    Co.,Ltd-ShanxiCo.,Ltd-ShanxiCo.,Ltd-ShanxiCo.,Ltd-Shanxi No.4

    No.4No.4No.4 Electric

    ElectricElectricElectric Power

    PowerPowerPowerConstructionConstructionConstructionConstruction CompanyCompanyCompanyCompany

    QualificationQualificationQualificationQualification andandandand PerformancePerformancePerformancePerformance

  • 8/11/2019 Coal Fired Power Plant (1)

    2/56

    2

    TableTableTableTable of of of of CCCContentsontentsontentsontents

    ....CompanyCompanyCompanyCompany introductionintroductionintroductionintroduction

    .Qualification.Qualification.Qualification.Qualification CertificateCertificateCertificateCertificate

    1. Qualification Certificate of Overseas Project Contracting of the People s Republic

    of China

    2. Business License for Enterprise Legal Person

    3. Qualification Certificate of Construction Enterprise

    4. Permit for Production Safety

    5. People s Republic of China Organization Code

    6. Quality, environmental and occupational health system certification

    7. Tax Registration Certificate

    8. Qualification grade certification of electric power construction project civil

    laboratory9. Qualification grade certification of electric power construction project metal

    laboratory

    10. Installation, alternation, repair and maintenance license of special equipment

    (boiler, pressure piping and lifting machinery)

    11. Permit for electric facilities installation (maintenance, commissioning)

    12. Installing civil nuclear pressure equipment license.

    .... CoalCoalCoalCoal FiredFiredFiredFired PowerPowerPowerPower PlantPlantPlantPlant ConstructionConstructionConstructionConstruction PerformancePerformancePerformancePerformance TableTableTableTable

    1. 600MW units

    2. 300 MW units

    3. Below 200 MW units

    .Project.Project.Project.Project honorshonorshonorshonors

  • 8/11/2019 Coal Fired Power Plant (1)

    3/56

    3

    IIIIntroductionntroductionntroductionntroduction onononon ChinaChinaChinaChina EnergyEnergyEnergyEnergy EngineeringEngineeringEngineeringEngineering GroupGroupGroupGroup Co.,Co.,Co.,Co., Ltd-ShanxiLtd-ShanxiLtd-ShanxiLtd-Shanxi No.4No.4No.4No.4 ElectricElectricElectricElectric

    PowerPowerPowerPower ConstructionConstructionConstructionConstruction CompanyCompanyCompanyCompany

    China Energy Engineering Group Co., Ltd-Shanxi No.4 Electric Power

    Construction Company (hereinafter referred to as "CEEC-S4EPC") is a

    professional company which provides integrated schemes on location surveying

    design ,whole set equipment procurement supply ,equipment fabrication

    supervision ,construction installation, commissioning ,operation and maintenance

    in the areas of thermal power, nuclear power ,fuel gas, hydroelectric power, wind

    power ,bioelectrogenesis, photovoltaic ,power transmission and transformation

  • 8/11/2019 Coal Fired Power Plant (1)

    4/56

    4

    project and industrial equipment installation ;also is a company which has

    execution capabilities on EPCO,EPC,BOT and DB project .

    Shanxi No.4 Electric Power Construction Company is a company with

    EPC first-class qualification of electric power project; electric power facilities

    installation (maintenance) first-class permit and commissioning third-class

    permit ; special equipment installation ,reform and maintenance permit

    (boiler ,lifting machineries and pressure piping ); installing civil nuclear pressure

    equipment license; qualification of building construction EPC second-class,

    earthwork construction (first class), steel structure construction (first class), top

    building construction (first class) and environment protection construction (first

    class) issued by related authorities of government in China .

    The company also has civil & metal laboratory of country-level and weld

    training center of first class in China s electric power industry. The company also

    achieved Qualification Certificate of Overseas Project Contracting of the People s

    Republic of China.

    Since its establishment in 1988, our company is rooted in coal energy base

    Shanxi ,which has the biggest scale and longest history .Until now ,total

    capabilities we constructed are 13440MW .Our company has excellent

    performance in 600 MW units ,300MW units and below 300 MW coal fired

    power plant .The projects we constructed have received China Project

    Construction LuBan Award national high quality project , national thermal

    power large unit (600MW class) competition championthe first prize , China

    high quality project of the unit, thermal power generating reliability gold medal

    unit , Shanxi construction project high quality prize Fenshui Cup, first

    session civil engineering prizeTaihang Cup of Shanxi Province etc. In addition,

    our company has rich experiences and advanced technology in constructing CFB

    units.

  • 8/11/2019 Coal Fired Power Plant (1)

    5/56

    5

    At present , our company has created best construction performance of

    300MW units in CFB area because of its continuous operation reaching 193 days

    since it was transferred.The company has been adhering to constructing long-term

    stability operation units. Many constructed units have operated continuously after

    it was put into operation and created good economic interests to customers.In the

    field of power transmission and transformation, besides 110KV, 220KV, 500KV

    substations, our company also constructed first class project in the world--1000kv

    Jindongnan - Nanyang - Jingmen UHV AC pilot demonstration project.

    Our company has set up resident commercial institutions in Indonesia and

    other countries and also set up good relationships with many well-known

    international companies .Our company also undertook works of project

    management ,civil supervision ,equipment fabrication supervision ,parts of

    materials supply ,equipment installation and commissioning for Keban Agung

    2*135MW units Coal Fired Power Plant.

    China Energy Engineering Group Co., Ltd is a large-size energy

    construction group approved by the State Council and directly managed by

    State-owned Assets Supervision and Administration Commission of the State

    Council. China Energy Engineering Group Co., Ltd manages several subsidiaries

    like China Gezhouba Group Corporation, China Power Engineering Consulting

    Group Corporation, Electric Power Planning & Engineering Institute, China

    Energy Equipment Co., Ltd and also electric power survey and design,

    construction, equipment manufacturing enterprises located in 15 provinces. China

    Energy Engineering Group Co., Ltd is a key and large enterprise with a

    professional business chain integrated with planning, surveying, designing,

    constructing, EPC, project management, equipment fabrication, investment and

    operation and also is a driving force in China and world s energy construction .

