CO2 STORAGE SCREENING FOR NORWAY · 2 STORAGE •Onshore hub •Offshore storage at Smeaheia saline...

17
1 CO2 STORAGE SCREENING FOR NORWAY Niels Peter Christensen Kari-Lise Rørvik

Transcript of CO2 STORAGE SCREENING FOR NORWAY · 2 STORAGE •Onshore hub •Offshore storage at Smeaheia saline...

Page 1: CO2 STORAGE SCREENING FOR NORWAY · 2 STORAGE •Onshore hub •Offshore storage at Smeaheia saline res. •Large capacity NORWAY: FULL-SCALE CCS PROJECT CO 2 CAPTURE • Sleipner

1

CO2 STORAGE SCREENING FOR NORWAY

Niels Peter ChristensenKari-Lise Rørvik

Page 2: CO2 STORAGE SCREENING FOR NORWAY · 2 STORAGE •Onshore hub •Offshore storage at Smeaheia saline res. •Large capacity NORWAY: FULL-SCALE CCS PROJECT CO 2 CAPTURE • Sleipner

GASSNOVA’sthree initiatives in advancing CCS

CLIMITResearch, Development and Demonstration program

Page 3: CO2 STORAGE SCREENING FOR NORWAY · 2 STORAGE •Onshore hub •Offshore storage at Smeaheia saline res. •Large capacity NORWAY: FULL-SCALE CCS PROJECT CO 2 CAPTURE • Sleipner

NPD STORAGE ATLAS THE POTENTIAL IS THERE

3

Page 4: CO2 STORAGE SCREENING FOR NORWAY · 2 STORAGE •Onshore hub •Offshore storage at Smeaheia saline res. •Large capacity NORWAY: FULL-SCALE CCS PROJECT CO 2 CAPTURE • Sleipner

CHALLENGE OF «BANKABLE» STORAGE

Operation

Investable

Possible

Hypothetical

4

OD`slagringsatlas

5+year

Locations mapped by Gassnova and Statoil: Utsira, Johansen, Troll Kystnær =Smeaheia, Frigg, Heimdal

Sleipner Snøhvit

Storage Atlas by NPD

Smeaheia

Page 5: CO2 STORAGE SCREENING FOR NORWAY · 2 STORAGE •Onshore hub •Offshore storage at Smeaheia saline res. •Large capacity NORWAY: FULL-SCALE CCS PROJECT CO 2 CAPTURE • Sleipner

Mongstad

Kårstø

Stord Basin

Johansen

Utsira South

STORAGE LOCATIONS EVALUATED BY GASSNOVA

5

Pre-Feasibility screening

study

Feasibility study

Conceptual Design studies

FEED study

Realisation OperationDG0 DG1 DG2 DG3 DG4Need Effect

TECHNICAL MATURITY

SmeaheiaUtsira SouthJohansen

Page 6: CO2 STORAGE SCREENING FOR NORWAY · 2 STORAGE •Onshore hub •Offshore storage at Smeaheia saline res. •Large capacity NORWAY: FULL-SCALE CCS PROJECT CO 2 CAPTURE • Sleipner

6

«I’m here about the details»

©MARK ANDERSON, ALL RIGHT RESERVED WWW.ANDERTOONS.COM

Page 7: CO2 STORAGE SCREENING FOR NORWAY · 2 STORAGE •Onshore hub •Offshore storage at Smeaheia saline res. •Large capacity NORWAY: FULL-SCALE CCS PROJECT CO 2 CAPTURE • Sleipner

7

THE JOHANSEN STORAGE COMPLEX

Injection Area

Activity plan for Johansen qualification

Full set of FEED-studies performed in 2009 and 2011

Page 8: CO2 STORAGE SCREENING FOR NORWAY · 2 STORAGE •Onshore hub •Offshore storage at Smeaheia saline res. •Large capacity NORWAY: FULL-SCALE CCS PROJECT CO 2 CAPTURE • Sleipner

8

THE UTSIRA FORMATION

Utsira South

Page 9: CO2 STORAGE SCREENING FOR NORWAY · 2 STORAGE •Onshore hub •Offshore storage at Smeaheia saline res. •Large capacity NORWAY: FULL-SCALE CCS PROJECT CO 2 CAPTURE • Sleipner

