COAL-FIRED POWER STATION AND ASSOCIATED … · coal-fired power station and associated...

13
COAL-FIRED POWER STATION AND ASSOCIATED INFRASTRUCTURE – IPP WATERBERG (THABAMETSI) POWER STATION, NEAR LEPHALALE, LIMPOPO PROVINCE (DEA Ref. No. 14/12/16/3/3/40) - CLIMATE CHANGE AND PALAEONTOLOGICAL IMPACT ASSESSMENT REPORT AVAILABLE FOR PUBLIC REVIEW Assigned to: Teams: Global Project: Thabametsi Coal-fired Power Station From: Gabriele Wood <[email protected]> To: Cc: Bcc: John Wesson <[email protected]>, Gideon Erasmus <[email protected]>, Mokgadi Makgato <[email protected]>, Bob Naidoo <[email protected]>, Mortimer Mannya <[email protected]>, Marlaine Andersen <[email protected]>, Molaudzi Engelin <[email protected]>, Robyn Hugo <[email protected]>, JC Dreyer <[email protected]>, Hardus Steenekamp <[email protected]>, Pat van Rooyen <[email protected]>, Kobus De Villiers <[email protected]>, Mariette Ventre <[email protected]>, Karen Steenkamp <[email protected]>, Zev Green <[email protected]>, Maila Ledwaba Masetlwa <[email protected]>, A Matukane <[email protected]>, Astrid Basson <[email protected]>, Kubentheran Nair <[email protected]>, Charity Radipabe <[email protected]>, Krishna Reddy <[email protected]>, Hanneline Smit <[email protected]>, Rico Euripidou <[email protected]>, Tinyiko Malungani <[email protected]>, Filomaine Swanepoel <[email protected]>, Regina Makgata <[email protected]>, Andy Mcleod <[email protected]>, Mahlangu <[email protected]>, Aron Kharivhe <[email protected]>, Dalene Pitcut <[email protected]>, Department of Energy <[email protected]>, Jo-Anne Thomas <[email protected]>, Langi Malamba <[email protected]>, TW Papo <[email protected]>, John Geeringh <[email protected]>, Moloko Jack Maeko <[email protected]>, Lindiwe Kgomo <[email protected]>, Johannes Molepo <[email protected]>, Phomozo Thivhafuni <[email protected]>, Edith Tukakgomo <[email protected]>, Victoria Bota <[email protected]>, T Malele <[email protected]>, Louis Rossel <[email protected]>, Avhashoni Nicholas Magada <[email protected]>, Dirk van Alphen <[email protected]>, Hennie van den Aardweg <[email protected]>, Boeta Steenekamp <[email protected]>, Thulie Mdluli <[email protected]>, Henri Nieuwoudt <[email protected]>, Mathemba Makola <[email protected]>, Nicolaas Pienaar <[email protected]>, Chris Erasmus <[email protected]>, Azwihangwisi Mulaudzi <[email protected]>, Joshua Hlapa <[email protected]>, Wolsey Otto Barnard <[email protected]>, Louis Loots <[email protected]>, Sam Mabotja <[email protected]>, Emile Marell <[email protected]>, Valerie Cilliers <[email protected]>, Louise Forward Projects Organisations Stakeholders Calendar Reports Emails more Sear © 2012 SugarCRM Inc. COAL-FIRED POWER STATION AND ASSOCIATED INFRAST... http://savannahsa.sugar-crm.co.za/index.php?module=Emails&action... 1 of 3 27/01/2017 16:47

Transcript of COAL-FIRED POWER STATION AND ASSOCIATED … · coal-fired power station and associated...

Page 1: COAL-FIRED POWER STATION AND ASSOCIATED … · coal-fired power station and associated infrastructure – ipp waterberg (thabametsi) power station, near lephalale, limpopo province

COAL-FIRED POWER STATION AND ASSOCIATED INFRASTRUCTURE – IPP

WATERBERG (THABAMETSI) POWER STATION, NEAR LEPHALALE,

LIMPOPO PROVINCE (DEA Ref. No. 14/12/16/3/3/40) - CLIMATE CHANGE AND

PALAEONTOLOGICAL IMPACT ASSESSMENT REPORT AVAILABLE FOR

PUBLIC REVIEW

Assigned to:

Teams: Global Project: Thabametsi Coal-fired Power Station

From: Gabriele Wood <[email protected]>

To:

Cc:

Bcc: John Wesson <[email protected]>, Gideon Erasmus <[email protected]>, Mokgadi

