Coiled Tubing Cleanout Operation

download Coiled Tubing Cleanout Operation

of 54

Transcript of Coiled Tubing Cleanout Operation

  • 8/18/2019 Coiled Tubing Cleanout Operation

    1/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' '

    © 2014 PETROLIAM NASIONAL BERHAD (PETRONAS)

    #ll rihts reserve* No +art of this oc,ment may -ere+ro,ce. store in a retrieval system or transmitte in anyform or -y any means (electronic. mechanical. +hotoco+yin.

    recorin or otherise) itho,t the +ermission of the co+yrihtoner*

    Coiled Tubin S!"le Cle"nou#O$e%"#ion

  • 8/18/2019 Coiled Tubing Cleanout Operation

    2/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' %

    • The CT is a contin,o,s lenth of steel or com+osite t,-in that is s,++lies+oole on a lare reel*

    • The CT ,nit is com+ose of a reel ith the CT. an in0ector. control console.+oer s,++ly an ell1control stac2*

    •  CT is ,se for intervention in oil an as ells an sometimes as+ro,ction t,-in in e+lete ells*

    Coiled Tubin

  • 8/18/2019 Coiled Tubing Cleanout Operation

    3/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' 3

    • Steel pipe 1” OD to 3.5” OD

    •  Yield strengths of 70,000, 80,000, 90,000, 100,000 psi• Relativel thin !all

    • "inite life d#e to fatig#e $$les %&ending'

    Tubin

  • 8/18/2019 Coiled Tubing Cleanout Operation

    4/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&'

    Basic CT unit comprises:

     – Injector head – CT reel

     – Power pack

     – Control cabin

     – Pressure control equipment(PCE

    B"&i! E'ui$en# P"!"e

  • 8/18/2019 Coiled Tubing Cleanout Operation

    5/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' 4

    In*e!#o% He"d

    • Hyra,lically +oere

    co,nter rotatin chains• 5ri++er -loc2s mo,nte in

    chain assem-ly

    • 6n0ector esination -aseon ma7im,m +,ll

    ca+a-ility. e* 3&8 can +,ll3&.&&& +o,ns

  • 8/18/2019 Coiled Tubing Cleanout Operation

    6/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' 9

    T+$i!"l In*e!#o% He"d

  • 8/18/2019 Coiled Tubing Cleanout Operation

    7/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' :

    ost in0ector heas have to sets of o++osin enless chains

    • $eries of ri++er -loc2s mo,nte on each chain

    • 5ri++in +rofile of each s,its a s+ecific t,-in si

  • 8/18/2019 Coiled Tubing Cleanout Operation

    8/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' =

    In*e!#o% He"d C,"in A&&ebl+

  • 8/18/2019 Coiled Tubing Cleanout Operation

    9/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' >

    CT Reel

    • (sed to store t#&ing• )arge radi#s for &est t#&ing life

    • )evel !ind asse*&l to !rap

    t#&ing on and off reel

  • 8/18/2019 Coiled Tubing Cleanout Operation

    10/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' '&

    Ty+ical reel com+onents? – Reel drum (1)

     – Reel drive system (2)

     – Levelwind assembly (3)

     – Lubrication system (4)

     – Depth counter (5)

    CT Reel

    1

    2

    3

    4

    5

  • 8/18/2019 Coiled Tubing Cleanout Operation

    11/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' ''

    Hyra,lic Poer Units are the main rivin com+onents of hyra,lic systems*Consistin mainly of a motor. a reservoir an a hyra,lic +,m+. these ,nits

    can enerate a tremeno,s amo,nt of +oer to rive most any 2in ofhyra,lic ram*

    Po-e% P"!

  • 8/18/2019 Coiled Tubing Cleanout Operation

    12/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' '%

    Con#%ol C"bin

    Primary control center for the CT

    Unit – C instrument ! controls

     – "#$ Control

     – %onitorin& 'uipment andoperations

  • 8/18/2019 Coiled Tubing Cleanout Operation

    13/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' '3

    CT. In%uen#& "nd Con#%ol&

    $rimary instruments and controls

    ei&ht indicator* circulatin& and wellhead pressures

    +econdary instruments and controls

    Depth,speed indicator* chain tensioner pressures* strippersystem pressure

    +upport instruments and controlsdrive system pressures* "#$ system pressure*

  • 8/18/2019 Coiled Tubing Cleanout Operation

    14/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' '

    Consists of to ain Parts• Bloo,t Preventer ($econary PC!)

