10
Coca-Cola’s Atlanta Landfill Gas Cogeneration Project Richard Crowther – Coca-Cola Jason Byars – MAS Energy 1

Transcript of Coca-Cola's First LFG Energy Project (PDF)

Page 1: Coca-Cola's First LFG Energy Project (PDF)

Coca-Cola’s Atlanta Landfill Gas Cogeneration Project

Richard Crowther – Coca-Cola

Jason Byars – MAS Energy

1

Page 2: Coca-Cola's First LFG Energy Project (PDF)

2

Live Positively is our commitment to making a positive difference in the world by re-designing the way we work and live, so sustainability is part of everything we do.

Coca-Co la ’s V i s i o n

Page 3: Coca-Cola's First LFG Energy Project (PDF)

Coca-Cola Freestyle

• Launched in 2009, Coca-Cola Freestyle is a revolutionary fountain that dispenses 100+ sparkling & still beverages

• Offers consumers unprecedented choice & variety such as 70+ low/no calorie options

• Technologically advanced including web based consumption reporting to manage inventory, and ordering efficiencies.

• Coca-Cola Freestyle can be found in 1000s of locations – restaurants, movie theatres, sports venues, colleges/universities, convenience stores, retail, drug stores, etc.

• Coca-Cola Freestyle has received numerous awards for innovation and design

3

Page 4: Coca-Cola's First LFG Energy Project (PDF)

4

ENERGY & CLIMATE

SUSTAINABLE PACKAGING

WATER STEWARDSHIP

Where does Coca -Co l a

focus on Sus t a i nab i l i t y ?

Page 5: Coca-Cola's First LFG Energy Project (PDF)

F l e e t T r a n s p o r t a t i o n

P r o d u c t i o n E f f i c i e n c y

A l te rna t i ve Energy

P r o d u c t D e l i v e r y

4 Key Areas for Energy & Cl imate

Page 6: Coca-Cola's First LFG Energy Project (PDF)

6

Alternative energy

Fuel Cells

Bio-Fuels

Solar Power

Cogeneration

Page 7: Coca-Cola's First LFG Energy Project (PDF)

Atlanta Project Overview • Project Description

– 6.525 MW CHP plant using LFG from Hickory Ridge landfill

– Electric and thermal energy used by Coca-Cola’s Atlanta Plant

– Project includes: • Landfill gas processing

• 6.0 mile dedicated pipeline

• 3 Jenbacher J616 engines

• Heat recovery steam generators

• Steam turbine chiller

• Project Schedule – Construction start – 12/2010

– Commercial operations – 3/2012

• Key Project Partners – Mas Energy

– Republic Services

– Atlanta Gas Light

– GE Jenbacher

– Veolia Energy N.A.

– Crowder Construction

Page 8: Coca-Cola's First LFG Energy Project (PDF)

System Schematic

Page 9: Coca-Cola's First LFG Energy Project (PDF)

Permitting Approach

Major Synthetic Minor

LAER required? Yes No

Emissions Reduction Credits required? Yes No

Permitting Timeline 10-14 months 3-4 months

Qualify for Sec. 1603 grant in 2010? No Yes

Page 10: Coca-Cola's First LFG Energy Project (PDF)

Q&A