Makgato <[email protected]>, Bob Naidoo

<[email protected]>, Mortimer Mannya <[email protected]>,

Marlaine Andersen <[email protected]>, Molaudzi Engelin <[email protected]>,

Robyn Hugo <[email protected]>, JC Dreyer <[email protected]>, Hardus Steenekamp

<[email protected]>, Pat van Rooyen <[email protected]>, Kobus De Villiers

<[email protected]>, Mariette Ventre <[email protected]>, Karen Steenkamp

<[email protected]>, Zev Green <[email protected]>, Maila Ledwaba

Masetlwa <[email protected]>, A Matukane <[email protected]>, Astrid

Basson <[email protected]>, Kubentheran Nair <[email protected]>, Charity Radipabe

<[email protected]>, Krishna Reddy <[email protected]>,

Hanneline Smit <[email protected]>, Rico Euripidou <[email protected]>,

Tinyiko Malungani <[email protected]>, Filomaine Swanepoel

<[email protected]>, Regina Makgata <[email protected]>, Andy

Mcleod <[email protected]>, Mahlangu <[email protected]>, Aron Kharivhe

<[email protected]>, Dalene Pitcut <[email protected]>,

Department of Energy <[email protected]>, Jo-Anne Thomas <[email protected]>,

Langi Malamba <[email protected]>, TW Papo

<[email protected]>, John Geeringh <[email protected]>, Moloko

Jack Maeko <[email protected]>, Lindiwe Kgomo

<[email protected]>, Johannes Molepo <[email protected]>, Phomozo

Thivhafuni <[email protected]>, Edith Tukakgomo

<[email protected]>, Victoria Bota <[email protected]>, T Malele

<[email protected]>, Louis Rossel <[email protected]>, Avhashoni

Nicholas Magada <[email protected]>, Dirk van Alphen

<[email protected]>, Hennie van den Aardweg <[email protected]>, Boeta

Steenekamp <[email protected]>, Thulie Mdluli <[email protected]>, Henri Nieuwoudt

<[email protected]>, Mathemba Makola <[email protected]>,

Nicolaas Pienaar <[email protected]>, Chris Erasmus <[email protected]>,

Azwihangwisi Mulaudzi <[email protected]>, Joshua Hlapa

<[email protected]>, Wolsey Otto Barnard <[email protected]>,

Louis Loots <[email protected]>, Sam Mabotja <[email protected]>,

Emile Marell <[email protected]>, Valerie Cilliers <[email protected]>, Louise

Forward

Projects Organisations Stakeholders Calendar Reports Emails more

Search

© 2012 SugarCRM Inc.

COAL-FIRED POWER STATION AND ASSOCIATED INFRAST... http://savannahsa.sugar-crm.co.za/index.php?module=Emails&action...

1 of 3 27/01/2017 16:47

Page 2: COAL-FIRED POWER STATION AND ASSOCIATED … · coal-fired power station and associated infrastructure – ipp waterberg (thabametsi) power station, near lephalale, limpopo province

