Mid-Region MPO Rec Num: 197.1 CN: A300079 Lead Agency: NMDOT D-3 Est. Letting: 10/31/2017 Proj I-40 Louisianna Westbound Ramps Fr: MP 162.5 To: MP 163.5 Project Desc.: Rehabilitation an/or reconstruction of the on and off ramps and subsequent interchange area. Other appurtenances as necessary. Est. Proj. Cost: $4,044,509 Project Phases: NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque RT1 I00040 Length: 1 Category: Hwy & Brg Pres Remarks: AM-Nov-17 (1TR), R-17-04 (Funds from A300077). PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: A300079 Construction Right-of-way Prel. Engr. FUND SOURCE 2018 2019 2020 2021 2022 2023 4 Yr. TOTALS Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design Environ. Document Other TIP Informational Years TIP Amendment Pending? Signif. Work Zone: RT2 Rt 1 BMP 162.5 Rt 2 BMP: 0 Rt 1 EMP: 163.5 Rt 2 EMP: 0 NHPP $3,455,629 $3,455,629 $4,044,509 $4,044,509 Totals $588,880 $588,880 State Match $0 $0 Local Match 04 Thursday, April 12, 2018

Transcript of CN: A300077 Mid-Region MPO Rec Num: 197 ... - · PDF fileCN: A300077 Mid-Region MPO Rec Num:...

Mid-Region MPO Rec Num: 197.1CN: A300079Lead Agency: NMDOT D-3

Est. Letting: 10/31/2017Proj I-40 Louisianna Westbound RampsFr: MP 162.5 To: MP 163.5

Project Desc.: Rehabilitation an/or reconstruction of the on and off ramps and subsequent interchange area. Other appurtenances as necessary.

Est. Proj. Cost: $4,044,509

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1 I00040

Length: 1Category: Hwy & Brg Pres

Remarks: AM-Nov-17 (1TR), R-17-04 (Funds from A300077).

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300079

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Signif.Work Zone:

RT2

Rt 1 BMP 162.5 Rt 2 BMP: 0 Rt 1 EMP: 163.5 Rt 2 EMP: 0

NHPP $3,455,629 $3,455,629

$4,044,509$4,044,509Totals

$588,880$588,880State Match

$0$0Local Match04

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 422.6CN: A300083Lead Agency: Pueblo of Isleta

Est. Letting:Proj Commuter Rail: Isleta Pueblo Quiet Zone Off-Track ImprovementsFr: Xing #019452T, 019451L, 019450E, To: 019449K, 019445H, 019443U & 019442M

Project Desc.: Project will include off-track improvements , including work on the drainage underpass. Design under A300081 by Rio Metro. FFY 2015 FUNDS WILL BE DELAYED TO FFY 2018 PER ISLETA PUEBLO & NMDOT ON APRIL 11, 2016.

Est. Proj. Cost: $950,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: Pueblo of Isleta

RT1

Length: 0Category: Transit

Remarks: AM-April-16, AM-jun-15, AM-jan-15, AM-sep-13 - proj split fr A300081.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300083

Construction■Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

Safety (HSIP) $855,000 $855,000

$950,000$950,000Totals

$95,000$95,000State Match

$0$0Local Match21

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 854.1CN: A300111Lead Agency: City of Albuquerque-DMD

Est. Letting:Proj University Blvd Multimodal Improvements Phase IIFr: George Rd To: Gibson Blvd.

Project Desc.: Const. missing bike facilities & improve existing roadway segments as needed, construction management services. Proj. will be Constructed in phases. Env. clearance will be requested for both phases.

Est. Proj. Cost: $3,219,288

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Bike/Ped

Remarks: AM-Sep-19, R-16-09, AM-may-15, R-15-07, AM-jan-14 proj split from A300110, AM-sep-13, AM-Oct-12, R-12-07, R-11-03, R-09-04, R-09-03. FY 14 funding to be used for phase I, Rio Bravo to George Rd. FY 15 funding to be used for phase II, George Rd to Gibson Blvd.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300111

Construction■Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other■

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP Rt 2 BMP: 0 Rt 1 EMP: Rt 2 EMP: 0

STP-U $2,000,000 $2,000,000

$3,219,288$3,219,288Totals

$0$0State Match

$340,824$340,824Local Match

$878,464$878,464Local Non-Match 28

03

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 802.1CN: A300142Lead Agency: City of Albuquerque-DMD

Est. Letting: 12/1/2022Proj GAP Closure for On-Street Bicycle FacilitiesFr: AMPA Wide To:

Project Desc.: Implement recommended bicyle improvements form the updated Bikeways and Trails Facility Plan.

Est. Proj. Cost: $1,141,152

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Bike/Ped

Remarks: R-15-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300142

Construction□Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

STP-U $975,000 $975,000

$1,141,152$1,141,152Totals

$0$0State Match

$166,152$166,152Local Match28

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 870.1CN: A300143Lead Agency: City of Albuquerque-DMD

Est. Letting: 3/1/2020Proj North Diversion Channel UndercrossingFr: North Diversion Channel and Indian School To:

Project Desc.: Design and construct an undercrossing of the NDC trail.

Est. Proj. Cost: $2,311,564

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Bike/Ped

Remarks: R-18-01, R-15-05

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300143

Construction□Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

STP-U $1,000,000 $975,000 $1,975,000

$2,311,564$1,170,412 $1,141,152Totals

$0$0 $0State Match

$336,564$170,412 $166,152Local Match28 28

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 437CN: A300160Lead Agency: County of Bernalillo

Est. Letting:Proj Sunport Blvd ExtensionFr: Woodward To: I-25 Exit 221 at Sunport Blvd

Project Desc.: Construct new 4 lane divided facility with bike lanes includes signage, drainage, and other necessary appurtenances. Demo ID NM006. Project total includes capital outlay & county funds in previous FYs.

Est. Proj. Cost: $21,506,874

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: Capacity Proj

Remarks: AM-AM-Nov-17, R-17-04, R-17-03, R-16-09, AM-nov-16 Removed remianing FFY 2017 STP-U funds ($1,708,800 federal) as result of lowered targets provided by NMDOT. Funds will be restored in upcoming FFY 2018-2023 TIP Dev. . R-16-09, R-16-04, AM-nov-15, AM-jan-15, AM-nov-14, R-13-14, R-13-05, R-13-04, AM-dec-12, R-12-09, R-12-07, AM-may-12, R-12-

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300160

Construction■Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: Rt 1 EMP: 0 Rt 2 EMP:

STP-U $2,658,375 $4,457,024 $1,367,040 $1,708,800$8,482,439

STP-U $2,136,000 $2,136,000

$16,892,980$2,500,000 $7,576,426 $5,216,554 $1,600,000 $2,000,000Totals

$0$0 $0 $0 $0 $0State Match

$1,809,509$364,000 $453,019 $759,530 $232,960 $291,200Local Match

$4,465,032$4,465,032Local Non-Match 01

01 01 01 01

15

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 865.1CN: A300161Lead Agency: County of Bernalillo

Est. Letting:Proj Woodward Road Improvements ProjectFr: Intersection of 2nd St & Woodward Road To: Intersection of Broadway Blvd & Woodward Rd

Project Desc.: Completely reconstruct Woodward Road to address vehicle, drainage, bicycle, and pedestrian needs. Bernalillo County will utilize design funds as soft match for construction per 08-25-15 letter from NMDOT.

Est. Proj. Cost: $4,782,641

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1 FL5085

Length: 0.581Category: Hwy & Brg Pres

Remarks: R-15-06 & R-15-05, R-14-09.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300161

Construction■Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0.581 Rt 2 EMP: 0

STP-U $4,086,289 $4,086,289

$4,782,641$4,782,641Totals

$0$0State Match

$696,352$696,352Local Match03

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 107.8CN: A300188Lead Agency: MRMPO

Est. Letting:Proj CMP Transportation Assessment ProgramFr: AMPA Wide To:

Project Desc.: Collect travel time and other data to assess the performance of the transportation network, analyze congested locations, identify projects to address regional needs, use data for project prioritization.

Est. Proj. Cost: $200,000

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: N/A not applicable

RT1

Length: 0Category: ITS-TSM

Remarks: R-17-04, (CN chng jul-14), R-13-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300188

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

STP-U $30,917 $30,917

$36,186$36,186Totals

$0$0State Match

$5,269$5,269Local Match18

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 107.9CN: A300189Lead Agency: MRMPO

Est. Letting:Proj CMP Transportation Assessment ProgramFr: AMPA Wide To:

Project Desc.: Collect travel time and other data to assess the performance of the transportation network, analyze congested locations, identify projects to address regional needs, use data for project prioritization.

Est. Proj. Cost: $363,814

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: N/A not applicable

RT1

Length: 0Category: ITS-TSM

Remarks: R-17-04, (CN chng jul-14), R-13-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300189

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

STP-U $310,843 $310,843

$363,814$363,814Totals

$0$0State Match

$52,971$52,971Local Match18

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 314CN: A300191Lead Agency: NMDOT D-3

Est. Letting:Proj NM 314 & Courthouse Rd Intersection ImprovementsFr: Park To: Teles

Project Desc.: Addition of northbound and southbound left-turn lanes and other intersection improvements as needed.

Est. Proj. Cost: $2,845,000

Project Phases:

NMDOT Dist.: 3 County: Valencia Municipality: Village of Los Lunas

RT1 NM0314

Length: 0.2Category: Hwy & Brg Pres

Remarks: R-18-01, AM-Dec-17, R-16-09, R-14-13, AM-nov-12, R-12-09.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300191

Construction■Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP 7.451 Rt 2 BMP: 0 Rt 1 EMP: 7.651 Rt 2 EMP: 0

Safety (HSIP) $540,000 $540,000

Safety (HSIP) $270,000 $270,000

Safety (HSIP) $1,701,000 $1,701,000

Safety (HSIP) $49,500 $49,500

$2,845,000$955,000 $1,890,000Totals

$284,500$95,500 $189,000State Match

$0$0 $0Local Match15

16

21

43

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 615.7CN: A300257Lead Agency: NMDOT D-3

Est. Letting: 2/28/2022Proj I-40 Embudo Channel ImprovementsFr: San Mateo Blvd To: Juan Tabo Blvd

Project Desc.: Reconstruction/rehabiliation of the Embudo Channel in the median of I-40. Project to be staged in sections and built over several years. Project is joint effort with AMAFCA and COA.

Est. Proj. Cost: $250,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1 I00040

Length: 5.31Category: Misc

Remarks: R-17-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300257

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Signif.Work Zone:

RT2

Rt 1 BMP 161.23 Rt 2 BMP: 0 Rt 1 EMP: 166.54 Rt 2 EMP: 0

STP-Flex $106,800 $106,800$0

$0 $125,000 $125,000Totals

$0 $18,200 $18,200State Match

$0 $0 $0Local Match04 04

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 448.6CN: A300280Lead Agency: NMDOT CRDC

Est. Letting: 9/1/2015Proj I-25 Rio Bravo Interchange ReconstructionFr: NM 500, Rio Bravo Blvd Exit #220 To: University to approx 500' west of Broadway

Project Desc.: Reconstruct interchange with possible changes in configuration.