    • $tri++er Pac2er (Primary PC!)

    #ccessories

    • Hyra,lic @,ic2 latches

    • A,-ricator risers

    • #a+ter flanes

    • Crossovers

    • lo tees

    • 6n1sit, test s,-s

    CT P%e&&u%e Con#%ol E'ui$en#

  • 8/18/2019 Coiled Tubing Cleanout Operation

    15/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' '4

    CT BOP

    CT P%e&&u%e Con#%ol E'ui$en#

  • 8/18/2019 Coiled Tubing Cleanout Operation

    16/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' '9

    CT $tri++er Pac2er (Pac2off)

    CT P%e&&u%e Con#%ol E'ui$en#

    • -nstalled above "#$ and below-n.ector /ead0

    • /ydraulic activation rom

    Control Cabin0• orms a dynamic seal around

    C as it moves in and out o thewell0

    • llows chan&e o pacin&elements without removin& Crom well0

    • 'ner&ied by well pressure rombelow0

    • dditional paco6 orceprovided by hydraulic pressure0

  • 8/18/2019 Coiled Tubing Cleanout Operation

    17/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' ':

    CT BHA

    CT 8n,c2le oint

    • %inimies Curvature '6ect # C• ssist in travelin& throu&h

    do&le&s• +ealed or $ressure Containment• Load Ratin& Comparable o C

  • 8/18/2019 Coiled Tubing Cleanout Operation

    18/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' '=

    CT BHA

    CT $ivel

    • llows rotation to ease mae upproblems

    • +ealed or pressure containments• /i&h tensile capability• $orts to lubricate bearin&

  • 8/18/2019 Coiled Tubing Cleanout Operation

    19/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' '>

    B"&i! E'ui$en# L"+ou#

  • 8/18/2019 Coiled Tubing Cleanout Operation

    20/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' %&

    CT roth has -een riven -y economics. contin,al technoloical avancesan the s,ccessf,l ,tili

  • 8/18/2019 Coiled Tubing Cleanout Operation

    21/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' %'

    The avantaes associate ith CT are?

    • The a-ility to o+erate on live ells – oes not re@,ire ell to -e 2ille. th,sre,cin ris2 of formation amae*

    • F,ic2 mo-ili

  • 8/18/2019 Coiled Tubing Cleanout Operation

    22/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' %%

    $cale Control

    • 6noranic com+o,n that +reci+itates ,e to loss of sol,-ility

    • "e@,ires ater

    • Presence of CO% increases chance of scale

    • Conitions

      1 ormation Eater Nat,rally Pro,ces $cale

      1 Com-ination of % 6ncom+ati-le Eaters

    • Three classifications  1 Eater $ol,-le – NaCl

      1 #ci $ol,-le – e$. CaCO3

      1 #ci 6nsol,-le – Ba$O

    • "emoval o+tions for #ci 6nsol,-le $cales

      1 ettin

      1 "otatin 0ettin tool – $lo "otatin et-laster  1 illin

    S!"le Reo/"l

  • 8/18/2019 Coiled Tubing Cleanout Operation

    23/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' %3

    $cale 6entification

    6m+ortant scale sam+les are o-taine ?