  • 8/11/2019 Coal Fired Power Plant (1)

    6/56

    24

    CoalCoalCoalCoal FiredFiredFiredFired PowerPowerPowerPower PlantPlantPlantPlant ConstructionConstructionConstructionConstruction PerformancePerformancePerformancePerformance TableTableTableTable

    600MW600MW600MW600MW unitsunitsunitsunits : :::

    No. Project name Sponsor ConstructionScale

    Start and finishtime

    1 Shanxi luneng Hequ Power

    Plant Phase I ProjectShandong Luneng

    Development Group Co.,Ltd2*600MW 2002.072005.01

    2 Shanxi Luneng Hequ Power Plant Phase II Project

    Shandong Luneng

    Development Group Co.,Ltd

    2*660MW 2008.102011.8

    3 Shanxi Yangcheng Power Plant Phase II Project

    China Datang GroupCorporation

    2*600MW 2005.05---2007.09

    4 Shanxi International ElectricPower Huaguang Generating

    Plant ( Shanxi Liulin Power Plant Phase II Project)

    Shanxi International ElectricPower Group Co.,Ltd

    2*600MW 2005.09---2007.12

    5 Shanxi Zhangshan Power Plant Phase II Project

    Beijing JingnengInternational Energy Co.,Ltd

    2*600MW 2006.05---2008.05

    6 Shanxi Huozhou Power PlantPhase I Project

    State Electric Group

    Corporation

    2*600MW 2009.10---2012.04

    7 Shanxi Zuoquan Power PlantPhase I Project

    Huaneng International

    Electric Co.,Ltd

    2*660MW 2010.082012.1

  • 8/11/2019 Coal Fired Power Plant (1)

    7/56

    25

    300MW300MW300MW300MW unitsunitsunitsunits

    No

    .

    Project name Sponsor Constructio

    n Scale

    Start and finish time

    1 The 5th Project of Taiyuan No.1heat Power Plant

    Former State Electric

    Power Company

    2*300MW 1987.11---1992.12

    2 The 6th Project of Taiyuan No.1heat Power Plant

    Former State Electric

    Power Company

    2*300MW 1996.5---2001.10

    3 Shanxi Yangcheng Power PlantPhase I Project

    North China Electric Power

    Group

    6*350MW 1998.03---2002.07

    4 Shanxi Zhaoguang Power PlantPhase I Project

    Shanxi International Electric

    Power Group Co.,Ltd

    2*300MW 2003.11---2005.07

    5 North Combined Power LinhePower PlantProject

    China Huaneng GroupCorporation ,North United

    Electric Power Co.,Ltd

    2*300MW 2004.08---2007.04

    6 Chongqing HechuanShuanghuai Power Plant

    Project

    China Power InvestmentCorporation

    2*300MW 2004.12---2006.11

    7 The 6th Poject of Taiyuan No.2heat Power Plant

    China Datang GroupCorporation

    2*300MW 2005.07---2007.04

    8 The Project of Inner MongoliaMenxi Power Plant

    Inner Mongolia Electric

    Power Group Co.,Ltd

    2*300MW 2006.04---2007.12

    9 Shanxi Pingshuo GanguePower Station Phase IIProject

    Shanxi Pingshuo CoalGangue Generating Co.,Ltd

    2*300MW 2007.03---2009.06

    10 Shanxi Ruiguang Heat Power Plant Project

    Shanxi International Electric

    Power Group Co.,Ltd

    2*300MW 2007.12---2011.12

    11 Jinghai Gangue Power StationProject

    Beijing Jingmei GroupCo. ,Ltd

    2*330MW 2008.04---2010.10

    12 Shanxi Houma Extension Electric

    Power Plant

    China Electric Power

    Investment Group

    Corporation

    2*300MW 2009.04---

    13 Guodian Changzhi Power Plant1st phase Project

    China Guodian Corporation 2*300MW 2009.08---2011.11

    14 Shanxi Youyu Coal Gangue Power Plant Project

    Beijing Energy Investment

    Group Co.,Ltd

    2*300MW 2010.04---2011.12

    15 Shanyin Yuguang Coal GanguePower Plant Project

    Shanxi International EnergyGroup Co.,Ltd

    2*300MW 2010.04---2012.05

  • 8/11/2019 Coal Fired Power Plant (1)

    8/56

    26

    16 Shanxi Hongguang LianshengCoal Gangue Power PlantProject

    Shanxi International Electric

    Power Group Co.,Ltd

    2*300MW 2010.06---2012.12

    17 Gansu Jinchang heat Power

    Plant 1st

    phase Project

    Gansu Electric Investment

    Corporation

    2*330MW 2012.05

    18 Inner Mongolia Kangbashi HeatPower Plant

    Beijing JingnengInternational Energy

    Engineering Co.,Ltd;

    2*350MW 2011.08---

    19 Inner Mongolia Beijiao heatPower Plant Phase I Project

    Inner Mongolia BeijiaoHeat Electric Co.,Ltd

    4*330MW 2012.10---

    20 Inner Mongolia Junzheng Power

    Plant

    Inner Mongolia Junzheng

    Energy Chemical Industry

    Co.,Ltd

    2*350MW 2013.1---

  • 8/11/2019 Coal Fired Power Plant (1)

    9/56

    27

    BelowBelowBelowBelow 300MW300MW300MW300MW unitsunitsunitsunits

    No

    .

    Project name Sponsor Construction

    Scale

    Start and finish time

    1 Huaneng Yushe Power Plant 1 st

    phase ProjectFormer State Electric

    Power Company

    2*100MW 1992.10---1994.12

    2 Fujian Nanping Paper-making

    Factory Power Station Project

    Nanping Paper-making

    Factory

    1*25MW 1996.02---1997.10

    3 Xinjiang Hami Second Power

    Plant Phase III Project

    China Huadian Corporation 2*125MW 2001.09---2004.04

    4 The 5th Project

    of Taiyuan No.2 heat Power Plant

    Former State Electric

    Power Company

    1*200MW 2001.09---2003.06

    5 State-owned Five-Four-One

    Power Plant Technical Project

    Five-Four-One Factory 1*27.5MW 2002.05---2005.01

    6 Shanxi Yuci Heat Power PlantPhase I Project

    Shanxi Hengneng HeatElectric Co.,Ltd

    2*25MW 2003.07---2006.01

    7 Shanxi Pingshuo Coal GanguePower Plant Phase 1 st Project

    Shanxi International ElectricPower Group Co.,Ltd

    2*50MW 2003.10---2005.01

    8 Shanxi Zhongyang Steel Co.,Ltd-Coal Gauge Heat Power Plant

    Shanxi Zhongyang SteelPlant

    2*135MW 2007.06---2010.09

    9 Indonesian Keban AgungCoal Fired Power Plant Project

    PTPE 2*135MW 2011 07---

  • 8/11/2019 Coal Fired Power Plant (1)

    10/56

    28

    600MW600MW600MW600MWunitsunitsunitsunits

    1.1.1.1.TheTheTheThe 1st1st1st1st extensionextensionextensionextension projectprojectprojectproject of of of of ShanxiShanxiShanxiShanxi LunengLunengLunengLuneng HequHequHequHequ PowerPowerPowerPower PlantPlantPlantPlant

    The 1 st extension project 2600MW units of Luneng Hequ Power Plant is

    located in Hequ County, Xinzhou City, Shanxi Province. It is sponsored by Shandong

    Luneng Development Group Co.,Ltd ,Shanxi Jinneng Group Co.,Ltd and Shanxi

    International Electric Power Company .It started in August,2002. BTG epuipments

    were supplied by Harbin Boiler Manufacture, Dongfang Steam Turbine Manufacture,Dongfang Electrical Machinery Manufacture. It was put into operation in

    January,2005. The construction and installation works of Unit 2 in the first phase

    2600MW units project of Shanxi Luneng Hequ Power Generation Co., Ltd.

    contracted by our company was awarded Special-class Award in National Coal-fired

    Unit (600 MW level) Competition, National excellent welding works, Gold medal

    unit for national power generation reliability in 2006 and Customer satisfaction

    project of construction industry in Shanxi Province.

