commissioning
Why is Commissioning Important?
Commissioning ensures that the
systems and materials that comprise
the Plant meet the Clients project
requirements and result in successful,
better built Plants. Therefore it is
critical that commissioning is involved
in both design and construction
phases in order to minimise costs
and maximise benefits. With an
increased focus on sustainability and
the consequences of insufficient
design review, inadequate equipment
capacity , inferior equipment
installation, insufficient maintenance
and improper system operation;
early commissioning should be
implemented into each Project stage
in order to realise cost savings and
successful Project delivery. Over time,
continuous commissioning is the best
way to determine whether controls
and equipment function properly.
Ensur ing Pro jec t Del ivery
Early review of design systems Input into Commissioning strategies
and the ability to represent the Client
as a professional team
Strategies for ensuring maintenancepractices are picked up early to
prevent breakdown maintenance
Ensure documentation requirementsare completed by the D&C team in a
format designed for the Client
Lead D&C teams to gain a smoothtransition for the O&M team
Detailed communication at all levelsthrough to the Clients Management
Integration of systems for best forproject outcomes
Understanding of Trainingrequirements for Operations Sta. Online/Real time reporting through
the life of the project (live dashboard
reporting utilising our CVRS system)
We are a community in commissioning, engaging on all levels as part of a
TEAM to ensure that commissioned means commissioned! Through our
people, systems and lessons learnt throughout various industries across the globe,
we deliver innovation, rectication and robust commissioning reviews and solutions.
As reinforced by our client base which has remained consistent over 15 active years,
we are able to make a dierence. Aside from constantly monitoring our knowledge
and ability, we have provided many solutions for dicult designs or process conditions
leaving clients satised they have a manageable and optimised plant to operate.
What is Commissioning?
Commissioning is defined as the process
by which an equipment, facility, or plant
(which is installed, or is complete or
near completion) is tested to verify
if it functions according to its design
objectives or specifications. It is essentially
an independent verification of the
Clients project requirements from
project inception through to handover
and can continue for the life of the
project. Commissioning typically begins
during the project design phase and
continues for at least one year after
construction is complete. It requires
thorough documentation of system
design, construction quality, functional
performance tests, and operation and
maintenance requirements. The training
of facility operators and staff is also a key
component of commissioning as they will
be responsible for plant operations and
maintenance.
Increased in-house knowledge and improved equipment operation
Better planning and coordination for smoother equipment start-up
Better up-front performance accountability
Improved Plant control and performance
-
8/9/2019 CN AU Mining Capabilities
3/5
Commissioning Innovations demonstrated by using
software, procedural guidelines and our own system;
AUTOCOMM
Experienced and skilled personnel - Mechanical, Electrical,
I&C, SCADA/PLC, Process and QA disciplines all of which
have operational and commissioning experience across
various industries
Defect Management Clear understanding of Plant elements
and groups whilst ensuring precise defect reporting and
priority management.
Documentation Experience in production, review &
processing of Commissioning/Design Documentation
Operations experience to ensure risks are minimised, with
added value of Process science skill to avert any incidents.
GAP analysis provided across the board from Design to
Handover enhancing the risks associated with overdesign,
incorrect procurement, abortive operational costs and
OPEX variance.
CNManagment is a local Australian company with links to an international network of capabilities, predominantly within the
UK. Founded in 1995, under the CNGroup of companies, our proven capabilities are based on decades of research and hands-
on practical experience culminating in a broad and continuing client database. Employing approximately 300 people across 3
countries, we have proven success in areas of commissioning, client tenders, innovation studies, project engineering, concept of
design and rectication of design and construction GAPS.
Andrew Rogers CommissioningManager
Recently completinga successful roleas
CommissioningManagerfortheSouthern
RegionalWaterPipeline Alliance;oneof
thelargestwaterinfrastructureprojectsin
Australia,AndrewRogershassincejoined
CNManagementinaseniorroletoguide
their Queensland operations. With an
extensiveknowledgeof water andwaste
waterprocesses,Andrewsawarenessand
experience within the Australian Water
Industryishighlyvaluedandrecognized.
Clive NeameManagingDirector
Creatorand ownerof the CNGroupof
companies,Clivehasover15 yearsof
managementandcommissioningexperience
acrossa numberof continents.Renowned
forhis ability to innovate commissioning
programmes,he brings a rich blend of
commercialandpersonalexperienceanda
proventrackrecordindeliveringsuccessful
resultsonaglobalscale.
Andr Bosch OMTechnicalManager
Backed by extensi ve exper ience in
the maintenance, const ruct ion and
telecommunica tion indus tr y. Andr
has exper ience in the development
o f Maintenance S trategies and the
Computerised MaintenanceManagement
S ys tem (CMMS) a s t he v ehi cle t o
deliver the vision of various service and
manufacturing industries. Prior positions
includeMaintenanceEngineerforBrisbane
Water,JohnHollandConstructions,Capral
AluminiumandBoralPlasterboard.