Est. Proj. Cost: $53,891,234

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1 I00025

Length: 1.6Category: Capacity Proj

Remarks: AM-jan-17, AM-dec-16, AM-nov-16, AM-July-16, AM-June-16, R-16-04, R-16-01, R-15-02, AM-feb-15, AM-sep-14, R-14-06, AM-jan-14, AM-dec-13, R-13-16, R-13-08, R-12-14, AM-oct-12, AM-may-11, AM-apr-11, R-11-03, R-11-02, AM-feb-11, AM-mar-10, R-09-04, R-09-03. Project cost includes FY 2011 & 2012 funding.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300280

Construction■Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Signif.Work Zone:

RT2

Rt 1 BMP 219.8 Rt 2 BMP: 0 Rt 1 EMP: 221.4 Rt 2 EMP: 0

NHPP $14,834,993 $14,834,993

STP-Flex $59,303 $59,303

$17,432,462$17,432,462Totals

$2,538,166$2,538,166State Match

$0$0Local Match03

03

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 465.1CN: A300302Lead Agency: City of Albuquerque-DMD

Est. Letting:Proj Unser Blvd Corridor Improvements Future StagesFr: Central Ave To: Bernalillo-Sandoval County Line

Project Desc.: Complete a uniform 4 and/or 6 lane roadway facility & implement multi-modal improvements; construction management services. Projet may be phased. (Some PE, Design & ROW done under A300300)

Est. Proj. Cost: $3,000,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1 NM0345

Length: 11.126Category: Capacity Proj

Remarks: R-15-15 (FFY 2017 funds moved to CN A302050), AM-jan-15, AM-sep-13, R-12-07, R-12-01.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300302

Construction■Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other■

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2 FL4082

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 3.645 Rt 2 EMP: 7.481

$2,000,000$2,000,000Totals

$2,000,000$2,000,000Local Bond Funds 03

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 250.5CN: A300375Lead Agency: NMDOT D-3

Est. Letting: 8/1/2016Proj I-25 MLK NB Off Ramp ImprovementsFr: Lead/Coal Ave on-ramp To: Lomas Blvd. off-ramp

Project Desc.: Abandonmentof an existing off-ramp. Improvements include removing the northbound MLK Jr off-ramp, extension of an auxillary lane on I-25 between Lead and Lomas and roadway improvements to Oak Street from Central Ave to MLK Ave.

Est. Proj. Cost: $200,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1 I00025

Length: 0.47Category: Safety

Remarks: R-16-07.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300375

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP 225.53 Rt 2 BMP: 0 Rt 1 EMP: 226 Rt 2 EMP: 0

STP-Flex $170,880 $170,880

$200,000$200,000Totals

$29,120$29,120State Match

$0$0Local Match21

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 651.6CN: A300376Lead Agency: NMDOT D-3

Est. Letting: 10/1/2022Proj I-25 S-Curve Pavement PreservationFr: Avenida Cesar Chavez To: Lomas Blvd.

Project Desc.: Pavement preservation to include pavement markings, signage, and other appurtenances as necessary.

Est. Proj. Cost: $4,500,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1 I00025

Length: 1.6Category: Hwy & Brg Pres

Remarks: R-17-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300376

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP 223.6 Rt 2 BMP: 0 Rt 1 EMP: 225.2 Rt 2 EMP: 0

NHPP $3,844,800$0

$0 $4,500,000Totals

$0 $655,200State Match

$0 $0Local Match05

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 448.7CN: A300377Lead Agency: NMDOT D-3

Est. Letting: 12/1/2022Proj I-25 NB WideningFr: Rio Bravo To: Sunport

Project Desc.: Widen I-25 to inlude a 4th lane as part of a commitment project from the Rio Bravo Interchange improvements (A300280).

Est. Proj. Cost: $3,000,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1 I00025

Length: 1.6Category: Capacity Proj

Remarks: R-17-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300377

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Signif.Work Zone:

RT2

Rt 1 BMP 220.5 Rt 2 BMP: 0 Rt 1 EMP: 222.1 Rt 2 EMP: 0

NHPP $2,563,200$0

$0 $3,000,000Totals

$0 $436,800State Match

$0 $0Local Match01

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 493.4CN: A300381Lead Agency: NMDOT CRDC

Est. Letting:Proj NM 528 Rio Rancho Blvd Improvements (Upper Section)Fr: Ridgecrest Dr/Leon Grande Ave To: Northern Blvd

Project Desc.: Pavement overlay and widening from 4 to 6 lanes including pavement markings, bike path, drainage improvements, shoulders, signage, and other appurtenances as necessary. ED, PE & Design under A300380.

Est. Proj. Cost: $23,316,834

Project Phases:

NMDOT Dist.: 3 County: Sandoval Municipality: City of Rio Rancho

RT1 NM0528

Length: 1.463Category: Capacity Proj

Remarks: R-17-04, R-16-04, R-16-01, AM-may-15, AM-feb-15, AM-jan-15, AM-dec-14, AM-nov-14, R-13-01, AM-oct-12, R-11-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300381

Construction□Right-of-way■Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other□

TIP Informational Years

TIP Amendment Pending? □

Signif.Work Zone:

RT2

Rt 1 BMP 8.327 Rt 2 BMP: 0 Rt 1 EMP: 9.79 Rt 2 EMP: 0

NHPP $9,376,280 $7,412,860 $16,789,140

STP-Flex $298,860 $298,860

$19,999,999$10,974,110 $9,025,889Totals

$2,911,999$1,597,830 $1,314,169State Match

$0$0 $0Local Match03 03

03

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 167CN: A300414Lead Agency: Village of Tijeras

Est. Letting: 3/1/2018Proj NM 333 & Patricio Garcia Shoulder Crossing ImprovementsFr: Patricio Garcia Rd @ Camino Municipal Rd To: Patricio Garcia Rd @ NM 333

Project Desc.: Design and construct new pedestrian walkway along Patricio Garcia and school bus pull off area along NM 333 and the intersection.

Est. Proj. Cost: $118,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: Village of Tijeras

RT1

Length: 0Category: Safety

Remarks: R-18-01, R-14-13.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300414

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

Safety (HSIP) $70,200 $70,200

$78,000$78,000Totals

$0$0State Match

$7,800$7,800Local Match21

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 6.8CN: A300423Lead Agency: NMDOT D-3

Est. Letting:Proj NM 6 Bridge Replacement ( Rio Grande Bridge #7453)Fr: To:

Project Desc.: Bridge Replacement and other appurtenances as necessary.

Est. Proj. Cost: $16,782,203

Project Phases:

NMDOT Dist.: 3 County: Valencia Municipality: Village of Los Lunas

RT1 NM0006

Length: 0Category: Hwy & Brg Pres

Remarks: R-18-01, AM-Jan-18, AM-Dec-17, R-17-07, R-17-04, R-16-04, R-15-09, R-15-05, R-14-01.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300423

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP 34.41 Rt 2 BMP: 0 Rt 1 EMP: 35.5 Rt 2 EMP: 0

NHPP $4,015,190 $4,015,190

STP-Flex $6,585,990 $2,373,712 $8,959,702

STP-Flex (Non-Chargeable) $606,624 $606,624

STP-Sm Urb $90,767 $90,767

$16,002,203$710,000 $12,407,748 $2,884,456Totals

$2,329,920$103,376 $1,806,568 $419,977State Match

$0$0 $0 $0Local Match11

11 11

15

11

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 260.1CN: A300424Lead Agency: NMDOT D-3

Est. Letting: 10/31/2022Proj NM 6 Pavement Preservation in Los LunasFr: Hunning Ranch Loop To: NM 47

Project Desc.: Pavement preservation to include ADA improvements and other miscellaneous construction as needed.

Est. Proj. Cost: $5,618,008

Project Phases:

NMDOT Dist.: 3 County: Valencia Municipality: Village of Los Lunas

RT1 NM0006

Length: 4.7Category: Hwy & Brg Pres

Remarks: R-17-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300424

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP 31.9 Rt 2 BMP: 0 Rt 1 EMP: 36.6 Rt 2 EMP: 0

STP-Flex $1,070,572$0

STP-Sm Urb $3,729,454$0

$0 $4,364,998 $1,253,010Totals

$0 $635,544 $182,438State Match

$0 $0 $0Local Match05

05

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 260.2CN: A300425Lead Agency: NMDOT D-3

Est. Letting: 10/31/2023Proj NM 6 Pavement Preservation West of I-25Fr: MP 23.6 To: MP 31.90

Project Desc.: Pavement preservation to correct surface defects, extend pavement life and improve safety along NM 6.

Est. Proj. Cost: $5,364,998

Project Phases:

NMDOT Dist.: 3 County: Valencia Municipality: Village of Los Lunas

RT1 NM0006

Length: 8.3Category: Hwy & Brg Pres

Remarks: R-17-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300425

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP 23.6 Rt 2 BMP: 0 Rt 1 EMP: 31.9 Rt 2 EMP: 0

STP-Flex $854,400$0

STP-Sm Urb $3,729,454$0

$0 $5,364,998Totals

$0 $781,144State Match

$0 $0Local Match05

05

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 347.1CN: A300431Lead Agency: City of Rio Rancho

Est. Letting:Proj Northern Blvd Expansion Phase BFr: Unser Blvd. To: Broadmoor Blvd.

Project Desc.: Design and Right-Of-Way Acquisition.

Est. Proj. Cost: $2,640,000

Project Phases:

NMDOT Dist.: 3 County: Sandoval Municipality: City of Rio Rancho

RT1 FL4098

Length: 1.14Category: Capacity Proj

Remarks: R-15-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300431

Construction□Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP 4.53 Rt 2 BMP: 0 Rt 1 EMP: 5.67 Rt 2 EMP: 0

STP-U $1,127,808 $1,127,808

STP-U $1,127,808 $1,127,808

$2,640,000$2,640,000Totals

$0$0State Match

$384,384$384,384Local Match15

16

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 872.4CN: A300504Lead Agency: County of Bernalillo

Est. Letting:Proj Bridge Blvd and Tower Rd Reconstruction Phase 2Fr: Young Ave To: Riverside Drain

Project Desc.: Design, Recon. & or widen Rd. sections including intersec. improv/realignments, sidewalks, ADA accomod., drainage, lighting, & other appurtenances as necess. (The $80,376 HUD match includes $15,000 in-kind). Soft match in A300501, A300503 & future phases.

Est. Proj. Cost: $7,514,045

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: Unincorporated Area

RT1

Length: 0Category: Hwy & Brg Pres

Remarks: AM-Feb-18, AM-Jan-18 FFY 2019 funds split from A300501.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300504

Construction■Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

STP-U $6,420,000 $6,420,000

$7,514,045$7,514,045Totals

$0$0State Match

$1,094,045$1,094,045Local Match04

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 3.4CN: A300604Lead Agency: NMDOT D-3

Est. Letting:Proj OrthophotographyFr: District 3 wide To:

Project Desc.: Orthophotographic services provided by the Mid-Region Council of Governments per MOU.

Est. Proj. Cost: $50,000

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: Misc

Remarks: R-13-16. (FY 2018 Allocation)

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300604

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

STP-Flex $42,720 $42,720

$50,000$50,000Totals

$7,280$7,280State Match

$0$0Local Match18

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 3.5CN: A300605Lead Agency: NMDOT D-3

Est. Letting:Proj OrthophotographyFr: District 3 wide To:

Project Desc.: Orthophotographic services provided by the Mid-Region Council of Governments per MOU.

Est. Proj. Cost: $50,000

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: Misc

Remarks: R-15-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300605

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

STP-Flex $42,720 $42,720

$50,000$50,000Totals

$7,280$7,280State Match

$0$0Local Match18

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 3.6CN: A300606Lead Agency: NMDOT D-3

Est. Letting: 10/1/2021Proj OrthophotographyFr: District 3 wide To:

Project Desc.: Orthophotographic services provided by the Mid-Region Council of Governments per MOU.

Est. Proj. Cost: $50,000

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: Misc

Remarks: R-17-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300606

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

STP-Flex $42,720$0

$0 $50,000Totals

$0 $7,280State Match

$0 $0Local Match18

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 636CN: A300655Lead Agency: City of Albuquerque-DMD

Est. Letting:Proj Zuni Rd ImprovementsFr: Washington St To: Central Ave

Project Desc.: Construct ADA compliant sidewalks & ramps, minor intersection realignment, lighting, upgrade signage/markings, improve crosswalks or other measures to reduce pedestrian & bicycle crashes.

Est. Proj. Cost: $3,643,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length:Category: Safety

Remarks: AM-Mar-18,AM-Aug-17, R-16-04, AM-oct-15, AM-mar-15, AM-jun-14, R-14-01, R-13-16, R-13-08.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300655

Construction■Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP Rt 2 BMP: 0 Rt 1 EMP: Rt 2 EMP: 0

Safety (HSIP) $2,700,000 $2,700,000

$3,643,000$3,643,000Totals

$300,000$300,000State Match

$0$0Local Match

$643,000$643,000Local Non-Match 21

21

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 636.1CN: A300659Lead Agency: City of Albuquerque-DMD

Est. Letting: 9/30/2020Proj Zuni Road ADA ImprovementsFr: Washington St. To: Central Ave.