9

THE UTSIRA SITE OF THE FEASIBILITY STUDY

Page 10: CO2 STORAGE SCREENING FOR NORWAY · 2 STORAGE •Onshore hub •Offshore storage at Smeaheia saline res. •Large capacity NORWAY: FULL-SCALE CCS PROJECT CO 2 CAPTURE • Sleipner

10

THE HEIMDAL SITE OF THE FEASIBILITY STUDY

Page 11: CO2 STORAGE SCREENING FOR NORWAY · 2 STORAGE •Onshore hub •Offshore storage at Smeaheia saline res. •Large capacity NORWAY: FULL-SCALE CCS PROJECT CO 2 CAPTURE • Sleipner

11

THE SMEAHEIA SITE OF THE FEASIBILITY STUDY

Page 12: CO2 STORAGE SCREENING FOR NORWAY · 2 STORAGE •Onshore hub •Offshore storage at Smeaheia saline res. •Large capacity NORWAY: FULL-SCALE CCS PROJECT CO 2 CAPTURE • Sleipner

Norcem HeidelbergCementCement plant

Yara PorsgrunnAmmonia plant

Klemetsrudanlegget ASWaste-to-energy plant

CO2 TRANSPORT Ship transportation

CO2 STORAGE • Onshore hub• Offshore storage at

Smeaheia saline res.• Large capacity

NORWAY: FULL-SCALE CCS PROJECT

CO2 CAPTURE

•Sleipner

1 Mt/yr since 1996

Snøhvit •↑0,7 Mt/yr since 2008

•TCM

Page 13: CO2 STORAGE SCREENING FOR NORWAY · 2 STORAGE •Onshore hub •Offshore storage at Smeaheia saline res. •Large capacity NORWAY: FULL-SCALE CCS PROJECT CO 2 CAPTURE • Sleipner

13

Pre-Feasibility screening

study

Feasibility study

Conceptual Design studies

FEED study

Realisation OperationDG0 DG1 DG2 DG3 DG4Need Effect

CURRENT STATUS

Smeaheia

Page 14: CO2 STORAGE SCREENING FOR NORWAY · 2 STORAGE •Onshore hub •Offshore storage at Smeaheia saline res. •Large capacity NORWAY: FULL-SCALE CCS PROJECT CO 2 CAPTURE • Sleipner

ADDITIONAL OPPORTUNITIES

STORAGE IN LATE LIFE FIELDS/EOR

14

Page 15: CO2 STORAGE SCREENING FOR NORWAY · 2 STORAGE •Onshore hub •Offshore storage at Smeaheia saline res. •Large capacity NORWAY: FULL-SCALE CCS PROJECT CO 2 CAPTURE • Sleipner

Several desk-top studies to evaluate CO2 EOR potential on the NCS the last ~20 years

Projects found to be non-commercial, for many reasons:

• CO2 availability

• Expensive top-side modifications

• Alternative flooding mechanisms more favorable

• Uncertain reservoir/infrastructure performance

• Project economics

Evaluating CO2 EOR Potential

However, new technological solutions and growing need for CO2 management might give future business potential for CO2 EOR. Offshore infrastructure map

6 juni 201715 Classification: Internal © Statoil ASA

Page 16: CO2 STORAGE SCREENING FOR NORWAY · 2 STORAGE •Onshore hub •Offshore storage at Smeaheia saline res. •Large capacity NORWAY: FULL-SCALE CCS PROJECT CO 2 CAPTURE • Sleipner

CO2 EOR “Step out” concept sketch

Brownfield

Isolated greenfield segment?

CO2

storage

Currently screening candidates to identify realistic CO2 EOR prospects

Subsea solutions

Platform solutions

Page 17: CO2 STORAGE SCREENING FOR NORWAY · 2 STORAGE •Onshore hub •Offshore storage at Smeaheia saline res. •Large capacity NORWAY: FULL-SCALE CCS PROJECT CO 2 CAPTURE • Sleipner

THANK YOU

17www.gassnova.no/en