    • $am+le Bailers

    • A6BGs

    $im+le la-oratory test can ientify hether the scale is aci sol,-le

    so s,ita-le scale removal co,l -e +lanne 

    S!"le Reo/"l

  • 8/18/2019 Coiled Tubing Cleanout Operation

    24/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' %

    S!"le Reo/"l

    "eore

    ter

  • 8/18/2019 Coiled Tubing Cleanout Operation

    25/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' %4

    • Penara1# +latform is ,ner P$C -eteenP!T"ON#$ an $a+,ra 8encana*

    • The Penara has a history of scale an a7iss,es* one chane an as lift valvechane (5AIC) o+eration as initiallyintene for the ells at Penara1#*

    • Hoever. t,-in clearance o+eration as

    ,na-le to -e com+lete ,e to o-str,ctionfrom scale/a7*

    • Penara is mono+o +latform hich is,nmane have limite ec2 s+ace ancrane ca+acity*

    • Hence the CT is one ith assistance ofor2 -are . $a,0ana T,0,h*

    C"&e S!en"%ioPen"%" Pl"#o%

  • 8/18/2019 Coiled Tubing Cleanout Operation

    26/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' %9

    ell B"!%ound

    Item Descriptionell name $enara 71

    Location $enara

    ield +mall

    ell ype #il $roducer

     ubin& +ie 3 89 *:02lb,t

    %in0 Restriction 20;:

  • 8/18/2019 Coiled Tubing Cleanout Operation

    27/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' %:

    CT O$e%"#ion

    Aormal CB #peration Catenary CB #peration

  • 8/18/2019 Coiled Tubing Cleanout Operation

    28/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' %=

  • 8/18/2019 Coiled Tubing Cleanout Operation

    29/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' %>

    CT E'ui$en#3&

    C Reel with'mer&ency Disconnect

    C Reel ControlCabin

  • 8/18/2019 Coiled Tubing Cleanout Operation

    30/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' 3&

    CT E'ui$en#3&

    "atch %ier $umpin& Bnit

  • 8/18/2019 Coiled Tubing Cleanout Operation

    31/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' 3'

    CT E'ui$en#3&

    Liuid Aitro&en an Aitro&en Converter

  • 8/18/2019 Coiled Tubing Cleanout Operation

    32/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' 3%

    CT E'ui$en#3&

    oosenec(ubin& rchuide)

    -n.ector rame

  • 8/18/2019 Coiled Tubing Cleanout Operation

    33/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' 33

    CT E'ui$en#3&

    Dual C#%"- "#$

    +"#$(+lip Ram)

    Dual C#%"- "#$

    +"#$(+lip Ram)

    lowbac Line

    $umpin& Line

    Dual C#%"- "#$

  • 8/18/2019 Coiled Tubing Cleanout Operation

    34/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' 3

    CT E'ui$en#3&

     E'"L+'R Coveredith a

     E'"L+'R terCleanup

  • 8/18/2019 Coiled Tubing Cleanout Operation

    35/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' 34

    CT BHAItem Description

    'ternal Dimple Connector -t is attached to the C end by set screws that en&a&ed perormeddimples which ormed usin& dimplin& tool

    C Release +ub essential piece o euipment used or releasin& the C rom thebottom hole assembly i it has become stuc while in the wellbore0

    G>over o provide connection between tools with di6erent connection andsies

    +horty %/ he %otor /ead ssembly serves as a multi>unction tool0 he%otor /ead ssembly combines the C connector* dual bac

    pressure valve* and hydraulic disconnect into one compact tool0Btiliin& this tool in the bottom hole assembly &reatly shortens theoverall len&th o the complete tool strin&0 shorter bottom holeassembly reuires less lubricator* allowin& or a much saer ri& upo the C in.ector head0 he components can also be separatedinto di6erent conH&urations dependin& on speciHc reuirements0

    +trai&ht "ar he +trai&ht "ar is oten used to etend very short tool strin&s*such as a simple cleanout or litin& tool strin&0 "y etendin& ashort tool strin& the possibility o standin& up in restrictions will

    reduce0 hereore a smoother R-/ will be achieved0

     E'"L+'R /i&h>pressure .ettin& service nole

    CT BHA

  • 8/18/2019 Coiled Tubing Cleanout Operation

    36/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' 39

    CT BHA

    DimpleConnector

    +trai&ht "ar

    +horty %/G over

  • 8/18/2019 Coiled Tubing Cleanout Operation

    37/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' 3:

    CT e#bl"e% He"d

  • 8/18/2019 Coiled Tubing Cleanout Operation

    38/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' 3=

    CT O$e%"#ion

    Operation Time(hrs)+pot * Ri& up and pressure test 12077

    +licline to perorm tubin& clearance ;077

    %ae C connector and termination sub 2077

    %ae up and unction test Eet"L+'R Aole 4077

    RunI1>R-/ with Eet"L+'R and perorm +C# 3;077

    RunI2>Aitro&en ic o6 27077

    Ri& Down ! +id ell 12077

    Contin&ency 12077

    %iscellaneous 12077

     otal /ours 11;

     otal Days 40J3

  • 8/18/2019 Coiled Tubing Cleanout Operation

    39/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' 3>

    10 Conduct saety meetin&0

    20 +pot euipment to space availability0

    30 Ri& up treatin& lines* C units and conduct unction and pressure test0

    40 Ri& up in.ector head onto in.ector .acin& rame0

    50 Ri& up crossover onto wellhead* necessary len&th o lubricators to space out between

    wellhead and "#$ and a pump>in tee0

    ;0 $repare hydraulic hoses0

    @0 +tart up euipment and run euipment or a ew minutes0

    J0 Eac up C control cabin0

    :0 unction test in.ector .acin& rame and "#$ rams0

    170 $repare in.ector head and &oosenec0

    Ri .$

  • 8/18/2019 Coiled Tubing Cleanout Operation

    40/54

  • 8/18/2019 Coiled Tubing Cleanout Operation

    41/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' '

    ob P%o!edu%e10 $icle the C with @05? /CL0

    20 Circulate the C with portable water at least twice throu&hout tubin& volume

    30 $erorm surace circulation test with varyin& pump rate

    40 unction test the E'"L+'R at surace

    50 "eore openin& the %aster Malve * pressure up above the valve eual to epectedwell shut in pressure

    ;0 ter openin& the valve* R-/ C at av&0 27t,min to pass throu&h wellhead stac

    @0 -ncrease R-/ speed to av&0 57t,min ater 57 t below wellhead stac0

    J0 +top the C 17 m above obstruction(wa,scale) as per +licline Drit Run0

    :0 +tart to pump seawater by increasin& the pump rate and try to brea throu&h theobstruction0

    170 - no pro&ress* pump mi o acid onto the obstruction and let it soa or at least 2hours0

    110 ter soain&* R-/ bac with pumpin& + and attempt brea throu&h theobstruction0

  • 8/18/2019 Coiled Tubing Cleanout Operation

    42/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' %

    ob P%o!edu%e110 #nce C have pass throu&h the obstruction *establish circulation by pumpin&

    nitriHed uid0

    120 ter the C have reached 'nd # ubin&* circulate 17bbls o &el and two bottomsup with seawater or clean returns are observed at surace

     E'"L+'R unction

     est

  • 8/18/2019 Coiled Tubing Cleanout Operation

    43/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' 3

    T,"n 5ou

  • 8/18/2019 Coiled Tubing Cleanout Operation

    44/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&'

    B"! .$ Slide&

  • 8/18/2019 Coiled Tubing Cleanout Operation

    45/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' 4

    N2 6i! 10 %ae C "/ as per dia&ram and perorm pressure test

    20 #pen %aster and Crown valve

    30 ter openin& the valve* R-/ C at av&0 27t,min to pass throu&h wellhead stac

    40 -ncrease R-/ speed to av&0 57t,min ater 57 t below wellhead stac0

    50 t ;77m start pumpin& the nitro&en0

    ;0 Returns are monitored at all time ater pumpin& started0

    @0 Continue R-/ to :77m * start pumpin& the nitro&en or an hour0

    J0 $ump the nitro&en at interval o 377m or an hour i the well is still not owin&0

    :0 - hydrocarbon is observed to be owin&* stop pumpin& A2 and monitor well ow0

    170 $##/ the C to surace0 #nce at surace secure the well and bleed pressurerom the riser0

    T%e"#en# P"%"e#e%&

  • 8/18/2019 Coiled Tubing Cleanout Operation

    46/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' 9

    T%e"#en# P"%"e#e%&Operating Data

     Eob Circulation 3577 psi

    ellhead or Choe $ressure 277 psi reatin& luid Data

    luid Aame $ure ater

    +peciHc ravity 1071

    +terlin& "ead Concentration 707wt?