Project Desc.: In accordance with the COA ADA Transition Plan, funds are to be used for the design and implementation of ADA related improvements to sidewalks/ramps. Intersection legs at Wyoming and Zuni already in design.

Est. Proj. Cost: $800,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Bike/Ped

Remarks: AM-Apr-18.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300659

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

$800,000$800,000Totals

$800,000$800,000Local Bond Funds 28

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 100.5CN: A300705Lead Agency: City of Albuquerque-DMD

Est. Letting:Proj AMPA Wide Bicycle Facil. Prog. & ActivitiesFr: Albuquerque Metro Area To:

Project Desc.: Improvements to bicycle facilities, programs and activities.

Est. Proj. Cost: $175,562

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Bike/Ped

Remarks: R-15-15 (FFY 2020 Allocation).

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300705

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

CMAQ-Flex $150,000 $150,000

$175,562$175,562Totals

$0$0State Match

$25,562$25,562Local Match28

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 100.6CN: A300706Lead Agency: City of Albuquerque-DMD

Est. Letting:Proj AMPA Wide Bicycle Facil. Prog. & ActivitiesFr: Albuquerque Metro Area To:

Project Desc.: Improvements to bicycle facilities, programs and activities.

Est. Proj. Cost: $175,562

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Bike/Ped

Remarks: R-15-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300706

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

CMAQ-Flex $150,000 $150,000

$175,562$175,562Totals

$0$0State Match

$25,562$25,562Local Match28

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 101.7CN: A300717Lead Agency: City of Albuquerque-P&R

Est. Letting: 10/1/2017Proj AMPA wide Bike/Ped Safety Education ProgramFr: AMPA Wide To:

Project Desc.: Increase youth safety in the AMPA through education on multi-modal transportation and proper use of infrastructure.

Est. Proj. Cost: $514,981

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: Bike/Ped

Remarks: R-17-04, R-17-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300717

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

TAP-Lg Urb $110,000 $110,000 $110,000 $110,000 $440,000

$514,981$128,745 $128,745 $128,745 $128,745Totals

$0$0 $0 $0 $0State Match

$74,981$18,745 $18,745 $18,745 $18,745Local Match28 28 28 28

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 123.8CN: A300748Lead Agency: City of Albuquerque-ABQ Ride

Est. Letting:Proj AMPA Wide Joint TDM-Travel Demand ManagementFr: AMPA Wide To:

Project Desc.: Transportation Demand Management Program to increase alternative modes of transportation with activities including public education, outreach, promotions, information and related equipment and services. Joint lead with Rio Metro in FY18 & FY19.

Est. Proj. Cost: $1,240,637

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: N/A not applicable

RT1

Length: 0Category: TDM

Remarks: R-13-05. (FY 2018 Allocation)

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300748

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

CMAQ-Flex $1,082,021 $1,082,021

$1,266,410$1,266,410Totals

$0$0State Match

$184,389$184,389Local Match24

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 123.9CN: A300749Lead Agency: City of Albuquerque-ABQ Ride

Est. Letting:Proj AMPA Wide Joint TDM-Travel Demand ManagementFr: AMPA Wide To:

Project Desc.: Transportation Demand Management Program to increase alternative modes of transportation with activities including public education, outreach, promotions, information and related equipment and services. Joint lead with Rio Metro in FY18 & FY19.

Est. Proj. Cost: $1,275,749

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: N/A not applicable

RT1

Length: 0Category: TDM

Remarks: R-13-05. (FY 2019 Allocation)

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300749

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

CMAQ-Flex $710,000 $710,000

$830,992$830,992Totals

$0$0State Match

$120,992$120,992Local Match24

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 103CN: A300750Lead Agency: City of Albuquerque-DMD

Est. Letting:Proj ITS-Albuquerque Traffic Management SystemFr: Albuquerque City Wide To:

Project Desc.: Plan, design, install, integrate and replace traffic signal infrastructure communications, monitoring devices, other ITS related elements and services, and construction management services. Separate CNs will be issued later for each FY as needed.

Est. Proj. Cost: $2,340,824

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: ITS-TSM

Remarks: R-15-09 Moves FFY 2019 funds to A300970. R-15-05, AM-mar-15 split FFY 15 allocation to A300755, AM-mar-15, AM-sep-13, R-13-05, AM-may-12, R-11-03, R-11-02, AM-oct-10 split by FY & new CN, AM-mar-10, AM-jan-10, R-09-04, R-09-03, AM-mar-09, R-09-02, AM-feb-09, AM-jul-08, R-08-01, R-06-05 & R-06-09. AM-jan-07, R-07-04, R-07-05. (FY 2019-2021

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300750

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: Rt 1 EMP: 0 Rt 2 EMP:

STP-U $1,000,000 $1,000,000 $2,000,000

$2,340,824$1,170,412 $1,170,412Totals

$0$0 $0State Match

$340,824$170,412 $170,412Local Match24 24

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 104.8CN: A300768Lead Agency: NMDOT D-3

Est. Letting:Proj ITS - District 3 Deployment of ITSFr: I-25 & I-40 & other State Hwys To: AMPA Wide

Project Desc.: Implement ITS Improvements in conformance to the Regional ITS Architecture.

Est. Proj. Cost: $1,000,000

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: ITS-TSM

Remarks: R-14-01. (FY 2018 Allocation)

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300768

Construction■Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

NHPP $854,400 $854,400

$1,000,000$1,000,000Totals

$145,600$145,600State Match

$0$0Local Match24

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 104.9CN: A300769Lead Agency: NMDOT D-3

Est. Letting:Proj ITS - District 3 Deployment of ITSFr: I-25 & I-40 & other State Hwys To: AMPA Wide

Project Desc.: Implement ITS Improvements in conformance to the Regional ITS Architecture.

Est. Proj. Cost: $4,750,000

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: ITS-TSM

Remarks: R-17-08, R-17-03, R-15-05, R-14-01. (FFY 2019-2023 Allocations)

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300769

Construction■Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

NHPP $640,800 $854,400 $854,400$640,800

STP-Flex $854,400 $854,400 $1,708,800

$2,750,000$750,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000Totals

$400,400$109,200 $145,600 $145,600 $145,600 $145,600State Match

$0$0 $0 $0 $0 $0Local Match24 24 24

24 24

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 568.9CN: A300799Lead Agency: NMDOT D-3

Est. Letting: 10/1/2021Proj AMPA Wide Motorist Assistance Courtesy PatrolsFr: AMPA Wide To:

Project Desc.: Operate courtesy patrols (H.E.L.P. vehicles) AMPA Wide

Est. Proj. Cost: $3,094,233

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: ITS-TSM

Remarks: R-18-01, R-17-08, R-17-03, R-16-07, R-15-05, R-15-02, R-13-05. (FY 2019, 2021, 2022 and 2023 Allocations).

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300799

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

NHPP $1,708,800 $213,600 $336,833 $213,600$1,922,400

STP-Flex $170,880 $170,880

$2,450,000$2,000,000 $250,000 $200,000 $394,233 $250,000Totals

$356,720$291,200 $36,400 $29,120 $57,400 $36,400State Match

$0$0 $0 $0 $0 $0Local Match24 24 24 24

24

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 650.9CN: A300809Lead Agency: NMDOT D-3

Est. Letting:Proj District 3 On-Call Planning & Design SupportFr: District 3 Wide Projects T.B.D. To:

Project Desc.: Provide planning, engineering, & design services on an on-call basis.

Est. Proj. Cost: $800,000

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: N/A not applicable

RT1

Length: 0Category: Misc

Remarks: R-17-04 Delete form FFY 2021, R-17-03, R-16-07, R-15-05, R-13-05. (FY 2019-2022 Allocations).

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300809

Construction□Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

STP-Flex $427,200 $256,320$427,200

$500,000$500,000 $300,000Totals

$72,800$72,800 $43,680State Match

$0$0 $0Local Match18 18

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 587.4CN: A300842Lead Agency: City of Albuquerque-DMD

Est. Letting: 12/1/2020Proj Albquerque Complete Streets: WestFr: Central Ave from 106th Street To: Central Ave to Unser

Project Desc.: Implementation of CABQ Complete Streets ordinance, consisting of median landscaping including plants, irrigation and median nose paving. Project extends along Central Avenue from Unser Blvd. to 106th St.

Est. Proj. Cost: $2,340,824

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1 FL4016

Length: 1.56Category: Misc

Remarks: AM-Mar-18, AM-Jan-18 Split out FFY 2019-2021 Funds to A300845. AM-Sep-17, R-15-15 (Programming of project is in compliance with recent COA adopted ordinance designation funding to this section of Central Avenue.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300842

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other■

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 1.56 Rt 2 EMP: 0

STP-U $2,000,000 $2,000,000

$2,340,824$2,340,824Totals

$0$0State Match

$340,824$340,824Local Match04

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 587.5CN: A300844Lead Agency: City of Albuquerque-DMD

Est. Letting:Proj Albquerque Complete Streets: EastFr: Central Ave from Louisiana To: Central Ave to Tramway

Project Desc.: Implementation of CABQ Complete Streets Ordinance, including ADA compliant sidewalks, pedestrian and cyclists amenities and landscaping.

Est. Proj. Cost: $3,511,236

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1 FL4016

Length: 4.06Category: Misc

Remarks: R-15-15 (Programming of project is in compliance with recent COA adopted ordinance designation funding to this section of Central Avenue.)

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300844

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 13.46 Rt 2 BMP: 0 Rt 1 EMP: 17.52 Rt 2 EMP: 0

STP-U $1,000,000 $1,000,000 $1,000,000 $3,000,000

$3,511,236$1,170,412 $1,170,412 $1,170,412Totals

$0$0 $0 $0State Match

$511,236$170,412 $170,412 $170,412Local Match04 04 04

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 587.8CN: A300845Lead Agency: City of Albuquerque-DMD

Est. Letting: 12/1/2020Proj Albquerque Complete Streets: WestFr: Central Ave from 106th Street To: Central Ave to Unser

Project Desc.: Implementation of CABQ Complete Streets Ordinance, including ADA compliant sidewalks, pedestrian and cyclists amenities, landscaping or transit/bus stop improvements.

Est. Proj. Cost: $5,852,060

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1 FL4016

Length: 1.56Category: Misc

Remarks: AM-Jan-18 FFY 2019-2021 Funds split from Parent Project A300844.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300845

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other■

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 1.56 Rt 2 EMP: 0

STP-U $1,000,000 $1,000,000 $1,000,000 $3,000,000

$3,511,236$1,170,412 $1,170,412 $1,170,412Totals

$0$0 $0 $0State Match

$511,236$170,412 $170,412 $170,412Local Match04 04 04

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 439CN: A300870Lead Agency: City of Albuquerque-DMD

Est. Letting: 3/31/2018Proj Irving Blvd WideningFr: Universe Blvd. To: Rio Los Pinos Dr.

Project Desc.: Widen roadway from 2 to 4 lanes, divided; includes bike lanes between Unser Blvd and Eagle Ranch Rd. Includes Intersection improvements. Former CN-L3039.

Est. Proj. Cost: $3,650,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1 FL5036

Length: 0.75Category: Capacity Proj

Remarks: R-13-16, R-11-03, R-11-02, AM-sep-10, R-09-04, R-09-03, R-09-01, R-07-04, R-07-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300870

Construction■Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP 0.748 Rt 2 BMP: Rt 1 EMP: 1.498 Rt 2 EMP:

$2,500,000$2,500,000Totals

$2,500,000$2,500,000Local Bond Funds 03

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 825.2CN: A300891Lead Agency: Village of Los Lunas

Est. Letting:Proj NM 314 Bike & Pedestrian Improvements-Northside of VillageFr: NM 6 To: James St

Project Desc.: Construct new bike/ped facilities including streetscape, drainage, and roadside improvements.

