Coffer Slabs Formwork

16
Coffers & Troughs Product catalogue

description

guide

Transcript of Coffer Slabs Formwork

Page 1: Coffer Slabs Formwork

Co

ffer

s &

Tro

ugh

sPr

oduc

t cat

alog

ue

Page 2: Coffer Slabs Formwork

Aces Group is India’s leading supplier of formwork, falsework and scaffolding to the construction and civil engineering industries. Aces Group not only manufactures, hires and sells world-class products, but also provides the design skills, technical advice and support.

Ace scaffolding is a unit of Aces Group.

Disclaimer

Copyright in this catalogue vests in Aces Group, to the making of copies in whole or in part without the prior written consent of Aces Group.

While every effort has been made to ensure the accuracy of the information in this catalogue, we cannot accept responsibility for any error which may occur as a result of reliance on the content of this catalogue and are not liable for any loss of any nature that may be incurred as a result of such reliance.

Details of any of the products may change without prior notice.

Note: The colours used in this document are for illustrative purposes only and may differ on actual product.

Page 3: Coffer Slabs Formwork

ContentsOverview

General Assembly

Kwik-Stage components

Coffers & Troughs

Coffers & Troughs on Kwik-Strip

Props

Kwik-Deck components

Coffers on Kwik-Deck

Coffers on Kwik-Deck on BS Props

Coffers on Kwik-Deck on Alu-up Props

Coffers on Kwik-Strip on Kwik-Stage

Page 4: Coffer Slabs Formwork

Co

ffer

s &

T

rou

ghs

Aces Group Coffer system is used to produce cocrete slabs with a waffled soffit finish. The ribs between the Coffers are reinforced and acts as down stand concrete beams to produce a two way spanning concrete slabs.

Aces Group Trough system is used to produce a one way spanning concrete slabs with a multiple inverted gutter shaped soffit finish. The ribs between the Troughs are reinforced to act as down stand concrete beams.

System features• Quick and easy to install and remove

• Lightweight and easy to handle

• Regular shape ensures ease of erection

• Versatile height and width configurations

• Stacking by “nesting” saves space on site and reduces transport cost

• Reduction in concrete and reinforcing steel

• Offers a fair faced concrete finish

Page 5: Coffer Slabs Formwork

Coffers & Troughs

General Assembly

Page 6: Coffer Slabs Formwork

CoffersCoffers are used to form waffle shaped voids in the soffits of concrete slabs.

Code DescriptionAG 9096 Form Coffer 900 x 525AG 9099 Form Coffer 900 x 425AG 9102 Form Coffer 900 x 325AG 9105 Form Coffer 900 x 225

DwangsTrough Dwangs are used to internally prop the sides of the Trough to enable the Troughs to withstand the concrete pressure.

Code DescriptionAG 9108 Trough Glass Fibre Stay/Dwang

Coffers & Troughs

Page 7: Coffer Slabs Formwork

TroughsTroughs are used to form one way spanning cocrete slabs.

Code DescriptionAG 9111 Trough Glass Fibre M1500 x 625AG 9114 Trough Glass Fibre M750 x 625AG 9117 Trough Glass Fibre M1500 x 525AG 9120 Trough Glass Fibre M750 x 525AG 9123 Trough Glass Fibre M1500 x 425AG 9126 Trough Glass Fibre M750 x 425AG 9129 Trough Glass Fibre M500 x 425AG 9132 Trough Glass Fibre M1500 x 325AG 9135 Trough Glass Fibre M750 x 325AG 9138 Trough Glass Fibre M500 x 325AG 9141 Trough Glass Fibre M1500 x 225AG 9144 Trough Glass Fibre M750 x 225AG 9147 Trough Glass Fibre M500 x 225AG 9150 Trough Glass Fibre E1000 x 625AG 9153 Trough Glass Fibre E500 x 625AG 9156 Trough Glass Fibre E1000 x 525AG 9159 Trough Glass Fibre E500 x 525AG 9162 Trough Glass Fibre E1000 x 425AG 9165 Trough Glass Fibre E500 x 425AG 9168 Trough Glass Fibre E1000 x 325AG 9171 Trough Glass Fibre E500 x 325AG 9174 Trough Glass Fibre E1000 x 225AG 9177 Trough Glass Fibre E500 x 225

Coffers & Troughs

Page 8: Coffer Slabs Formwork

Coffers & Troughs

Page 9: Coffer Slabs Formwork

Coffers & Troughs

General Assembly

Page 10: Coffer Slabs Formwork

Application- Troughs on Kwik-Stage on Kwik-Stage

Coffers & Troughs

Page 11: Coffer Slabs Formwork

Application- Coffers on Kwik-Strip on Kwik-Stage (900mm Grid)

Coffers & Troughs

Coffers

Unstripped position

Stripped position

Kwik-Strip Beam

Standard

900mm 900mm

Double Headed Jack

900 Kwik-Stage Ledger

75 mm75 mm

Page 12: Coffer Slabs Formwork

Coffer

Coffer

Kwik-Deck Coffer Support Beam supports both the Coffer and the 825mm Deck Panels

Kwik-Deck Beam

100 mm 100 mmUnstripped position

Stripped position

Kwik-Deck Beam

925 Kwik-Stage Ledger

925mm 925mm

BT Jack

Kwik-Stage Standard

Note: Coffers supported on Kwik-Deck System work on a 900x925mm Grid due to the 100mm wide Kwik-Deck Beams

Application- Coffers on Kwik-Deck on Kwik-Stage (925mm Grid)

Page 13: Coffer Slabs Formwork

Coffer

Kwik-Deck Beam

Kwik-Deck Drop Head

BS Props

Coffer Support Beam

Application- Coffers on Kwik-Deck on BS Props

Page 14: Coffer Slabs Formwork

Coffer

Kwik-Deck Beam

Kwik-Deck Drop Head

Alu-Up Props

Coffer Support Beam

Application- Coffers on Kwik-Deck on Alu-Up Props

Page 15: Coffer Slabs Formwork

Coffer

Kwik-Deck Beam

Kwik-Deck Drop Head

Kwik-Stage Standard

Kwik-Stage Ledger

Coffers on Kwik-Deck on Kwik Stage

Page 16: Coffer Slabs Formwork

www.acesgroups.com

Paramjit Singh WasonPricewaterhouseCoopers Pvt Ltd. Bulidig 8 Tower B, DLF Cyer CityGurgaon 122002

Anmol Singh WasonPricewaterhouseCoopers Pvt Ltd. Bulidig 8 Tower B, DLF Cyer CityGurgaon 122002