  • 8/11/2019 Coal Fired Power Plant (1)

    11/56

    29

    2.2.2.2.TheTheTheThe secondsecondsecondsecond extensionextensionextensionextension projectprojectprojectproject of of of of ShanxiShanxiShanxiShanxi LunengLunengLunengLuneng HequHequHequHequ PowerPowerPowerPower PlantPlantPlantPlant

    The second extension project 2600MW units of Luneng Hequ Power Plant is

    located in Hequ County, Xinzhou City, Shanxi Province. It is sponsored by Shandong

    Luneng Development Group Co.,Ltd ,Shanxi Jinneng Group Co.,Ltd and Shanxi

    International Electric Power Company .It started in June,2008. BTG equipments were

    supplied by Harbin Boiler Manufacture, Dongfang Steam Turbine Manufacture,

    Dongfang Electrical Machinery Manufacture. It was put into operation in August

    2011. This project is our company s milestone of building 600MW supercritical units

    .

  • 8/11/2019 Coal Fired Power Plant (1)

    12/56

    30

    3.3.3.3.TheTheTheThe secondsecondsecondsecond phasephasephasephase projectprojectprojectproject of of of of YangchengYangchengYangchengYangcheng PowerPowerPowerPower PlantPlantPlantPlant

    The second phase project 2600MW units of Yangcheng Power Plant is sponsored

    by China Datang Yangcheng Power Generation Co., Ltd.,Jiangsu Assess Management

    Group Co.,Ltd and Shanxi International Electric Power Company .It started in

    May ,2005. BTG equipments were supplied by Dongfang Boiler Manufacture, Harbin

    Steam Turbine Manufacture, and Harbin Electrical Machinery Manufacture. It was

    put into operation in September 2007. No.1 unit of the 2nd extension project

    2600MW units of Datang Yangcheng Power Plant has operated continuously and

    stably for 132 days after test run for 168 hours on 20th ,Sept,2007.The second phase

    2 600MW project of Yangcheng Power Plant was awarded the honorable title of The

    unit of putting into operation after reaching the standards, the Third Prize in

    National Coal-fired Unit (600 MW level) Competition (2008) Up-to-standard site

    for safety and civilized construction and 2008 Customer satisfaction project of

    construction industry in Shanxi Province etc.

  • 8/11/2019 Coal Fired Power Plant (1)

    13/56

    31

    4.4.4.4.TheTheTheThe firstfirstfirstfirst stagestagestagestage projectprojectprojectproject of of of of ShanxiShanxiShanxiShanxi InternationalInternationalInternationalInternational HuaguangHuaguangHuaguangHuaguang PowerPowerPowerPower PlantPlantPlantPlant

    The 2600MW units of Shanxi Internationnal Electricity (Liulin) Huaguang

    Power Plant is located in Angou Village, Mucun Town, Liulin County, Shanxi

    Province. The project adopts EP C mode. It is sponsored by Shanxi International

    Electric Power Generation Co., Ltd, China Huaneng Group and Shanxi Coking Coal

    Group Co.Ltd. It started in September,2005. BTG equipments were supplied by

    Shanghai Boiler Co., Ltd, Shanghai Steam Turbine Co., Ltd, and Shanghai Steam

    Turbine & Generator Co., Ltd. It was put into operation in December, 2007. No.1 unit

    of the 1st stage project 2600MW units of Shanxi Internationnal Electricity Huaguang

    Power Plant has operated continuously and stably for 145 days after test run for 168

    hours on 30th ,Dec,2007. It was awarded Customer satisfaction project of

    construction industry in Shanxi Province.

  • 8/11/2019 Coal Fired Power Plant (1)

    14/56

    32

    5.5.5.5.TheTheTheThe secondsecondsecondsecond extensionextensionextensionextension projectprojectprojectproject of of of of ShanxiShanxiShanxiShanxi ZhangshanZhangshanZhangshanZhangshan PowerPowerPowerPower PlantPlantPlantPlant

    The second extension project 2600MW units of Shanxi Zhangshan Power Plant

    is located in Zhangshan Road, North Suburb, Changzhi City, Shanxi Province. It is

    sponsored by Shanxi Zhangshan Power Generation Co., Ltd. It started in May, 2006.

    BTG equipments were supplied by Shanghai Boiler Co., Ltd. Shanghai Steam Turbine

    Co. Ltd, Shanghai Steam Turbine & Generator Co., Ltd. It was put into operation in

    May 2008. It was awarded Customer satisfaction project of construction industry in

    Shanxi Province.

  • 8/11/2019 Coal Fired Power Plant (1)

    15/56

    33

    6.6.6.6.ShanxiShanxiShanxiShanxi HuozhouHuozhouHuozhouHuozhou PowerPowerPowerPower PlantPlantPlantPlant PhasePhasePhasePhase IIII ProjectProjectProjectProject

    Shanxi Huozhou Power Plant Phase I Project is located in Xinzhi County ,Huozhou

    City ,Shanxi Province with Net Dependable Capacity2 x 600 MW and is invested by State

    Electric Power Group. BTG equipments were supplied by Dongfang Boiler Co.,Ltd ,Dongfang

    Steam Turbine Co.,Ltd,and Dongfang ElectricalMachinery Co.,Ltd.

  • 8/11/2019 Coal Fired Power Plant (1)

    16/56

    34

    7.7.7.7.TheTheTheThe first-stagefirst-stagefirst-stagefirst-stage projectprojectprojectproject of of of of HuanengHuanengHuanengHuaneng ShanxiShanxiShanxiShanxi ZuoquanZuoquanZuoquanZuoquanPowerPowerPowerPower PlantPlantPlantPlant

    Huaneng Shanxi Zuoquan Power Plant first-stage project has Net Dependable

    Capacity (NDC) 2 x 600 MW. It is located in Zuoquan county, Shanxi province. It is sponsored

    by Huaneng International Electric Power Co. Ltd and Shanxi International Electric Power Co.,

    Ltd. It started in March, 2010. BTG equipments were supplied by Dongfang Boiler Co., Ltd,

    Dongfang Steam Turbine Co., Ltd, Dongfang Electrical Machinery Co., Ltd. It was put into

    operationin January l , 2012.