Est. Proj. Cost: $1,771,185

Project Phases:

NMDOT Dist.: 3 County: Valencia Municipality: Village of Los Lunas

RT1 NM0314

Length: 0.418Category: Bike/Ped

Remarks: AM-Oct-17, R-13-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300891

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP 8.08 Rt 2 BMP: 0 Rt 1 EMP: 8.498 Rt 2 EMP: 0

STP-Sm Urb $226,995 $226,995

STP-Sm Urb $1,286,305 $1,286,305

$1,771,184$265,678 $1,505,507Totals

$0$0 $0State Match

$257,884$38,683 $219,202Local Match15

28

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 41.1CN: A300922Lead Agency: NMDOT D-3

Est. Letting: 12/1/2021Proj NM 556 (Tramway Blvd) @ Montgomery Signal UpgradeFr: NM556 and Montgomery To:

Project Desc.: Provide signal upgrades within intersection on all approaches, and implement multimodal improvements.

Est. Proj. Cost: $300,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1 NM0556

Length: 0.4Category: ITS-TSM

Remarks: R-17-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300922

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2 FL4018

Rt 1 BMP 11 Rt 2 BMP: 12.639 Rt 1 EMP: 11.2 Rt 2 EMP: 12.839

STP-Flex $256,320$0

$0 $300,000Totals

$0 $43,680State Match

$0 $0Local Match24

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 42.1CN: A300942Lead Agency: County of Bernalillo

Est. Letting:Proj NM 500 Rio Bravo Blvd & 2nd St Intersection ImprovementsFr: NM 500 at 2nd St (MP 3.16) To:

Project Desc.: Plan, environmental, design, right-of-way, and construct intersection improvements with pedestrian and bicycle facilities. NOTE: local match will be used as a soft match towards preliminary engineering and design.

Est. Proj. Cost: $2,340,824

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: Unincorporated Area

RT1 NM0500

Length: 0.2Category: Hwy & Brg Pres

Remarks: R-15-06 & R-15-05. AM-feb-12 split fr A300940.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300942

Construction■Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 3.064 Rt 2 BMP: 0 Rt 1 EMP: 3.264 Rt 2 EMP: 0

STP-U $2,000,000 $2,000,000

$2,340,824$2,340,824Totals

$0$0State Match

$340,824$340,824Local Match01

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 209CN: A300943Lead Agency: County of Bernalillo

Est. Letting:Proj NM 500 Rio Bravo Adaptive Signal Control Technology ProjectFr: Coors Blvd To: University Blvd.

Project Desc.: Install adaptive signal control system and fiber optic cable on Rio Bravo Blvd. from Coors Blvd. to University Blvd. NOTE: Local match will be used as a soft match for preliminary engineering and design.

Est. Proj. Cost: $1,200,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: Unincorporated Area

RT1 NM0500

Length: 4.54Category: ITS-TSM

Remarks: R-15-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300943

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 4.54 Rt 2 EMP: 0

STP-U $1,025,280 $1,025,280

$1,200,000$1,200,000Totals

$0$0State Match

$174,720$174,720Local Match24

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 42.2CN: A300944Lead Agency: NMDOT D-3

Est. Letting: 12/30/2022Proj NM 500 (Rio Bravo) and 98th Street Signal UpgradeFr: NM 500 and 98th Street To:

Project Desc.: Provide signal upgrade within intersection on all approaches and implement multimodal improvements.

Est. Proj. Cost: $300,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: Unincorporated Area

RT1 NM0500

Length: 0.4Category: ITS-TSM

Remarks: R-17-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300944

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP 5.5 Rt 2 BMP: 0 Rt 1 EMP: 5.7 Rt 2 EMP: 0.2

STP-Flex $256,320$0

$0 $300,000Totals

$0 $43,680State Match

$0 $0Local Match24

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 537.3CN: A300961Lead Agency: Village of Los Lunas

Est. Letting:Proj Los Lunas Corridor River Crossing ROW AcquisitionFr: I-25 To: NM 47

Project Desc.: Acquire rights-of-way as identified in the Los Lunas Corridor Study.

Est. Proj. Cost: $3,983,244

Project Phases:

NMDOT Dist.: 3 County: Valencia Municipality: Village of Los Lunas

RT1

Length: 0Category: Capacity Proj

Remarks: AM-feb-18, AM-Sep-17, R-17-02 (funds added from A301450), R-16-04, R-15-05, AM-oct-13, R-13-05, R-13-04.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300961

Construction□Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

STP-Sm Urb $106,800 $106,800

STP-Sm Urb $987,188 $251,946 $1,156,715 $153,901 $2,549,750

$3,109,258$1,280,417 $294,881 $1,353,833 $180,128Totals

$0$0 $0 $0 $0State Match

$452,708$186,429 $42,935 $197,118 $26,227Local Match15

16 16 16 16

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 49.1CN: A300970Lead Agency: City of Albuquerque-DMD

Est. Letting: 12/1/2021Proj ITS Regional Transportation Management Center (TMC)Fr: 400 Wyoming Blvd. NE, Albuquerque, NM To:

Project Desc.: Design & construct a regional transportation management center (TMC) for all ITS stakeholders. TMC will integrate multi-agency ITS components, signal systems, & interstate/arterial monitoring systems for real-time transportation & incident management.

Est. Proj. Cost: $15,996,933

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: ITS-TSM

Remarks: R-16-09, AM-nov-16, AM-dec-15, The City is currently designing the project using a SIB loan. The SIB loan will be paid back with the federal funds. AM-oct-15, R-15-09 Adds FFY 2016 and 2019 funds from A300750 & A300171 , AM-jan-15, AM-apr-14 The value of the building will be used as "soft match" per the fully executed MOU., R-13-14, AM-oct-12, R-11-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300970

Construction■Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

STP-U $93,300 $93,300

$109,199$109,199Totals

$0$0State Match

$15,899$15,899Local Match24

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 50CN: A300971Lead Agency: MRCOG

Est. Letting:Proj ITS Incident Management & Signal Oper. EnhancementsFr: AMPA river crossings, frontage roads and select To:

Project Desc.: Implement ITS on CMP corridors to improve operational efficiency. Implementation priority to be based on operational analysis & CMP strategies matrix. Includes: signal timing enhancements & other ITS improvements & active corridor management.

Est. Proj. Cost: $1,354,457

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: ITS-TSM

Remarks: AM-oct-15, R-13-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A300971

Construction■Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

CMAQ-Flex $889,993 $889,993

STP-U $267,255 $267,255

$1,354,457$1,354,457Totals

$151,665$151,665State Match

$45,543$45,543Local Match24

24

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 485CN: A301011Lead Agency: NMDOT D-3

Est. Letting:Proj I-25 Widening PHASE IIFr: Broadway Blvd To: Rio Bravo Blvd

Project Desc.: Adding one lane in each direction, pavement rehabilitation and/or reconstruction as needed. Project includes PE, Design, ROW and other appurtenances as necessary.

Est. Proj. Cost: $7,735,888

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: Various Multiple Jurisd.

RT1 I00025

Length: 5.7Category: Capacity Proj

Remarks: R-18-01, AM-Nov-17, R-16-04, R-15-06 & R-15-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301011

Construction■Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP 216.3 Rt 2 BMP: 0 Rt 1 EMP: 222 Rt 2 EMP: 0

NHPP $6,002,919 $6,002,919

STP-Flex (Non-Chargeable) $606,624 $606,624

$7,735,888$710,000 $7,025,888Totals

$1,126,345$103,376 $1,022,969State Match

$0$0 $0Local Match03

15

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 28CN: A301020Lead Agency: NMDOT D-3

Est. Letting: 10/1/2018Proj Paseo del Norte PCCP Intersection DesignFr: 2nd Street To: Wyoming Blvd.

Project Desc.: Design the PCCP intersections on NM 423 (PdN) between 2nd Street and Wyoming Blvd.

Est. Proj. Cost: $5,375,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: Various Multiple Jurisd.

RT1 NM0423

Length: 3.85Category: Hwy & Brg Pres

Remarks: AM-Jun-17 Project split to A301021, R-17-03. R-16-09, R-16-04, R-16-01, R-15-09, AM-feb-15, R-13-05, R-12-14, AM-oct-12, R-11-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301020

Construction□Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Signif.Work Zone:

RT2

Rt 1 BMP 9.224 Rt 2 BMP: 0 Rt 1 EMP: 13.072 Rt 2 EMP: 0

NHPP $4,272,000$0

$0 $5,000,000Totals

$0 $728,000State Match

$0 $0Local Match06

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 24.2CN: A301031Lead Agency: County of Bernalillo

Est. Letting: 9/30/2019Proj Alameda DrainTrail Phase 2Fr: Osuna Rd To: El Pueblo Rd

Project Desc.: Construct a multi-use trail.

Est. Proj. Cost: $2,580,519

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: Unincorporated Area

RT1 NM0047

Length: 1.74Category: Bike/Ped

Remarks: R-17-04, R-17-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301031

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 55.506 Rt 2 BMP: 0 Rt 1 EMP: 57.246 Rt 2 EMP: 0

TAP-Lg Urb $256,320 $256,320

TAP-Lg Urb $439,675 $472,800 $1,036,000 $1,948,475

$2,580,518$300,000 $514,601 $553,371 $1,212,547Totals

$0$0 $0 $0 $0State Match

$375,723$43,680 $74,926 $80,571 $176,547Local Match15

28 28 28

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 24.3CN: A301032Lead Agency: City of Albuquerque-P&R

Est. Letting: 11/30/2018Proj Alameda Drain/2nd Street Bike/Ped Trail Ph 3Fr: 4th Street at Matthew Ave To: Montano Rd at 2nd St

Project Desc.: Design and construct a paved multi-use trail along the Alameda Drain. Project includes construction management for paving, striping, signage, landscaping, crossing treatments and other appurtenances as needed.

Est. Proj. Cost: $1,025,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Bike/Ped

Remarks: AM-Feb-18, R-17-08, R-17-04, R-17-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301032

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

TAP-Lg Urb $94,838 $94,838

TAP-Lg Urb $379,354 $379,354

$1,025,000$353,750 $671,250Totals

$0$0 $0State Match

$80,808$16,162 $64,646Local Match

$242,750$242,750Local Bond Funds

$227,250$227,250Local Bond Funds

15

28

15

28

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 9.1CN: A301041Lead Agency: City of Rio Rancho

Est. Letting: 10/31/2017Proj Southern Blvd Reconstruction Phase IFr: 630' West of Golf Course Rd To: NM 528

Project Desc.: Reconst. Southern Blvd. to include to include signalized intersection, street light installation, curb & gutter, sidwalk & roadway pavement replacement, turning lane construction, storm drain construction, striping & signage, & water & sewer line const.

Est. Proj. Cost: $16,787,783

Project Phases:

NMDOT Dist.: 3 County: Sandoval Municipality: City of Rio Rancho

RT1 FL4096

Length: 1.306Category: Hwy & Brg Pres

Remarks: R-17-07, R-17-04, R-17-01, R-16-04, R-13-05. Environmental, Right-of-Way and Final design funds will be used as soft match for construction.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301041

Construction■Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP 5.757 Rt 2 BMP: 0 Rt 1 EMP: 7.063 Rt 2 EMP: 0

STP-U $7,722,706 $7,722,706

$15,937,783$15,937,783Totals

$0$0State Match

$1,316,041$1,316,041Local Match

$6,899,036$6,899,036Local Non-Match 03

03

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 508.1CN: A301050Lead Agency: City of Albuquerque-DMD

Est. Letting: 3/1/2020Proj Westside Blvd WideningFr: Golf Course Rd To: NM 528

Project Desc.: Rehab & widen from 2 to 4 lanes, bike lanes, pedestrian enhancements and other improvements per the Westside-McMahon Corridor Study. Transitions fr. Improv. To exist. Roadway sections include 350' w. of Westside/Golf Course intersection SEE REMARKS SEC.