    +cale Data

    $re>.ob drit 2 2,2 in

    +cale 'ccentricity 7 in

    $ost Eob Drit 20;3in

    +cale Len&th ;21207 t

    Aole Data

    Aumber o Radial Aoles 2

    +ie o Radial Aoles 70125in

    +ie o Down Eet Aoles 77:3in

    Calculated ool Data

    %a llowable Drit Rin& #D 20;JJin

    Tubin Pi!le Mi7

  • 8/18/2019 Coiled Tubing Cleanout Operation

    47/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' :

    Tubin Pi!le Mi7

    Concentrationfor 1000 gal 10 bbls

    272 /CL 33? J5 &als

    @@4 $ortable ater 325 &als

    ;5 -ron Control 25 lbs

    ; Corrosion-nhibitor

    3 &als

    5 -ron Control 2 lbs

    Po-e%CLEAN 8el

  • 8/18/2019 Coiled Tubing Cleanout Operation

    48/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' =

    Po-e%CLEAN 8el

    Item Material Conc. Unit Total Unit

    1 $ortableater

    42 &al,bbl 4277 &al

    2 E5@2 10@5 lb,bbl 1@5 lb

    3 E353(#2scaven&er)

    305 lb,bbl 357 lb

    4 173 7025 &al,bbl 25 &al

    DAD A!id

  • 8/18/2019 Coiled Tubing Cleanout Operation

    49/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' >

    DAD A!id

    Item Material Conc. Unit Total Unit

    1 $ortable ater 427 &pt 1;J &al

    2

    3

    4

  • 8/18/2019 Coiled Tubing Cleanout Operation

    50/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' 4&

    CT E'ui$en#3&

    -n.ector rame

    +tripper on Close upRiser

    Dual C#%""#$

    oosenec

    ellhead+tac

    +"#$

    +tripper

    I * # H d P i C #

  • 8/18/2019 Coiled Tubing Cleanout Operation

    51/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' 4'

    In*e!#o% He"d 9 P%i"%+ Co$onen#&

    Primary com+onents/f,nctions

    incl,e? – /ydraulic drive,brae system (1)

     – Drive chains and tensioners (2)

     – oosenec or &uide>arch (3)

     – ei&ht indicator sensor (4) – Depth system sensor (5)

     – +tripper mount (;)

    1

    2

    3

    4

    ;

  • 8/18/2019 Coiled Tubing Cleanout Operation

    52/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' 4%

    PI!ecommen"ations

    T#bing $i%e!a"i#s

    (in.) (in.)1&1' to *+

    1&1'+ to *+

    1&,' *+ to -

    + *+ to-

    +&,' -0 to 1+0

    +&*' -0 to1+0

    ,&1'+ - to 1+0

    +R -0 50in.

    +R -80 108in.

    +R -0 7in.

    8uide A%!,

    Reel S-i/el "nd M"niold

  • 8/18/2019 Coiled Tubing Cleanout Operation

    53/54

    Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berha (P!T"ON#$) %&' 43

    Reel S-i/el "nd M"niold

    Cable

    Coiled tubin&

    $ressure

    bulhead

    C isolationvalve

    Reelcollector

    Reelale

     Eumper cable

    Reelswivel

  • 8/18/2019 Coiled Tubing Cleanout Operation

    54/54

    /#ipment eight

    (MT)

    2ength

    (ft)

    i"th

    (ft)

    3eigh

    t (ft)1>1,4< 12N t CReel

    11 17 J 17

    -n.ector /ead @ 5 3 @

     Eacin& rame 4 17 12 17

    Control Cabin @ 12 J :

    $ower $ac @ J J J

    Combi "#$ 1 J 3 5

    luid $ump 17 25 ; ;

     win "atch %ier ; 22 J 17

    $re>mi an 5 21 : :

    Liuid Aitro&en an

    11 14 J :

    CT ei,# : ;oo#$%in#