  • 8/11/2019 Coal Fired Power Plant (1)

    17/56

    35

    300MW300MW300MW300MW unitsunitsunitsunits

    1.1.1.1. TheTheTheThe 5555thththth extensionextensionextensionextension projectprojectprojectproject of of of of TaiyuanTaiyuanTaiyuanTaiyuan No.1No.1No.1No.1 heatheatheatheat PowerPowerPowerPower PlantPlantPlantPlant

    The engineering of the 5 th extension project of Taiyuan No.1 heat Power Plant It

    is located in Jinsheng Township, Nanjiao district, Taiyuan province. The project has

    Net Dependable Capacity (NDC) 2 x 300 MW, which has the largest single capacity

    in generating sets in Shanxi province. It started in November, 1987. BTG

    epuipments were supplied by Lafak Boiler Manufacture in Poland, Sichuan Dongfang

    Steam Turbine Manufacture, Dongfang Electrical Machinery Manufacture and it was

    put into operation in December, 1991.

  • 8/11/2019 Coal Fired Power Plant (1)

    18/56

    36

    2.2.2.2.TheTheTheThe 6666thththth extensionextensionextensionextension projectprojectprojectproject of of of of TaiyuanTaiyuanTaiyuanTaiyuan No.1No.1No.1No.1 heatheatheatheat PowerPowerPowerPower PlantPlantPlantPlant

    The engineering of the 6 th extension project 2300MW units of Taiyuan No.1heat Power Plant It is located in Jinsheng Township, Nanjiao district, in Taiyuan province. The project has Net Dependable Capacity (NDC) 2 x 300 MW. It started inMay, 1996. The project is sponsored by North China Electric Power Company, ShanxiLocal Electric Power Company and Shanxi Electric Power Company.BTGepuipments were supplied by Dongfang Boiler Manufacture, Dongfang Steam

    Turbine Manufacture, Dongfang Electrical Machinery Manufacture. It was put intooperation in January,2001. It was awarded national excellent welding project byChina Project Construction Welding Association in November, 2000.It was awardedthermal power high quality project by State Power Corporation in February,2001.No.13,14 unit won China Project Construction LuBan Award national highquality project in December, 2001.It was awarded national consumer satisfaction project by China Association Of Construction Enterprise Management in April,2002.

  • 8/11/2019 Coal Fired Power Plant (1)

    19/56

    37

    3.3.3.3. TheTheTheThe firstfirstfirstfirst stagestagestagestage of of of of ShanxiShanxiShanxiShanxi YangchengYangchengYangchengYangcheng PowerPowerPowerPower PlantPlantPlantPlant

    The Yangcheng Power Plant has Net Dependable Capacity (NDC) 6350MWunits. It is located in Beiliu town,Yangcheng county ,Jincheng city ,ShanxiProvince .It is sponsored by North China electric power company ,Jiangsu investmentcompany ,Jiangsu electric power company, Shanxi Local electric power company andAmerica AES generating co. ,ltd .The project adopts EPC mode . It started in August,

    1997. BTG epuipments were supplied by Foster Wheeler in USA, Siemens inGermany. It was put into operation in July, 2002. No.3 unit was named transfer of production of standard production unit of infrastructure by State Power Corporationin August, 2002. No.3 unit of the first-stage project 6350MW in Yangcheng Power Plant undertaken by our company has created best performance because of itscontinuous operation reaching 506 days since it was transferred. The basis of No.6steam turbine was awarded Electric power construction engineering high quality project of Shanxi Province by Electric Power Construction Engineering QualityInspection Station Of Shanxi Province in April, 200 az1.No.3 unit was awardednational thermal power import large unit (300MW class) competition the first prize in August, 2007.

  • 8/11/2019 Coal Fired Power Plant (1)

    20/56

    38

    4444.... TheTheTheThe 1111stststst extensionextensionextensionextension projectprojectprojectproject of of of of ShanxiShanxiShanxiShanxi ZhaoguangZhaoguangZhaoguangZhaoguang PowerPowerPowerPower PlantPlantPlantPlant

    The 1 st extension project of Shanxi Zhaoguang Power Plant is sponsored by

    Shanxi International Electric Power Co., Ltd, Beijing International Electric Power

    Development and Investment and Shanxi Electric Power Company .The project has

    Net Dependable Capacity (NDC) 2 x 300MW. It is located in North Sizhuang Street,

    Huozhou city, Shanxi province. BTG equipments were supplied by Shanghai Boiler

    Co., Ltd, Shanghai Steam Turbine Co. Ltd, and Shanghai Steam Turbine & Generator

    Co. Ltd. It started in August, 2003. It was put into operation in July, 2005.

  • 8/11/2019 Coal Fired Power Plant (1)

    21/56

    39

    5.5.5.5.TheTheTheThe firstfirstfirstfirst stagestagestagestage of of of of InnerInnerInnerInner MongoliaMongoliaMongoliaMongolia LinheLinheLinheLinhe PowerPowerPowerPower PlantPlantPlantPlant

    The project of heating supply units of Inner Mongolia Linhe Power Plant has Net

    Dependable Capacity (NDC) 2 x 300 MW. It is sponsored by Beifang Combined

    Electric Power Co., Ltd.and located in Bayannur Zone, Lihe City, Inner Mongolia.It

    started in August,2004. BTG equipments were supplied by Dongfang Boiler Co., Ltd,

    Dongfang Steam Turbine Co., Ltd, Dongfang Electrical Machinery Co., Ltd. It was

    put into operation in April, 2007. It has the position of the First Place of 300

    MW-Level in Inner Mongolia and receives Customer Satisfaction Award for

    construction & installation works of Unit 1.

  • 8/11/2019 Coal Fired Power Plant (1)

    22/56

    40

    6.6.6.6.TheTheTheThe firstfirstfirstfirst stagestagestagestage projectprojectprojectproject of of of of ChongqinChongqinChongqinChongqin ShuanghuaiShuanghuaiShuanghuaiShuanghuai PowerPowerPowerPower PlantPlantPlantPlant

    The first stage project of Chongqin Shuanghuai Power Plant has Net Dependable

    Capacity (NDC) 2 x 300 MW. It is sponspored by Chongqin Hechuan Power

    Generation Co., Ltd.It started in December, 2004. BTG equipments were supplied by

    Dongfang Boiler Co., Ltd, Dongfang Steam Turbine Co., Ltd, Dongfang Electrical

    Machinery Co., Ltd. It was put into operation in April, 2007. It was named standard

    and operation unit by China Energy Investment Corporation in October, 2008.