Dries Basson <[email protected]>, Maylene Broderick <[email protected]>,

Jaco Wolmarans <[email protected]>, Penny-Jane Cooke

<[email protected]>, Shelly Lizzo <[email protected]>, K Lithole

<[email protected]>, Jacques du Plessis <[email protected]>,

Selekane Phahladira <[email protected]>, Francisca Fynaut <[email protected]>,

Leonard Sole <[email protected]>, Patrick Motela <[email protected]>,

Dawie Smit <[email protected]>, S Snyders <[email protected]>, Ian

Hall <[email protected]>, J.T Ramphago <[email protected]>, Frans

Mabotja <[email protected]>, MM Komape <[email protected]>, Nakedi

Maake <[email protected]>, Susara Maria Gouws <[email protected]>, Nicole

Loser <[email protected]>, Johan Koekemoer <[email protected]>,

Nnana Manamela <[email protected]>, Dawid van der Walt

<[email protected]>, Nokukhanya Khumalo <[email protected]>,

Thomas Tau <[email protected]>, Thoko Buthelezi <[email protected]>, Nakkie

Maartens <[email protected]>, Marius Fuls <[email protected]>,

Catharina Alletha Erasmus <[email protected]>, Jurie Delport

<[email protected]>, C C van Wyk <[email protected]>, Eben Badenhorst

<[email protected]>, Francois van der Berg

<[email protected]>, Stanley Koenaite <[email protected]>, Lephalale

Local Municipality <[email protected]>, Ria Wells <[email protected]>, Dominique

Doyle <[email protected]>, Melita Steele <[email protected]>,

Mashudu Marubini <[email protected]>, Sambulo Mnguni <[email protected]>,

BirdLife South Africa <[email protected]>, Julian Eslait <[email protected]>,

Gwen Mahuma <[email protected]>, Wolfie Jahn <[email protected]>, Cliffe

Delaporte <[email protected]>, Johan Lourens

<[email protected]>

Subject: COAL-FIRED POWER STATION AND ASSOCIATED INFRASTRUCTURE – IPP

WATERBERG (THABAMETSI) POWER STATION, NEAR LEPHALALE, LIMPOPO

PROVINCE (DEA Ref. No. 14/12/16/3/3/40) - CLIMATE CHANGE AND

PALAEONTOLOGICAL IMPACT ASSESSMENT REPORT AVAILABLE FOR PUBLIC REVIEW

Body: Dear Stakeholder

Thabametsi Power Company Proprietary Limited, an Independent Power Producer (IPP) is

proposing the construction of a coal-fired power station (the “Project”) on the farm Onbelyk

254 LQ near Lephalale in the Limpopo Province. The project is known as the Thabametsi

Coal-Fired Power Station. The power station will have a generating capacity of up to

1200MW which is intended to provide baseload electricity for integration into the national

grid.

The project was authorized by the National Department of Environmental Affairs (DEA) on 25

February 2015 (in terms of the 2010 EIA Regulations). Subsequently, an appeal was lodged

on 11 May 2015 by the Centre for Environmental Rights. On 14 September 2015, a decision

on the appeal was issued by the Minister of Environmental Affairs. The grounds of the

appeal were dismissed, however it was contended that climate change impacts had not been

adequately addressed in the EIA and that a palaeontological study is required to be

conducted for the proposed project.

The scope of work for the above-mentioned studies was presented in a Scope of Work

Report. The Scope of Work report was accepted by the DEA on the 16 January 2017. The

detailed outcomes of the climate change study, paleontological assessment and resilience

assessment conducted as part of the new conditions and requirements of the Environmental

Authorization are presented in an assessment report in line with the accepted Scope of Work

© 2012 SugarCRM Inc.

Projects Organisations Stakeholders Calendar Reports Emails more

COAL-FIRED POWER STATION AND ASSOCIATED INFRAST... http://savannahsa.sugar-crm.co.za/index.php?module=Emails&action...

2 of 3 27/01/2017 16:47

Page 3: COAL-FIRED POWER STATION AND ASSOCIATED … · coal-fired power station and associated infrastructure – ipp waterberg (thabametsi) power station, near lephalale, limpopo province

Print Back to top

February 2017. Please refer to the attached notification letter for further information in this

regard.

Kind regards,

Mrs Gabriele Wood

Public Participation and Social Consultant

Savannah Environmental (Pty) Ltd

Tel: 27 11 656 3237

Fax: 086 684 0547

Email: [email protected]

www.savannahsa.com

Show Plain Text

Attachments: Thabametsi Notification Letter CCIA 27.01.2017.pdf

Projects

(1 - 1 of 1)

Name Assigned To Start Date: End Date:

Thabametsi Coal-fired Power Gabriele01/03/2012 31/07/2013

Attachments

(1 - 1 of 1)

Subject ContactLastModified

Thabametsi Notification Letter CCIA27.01.2017.pdf

27/01/201716.47

Activities

Accounts

Contacts

Email Stakeholders

Users

Create

edit

edit

© 2012 SugarCRM Inc.

Projects Organisations Stakeholders Calendar Reports Emails more

COAL-FIRED POWER STATION AND ASSOCIATED INFRAST... http://savannahsa.sugar-crm.co.za/index.php?module=Emails&action...

3 of 3 27/01/2017 16:47

Page 4: COAL-FIRED POWER STATION AND ASSOCIATED … · coal-fired power station and associated infrastructure – ipp waterberg (thabametsi) power station, near lephalale, limpopo province

From the desk of Gabriele Wood

E-mail: [email protected] _____________________________________

27 January 2017

Dear Stakeholder

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

PUBLIC PARTICIPATION PROCESS

COAL-FIRED POWER STATION AND ASSOCIATED INFRASTRUCTURE – IPP

WATERBERG (THABAMETSI) POWER STATION, NEAR LEPHALALE, LIMPOPO

PROVINCE

(DEA Ref. No. 14/12/16/3/3/40)

CLIMATE CHANGE AND PALAEONTOLOGICAL IMPACT ASSESSMENT

REPORT AVAILABLE FOR PUBLIC REVIEW

Dear Stakeholder

Thabametsi Power Company Proprietary Limited, an Independent Power Producer

(IPP) is proposing the construction of a coal-fired power station (the “Project”) on the

farm Onbelyk 254 LQ near Lephalale in the Limpopo Province. The project is known

as the Thabametsi Coal-Fired Power Station. The power station will have a generating

capacity of up to 1200MW which is intended to provide baseload electricity for

integration into the national grid.

