Coastal Restoration Team Mississippi River Reintroduction into Bayou Lafourche Special Joint...

download Coastal Restoration Team Mississippi River Reintroduction into Bayou Lafourche Special Joint Legislative Committee Meeting August 16, 2006 Special Joint.

If you can't read please download the document

Transcript of Coastal Restoration Team Mississippi River Reintroduction into Bayou Lafourche Special Joint...

  • Slide 1

Coastal Restoration Team Mississippi River Reintroduction into Bayou Lafourche Special Joint Legislative Committee Meeting August 16, 2006 Special Joint Legislative Committee Meeting August 16, 2006 W092004002GNV Slide 2 Coastal Restoration Team 102 Years on the Bayou Potable Water Dilemma in Thibodaux Late 30s/Early 40s Walter Lemann Pump Station Built 1955 Bayou Lafourche Dammed 1904 1 st Report of Salt Water Intrusion 1906 EPA Proposed 2,000 cfs Siphon Project 1995 MRRBL Sponsored by EPA Funded by CWPPRA October 2001 Slide 3 Coastal Restoration Team Project Purpose To nourish and protect the marshes of the Barataria and Terrebonne Basins through the reintroduction of freshwater, sediments, and nutrients from the Mississippi River. The proposed project has the added benefits of ensuring long-term freshwater supply to the communities and industries served by the Bayou Lafourche Freshwater District, by limiting saltwater intrusion and enhancing water supply. Slide 4 Coastal Restoration Team Task Force Stipulations LA Pays 50% of E&D The allocation of Phase 1 E&D funds does not Commit the Task Force to a Specific Level of Construction Funding Approved thru 30% design 30% Design Review Decision will be based on: Updated Costs and Benefits of the project alternatives An Assessment of existing and planned projects in the area on the benefits of the Bayou Lafourche project. Preliminary cost and benefit allocations A list of Preliminary Cost Sharing Sources Cost Sharing will be proportionally based on benefits received Slide 5 Coastal Restoration Team Unique Achievements Outreach focused on public concerns Special Joint Legislative Committee established Basin Wide Modeling RMA Model 2400 square miles HEC RAS Water Level Impacts Detailed Benefits Assessment Salinity reduction/sediment-nutrient loading Slide 6 Coastal Restoration Team RMA Model Slide 7 Coastal Restoration Team Continuity Lines Slide 8 Coastal Restoration Team Model Area by Basin Slide 9 Coastal Restoration Team Run 05 Slide 10 Coastal Restoration Team Run 10 Slide 11 Coastal Restoration Team Run 10-5 Benefit Area Slide 12 Coastal Restoration Team Screening of Alternatives 144 alternatives initially developed Alternatives screened on quantitative and qualitative criteria Slide 13 Coastal Restoration Team Summary of Qualitative Rankings TABLE 4-9 SUMMARY OF QUALITATIVE SCORING Criteria Alternative 152032384447Least Rise Maintenance5435322 Construction Impacts5324421 Dredge Volume5435421 Expandability2333553 Stormwater ControlFlood Control 2342355 Diversion Flow3343453 PermittingROWEnviron mental Impacts 5324311 Total ScoreN/A232126 22N/A Slide 14 Coastal Restoration Team Summary of Quantitative Values TABLE 4-7 SUMMARY OF QUANTITATIVE VALUES Alternative Flow (cfs)Cost($)AAHUs Cost/cfs ($)Cost/AAHUAAHUs/cfs Water Level Impacts ($) 151,000170,000,000NA166,000NA 4,687,000 201,000261,000,0001,819256,000143,5001.784,674,000 321,500331,000,0002,266216,000146,1001.484,674,000 381,000184,000,0002,031190,00090,6002.094,674,000 441,400251,000,0002,164179,000116,0001.554,086,000 472,000379,000,0002,203190,000172,0001.104,086,000 Least Rise1,000379,000,000NA379,000NA 1,164,000 Slide 15 Coastal Restoration Team Preferred Alternative Selection 38 selected: Most cost efficient Most AAHUs per cfs (121,025 Acres) Moderate water level impacts Moderate construction/dredging impacts Slide 16 Coastal Restoration Team Where are we now? Ph 1 Model Report And Water Level Analysis June/July 2005 Final Phase 1 Report November 2005 Review of Existing Data June 2003 Historical Water Level Analysis May 2004 Draft Ph 1 Report August 2004 Final Phase 2 Report March 2006 30% Design Meeting May 9, 2006 Slide 17 Coastal Restoration Team Where are we going? Final Design? 30% Design Meeting May 9, 2006 CWPPRA Technical Committee Meeting June 14, 2006 CWPPRA Task Force Meeting July 12, 2006 Slide 18 Coastal Restoration Team July 12 th CWPPRA Task Force Stipulations 1.Identify a potential funding source for $2.5 M in Federal funds 2.Determine the impact of conducting an ITR on the work done to date 3.Investigate the legality of spending Federal monies without a determination of feasibility WRDA Bill passage? Funding Options? Slide 19 Coastal Restoration Team www.bayoulafourche.org Slide 20 Coastal Restoration Team Calculated Acres Benefited Slide 21 Coastal Restoration Team Next Steps: Drainage Analysis Operation/Maintenance Plan Marsh Creation Cost Estimate Updates Benefits Analysis (WVA) 95% Pump station design 95% Control structures design 95% Channel design Final Plans and Specification Completed Final EIS Identification of Construction Funding Slide 22 Coastal Restoration Team ALT #38: BL, 2-0 RM29, 1000 cfs, $183 M Thibodaux Lockport Donaldsonville Existing Alt #38