Est. Proj. Cost: $11,988,332

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1 FL5257

Length: 0.823Category: Capacity Proj

Remarks: R-18-01 on Westside; 250' east of intersection of Westside and NM 528, on Westside, 250' north of the intersection of Westside and Golf Course;, on Golf Course; 600' south of the intersection of Westide and Golf Course, on Golf Course and ADA ramp improvement on the SE corner of the NM 528 and Westside intersection., R-17-04, R-17-03, R-16-04, R-15-05,

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301050

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP 1.331 Rt 2 BMP: Rt 1 EMP: 2.154 Rt 2 EMP:

STP-U $3,000,000 $3,642,831 $3,000,000$6,642,831

$7,774,849$3,511,236 $4,263,613 $3,511,236Totals

$0$0 $0 $0State Match

$1,132,018$511,236 $620,782 $511,236Local Match03 03 03

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 66CN: A301060Lead Agency: City of Albuquerque-ABQ Ride

Est. Letting:Proj West Central Ave ImprovementsFr: Rio Grande River To: San Pasqual Ave.

Project Desc.: Plan, design & construct street & transit improvements to accommodate & ensure complete integration with the Central Ave. Bus Rapid Transit project. Project includes pedestrian improv. to enhance transit use. Total proj. cost includes future phasing.

Est. Proj. Cost: $5,096,442

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1 FL4016

Length: 4.497Category: Transit

Remarks: AM-aug-15, AM-may-15, AM-mar-15, AM-jan-15, AM-sep-13, R-13-05, R-13-04, R-11-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301060

Construction■Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP 2.839 Rt 2 BMP: 0 Rt 1 EMP: 7.336 Rt 2 EMP: 0

$500,000$500,000Totals

$500,000$500,000Local Bond Funds 23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 438.2CN: A301070Lead Agency: City of Albuquerque-DMD

Est. Letting:Proj Osuna Blvd Widening Phase IIFr: Edith Blvd To: North Diversion Channel

Project Desc.: Widen from 4 to 6 lanes, divided. Includes bike lanes and multi-purpose trail.

Est. Proj. Cost: $12,490,824

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1 FL4052

Length: 1.056Category: Capacity Proj

Remarks: R-16-04, R-13-16, R-13-05, R-11-03, R-11-02.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301070

Construction■Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP 0.866 Rt 2 BMP: 0 Rt 1 EMP: 1.922 Rt 2 EMP: 0

$2,500,000$2,500,000Totals

$2,500,000$2,500,000Local Non-Match 03

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 6.6CN: A301121Lead Agency: Village of Los Lunas

Est. Letting:Proj I-25 & NM 6 Interchange Enhancements Phase IIFr: I-25 Exit 203 vicinity To:

Project Desc.: Erosion control, vegetation management, and landscaping as appropriate.

Est. Proj. Cost: $829,588

Project Phases:

NMDOT Dist.: 3 County: Valencia Municipality: Village of Los Lunas

RT1 NM0006

Length: 0.082Category: Misc

Remarks: AM-Apr-18, AM-Sep-17, R-16-09, AM-May-16, R-13-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301121

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Signif.Work Zone:

RT2

Rt 1 BMP 32.775 Rt 2 BMP: Rt 1 EMP: 32.857 Rt 2 EMP:

STP-Sm Urb $623,360 $623,360

$729,588$729,588Totals

$0$0State Match

$106,228$106,228Local Match31

Wednesday, April 18, 2018

Administrative Modification April 2018: Made a minor project scope revision per NMDOT request.

Mid-Region MPO Rec Num: 6.9CN: A301122Lead Agency: Village of Los Lunas

Est. Letting:Proj I-25 & NM 6 Interchange Beautification Enhancements Phase IIIFr: I-25 Exit 203 vicinity To:

Project Desc.: Erosion control, vegetation management, drainage improvements and landscaping as appropriate.

Est. Proj. Cost: $1,592,958

Project Phases:

NMDOT Dist.: 3 County: Valencia Municipality: Village of Los Lunas

RT1 I00025

Length: 0.4Category: Misc

Remarks: R-16-09, R-15-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301122

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Signif.Work Zone:

RT2

Rt 1 BMP 204.4 Rt 2 BMP: 0 Rt 1 EMP: 204.8 Rt 2 EMP: 0

STP-Rural $35,440 $35,440

STP-Rural $640,800 $640,800

STP-Rural $4,272 $4,272

STP-Sm Urb $35,440 $35,440

STP-Sm Urb $640,800 $640,800

STP-Sm Urb $4,272 $4,272

$1,592,959$82,959 $1,510,000Totals

$0$0 $0State Match

$231,935$12,079 $219,856Local Match15

31

43

15

31

43

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 376CN: A301141Lead Agency: City of Rio Rancho

Est. Letting: 10/30/2021Proj Lincoln Ave Construction (Interim 2 Lane)Fr: NM347 Paseo del Volcan To: Adams Lane

Project Desc.: Construct 2 lane roadway. Intersection improvements at NM 347.

Est. Proj. Cost: $5,116,056

Project Phases:

NMDOT Dist.: 3 County: Sandoval Municipality: City of Rio Rancho

RT1

Length: 0Category: Capacity Proj

Remarks: R-17-03, R-16-04, R-15-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301141

Construction□Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

STP-U $1,857,096 $2,031,327$1,857,096

$2,173,567$2,173,567 $2,377,489Totals

$0$0 $0State Match

$316,471$316,471 $346,162Local Match01 01

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 165.1CN: A301161Lead Agency: NMDOT D-3

Est. Letting: 10/31/2022Proj District 3 Bridge Replacements-NM 165Fr: Need Bridge #s To:

Project Desc.: Replace five deficient slab bridges on NM 165 with culverts.

Est. Proj. Cost: $2,000,000

Project Phases:

NMDOT Dist.: 3 County: Sandoval Municipality: Unincorporated Area

RT1 NM0165

Length: 2.3Category: Hwy & Brg Pres

Remarks: R-17-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301161

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP 9.6 Rt 2 BMP: 0 Rt 1 EMP: 11.9 Rt 2 EMP: 0

STP-Flex $1,708,800$0

$0 $2,000,000Totals

$0 $291,200State Match

$0 $0Local Match11

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 386.3CN: A301232Lead Agency: NMDOT CRDC

Est. Letting: 7/31/2017Proj US 550 Reconstruction & WideningFr: MP .60 To: MP 3.00

Project Desc.: (Ref CP-91) Reconstruction, widening (1 lane each dir), bridge rehabilitation & repairs, includes ADA compliance, sidewalks and other appurtenances as necessary.

Est. Proj. Cost: $3,267,261

Project Phases:

NMDOT Dist.: 3 County: Sandoval Municipality: Town of Bernalillo

RT1 US0550

Length: 2.4Category: Capacity Proj

Remarks: R-18-01, AM-Sep-17, AM-Jun-17, AM-Jan-17, AM-Sep-16, AM-July-16, R-16-04, AM-Mar-16 Split out phase to A301233, R-16-01, AM-jan-16 (STP-Flex funds Split from A300798 and minor termini change). AM-may-15, AM-feb-15, R-14-09.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301232

Construction□Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Signif.Work Zone:

RT2

Rt 1 BMP 0.6 Rt 2 BMP: 0 Rt 1 EMP: 3 Rt 2 EMP: 0

HPP $176,000 $176,000

NHPP $38,799 $38,799

$515,411$515,411Totals

$50,612$50,612State Match

$0$0Local Match

$250,000$250,000Road Fund

15

15

15

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 386.4CN: A301233Lead Agency: NMDOT CRDC

Est. Letting:Proj US 550 Construction & Widening Phase 1Fr: MP 1.35 To: 2.45

Project Desc.: Roadway widening and rehab. (1 new NB lane), bridge rehabilitation & repairs, includes ADA compliance, sidewalks and other appurtenances as necessary.

Est. Proj. Cost: $16,186,429

Project Phases:

NMDOT Dist.: 3 County: Sandoval Municipality: Town of Bernalillo

RT1 US0550

Length: 1.1Category: Capacity Proj

Remarks: AM-Jun-17, R-17-04, AM-Mar-17, AM-Jan-17 Split baby project out to A301234, R-16-09, AM-Sep-16, AM-July-16, R-16-04, AM-Mar-16 Project split from A301232.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301233

Construction■Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Signif.Work Zone:

RT2

Rt 1 BMP 1.35 Rt 2 BMP: 0 Rt 1 EMP: 2.45 Rt 2 EMP: 0

HPP $541,142 $541,142

NHPP $2,136,001 $2,136,001

STP-Flex $8,544 $8,544

$3,186,429$3,186,429Totals

$500,742$500,742State Match

$0$0Local Match03

03

03

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 386.5CN: A301234Lead Agency: NMDOT CRDC

Est. Letting: 8/1/2019Proj US 550 Construction & Widening Phase 2Fr: MP.6 To: MP 3.0

Project Desc.: ROW purchase, reconstruction and widening (1 lane in each direction), bridge rehabilitation and repairs. Project includes ADA compliance, Sidewalks and other appurtenances as necessary.

Est. Proj. Cost: $25,464,951

Project Phases:

NMDOT Dist.: 3 County: Sandoval Municipality: Town of Bernalillo

RT1 US0550

Length: 2.4Category: Capacity Proj

Remarks: AM-Mar-18, R-18-01, AM-Sep-17, R-17-07, AM-Jun-17, R-17-02, AM-jan-17 Project split from A301233.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301234

Construction□Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Signif.Work Zone:

RT2

Rt 1 BMP 0.6 Rt 2 BMP: 0 Rt 1 EMP: 3 Rt 2 EMP: 0

HPP $15,049,099 $15,049,099

NHPP $2,648,640 $2,990,400 $5,639,040

NHPP $45,776 $45,776

$25,464,950$21,964,950 $3,500,000Totals

$4,731,035$4,221,435 $509,600State Match

$0$0 $0Local Match03

03 03

16

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 382.2CN: A301312Lead Agency: Town of Bernalillo

Est. Letting:Proj Bernalillo Main St Streetscape Phase IIIFr: Calle Presidente To: Calle del Norte

Project Desc.: Sidewalk replacement for ADA compliance, pedestrian and roadway lighting and ADA compliant crosswalks. Phases I & II under CN 3450.

Est. Proj. Cost: $1,297,178

Project Phases:

NMDOT Dist.: 3 County: Sandoval Municipality: Town of Bernalillo

RT1

Length: 0Category: Bike/Ped

Remarks: R-17-04, R-16-09, AM-nov-16, R-16-04, R-15-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301312

Construction■Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

STP-U $1,108,309 $1,108,309

$1,297,178$1,297,178Totals

$0$0State Match

$188,869$188,869Local Match04

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 380.3CN: A301321Lead Agency: City of Rio Rancho

Est. Letting: 11/1/2021Proj Unser Blvd Widening (Phase 2B)Fr: Farol/Cherry Rd To: NM 347 (Paseo del Volcan)

Project Desc.: Complete ROW land acquisitions for this phase.

Est. Proj. Cost: $416,524

Project Phases:

NMDOT Dist.: 3 County: Sandoval Municipality: City of Rio Rancho

RT1 FL4082

Length: 0Category: Capacity Proj

Remarks: R-16-04, AM-jan-16.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301321

Construction□Right-of-way■Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

STP-U $300,000 $300,000

$351,124$351,124Totals

$0$0State Match

$51,124$51,124Local Match16

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 114CN: A301343Lead Agency: NMDOT D-3

Est. Letting: 10/1/2020Proj District 3 Bridge Repairs - Mateo Overpass Bridge ReplacementFr: To:

Project Desc.: Bridge replacement on NM 22 Mateo Overpass (Bridge #7079).

Est. Proj. Cost: $2,769,229

Project Phases:

NMDOT Dist.: 3 County: Sandoval Municipality: Pueblo of Santo Domingo

RT1 NM0022

Length: 0.6Category: Hwy & Brg Pres

Remarks: R-18-01, R-17-04 (FFY 2019 NHPP funds moved to A300077), R-16-09 Funds split from A300690.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301343

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 3.8 Rt 2 BMP: 0 Rt 1 EMP: 4.4 Rt 2 EMP: 0

STP-Flex $2,366,029 $2,366,029

$2,769,229$2,769,229Totals

$403,200$403,200State Match

$0$0Local Match11

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 115CN: A301344Lead Agency: NMDOT D-3

Est. Letting: 1/1/2018Proj District 3 Bridge Deck OverlaysFr: I-25 over the Rio Grande (Bridge #7355) To: & NM 528 over the Rio Grande (Bridge #8832)

Project Desc.: Bridge Deck Overlay: I-25 SB over the Rio Grande (Bridge #7355) and NM 528 over the Rio Grande River (Bridge #8832).