KeySkills
AboutUs
OurLeaders
Feasibility Studies
Successful feasibility studies with accurate
and experienced environments will reduce
CAPEX and OPEX and prolong stable
asset environment. Innovated systems and
knowledge transfer enables us to collect
and process data eciently.
Pre-Commissioning
In readiness for the commissioning of the
system as a whole, individual pieces of
equipment/instruments are required to
function in isolation. This is a vital element
in achieving successful commissioning.
Process Commissioning
A planned and structured approach
by ensuring the process design is fully
understood and reviewed.
Reliability Performance
A planned schedule for assessing the
reliability of the system and understanding
the resource requirements to prepare for
unforeseen events.
Commissioning Review
An independent assessment of the
commissioning process for the purpose of
providing a review to the Client.This is vital
to ensure that a robust commissioning
management system is implemented and
monitored.
Defect Management
A defect management system is required
to ensure all defects are identied,
recorded and recommendations are made
for rectication.
Design Challenge & Innovation
Understanding the dierent stages of a
project in order to realise savings. This is
achieved through understanding the scope
and development of strategies, focusing
on increased eciency. Additionally,
milestones are developed and documents
produced by the O&M Documentation
Team to ensure project timeframes are
met.
Project Commissioning Engineering
Completion of Work Method Statements
and Risk Assessments for all works and
procedures for the site, prior to the Wet
Testing using CN Equipment to bring
services into a commissioned state. The key
values include; Early Start Commissioning
with Access Database System to record
commissioning that eliminates out of date
documents, direct commissioning that
eliminates third parties attendance and
repetitive costs incurred, as well as tamper
proof systems tted on all equipment that
prohibit changes by unauthorised parties.
Process Support
Following a review of the Commissioning
Plan, the team are able to further support
the project through; open communication
with all project groups, ensure compliance
of statutory requirements for b ulk transfer
of water, supply technical reports &
discussion papers, review process model,
provide recommendations to analyse the
requirements for control and targets for
chemical dosing and optimised methods.
PLC, SCADA & Telemetry
The team are able to design, review and
commission any conguration of work in
the aspects of Data and I/O Management.
The availability of PLC, Telemetry and
SCADA engineers provides the client with
signicant commercial potential and allows
in-house management of these areas.
cap
abilities
-
8/9/2019 CN AU Mining Capabilities
4/5
Tailored to P&IDs di rect interface with design using Asset and P&ID Tags.
Live Status - for the Installation, Testing & Commissioning of the entire Plant.
Central Resource - Live progress reports and project documentation.
Online access portal - allows anywhere, anytime review
Defect Management - provides a systematic method for documenting, tracking and following up on
critical issues & defects.
Multiuser access through designated logins to ensure access levels, tracking and accountability
Avoids GAPS - created when fast tracking programmes
Audit trail - allows continual audit, accountability & transparency
Intelligent Systems
Autocomm is a web based dashboard project
management system for the Water/Oil & Gas industries
that provides commissioning visibility throughout the
projects life cycle. The program software is designed
to ensure clients, project managers and the general
public (at an agreed level of access) have access to
real-time project programme information. The ability
to readily access information from anywhere ensures
that the client and project members are never apart.
Clients have access to the project overview and are
able to track as well as report on the projects progress,
without the expense of managing extensive resource
proles on sta or contractors. (Avoiding client gaps).
Case Study - Adelaide Aqua
Utilising Autocomm, the commissioning team was able to
eectively realise the project requirements. The system was
tailored to meet the needs of the multinational consortium,
Adelaide Aqua. The following measures were implemented:
Asset and P&ID tagging a compiled list of assets received
from the project were able to be s treamlined into specic
lters and uploaded to the database. Assets were then
tagged specically to its P&ID Drawing and assigned its
relevant OM Manual.
First Water Review - Intelligent P&IDs were created with
the ability to view isolation points
Flow Level Display - Ability to view multiple commissioning
ow levels
HV-LV Display - Energisation of HV-LV Systems
Reporting Each asset was assigned reports (Delivery,
Installation, Pre-commissioning, Available). Each report
was dependant on its previous to eliminate any fast-
tracking and prevent future risks associated with it.
Document Management - Operational Philosophies andGAs for each plant area were made available for quick
referencing and download
Defect Management Throughout the reporting phase,
a defect option was linked to each report in order to
highlight the number of defects and assign a priority.
Project Outcome
In implementing Autocomm, the project is able to; reduce its
overall project risk prole and realise signicant time and cost
value to all project control functions. Additionally, Clients have
access to a live status overview of their project utilising the
Dashboard function to display milestones.
-
8/9/2019 CN AU Mining Capabilities
5/5
CNMANAGEMENT
Australia
Waterfront Place, Level 25, 1 Eagle Street, Brisbane QLD 4000Ph: (07) 3229 0255
Email: [email protected]
UK Scotland
7 Woodstone Court, Pier Road, Rhu Scotland G848LH
Ph: +44 (0) 7767845032
Email: [email protected]
UK Yorkshire
9 The Wend, Carlton in Craven Yorkshire BD233EEPh: +44 (0) 7802518925
Email: [email protected]
www.cngmanagement.com