
16126
28 AUGUST 2017
PRELIMIN
ARY
NOT FOR C
ONSTRUCTIO
N
No. Description Date
0' 2' 4' 8' 16'
A1.36A
1 SIXTH LEVEL FINISH PLAN - AREA A
![Page 9: COLOR SCHEDULE PART 1 GENERAL 1.01SECTION · PDF fileA. Color and sheen are of prime importance for all aspects of this project. ... SST-1 Difiniti Bonito 3cm PLASTIC LAMINATE (PL):](https://reader031.fdocuments.in/reader031/viewer/2022030509/5ab915a17f8b9ad5338d9568/html5/thumbnails/9.jpg)
BATHROOM
CLOSET
LIVING ROOM
CLOSET
MECH
LAUNDRY
KITCHEN
01
05 09
07
2'-4 3/4"
3'-0"
2'-0"
1'-7 5/8"
5'-6
"
12'-2 1
/2"
9'-6
"
27'-2 1
/2"
9'-10 1/2" 6'-5 1/4"
4'-4 3/4" 3'-2 3/8" 2'-0 3/8" 3'-0 1/2" 3'-0 3/4"
6
7
9"
9" 9
"
1'-0
"
3'-3
"
4'-0 1
/4"
4'-4 3
/4"
04 A5.11
5
A5.114
2
2'-0"1'-0"
1"
3'-0
"
(3'-4
" M
AX
)
3'-2
"
MIRROR(MR-1)
1"
1'-0"
3'-10"
HOLD
1'-5"1'-3" MIN
2'-7 1
/2"
4
5
2" 2"
1" 1'-6"
CLEAR
2'-6"
CLEAR
2'-0" 3'-0" 1'-9"
1" CLEAR
2'-7"
1"
3'-0
"1
'-6
"3
'-0
"
1" 1'-6" 2'-6" 2'-0" 3'-0"
1'-6
"
1'-9" 2'-9"
6'-0
"
7'-6
"
13'-7"
1'-6
"1
'-6
"
8
1. SEE SHEET A1.01 FOR GENERAL PLAN NOTES.
2. ALL SHELVING WITHIN UNIT TO CONSIST OF WHITE MELAMINE SHELVES AT 5'-10" A.F.F. W/ CLOTHING ROD BENEATH AT 5'-6" A.F.F. AT ANSI UNITS, INSTALL AN ADDITIONAL SHELF AT 4'-0" A.F.F. AND AN ADDITIONAL CLOTHING ROD AT 3'-6" A.F.F. AT HALF OF THE TOTAL SHELF SPACE.
3. PROVIDE SHOWER ROD (TBA-R5) AT ALL SHOWERS IN EACH UNIT.
4. ALL WOOD BASE (WB-1) AT UNITS TO BE PAINTED MDF, 3/4" THICK X 6" HIGH. SEE ROOM FINISH SCHEDULE FOR FINISH.
5. ALL CABINETS IN PALETTE 1 TO BE RESIDENTIAL CASEWORK (RC-1). ALL BASE CABINETS IN PALETTE 2 TO BE (RC-2). ALL UPPER CABINETS IN PALETTE 2 TO BE RESIDENTIAL CASEWORK (RC-3). ALL UNIT KITCHEN COUNTERS TO BE SIMULATED STONE (SST-1). ALL BATHROOM COUNTERS TO BE SOLID SURFACE MATERIAL (SSM-1). SEE UNIT FINISH LEGEND, THIS SHEET, FOR PALETTE LOCATIONS.
6. WITHIN UNITS, ALL WINDOWS & DOORS TO DECKS TO RECEIVE ROLLER SHADES (RS-1).
7. PROVIDE METAL TRIM (TRS-1) AT ALL OUTSIDE CORNERS AND EXPOSED EDGES OF TILE (PT-2, PT-3, PT-4, PT-5 & PT-6)
8. FINISH ALL EXPOSED CABINET SIDES.
9. WITHIN UNITS ALL WINDOWS AND DOORS TO RECEIVE HORIZONTAL LOUVER BLINDS (HLB-1).
GENERAL NOTES
1. <insert notes keyed to the door schedule remarks column>.
GENERAL DOOR SCHEDULE NOTES (DSN)
1. SEE SHEET A1.31B FOR GENERAL FINISH NOTES
GENERAL FINISH NOTES
1. ALL CEILINGS WITHIN UNITS TO BE BOTTOM OF FLOOR/CEILING ASSEMBLY. ALL HORIZONTAL SURFACES TO BE PAINTED (P-3) UNLESS NOTED OTHERWISE.
2. PAINT ALL HORIZONTAL AND VERTICAL SURFACES OF SOFFITS TO MATCH ADJACENT CEILING COLOR AND FINISH UNLESS OTHERWISE NOTED.
GENERAL UNIT RCP NOTES
1. SEE SHEET A8.01 FOR GENERAL INTERIOR ELEVATION NOTES.
GEN INTERIOR ELEV NOTES
MATERIAL KEY
EXTENTS OF CARPET (CPT-1)
EXTENTS OF LUXURY VINYL TILE (VT-1 OR VT-2) ASHLAR INSTALL. SEE UNIT RFS FOR LOCATIONS. HATCH INDICATES DIRECTION.
EXTENTS OF SHEET VINYL (SV-1).HATCH INDICATES DIRECTION.