  • 8/11/2019 Coal Fired Power Plant (1)

    23/56

    41

    7.7.7.7. TheTheTheThe 6666thththth extensionextensionextensionextension projectprojectprojectproject of of of of TaiyuanTaiyuanTaiyuanTaiyuan No.2No.2No.2No.2 heatheatheatheat powerpowerpowerpower plantplantplantplant

    The engineering of the 6 th extension project of Taiyuan No.2 heat power plant :

    The project has Net Dependable Capacity (NDC) 2 x 300 MW and adopts air cooling

    technology .It is located in No.5, Xiliu Road, Taiyuan City, Shanxi Province. It is

    sponsored by Datang Taiyuan No.2 Thermal Power Plant. It started in July, 2005.

    BTG equipments were supplied by Sichuan Dongfang Boiler Co., Ltd, Shanghai

    Steam Turbine Co., Ltd, and Shanghai Steam Turbine & Generator Co., Ltd. It was

    put into operation in April, 2007. Its 240 meter chimney is awarded Fenshui Cup

    Quality Award for construction works in Shanxi Province in 2008.

  • 8/11/2019 Coal Fired Power Plant (1)

    24/56

    42

    8888 ....TheTheTheThe projectprojectprojectproject of of of of InnerInnerInnerInner MongoliaMongoliaMongoliaMongolia MenxiMenxiMenxiMenxi PowerPowerPowerPower Plant:Plant:Plant:Plant:

    The project has Net Dependable Capacity (NDC) 2 x 300 MW. Unit 2 in Mengxi

    2300MW (circulating fluidized bed boiler) air cooling units is contracted by S4EPC.

    It is located in Mengxi Hi-tech Garden, Erdos City, and Inner Mongolia. It is

    sponsored by Mengxi Power Plant of Beifang Combined Electric Power Co., Ltd. It

    started in April, 2006. BTG equipments were supplied by Shanghai Boiler Co., Ltd,

    Shanghai Steam Turbine Co., Ltd, and Shanghai Steam Turbine & Generator Co., Ltd.

    It was put into operation in December, 2007.

  • 8/11/2019 Coal Fired Power Plant (1)

    25/56

    43

    9.9.9.9.TheTheTheThe 2222ndndndnd extensionextensionextensionextension projectprojectprojectproject of of of of ShanxiShanxiShanxiShanxi PingshuoPingshuoPingshuoPingshuo CoalCoalCoalCoal GangueGangueGangueGangue PowerPowerPowerPower PlantPlantPlantPlant

    The CFB engineering of the 2 nd extension project 2300MW units of Shanxi

    Pingshuo coal gangue Power Plant is sponsored by Shanxi Pingshuo coal gangue

    Power Generation Co., Ltd. It is located in Pinglu District, Shuozhou City, Shanxi

    Province .It started in March, 2007. BTG equipments were supplied by Shanghai

    Boiler Co., Ltd. Shanghai Steam Turbine Co. Ltd, and Shanghai Steam Turbine &

    Generator Co., Ltd. It was put into operation in June, 2009. No.4 unit of the 2nd

    extension project 2300MW units of Shanxi Pingshuo Coal gangue Power Generation

    Co., Ltd has operated continuously for 193 days after it was put into operation.

  • 8/11/2019 Coal Fired Power Plant (1)

    26/56

    44

    10101010.... TheTheTheThe firstfirstfirstfirst stagestagestagestage projectprojectprojectproject of of of of ShanxiShanxiShanxiShanxi RuiguingRuiguingRuiguingRuiguing PowerPowerPowerPower PlantPlantPlantPlant

    The first stage project of Shanxi Ruiguing Power Plant is sponsored by Shanxi

    International Electric Power Co., Ltd. The project has Net Dependable Capacity

    (NDC) 2300MW .It is located in Dongshagou village ,Wujinshan town , Yuci city,

    Shanxi province .It started in November, 2007. BTG equipments were supplied by

    Shanghai Boiler Co., Ltd. Shanghai Steam Turbine Co. Ltd, and Shanghai Steam

    Turbine & Generator Co., Ltd. It was put into operation in December, 2012.

  • 8/11/2019 Coal Fired Power Plant (1)

    27/56

    45

    11.11.11.11.JinghaiJinghaiJinghaiJinghai GangueGangueGangueGangue PowerPowerPowerPower PlantPlantPlantPlant

    2300MW coal-fired air cooling units project of Jinghai Gangue Power Plant

    (circulating fluidized bed boiler) is located in West Zhuozishan Street, Wuhai City,

    Inner Mongolia. It is sponsored by Inner Mongolia Jinghai Gangue Power Generation

    Co., Ltd. It started in April, 2004. BTG equipments were supplied by Orient group

    Co., Ltd. It was put into operation in September, 2010.

  • 8/11/2019 Coal Fired Power Plant (1)

    28/56

    46

    12.12.12.12.ShanxiShanxiShanxiShanxi HoumaHoumaHoumaHouma HeatHeatHeatHeat ExtensionExtensionExtensionExtension ElectricElectricElectricElectric PowerPowerPowerPower ProjectProjectProjectProject

    2300MW coal-fired air cooling and heat supplying units project of Shanxi Houma

    Power Plant is located in Zhangshao Village ,Houma City, Shanxi Province. It is

    sponsored by China Electric Power Investment Group Co.,Ltd and Shanxi Zhangze

    Electric Power Co.,Ltd.It started in April, 2009. The Project Now is in construction .

  • 8/11/2019 Coal Fired Power Plant (1)

    29/56

    47

    13131313.... TheTheTheThe firstfirstfirstfirst stagestagestagestage projectprojectprojectproject of of of of StateStateStateState GridGridGridGrid ShanxiShanxiShanxiShanxi ChangzhiChangzhiChangzhiChangzhi PowerPowerPowerPower PlantPlantPlantPlant

    The first stage project of State Grid Shanxi Changzhi Power Plant is sponsored by

    State Grid North China Electric Power Co., Ltd and Hebei Construction Energy and

    Investment Co.,Ltd. The project has Net Dependable Capacity (NDC) 2300MW .It is

    located in North Yangbao village, Houbeizhuang town, Changzhi city, Shanxi

    province .It started in April, 2009. BTG equipments were supplied by Orient Boiler

    group Co., Ltd. It was put into operation in October, 2011.