The project was authorized by the National Department of Environmental Affairs

(DEA) on 25 February 2015 (in terms of the 2010 EIA Regulations). Subsequently, an

appeal was lodged on 11 May 2015 by the Centre for Environmental Rights. On 14

September 2015, a decision on the appeal was issued by the Minister of

Environmental Affairs. The grounds of the appeal were dismissed, however it was

contended that climate change impacts had not been adequately addressed in the EIA

and that a palaeontological study is required to be conducted for the proposed

project.

The scope of work for the above-mentioned studies was presented in a Scope of Work

Report. The Scope of Work report was accepted by the DEA on the 16 January 2017.

The detailed outcomes of the climate change study, paleontological assessment and

resilience assessment conducted as part of the new conditions and requirements of

the Environmental Authorization are presented in an assessment report in line with

the accepted Scope of Work and additional requirements of the DEA as detailed in

their letter dated 16 January 2017.

This assessment report is available for a 30-day public review 27 January 2017 to

27 February 2017. The report can be viewed at the following locations:

Page 5: COAL-FIRED POWER STATION AND ASSOCIATED … · coal-fired power station and associated infrastructure – ipp waterberg (thabametsi) power station, near lephalale, limpopo province

» Lephalale Local Municipality Public Library (Address: Cnr Joe Slovo Street and

Douwater Avenue, Lephalale)

» Marapong Community Library (Address: 1456 Setlhora Street, Marapong)

» Manketti Lodge, Ferroland Management Offices, Lephalale

» AgriSA: Lephalale, Albert Street, Lephalale

The report is also available electronically on the website

www.savannahsa.com/projects. CD copies of the report may also be requested from

Savannah Environmental.

Any comments on this report can be submitted, in writing, to:

Please do not hesitate to contact us should you require additional information

and/or clarification regarding the proposed project. Our team welcomes your

participation and looks forward to your involvement throughout this process.

Kind Regards

GABRIELE WOOD

PUBLIC PARTICIPATION AND SOCIAL CONSULTANT

SAVANNAH ENVIRONMENTAL

Gabriele Wood of Savannah Environmental

Post: PO Box 148, Sunninghill, 2157 Johannesburg

Tel: 011 656 3237

Fax: 086 684 0547

Email: [email protected]

www.savannahsa.com

Page 6: COAL-FIRED POWER STATION AND ASSOCIATED … · coal-fired power station and associated infrastructure – ipp waterberg (thabametsi) power station, near lephalale, limpopo province
Page 7: COAL-FIRED POWER STATION AND ASSOCIATED … · coal-fired power station and associated infrastructure – ipp waterberg (thabametsi) power station, near lephalale, limpopo province
Page 8: COAL-FIRED POWER STATION AND ASSOCIATED … · coal-fired power station and associated infrastructure – ipp waterberg (thabametsi) power station, near lephalale, limpopo province
Page 9: COAL-FIRED POWER STATION AND ASSOCIATED … · coal-fired power station and associated infrastructure – ipp waterberg (thabametsi) power station, near lephalale, limpopo province
Page 10: COAL-FIRED POWER STATION AND ASSOCIATED … · coal-fired power station and associated infrastructure – ipp waterberg (thabametsi) power station, near lephalale, limpopo province
Page 11: COAL-FIRED POWER STATION AND ASSOCIATED … · coal-fired power station and associated infrastructure – ipp waterberg (thabametsi) power station, near lephalale, limpopo province
Page 12: COAL-FIRED POWER STATION AND ASSOCIATED … · coal-fired power station and associated infrastructure – ipp waterberg (thabametsi) power station, near lephalale, limpopo province

1

Gabriele Wood

From: Koketso <[email protected]>

Sent: 01 February 2017 17:01

To: 'Gabriele Wood'

Subject: SE1524 IPP Thabametsi SAHRIS

Hi Gabi.

Please see below screenshot.

Regards

Page 13: COAL-FIRED POWER STATION AND ASSOCIATED … · coal-fired power station and associated infrastructure – ipp waterberg (thabametsi) power station, near lephalale, limpopo province

2

Koketso Mobeng

Project Coordinator

Email: [email protected]

www.savannahSA.com

Awarded Leading Environmental Consultant on Wind Projects in 2013 & 2015 (SAWEA)

Disclaimer

This message and any files transmitted with it may contain information which is privileged, confidential or otherwise protected from disclosure. If you are not theintended recipient of this message, or if you have received it in error, please notify the sender immediately and delete the original and any attachments without makinga copy or disclosing its contents.