PALETTE 1
PALETTE 2
SHEET:
DATE:
PROJECT:
119 SOUTH 49TH AVENUE
OMAHA, NEBRASKA 68132
(402)551-0800
C COPYRIGHT 2017
C:\
Use
rs\jsta
r\D
ocum
ents
\16
12
6_J-D
evelo
pm
ent_
R1
7_JS
tar.
rvt
8/2
4/2
017
9:4
4:3
4 A
M
A5.11
J DEVELOPMENTCOMPANY
THE CENTERLINEAPARTMENTS
UNIT A-1 PLANS ANDINTERIOR ELEVATIONSAND UNIT ROOM FINISH
SCHED
16126
28 AUGUST 2017
PRELIMIN
ARY
NOT FOR C
ONSTRUCTIO
N
No. Description Date
0' 2' 4' 8'1'
A5.11
1 UNIT A-1 FLOOR PLAN
0' 2' 4' 8'1'
A5.11
2 UNIT A-1 FLOOR FINISH PLAN
0' 2' 4' 8'1'
A5.11
3 UNIT A-1 REFLECTED CEILING PLAN
0' 1' 2' 4'
A5.11
5 BATHROOM
0' 1' 2' 4'
A5.11
4 KITCHEN
KEYED UNIT NOTESTAG USED FOR THIS SCHEDULE
1 ALIGN
2 EXTENTS OF ACCENT PAINT. SEE UNIT RFS FOR COLOR.
3 REMOVABLE FRONT ON CASEWORK FOR ACCESSIBILITY.CONTINUE FLOOR & WALL FINISHES BENEATH/BEHIND CABINET.
4 TOILET PAPER HOLDER (TBA-R1). MOUNT AT 2'-0" A.F.F.
5 TOWEL RING (TBA-R2). MOUNT AT 52" A.F.F. TYP. MOUNT AT 48"A.F.F. AT ANSI UNITS.
6 TOWEL BAR (TBA-R3). MOUNT AT 48" A.F.F.
7 ROBE HOOK (TBA-R4). MOUNT AT 60" A.F.F. TYP. MOUNT AT 48"A.F.F. AT ANSI UNITS.
8 FINISHED END PANEL
UNIT ROOM FINISH SCHEDULE - PALETTE 1ROOM FLOOR FINISH BASE FINISH WALL FINISH CEILING FINISH COMMENTS
KITCHEN VT-1 WB-1 P-1, P-7* GWB, P-3 *SEE UNIT FLOOR FINISH PLAN FOR EXTENTS
KITCHEN 1 VT-1 WB-1 P-1 GWB, P-3
LIVING ROOM VT-1 WB-1 P-1, P-7* GWB, P-3 *SEE UNIT FLOOR FINISH PLAN FOR EXTENTS
BEDROOM CPT-1 WB-1 P-1 GWB, P-3
BATHROOM SV-1 WB-1 P-1 GWB, P-3
CLOSET VT-1 WB-1 P-1 GWB, P-3
CLOSET 1 CPT-1 WB-1 P-1 GWB, P-3
CLOSET 2 CPT-1 / SV-1* WB-1 P-1 GWB, P-3 *SV-1 BENEATH W/D. SEE UNIT FLOOR FINISH PLAN
LAUNDRY VT-1 WB-1 P-1 GWB, P-3
MECH - - - -
UNIT ROOM FINISH SCHEDULE - PALETTE 2ROOM FLOOR FINISH BASE FINISH WALL FINISH CEILING FINISH COMMENTS
KITCHEN VT-2 WB-1 P-1, P-8* WB, P-3 *SEE UNIT FLOOR FINISH PLAN FOR EXTENTS
KITCHEN 1 VT-2 WB-1 P-1 WB, P-3
LIVING ROOM VT-2 WB-1 P-1, P-8* WB, P-3 *SEE UNIT FLOOR FINISH PLAN FOR EXTENTS
BEDROOM CPT-1 WB-1 P-1 WB, P-3
BATHROOM SV-1 WB-1 P-1 WB, P-3
CLOSET VT-2 WB-1 P-1 WB, P-3
CLOSET 1 CPT-1 WB-1 P-1 WB, P-3
CLOSET 2 CPT-1 / SV-1* WB-1 P-1 WB, P-3 *SV-1 BENEATH W/D. SEE UNIT FLOOR FINISH PLAN
LAUNDRY VT-2 WB-1 P-1 WB, P-3
MECH - - - -
DOOR SCHEDULE - A-1DOOR
NO.
DOOR FRAME
LABEL HDWR. REMARKSPR. WIDTH HEIGHT TYPE MAT'L FIN. TYPE MAT'L FIN. DEPTH HEAD DETAIL JAMB DETAIL SILL DETAIL
01 - - - 3' - 0" 7' - 0" D1 WD P-2/P-3 HM P-2/P-3 0' - 8 1/4"
04 - - - 2' - 10" 6' - 8" D1 WD P-3 - - - WD P-3 0' - 4 3/4" - - - - - -
05 - - - 3' - 6" 6' - 8" D1 WD P-3 - - - WD P-3 0' - 4 3/4" - - - - - -
07 - - - 2' - 6" 6' - 8" D1 WD P-3 - - - WD P-3 0' - 4 3/4" - - - - - -
09 - - - 2' - 4" 6' - 8" D1 WD P-3 - - - WD P-3 0' - 4 3/4" - - - - - -
UNIT FINISH LEGEND
NOTE: NOT ALL ROOMS EXIST IN EACH UNIT. SEE UNIT FINISH LEGEND, THIS SHEET, FOR FINISH PALETTE LOCATIONS. NOTE: NOT ALL ROOMS EXIST IN EACH UNIT. SEE UNIT FINISH LEGEND, THIS SHEET, FOR FINISH PALETTE LOCATIONS.
NOTE: FOR ALL UNIT INTERIOR DOORS, BASE BID DOOR TYPE D3, ALTERNATE BID TYPE D4