  • 8/11/2019 Coal Fired Power Plant (1)

    30/56

    48

    14141414.... TheTheTheThe projectprojectprojectproject of of of of ShanxiShanxiShanxiShanxi YouyuYouyuYouyuYouyu coalcoalcoalcoal ganguegangueganguegangue PowerPowerPowerPower PlantPlantPlantPlant

    The project of Shanxi Youyu coal gangue Power Plant is sponsored by Beijing

    Energy Investment Co., Ltd and Gemeng International Energy Co.,Ltd. The project

    has Net Dependable Capacity (NDC) 2300MW .It is located in Yejia village ,Youyu

    county ,Shuozhou city, Shanxi province .It started in November, 2009. BTG

    equipments were supplied by Shanghai Boiler Co., Ltd. and Beijing Beizhong Steam

    Turbine Generator Co., Ltd. It was put into operation in December, 2011.

  • 8/11/2019 Coal Fired Power Plant (1)

    31/56

    49

    15.15.15.15.ShanyinShanyinShanyinShanyin YuguangYuguangYuguangYuguang CoalCoalCoalCoal GangueGangueGangueGangue PowerPowerPowerPower PlantPlantPlantPlant ProjectProjectProjectProject

    Shanyin Yuguang Coal Gangue Power Plant Project is located in Beizhouzhuang

    Village ,Shanyin County ,Shanxi Province with Net Dependable Capacity

    2*300MW.This project is sponsored by Shanxi International Energy Group Co.,Ltd

    and Shanxi Jinhaiyang Energy Group Co.,Ltd. BTG were supplied by Shanghai

    Electric Group Co.,Ltd.

  • 8/11/2019 Coal Fired Power Plant (1)

    32/56

    50

    16.16.16.16.ShanxiShanxiShanxiShanxi HongguangHongguangHongguangHongguang LianshengLianshengLianshengLiansheng CoalCoalCoalCoal GangueGangueGangueGangue Power Power Power Power PlantPlantPlantPlant ProjectProjectProjectProject

    Shanxi Honguang Liansheng Coal Gangue Power Plant Project is located in

    Xuecun Village ,Liulin County,Shanxi Province with Net Dependable Capacity 2*300

    MW.The project is sponsored by Shanxi International Electric Power Group Co.,Ltd

    and Liansheng Group. The project started in June ,2010 and finished in Dec.,2012.

  • 8/11/2019 Coal Fired Power Plant (1)

    33/56

    51

    15.15.15.15. GansuGansuGansuGansu JinchangJinchangJinchangJinchang heatheatheatheat Power Power Power Power PlantPlantPlantPlant 1111stststst phasephasephasephase ProjectProjectProjectProject

    18.Inner18.Inner18.Inner18.Inner MongoliaMongoliaMongoliaMongolia KangbashiKangbashiKangbashiKangbashi HeatHeatHeatHeat PowerPowerPowerPower PlantPlantPlantPlant

    19.19.19.19.Inner Inner Inner Inner MongoliaMongoliaMongoliaMongolia BeijiaoBeijiaoBeijiaoBeijiao heatheatheatheat Power Power Power Power PlantPlantPlantPlant PhasePhasePhasePhase I III ProjectProjectProjectProject

    20.Inner20.Inner20.Inner20.Inner MongoliaMongoliaMongoliaMongolia JunzhengJunzhengJunzhengJunzheng PowerPowerPowerPower PlantPlantPlantPlant

    The above four projects now are in construction .

  • 8/11/2019 Coal Fired Power Plant (1)

    34/56

    52

    BelowBelowBelowBelow 333300MW00MW00MW00MWunitsunitsunitsunits

    1.1.1.1. TheTheTheThe firstfirstfirstfirst projectprojectprojectproject of of of of ShanxiShanxiShanxiShanxi HuanengHuanengHuanengHuaneng YusheYusheYusheYushe powerpowerpowerpower plantplantplantplant

    The project is located in Yushe County, Jinzhong Shanxi. It has Net Dependable

    Capacity (NDC) 2 x 100 MW. It is sponsored by Shanxi province Heneng Power

    Generation Company. BTG equipments were supplied by three major factories in

    harbin. It was awarded High Quality Project of the Whole Units in Oct. 1996.

    .Fujian.Fujian.Fujian.Fujian NanpingNanpingNanpingNanping Paper-makingPaper-makingPaper-makingPaper-making FactoryFactoryFactoryFactory PowerPowerPowerPower StationStationStationStation ProjectProjectProjectProject

    The project is located in west area of Nanping Paper Mill. It has Net

    Dependable Capacity (NDC) 2 x 25 MW and adopts extraction Steam technology.

    Equipments were supplied by Nanping Paper Mill.

  • 8/11/2019 Coal Fired Power Plant (1)

    35/56

    53

    3.3.3.3.TheTheTheThe 5th5th5th5th ExtensionExtensionExtensionExtension TechnicalTechnicalTechnicalTechnical andandandand ImprovingImprovingImprovingImproving ProjectProjectProjectProject of of of of TaiyuanTaiyuanTaiyuanTaiyuan No.2No.2No.2No.2

    HeatHeatHeatHeat PowerPowerPowerPower PlantPlantPlantPlant

    The project is located in Taiyuan Shanxi. It has Net Dependable Capacity(NDC) 1200MW unit. It was our company s first project of 200MW unitconstruction by competitive bidding. It is sponsored by Taiyuan No.2 Heat Power Plant.BTG equipments were supplied by Dongfang Boiler Manufacture ,DongfangSteam Turbine Manufacture and Dongfang Electrical Machinery Manufacture.It wasawarded Excellent Project of Shanxi Province by Construction Engineering QualityInspection Station of Shanxi province in Aug. 2004, National Excellent WeldingProject by China Project Construction Welding Association in Aug.2004, ShanxiConstruction Project High Quality Prize Fenshui Cup in 2004 by ShanxiConstruction Industry Association in Jan.2005. the air-cooling tower and chimney project was awarded First Session Civil Engineering Prize Taihang Cup of ShanxiProvince by Shanxi Civil Construction Association in Dec.2005.

    4 TheTheTheThe TTTThirdhirdhirdhird PPPProjectrojectrojectroject of of of of XinjiangXinjiangXinjiangXinjiang HamiHamiHamiHami No.2No.2No.2No.2 PPPPlantlantlantlant

    The project is located in Hami county, Xinjiang. It has Net DependableCapacity (NDC) 2125MW. BTG equipment s were supplied by Shanghai SteamTurbine Manufacture, Shanghai Electrical Machinery Plant and Shanghai Boiler Manufacture.

  • 8/11/2019 Coal Fired Power Plant (1)

    36/56

    54

    5555.... TheTheTheThe FirstFirstFirstFirst ProjectProjectProjectProject of of of of ShanxiShanxiShanxiShanxi PingshuoPingshuoPingshuoPingshuo CoalCoalCoalCoal GangueGangueGangueGangue PowerPowerPowerPower Plant.Plant.Plant.Plant.