Est. Proj. Cost: $1,243,651

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1 I00025

Length: 0.8Category: Hwy & Brg Pres

Remarks: AM-july-17 termini adjust, R-17-04.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301344

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2 NM0528

Rt 1 BMP 214 Rt 2 BMP: 3.5 Rt 1 EMP: 214.5 Rt 2 EMP: 3.8

NHPP (Non-Chargeable) $1,062,575 $1,062,575

$1,243,650$1,243,650Totals

$181,075$181,075State Match

$0$0Local Match14

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 116CN: A301345Lead Agency: NMDOT D-3

Est. Letting: 1/1/2019Proj District 3 Bridge Pavement Preserevation-FR4058Fr: Bridge #7398 (18.1 miles east of jct I25/I40) To:

Project Desc.: Major rehab, deck replacement, pier and abutment repair and bearing replacement of Bridge # 7398 on FR4058.

Est. Proj. Cost: $4,000,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: Unincorporated Area

RT1 FR4058

Length: 0.1Category: Hwy & Brg Pres

Remarks: R-18-01, R-17-04.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301345

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0.1 Rt 2 BMP: 0 Rt 1 EMP: 0.2 Rt 2 EMP: 0

NHPP $3,417,600 $3,417,600

$4,000,000$4,000,000Totals

$582,400$582,400State Match

$0$0Local Match14

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 117CN: A301346Lead Agency: NMDOT D-3

Est. Letting: 1/1/2020Proj District 3 Bridge PreservationFr: Various I-40 Bridges To:

Project Desc.: Epoxy Urethane Overlay improvements on the following bridges: Bridge #9920, Bridge #9919, Bridge # 9916, Bridge # 9915, Bridge #9912, Bridge #6910, Bridge #6906, Bridge # 9908, Bridge #9904 and Bridge #6903.

Est. Proj. Cost: $1,373,629

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Hwy & Brg Pres

Remarks: R-17-04.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301346

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

NHPP (Non-Chargeable) $1,173,629 $1,173,629

$1,373,629$1,373,629Totals

$200,000$200,000State Match

$0$0Local Match14

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 117.1CN: A301347Lead Agency: NMDOT D-3

Est. Letting: 2/1/2021Proj District 3 Bridge Preservation (Bridge Deck Overlays)Fr: New Project Various I-40 Bridges To:

Project Desc.: Bridge Deck Overlay improvements on the following I-40 bridges: Bridge #6901, Bridge #9901, Bridge # 6905, Bridge # 9905, Bridge #9909, Bridge #6908, Bridge #9913, Bridge # 9917, Bridge #9918 and Bridge #9914.

Est. Proj. Cost: $1,789,238

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: Hwy & Brg Pres

Remarks: R-17-04.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301347

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

NHPP (Non-Chargeable) $1,528,725 $1,528,725

$1,789,238$1,789,238Totals

$260,513$260,513State Match

$0$0Local Match14

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 935CN: A301350Lead Agency: Village of Los Lunas

Est. Letting:Proj Southeast Los Lentes Road ImprovementsFr: Morris Rd To: Aspen Dr

Project Desc.: Reconstruct roadway including new detached multi-use trail, drainage, lighting and related improvements.

Est. Proj. Cost: $576,320

Project Phases:

NMDOT Dist.: 3 County: Valencia Municipality: Village of Los Lunas

RT1 FL5230

Length: 0.74Category: Capacity Proj

Remarks: R-16-04, R-13-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301350

Construction□Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0.74 Rt 2 EMP: 0

STP-Sm Urb $406,968 $406,968

STP-Sm Urb $85,440 $85,440

$576,320$100,000 $476,320Totals

$0$0 $0State Match

$83,912$14,560 $69,352Local Match04

15

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 936CN: A301360Lead Agency: Village of Los Lunas

Est. Letting:Proj Carson Dr-Aspen Dr-NMRX Station Rd Bike & Pedestrian Improv.Fr: Carson fr Aspen to Pine St; Aspen fr Carson to L To: Connection to NMRX Station Rd

Project Desc.: Roadway rehab including new ped/bike facility extensions to the Los Lunas Railrunner Station. Other appertenances as necessary.

Est. Proj. Cost: $1,285,861

Project Phases:

NMDOT Dist.: 3 County: Valencia Municipality: Village of Los Lunas

RT1

Length: 0Category: Hwy & Brg Pres

Remarks: AM-Sep-17, AM-May-16, R-13-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301360

Construction■Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

STP-Sm Urb $93,504 $855,136 $948,640

$1,110,300$109,438 $1,000,861Totals

$0$0 $0State Match

$161,660$15,934 $145,725Local Match06 06

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 937CN: A301370Lead Agency: Town of Peralta

Est. Letting:Proj Molina Road - Roadway and Pedestrian ImprovementsFr: NM 47 To: Frederick Ln

Project Desc.: Roadway rehabilitation to include new sidewalks, drainage improvements, access management and other appertenances as necessary.

Est. Proj. Cost: $312,815

Project Phases:

NMDOT Dist.: 3 County: Valencia Municipality: Town of Peralta

RT1

Length:Category: Hwy & Brg Pres

Remarks: AM-Mar-18, AM-Sep-17, AM-May-16, AM-Oct-13, R-13-05, R-13-04.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301370

Construction■Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP Rt 2 BMP: 0 Rt 1 EMP: Rt 2 EMP: 0

STP-Sm Urb $212,160 $212,160

$248,315$248,315Totals

$0$0State Match

$36,155$36,155Local Match06

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 939CN: A301380Lead Agency: County of Valencia

Est. Letting:Proj NM 263 & El Cerro Mission Blvd Intersection ImprovementsFr: El Cerro Loop (NM 263) To: Intersection of El Cerro Mission Blvd

Project Desc.: Reconfigure intersection of El Cerro Mission Blvd as it joins NM 263

Est. Proj. Cost: $100,000

Project Phases:

NMDOT Dist.: 3 County: Valencia Municipality: Unincorporated Area

RT1

Length:Category: Hwy & Brg Pres

Remarks: AM-Sep-17, AM-May-16, AM-Oct-13, R-13-05, R-13-04.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301380

Construction■Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP Rt 2 BMP: 0 Rt 1 EMP: Rt 2 EMP: 0

STP-Sm Urb $64,080 $64,080

STP-Sm Urb $21,360 $21,360

$100,000$100,000Totals

$0$0State Match

$14,560$14,560Local Match04

15

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 941CN: A301400Lead Agency: County of Valencia

Est. Letting:Proj Meadowlake Road ImprovementsFr: NM 263 (El Cerro Loop) To: Mesa Estates Rd.

Project Desc.: Pavement preservsation and rehab including pavement markings, signage, widen shoulders, drainage improvements and other appurtenances as necessary. State Capital Outlay funds will be used to cover design.

Est. Proj. Cost: $4,225,000

Project Phases:

NMDOT Dist.: 3 County: Valencia Municipality: Unincorporated Area

RT1 61A115

Length: 8.63Category: Hwy & Brg Pres

Remarks: AM-Apr-18, AM-Nov-16, AM-Aug-16, R-16-04, R-15-05, AM-oct-2013, R-13-05, R-13-04.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301400

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 8.63 Rt 2 EMP: 0

STP-Sm Urb $2,361,092 $949,708 $3,310,800

$3,875,000$2,763,450 $1,111,550Totals

$0$0 $0State Match

$564,200$402,358 $161,842Local Match04 04

Wednesday, April 18, 2018

Administrative Modification April 2018: Made a minor project scope revision per NMDOT request.

Mid-Region MPO Rec Num: 99.1CN: A301441Lead Agency: NMDOT D-3

Est. Letting: 10/1/2022Proj NM 14 Slope Erosion MitigationFr: New TIP Dev. To: New TIP Dev

Project Desc.: Slope erosion miitigation and other appurtenances as needed.

Est. Proj. Cost: $2,532,020

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: Unincorporated Area

RT1 NM0014

Length: 0.7Category: Misc

Remarks: R-17-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301441

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 3.5 Rt 2 BMP: 0 Rt 1 EMP: 4.2 Rt 2 EMP: 0

STP-Flex $344,332$0

STP-Rural $1,819,026$0

$0 $2,532,020Totals

$0 $368,662State Match

$0 $0Local Match04

04

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 99.2CN: A301442Lead Agency: NMDOT D-3

Est. Letting: 3/1/2023Proj NM14/NM 536/Frost Rd intersection ImprovementsFr: NM 14 / NM 536 / Frost Rd Intersection To:

Project Desc.: Intersection improvements with possible reconfiguration to increase safety and decrease confusion at intersection.

Est. Proj. Cost: $2,129,010

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: Unincorporated Area

RT1 NM0014

Length: 0.85Category: Safety

Remarks: R-17-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301442

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2 NM0536

Rt 1 BMP 5.5 Rt 2 BMP: 0 Rt 1 EMP: 6.1 Rt 2 EMP: 0.25

STP-Rural $1,819,026$0

$0 $2,129,010Totals

$0 $309,984State Match

$0 $0Local Match21

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 99.3CN: A301443Lead Agency: NMDOT D-3

Est. Letting: 8/30/2017Proj NM 14 Roadway Preservation & Rehab Phase 1Fr: MP 0.0 To: MP 2.0

Project Desc.: Mill and inlay; ADA; multiuse trail; access control; drainage/erosion; evaluation of NM 14/NM536/Frost Road.

Est. Proj. Cost: $3,203,961

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: Unincorporated Area

RT1 NM0014

Length: 2Category: Hwy & Brg Pres

Remarks: AM-Sep-17, AM-Jun-17 funds split from A301440.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301443

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 2 Rt 2 EMP: 0

STP-Flex $640,800 $640,800

STP-Rural $192,993 $192,993

$975,881$975,881Totals

$142,088$142,088State Match

$0$0Local Match06

06

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 99.4CN: A301444Lead Agency: NMDOT D-3

Est. Letting:Proj NM 14 Roadway Preservation & Rehab Phase 2Fr: MP 2.0 To: MP 4.0

Project Desc.: NM 14 Roadway Preservation & Rehab Phase 2.

Est. Proj. Cost: $4,379,452

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: Unincorporated Area

RT1 NM0014

Length: 2Category: Hwy & Brg Pres

Remarks: R-18-01, AM-Jan-18, R-17-07.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301444

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP 2 Rt 2 BMP: 0 Rt 1 EMP: 4 Rt 2 EMP: 0

STP-Flex $333,232 $333,232

STP-Flex $110,696 $110,696

STP-Rural $1,531,870 $1,766,006 $3,297,876

$4,379,452$2,312,498 $2,066,955Totals

$637,648$336,700 $300,949State Match

$0$0 $0Local Match06

15

06 06

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 99.5CN: A301445Lead Agency: NMDOT D-3

Est. Letting:Proj NM 14 Roadway Preservation & Rehab Phase 3Fr: MP 4.0 To: MP 6.0

Project Desc.: NM 14 Roadway Preservation & Rehab Phase 3.

Est. Proj. Cost: $1,771,154

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: Unincorporated Area

RT1 NM0014

Length: 2Category: Hwy & Brg Pres

Remarks: R-17-07.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301445

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP 4 Rt 2 BMP: 0 Rt 1 EMP: 6 Rt 2 EMP: 0

STP-Rural $339,320 $1,173,954 $1,513,274

$1,771,154$397,144 $1,374,010Totals

$257,880$57,824 $200,056State Match

$0$0 $0Local Match06 06

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 938CN: A301460Lead Agency: Village of Corrales

Est. Letting:Proj West Meadowlark Lane ImprovementsFr: Municipal Boundary To: Loma Larga/Meadowlark Intersection

Project Desc.: Construct a two-lane roadway with traffic calming features, including medians and drainage facilities. 2016 MAP funds included in the total cost.