    The project is located in Shuozhou Shanxi. It has Net Dependable Capacity

    (NDC) 2 x 50 MW and adopts air cooling fire coal units. BTG equipments were

    supplied by Harbin Boiler Manufacture, Dongfang Steam Turbine Manufacture, Jinan

    Power Equipment Factory.

    6 JiangJiangJiangJiang County,County,County,County, ShanxiShanxiShanxiShanxi State-ownedState-ownedState-ownedState-owned Five-Four-OneFive-Four-OneFive-Four-OneFive-Four-One CaptiveCaptiveCaptiveCaptive PowerPowerPowerPower

    PlantPlantPlantPlant TechnicalTechnicalTechnicalTechnical TransformationTransformationTransformationTransformation ProjectProjectProjectProject

    The project is located in Jiang County, Yuncheng Shanxi. It has primary Net

    Dependable Capacity (NDC) 425MW and adopts condensing

    steam turbine generating units. It is the first project of recirculating fluidized bed

    construction.The boiler was supplied by Jinan Boiler Group Co.Ltd. 5# steam turbine

    and generator were supplied by Wuhan Turbine Factory.

  • 8/11/2019 Coal Fired Power Plant (1)

    37/56

    55

    7.7.7.7.ShanxiShanxiShanxiShanxi ZhongyangZhongyangZhongyangZhongyang SteelSteelSteelSteel GroupGroupGroupGroup CoalCoalCoalCoal GangueGangueGangueGangue CaptiveCaptiveCaptiveCaptive PowerPowerPowerPower PlantPlantPlantPlant ProjectProjectProjectProject

    The project is located in Zhongyang County, shanxi. It has Net Dependable

    Capacity (NDC) 2135MW units. BTG were supplied by Harbin Boiler Manufacture,

    Harbin Steam Turbine Manufacture and Harbin Power Equipment Factory. It is

    sponsored by Shanxi Zhongyang Steel Plant.

    8.Yuci8.Yuci8.Yuci8.Yuci HeatHeatHeatHeat ElectricElectricElectricElectric PowerPowerPowerPower PlantPlantPlantPlant PhasePhasePhasePhase IIII ProjectProjectProjectProject

    Shanxi Yuci Heat Electric Power Plant Phase I Project is located in Kou Village ,Zhangqing

    County ,Yuci District ,Jinzhong City with Net Dependable Capacity 25MW.BTG were supplied

    by Sichuan Boiler Factory ,Qingdao Jieneng Turbine Co.,Ltd and Shandong Jinan Generating

    Equipment Factory.

  • 8/11/2019 Coal Fired Power Plant (1)

    38/56

    56

    9.Keban9.Keban9.Keban9.Keban AgungAgungAgungAgung 2x135MW2x135MW2x135MW2x135MW Coal-FiredCoal-FiredCoal-FiredCoal-Fired PowerPowerPowerPower PlantPlantPlantPlant

    Keban Agung 2x135MW Coal-Fired Power Plant islocated at Lahat, South Sumatera,

    Indonesia.The general contractor is Hebei Machinery Import and Export Co.Ltd .BTG were

    supplied by China Western Power Energy Industrial Co.,Ltd, Nanjing Turbine Factory and Jinan

    Generating Equipment Factory .We are responsible for installation of the two units .Now the

    project is in construction .

  • 8/11/2019 Coal Fired Power Plant (1)

    39/56

    57

  • 8/11/2019 Coal Fired Power Plant (1)

    40/56

    58

    ProjectProjectProjectProject HHHHonorsonorsonorsonors

    No. Awarded name Awarded

    level

    Awarded

    time

    1The 6th extension project of Taiyuan No.1 Heat Power Plant.(2300MW) won China Project Construction LuBan Award

    nationalhigh quality project . National 2001.12

    2Yangcheng Power Plant first-stage project 6350MW : No.3unit was awarded national thermal power import large unit(300MW class)competition the first prize

    2007.6

    3Acquire national excellent welding project in unit4 welding projectof Shanxi Ping shuo secondextension project 2004.8

    42#unit of Shanxi Luneng Hequ Generating Co.,Ltd wasawarded standard and operation unit of electric industy in2005.

    2005.11

    5 No.2 unit of Shanxi Luneng Hequ Power Plant was awardednational thermal power large unit(600MW class) competitionchampion top award in 2005

    2006.5

    6 No.2 unit of Shanxi Luneng Hequ Power Plant was awardednational thermal power large unit(600MW class) competitionchampion the first prize in 2006

    2007.6

    7 No.2 unit installation and welding project of Shanxi

    Luneng Hequ first stage power plant 2*600 MW was awardednationalexcellentwelding project

    2007. 8

    8 No.2 unit of Shanxi Luneng Hequ Power Plant was awardedthermal power generatingreliability gold medal unit(600MWclass) in 2006

    2007. 5

    92*300MW units project chimney and common building installation project of Shanxi ZhangshanGenerating Co.,Ltd was awarded China high quality project of the unit

    2006 .6

    102*300MW units of Shanxi Zhangshan Generating Co.,Ltdwas awarded state high qualityproject silver medal in 2006 2006. 11

    11#6 unit of Yangcheng International Generating Co.,Ltd wasawarded the gold and reliable metal in 2008 nationalgeneratingunits

    2009.5

    12 No.7 unit of Datang Yangcheng generating co., ltd was

    awarded national thermal power large unit (600MW class)competition the third prize in 2008

    2009.5

  • 8/11/2019 Coal Fired Power Plant (1)

    41/56

    59

    13 1000kv Jindongnan - Nanyang - Jingmen UHV AC pilotdemonstration project was awarded high quality competitive projects of New Peoples Republic of China establishing 60years

    2009. 10

    141000kv Jindongnan - Nanyang - Jingmen UHV AC pilotdemonstration project was awarded the gold medal in 2010 NationalQuality Engineering

    2010 .12

    151000KV ultra-high Jindongnan Substation construction projectwas awarded consumer satisfaction project in Shanxi province constructivefield in 2009 Province

    2009 .12

    1615#,16# of Taiyuan No.1 Heat Power Plant was awardedShanxi constructionprojecthigh quality prize Fenshui Cup 2002. 12

    177#cooling tower of Datang Yangcheng Power Plant second-stage project 2600MW was awarded consumer satisfaction project in Shanxi province constructive field in2008

    2009. 1

    18 7#cooling tower of Datang Yangcheng Power Plant second-stage project 2600MW was awarded standard andoperationunit

    2009. 1

    19 7#cooling tower of Datang Yangcheng Power Plant second-stageproject 2600MW was awarded Shanxi construction projecthigh quality prize FenshuiCup

    2009.12

    20 The 5th extension technical and improving project of Taiyuan

    No.2 Heat Power Plant 1200MW was awarded Shanxiconstructionprojecthigh quality prize Fenshui Cup

    2005.1

    21 The air-cooling tower and chimney project of the 5th extension

    technical and improving project of Taiyuan No.2 Heat Power Plant 1200MW was awarded first session civilengineering prizeTaihang Cup of Shanxi Province

    2005.12

    22 No.2 unit of Shanxi Luneng Hequ Power Plant first-stage project (2600MW) was awarded consumer satisfaction project in Shanxi province constructive field

    2007.1

    23 The 3rd extension project of Shanxi Zhangze Power Plant

    (2300MW) was awarded the First Civil Taihang Cup CivilEngineeringPrize

    2005.12

    24 The 201m chimney of 2nd extension project of HuanengYushe Power Plant (2300MW) was awardedShanxiconstructionprojecthigh quality prize FenshuiCup

    2006.1

    25 The first-stage project of North Unite Electric Power LinheHeat Power Plant (2300MW) was awarded consumer satisfaction award of No.1 unit construction and installationengineering

    2007.3

    26 Liulin power plant second project (unit 3) of HuaguangGenerating Co.,Ltd was awarded consumer satisfaction

    2009.1

  • 8/11/2019 Coal Fired Power Plant (1)

    42/56

    60

    project in Shanxi provinceconstructivefield in 2008

    27 The first-stage project of Chongqin Hechuan ShuanghuaiPower Plant (2300MW) was named project qualityexcellentunit

    2007.8

    28 The first-stage project of Chongqin Hechuan ShuanghuaiPower Plant (2300MW) was named standard and operationunit by ChinaEnergy Investment Corporation

    2008.10

    29 Shanxi Zhangshan Power Plant second extension project(2600MW) was awarded consumer satisfaction project inShanxi province constructivefield in 2010

    2010.12

    PleasePleasePleasePlease seeseeseesee picturespicturespicturespictures of of of of honors:honors:honors:honors:

    The 6th extension project of Taiyuan No.1 Heat Power Plant. (2300MW) won China

    ProjectConstructionLuBanAward nationalhigh qualityproject .

  • 8/11/2019 Coal Fired Power Plant (1)

    43/56

    61

    Yangcheng Power Plant first-stage project 6350MW : No.3 unit was awarded national

    thermal power import largeunit (300MW class) competition the first prize

    Acquire nationalexcellentwelding project in unit4welding projectof Shanxi

    Pingshuo second extension project

  • 8/11/2019 Coal Fired Power Plant (1)

    44/56

    62

    2#unitof Shanxi Luneng Hequ Generating Co.,Ltdwas awarded

    standard and operationunit of electricindusty in 2005.

    No.2 unit of Shanxi Luneng Hequ Power Plant was awarded national thermal power

    large unit (600MW class) competitionchampion top award in 2005

  • 8/11/2019 Coal Fired Power Plant (1)

    45/56

  • 8/11/2019 Coal Fired Power Plant (1)

    46/56

    64

    No.2unit of Shanxi LunengHequ Power Plant was awarded

    thermal power generatingreliability goldmedal unit (600MW class) in 2006

    2*300MW units project chimney and common building installation project of

    Shanxi Zhangshan Generating Co.,Ltdwasawarded China high quality project of the unit

  • 8/11/2019 Coal Fired Power Plant (1)

    47/56

    65

    2*300MW units of Shanxi Zhangshan Generating Co.,Ltdwasawarded

    state high qualityproject silver medal in 2006

    #6 unitof YangchengInternationalGeneratingCo.,Ltdwas awarded

    the gold and reliable metal in 2008national generatingunits

  • 8/11/2019 Coal Fired Power Plant (1)

    48/56

    66

    No.7 unitof Datang Yangcheng generatingco., ltd was awarded

    nationalthermal power largeunit(600MW class) competition the third prize in 2008

    1000kv Jindongnan - Nanyang - Jingmen UHVAC pilotdemonstrationproject was awarded

    high quality competitive projectsof New Peoples Republic of China establishing 60 years

  • 8/11/2019 Coal Fired Power Plant (1)

    49/56

    67

    1000kv Jindongnan - Nanyang - Jingmen UHVAC pilotdemonstration project

    was awarded the gold medal in 2010 NationalQualityEngineering

    1000KV ultra-highJindongnan Substation construction project was awarded

    Consumer satisfaction project in Shanxi province constructive field in 2009

  • 8/11/2019 Coal Fired Power Plant (1)

    50/56

  • 8/11/2019 Coal Fired Power Plant (1)

    51/56

    69

    7#cooling tower of Datang Yangcheng Power Plant second -stage project 2600MW

    was awarded standard and operationunit

    7#coolingtower of Datang Yangcheng Power Plantsecond -stage project 2600MW was

    awarded Shanxi construction projecthigh qualityprize FenshuiCup

  • 8/11/2019 Coal Fired Power Plant (1)

    52/56

    70

    The 5th extension technical and improving project of Taiyuan No.2 Heat Power Plant

    1200MW was awarded Shanxi construction projecthigh quality prize Fenshui Cup

    The air-cooling tower and chimney project of the 5th extension technical and improving

    projectof Taiyuan No.2 HeatPower Plant 1200MW was awarded first session civil

    engineering prizeTaihang Cup of Shanxi Province

  • 8/11/2019 Coal Fired Power Plant (1)

    53/56

    71

    No.2 unit of Shanxi Luneng Hequ Power Plant first-stage project (2600MW) was

    awarded consumer satisfaction project in Shanxi province constructive field

    The 3rd extension project of Shanxi Zhangze Power Plant (2300MW) was awarded The

    First CivilTaihang Cup CivilEngineeringPrize

  • 8/11/2019 Coal Fired Power Plant (1)

    54/56

    72

    The 201m chimney of 2nd extension project of Huaneng Yushe Power Plant (2300MW)

    was awarded Shanxi constructionprojecthigh quality prize FenshuiCup

    The first-stage project of North Unite Electric Power Linhe Heat Power Plant (2300MW)

    was awarded consumer satisfactionaward of No.1 unit constructionand installationengineering

  • 8/11/2019 Coal Fired Power Plant (1)

    55/56

    73

    Liulin power plant second project (unit 3) of Huaguang Generating Co.,Ltd was awarded

    consumer satisfaction project in Shanxi provinceconstructive field in 2008

    The first-stage projectof Chongqin Hechuan Shuanghuai Power Plant(2300MW)

    wasnamed project qualityexcellentunit

  • 8/11/2019 Coal Fired Power Plant (1)

    56/56

    The first-stage project of Chongqin Hechuan Shuanghuai Power Plant (2300MW) was

    named standard and operation unit by China Energy Investment Corporation