Est. Proj. Cost: $700,333

Project Phases:

NMDOT Dist.: 3 County: Sandoval Municipality: Village of Corrales

RT1 FL5114

Length: 0.67Category: Safety

Remarks: AM-Feb-18, AM-Dec-17, R-16-07, R-16-04, R-15-07, R-13-05, R-13-04.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301460

Construction■Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 1.2 Rt 2 BMP: 0 Rt 1 EMP: 1.87 Rt 2 EMP: 0

STP-U (Non-Chargeable) $273,408 $273,408

$320,000$320,000Totals

$0$0State Match

$46,592$46,592Local Match21

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 920CN: A301470Lead Agency: City of Albuquerque-DMD

Est. Letting:Proj Alameda Blvd Improvements (phase 1)Fr: I-25 To: Louisiana

Project Desc.: Additional travel lanes in each direction, deceleration lanes for right-turn movements, continue existing bike/ped facilities, multi-use trail, upgrade of traffic signals as needed, signal timing, ITS communiciations, and other appurtenances as necc.

Est. Proj. Cost: $2,000,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1 FL4020

Length: 0.733Category: Capacity Proj

Remarks: R-16-09, R-16-04, R-16-01 Removed at MTB, R-13-16, R-13-05, R-13-04.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301470

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP 3.236 Rt 2 BMP: 0 Rt 1 EMP: 2.503 Rt 2 EMP: 0

$2,000,000$2,000,000Totals

$2,000,000$2,000,000Local Non-Match 03

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 920.1CN: A301471Lead Agency: City of Albuquerque-DMD

Est. Letting: 12/1/2021Proj Alameda Blvd Improvements Phase 2 StudyFr: I-25 To: Southern Blvd.

Project Desc.: Study and Identify context sensative transportation solutions within the Alameda corridor.

Est. Proj. Cost: $959,738

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1 NM0528

Length: 0.287Category: Capacity Proj

Remarks: R-18-01, R-16-04, R-16-01 Removed at MTB.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301471

Construction□Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP 0.287 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

STP-U $820,000 $820,000

$959,738$959,738Totals

$0$0State Match

$139,738$139,738Local Match03

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 920.2CN: A301472Lead Agency: City of Albuquerque-DMD

Est. Letting:Proj Alameda Blvd Improvements (Phase 3)Fr: Edith To: San Mateo/Jefferson

Project Desc.: Additional travel lanes in each direction, deceleration lanes for right-turn movements, continue existing bike/ped facilities, multi-use trail, upgrade of traffic signals as needed, signal timing, ITS communiciations, and other appurtenances as needed.

Est. Proj. Cost: $7,950,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1 NM0528

Length: 1.154Category: Capacity Proj

Remarks: R-16-04.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301472

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP 1.432 Rt 2 BMP: 0 Rt 1 EMP: 0.287 Rt 2 EMP: 0

$4,450,000$4,450,000Totals

$4,450,000$4,450,000Local Bond Funds 03

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 932CN: A301480Lead Agency: Village of Los Lunas

Est. Letting:Proj Camelot Blvd ExtensionFr: Sichler Rd To: end of existing Camelot Blvd

Project Desc.: Construct roadway extension with a ditch crossing including paved shoulders, lighting improvements, drainage features and other appurtenances as necessary.

Est. Proj. Cost: $1,638,436

Project Phases:

NMDOT Dist.: 3 County: Valencia Municipality: Village of Los Lunas

RT1

Length: 0Category: Capacity Proj

Remarks: AM-Sep-17, AM-nov-16, AM-May-16, R-13-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301480

Construction■Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

STP-Sm Urb $151,816 $1,248,064 $1,399,880

$1,638,436$177,687 $1,460,749Totals

$0$0 $0State Match

$238,556$25,871 $212,685Local Match01 01

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 96.3CN: A301522Lead Agency: County of Bernalillo

Est. Letting:Proj 2nd St SW (Valle de Oro) Trail Phase 2Fr: Prosperity Ave. To: Rio Bravo Blvd.

Project Desc.: Construct mult-use trail. Project may be phased.

Est. Proj. Cost: $381,383

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: Unincorporated Area

RT1

Length: 0Category: Bike/Ped

Remarks: R-16-04.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301522

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

STP-U $325,854 $325,854

$381,383$381,383Totals

$0$0State Match

$55,529$55,529Local Match28

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 138.5CN: A301555Lead Agency: NMDOT D-3

Est. Letting: 1/1/2019Proj NM 6/BNSF Railroad Bridge PreservationFr: NM 6 and Bridge # 7660 To:

Project Desc.: Major rehab, deck replacement, pier and abutment repair and beaing replacment on NM6.BNSF Railroad Bridge #7660.

Est. Proj. Cost: $1,730,000

Project Phases:

NMDOT Dist.: 3 County: Valencia Municipality: Unincorporated Area

RT1 NM0006

Length: 0.5Category: Hwy & Brg Pres

Remarks: R-18-01, R-17-04.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301555

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP 27.5 Rt 2 BMP: 0 Rt 1 EMP: 28 Rt 2 EMP: 0

STP-Bridge Off Sys $1,384,000 $1,384,000

$1,730,000$1,730,000Totals

$346,000$346,000State Match

$0$0Local Match14

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 70.1CN: A301570Lead Agency: NMDOT D-3

Est. Letting:Proj NM 347 Paseo del Volcan ROW AcquisitionFr: I-40 To: US 550

Project Desc.: ROW acquisition for the PDV Cooridor. (Old CN 2607)

Est. Proj. Cost: $2,948,000

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: Capacity Proj

Remarks: R-18-01 FFY 2016 State Capital Outlay C3162540, AM-jan-16 added FFY 2014 and 2015 State Capital Outlay C3142082, C3150952 & C3151159 & B4066 (0ld 15-1159/13-1866), AM-sep-14, FFY 15 funds moved to FFY 17 for fiscal constraint purposes. R-13-16. (FY 2014 & 2015 Allocations).

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301570

Construction□Right-of-way■Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

$948,000$948,000Totals

$948,000$948,000State Capital Outlay 16

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 418.9CN: A301572Lead Agency: NMDOT ROW Bureau

Est. Letting:Proj NM 347 Paseo del Volcan ROW Acquisition - Northern Sect.Fr: Bernallilo-Sandoval County Line To: Unser Blvd

Project Desc.: Acquire rights-of-way for future roadway. Project may extend beyond 2040 MTP.

Est. Proj. Cost: $1,080,000

Project Phases:

NMDOT Dist.: 3 County: Sandoval Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: Misc

Remarks: R-18-01 FFY 2016 State Capital Outlay C3162581, R-15-06.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301572

Construction□Right-of-way■Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other□

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

$830,000$830,000Totals

$580,000$580,000State Capital Outlay

$250,000$250,000Local Non-Match 16

16

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 671CN: A301620Lead Agency: NMDOT CRDC

Est. Letting:Proj NM 337 Bridge Replacement in ChililiFr: To:

Project Desc.: Replacement of bridge on NM 337 (Bridge Number 5548)

Est. Proj. Cost: $3,500,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: Unincorporated Area

RT1 NM0337

Length: 0.81Category: Hwy & Brg Pres

Remarks: R-17-04, AM-feb-15, R-14-01.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301620

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 9.555 Rt 2 BMP: 0 Rt 1 EMP: 10.365 Rt 2 EMP: 0

STP-Flex $1,546,134 $1,546,134

STP-Rural $1,444,266 $1,444,266

$3,500,000$1,809,614 $1,690,386Totals

$509,600$263,480 $246,120State Match

$0$0 $0Local Match11

11

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 671.1CN: A301621Lead Agency: NMDOT D-3

Est. Letting: 10/31/2022Proj NM337 Bridge ReplacementFr: New TIP Dev. Need bridge Number!!! To: Need Bridge Number!!!

Project Desc.: Replace deficient slab bridge with a concrete bridge.

Est. Proj. Cost: $3,500,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: Village of Tijeras

RT1 NM0337

Length: 0.01Category: Hwy & Brg Pres

Remarks: R-17-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301621

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP 29.04 Rt 2 BMP: 0 Rt 1 EMP: 29.05 Rt 2 EMP: 0

STP-Flex $2,990,400$0

$0 $3,500,000Totals

$0 $509,600State Match

$0 $0Local Match11

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 63.1CN: A301710Lead Agency: City of Albuquerque-DMD

Est. Letting: 9/1/2018Proj Rio Grande Blvd Intersection ImprovementsFr: Rio Grande To: Candelaria

Project Desc.: Construction of roundabout at the intersection of Rio Grande and Candelaria and approaches north and south of the intersection as necessary to accommodate the transition of the facility. See old CN A300650.

Est. Proj. Cost: $1,760,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length:Category: Safety

Remarks: AM-oct-15, AM-apr-15, R-14-09.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301710

Construction■Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other■

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: Rt 1 EMP: Rt 2 EMP:

Safety (HSIP) $1,584,000 $1,584,000

$1,760,000$1,760,000Totals

$176,000$176,000State Match

$0$0Local Match21

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 700CN: A301740Lead Agency: County of Bernalillo

Est. Letting: 6/30/2017Proj Sunset Rd SW Roadway and Safety ImprovementsFr: Goff Blvd To: Bridge Blvd

Project Desc.: Construct new roadway which includes safety improvements to add sidwalks, signage, drainage and other appurtenances as necessary.

Est. Proj. Cost: $3,800,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: Unincorporated Area

RT1

Length: 0Category: Safety

Remarks: AM-Aug-17, R-17-02, R-16-09, R-14-13.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301740

Construction■Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

Safety (HSIP) $13,500 $13,500

Safety (HSIP) $436,500 $436,500

$500,000$500,000Totals

$50,000$50,000State Match

$0$0Local Match16

21

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 172CN: A301780Lead Agency: NMDOT Transit Rail

Est. Letting:Proj Railroad Crossing Improv - Avenida Bernalillo and NMRX RR (Crossing 013758J)Fr: Avenida Bernalilo (NM 473) Railroard Crossing # To:

Project Desc.: Construct surface to accommodate pedestrians.

Est. Proj. Cost: $400,000

Project Phases:

NMDOT Dist.: 3 County: Sandoval Municipality: Town of Bernalillo

RT1 NM0473

Length: 0.02Category: Safety

Remarks: R-18-01, R-17-04, R-15-09 (Removed project from FFY 2014-2019 TIP), R-14-13.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301780

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0.07 Rt 2 BMP: 0 Rt 1 EMP: 0.09 Rt 2 EMP: 0

Rail Xing Haz Elim (Sect 130) $360,000 $360,000

$400,000$400,000Totals

$40,000$40,000State Match

$0$0Local Match22

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 172.1CN: A301781Lead Agency: NMDOT Transit Rail

Est. Letting:Proj Railroad Crossing Improv - Lucero Rd and NMRX RR (Crossing 013760D)Fr: Lucero Road-Railroad Crossing #013760D, Bern To:

Project Desc.: Construct new surface.

Est. Proj. Cost: $160,000

Project Phases:

NMDOT Dist.: 3 County: Sandoval Municipality: Town of Bernalillo

RT1

Length: 0Category: Safety

Remarks: R-17-04, R-15-09 (Removed project from FFY 2014-2019 TIP), R-14-13.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301781

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

Rail Xing Haz Elim (Sect 130) $144,000 $144,000

$160,000$160,000Totals

$16,000$16,000State Match

$0$0Local Match22

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 172.2CN: A301782Lead Agency: NMDOT Transit Rail

Est. Letting:Proj Railroad Crossing Improv - Ortega Rd and NMRX RR (Crossing 013773E)Fr: Ortega Road-Railroad Crossing #013773E, Albu To:

Project Desc.: Construct new surface on Ortega Rd between Edith and 2nd Street NE.

Est. Proj. Cost: $165,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: Village of Los Ranchos de Albuquerque

RT1

Length: 0Category: Safety

Remarks: R-17-04, R-16-01, R-15-09, R-14-13.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301782

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

Rail Xing Haz Elim (Sect 130) $148,500$0

$0 $165,000Totals

$0 $16,500State Match

$0 $0Local Match22

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 172.3CN: A301783Lead Agency: NMDOT Transit Rail

Est. Letting:Proj Railroad Crossing Improv - 8th Street Albuquerque and NMRX/BNSF RR (Crossing 019679L)Fr: 8th Street -Railroad Crossing #019679L, Albuqu To:

Project Desc.: Construct new surface and approaches. (8th Street Between Aspen and Haines Ave).

Est. Proj. Cost: $150,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Safety

Remarks: R-17-04, R-15-09 (Removes this project from FFY 2014-2019 TIP), R-14-13.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301783

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

Rail Xing Haz Elim (Sect 130) $135,000 $135,000

$150,000$150,000Totals

$15,000$15,000State Match

$0$0Local Match22

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 196CN: A301800Lead Agency: NMDOT D-3

Est. Letting:Proj Old Highway 60- Bridge ReplacementFr: Old Highway 60- Bridge over Rio Puerco To:

Project Desc.: Replace Bridge #531.

Est. Proj. Cost: $1,268,055

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: Unincorporated Area

RT1

Length: 0Category: Hwy & Brg Pres

Remarks: R-17-01 (Project moved to FFY 2022), R-16-09, R-16-07, R-15-02 funds split from A300690.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301800

Construction□Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FLAP-Federal Lands Access $1,083,426$0

$0 $1,083,426Totals

$0 $0State Match

$0 $0Local Match16

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 75.8CN: A301801Lead Agency: NMDOT D-3

Est. Letting: 10/31/2022Proj District 3 Bridge Replacement-AlgadonesFr: Bridge # 7628 To:

Project Desc.: Replace Bridge 7628 on NM 313 MP 12.98.

Est. Proj. Cost: $2,000,000

Project Phases:

NMDOT Dist.: 3 County: Sandoval Municipality: Unincorporated Area

RT1 NM0313

Length: 0.5Category: Hwy & Brg Pres

Remarks: R-17-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301801

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP 11.75 Rt 2 BMP: 0 Rt 1 EMP: 12.25 Rt 2 EMP: 0

NHPP $1,708,800$0

$0 $2,000,000Totals

$0 $291,200State Match

$0 $0Local Match11

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 202CN: A301820Lead Agency: Rio Metro Transit Dist

Est. Letting:Proj AMPA Wide Joint TDM-Travel DemandFr: AMPA Wide To:

Project Desc.: Transportation Demand Management Program to increase alternative modes of transportation with activities including public education, outreach, promotions, information and related equipment and services. Joint lead with ABQ-RIDE in FY20 & FY21.

Est. Proj. Cost: $1,275,749

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: TDM

Remarks: R-15-05. (FFY 2020 Allocation).

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301820

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

CMAQ-Flex $1,090,000 $1,090,000

$1,275,749$1,275,749Totals

$0$0State Match

$185,749$185,749Local Match24

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 202.1CN: A301821Lead Agency: Rio Metro Transit Dist

Est. Letting:Proj AMPA Wide Joint TDM-Travel DemandFr: AMPA Wide To:

Project Desc.: Transportation Demand Management Program to increase alternative modes of transportation with activities including public education, outreach, promotions, information and related equipment and services. Joint lead with ABQ-RIDEin FY20 & FY21.

Est. Proj. Cost: $1,314,373

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: TDM

Remarks: R-15-05 (FFY 2021 Allocation).

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301821

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

CMAQ-Flex $1,123,000 $1,123,000

$1,314,373$1,314,373Totals

$0$0State Match

$191,373$191,373Local Match24

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 204CN: A301830Lead Agency: City of Albuquerque-DMD

Est. Letting:Proj Concrete Replacement:Downtown Transit RoutesFr: 2nd Street Between Gold and Lomas To: Lomas Between 5th and 2nd Street

Project Desc.: System preservation effort to replace existing asphalt with concrete to better support transit operations.

Est. Proj. Cost: $2,574,906

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1 FL4035

Length: 0.76Category: Hwy & Brg Pres

Remarks: R-15-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301830

Construction□Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2 FL4040

Rt 1 BMP 6.44 Rt 2 BMP: 1.11 Rt 1 EMP: 7 Rt 2 EMP: 1.31

STP-U $1,200,000 $1,000,000 $2,200,000

$2,574,906$1,404,494 $1,170,412Totals

$0$0 $0State Match

$374,906$204,494 $170,412Local Match04 04

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 201CN: A301840Lead Agency: MRMPO

Est. Letting:Proj CMP Transportation Analysis ProgramFr: AMPA Wide To:

Project Desc.: Collect travel time and other data to assess the performance of the transportation network, analyze congested locations, identify projects to address regional needs, use data for project prioritization.

Est. Proj. Cost: $224,951

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: N/A not applicable

RT1

Length: 0Category: ITS-TSM

Remarks: R-15-05 (FFY 2020 Allocation).

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301840

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

STP-U $192,198 $192,198

$224,951$224,951Totals

$0$0State Match

$32,753$32,753Local Match18

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 201.1CN: A301841Lead Agency: MRMPO

Est. Letting:Proj CMP Transportation Analysis ProgramFr: AMPA Wide To:

Project Desc.: Collect travel time and other data to assess the performance of the transportation network, analyze congested locations, identify projects to address regional needs, use data for project prioritization.

Est. Proj. Cost: $225,000

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: N/A not applicable

RT1

Length: 0Category: ITS-TSM

Remarks: R-05-05 (FFY 2021).

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301841

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

STP-U $192,240 $192,240

$225,000$225,000Totals

$0$0State Match

$32,760$32,760Local Match18

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 201.2CN: A301842Lead Agency: MRMPO

Est. Letting: 8/1/2022Proj CMP Transportation Analysis ProgramFr: AMPA Wide To:

Project Desc.: Collect travel time and other data to assess the performance of the transportation network, analyze congested locations, identify projects to address regional needs, use data for project prioritization.

Est. Proj. Cost: $175,000

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: ITS-TSM

Remarks: R-17-03 (FFY 2022 Allocation).

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301842

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

STP-U $149,520$0

$0 $175,000Totals

$0 $0State Match

$0 $25,480Local Match24

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 201.3CN: A301843Lead Agency: MRMPO

Est. Letting: 8/1/2023Proj CMP Transportation Analysis ProgramFr: AMPA Wide To:

Project Desc.: Collect travel time and other data to assess the performance of the transportation network, analyze congested locations, identify projects to address regional needs, use data for project prioritization.

Est. Proj. Cost: $200,000

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: ITS-TSM

Remarks: R-17-03 (FFY 2023 Allocation).

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301843

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

STP-U $170,880$0

$0 $200,000Totals

$0 $0State Match

$0 $29,120Local Match24

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 211CN: A301850Lead Agency: SSCAFCA

Est. Letting:Proj Unser Blvd Dam & RealignmentFr: Unser Blvd and Wimmera Rd. To: Unser Blvd and Osage Rd.

Project Desc.: Realign a portion of Unser Blvd in accordance with NMDOT specs for road curvature to remove Unser Blvd from the floodplain & provide downstream protection against flooding. Const. will include a culvert crossing for the passage of storm flows.

Est. Proj. Cost: $1,273,080

Project Phases:

NMDOT Dist.: 3 County: Sandoval Municipality: Unincorporated Area

RT1 FL4082

Length: 1Category: Hwy & Brg Pres

Remarks: R-15-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301850

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 16.95 Rt 2 BMP: 0 Rt 1 EMP: 17.95 Rt 2 EMP: 0

STP-U $1,087,720 $1,087,720

$1,273,080$1,273,080Totals

$0$0State Match

$185,360$185,360Local Match04

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 190.1CN: A301861Lead Agency: Rio Metro Transit Dist

Est. Letting: 12/30/2018Proj AMPA Wide Bike Share ProgramFr: Various Locations To:

Project Desc.: Replace existing and install new bike share stations, including bicycles, signs, kiosks, fare payment, communications and other bike share-related appurtenances and technologies.

Est. Proj. Cost: $1,257,335

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Bike/Ped

Remarks: R-17-04, R-17-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301861

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

TAP-Lg Urb $511,067 $563,200 $1,074,267

$1,257,335$598,159 $659,176Totals

$0$0 $0State Match

$183,068$87,092 $95,976Local Match28 28

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 212CN: A301880Lead Agency: City of Belen

Est. Letting:Proj West Aragon Rd. ImprovementsFr: Intersection of North Mesa Rd. To: Intersection of Main St.

Project Desc.: rehab roadway base, asphalt, curb and gutter. drainage improvements as well as sidewalk, drive pads, and pedestrian facilities will all be included in the project.

Est. Proj. Cost: $2,362,000

Project Phases:

NMDOT Dist.: 3 County: Valencia Municipality: City of Belen

RT1 FL4228

Length: 0.66Category: Hwy & Brg Pres

Remarks: R-16-04, R-15-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301880

Construction■Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0.588 Rt 2 BMP: 0 Rt 1 EMP: 1.25 Rt 2 EMP: 0

STP-Sm Urb $1,488,365 $1,488,365

STP-Sm Urb $444,288 $444,288

STP-Sm Urb $42,720 $42,720

STP-Sm Urb $42,720 $42,720

$2,362,000$520,000 $1,842,000Totals

$0$0 $0State Match

$343,907$75,712 $268,195Local Match04

15

16

43

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 250.3CN: A301900Lead Agency: NMDOT CRDC

Est. Letting:Proj I-25 / Montgomery Blvd. Interchange ReconstructionFr: (Bridge #6261) To:

Project Desc.: Reconstrcut interchange with bridge rehab or replacement.

Est. Proj. Cost: $46,395,259

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1 I00025

Length: 0.7Category: Hwy & Brg Pres

Remarks: R-18-01, AM-Dec-17, R-17-04, R-15-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301900

Construction□Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Signif.Work Zone:

RT2

Rt 1 BMP 229.2 Rt 2 BMP: 0 Rt 1 EMP: 229.9 Rt 2 EMP: 0

NHPP $13,407,454 $25,114,433 $38,521,887

STP-Flex $434,703 $434,703

STP-Flex (Non-Chargeable) $683,520 $683,520

$46,395,259$800,000 $15,692,244 $29,903,014Totals

$6,755,149$116,480 $2,284,790 $4,353,878State Match

$0$0 $0 $0Local Match03 03

03

15

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 721CN: A301920Lead Agency: City of Albuquerque-DMD

Est. Letting:Proj Volcano Heights Transit Blvd. ConstructionFr: Paseo del Norte To: Unser Blvd

Project Desc.: Plan, design and construct the proposed Transit Blvd in coordination with RMRTD and ABQ-Ride for the Volcano Heights Sector Development Plan.

Est. Proj. Cost: $500,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Transit

Remarks: R-15-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301920

Construction□Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

$500,000$500,000Totals

$500,000$500,000Local Non-Match 15

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 230CN: A301930Lead Agency: Pueblo of Cochiti

Est. Letting:Proj TTP- Pueblo de CochitiFr: To:

Project Desc.: Various multimodal transportation projects & activities. For project specific information contact the tribal government office.

Est. Proj. Cost: $2,243,872

Project Phases:

NMDOT Dist.: 3 County: Sandoval Municipality: Pueblo of Cochiti

RT1

Length: 0Category: Hwy & Brg Pres

Remarks: AM-May-16 (moved $82,386 to A301290), AM-April-16, R-15-06 & R-15-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301930

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FLHP-Tribal Trans Prog $426,381 $447,700 $492,470 $541,717 $1,908,268

$1,908,268$426,381 $447,700 $492,470 $541,717Totals

$0$0 $0 $0 $0State Match

$0$0 $0 $0 $0Local Match06 06 06 06

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 231CN: A301940Lead Agency: Pueblo of Isleta

Est. Letting:Proj TTP-Pueblo of IsletaFr: To:

Project Desc.: Various multimodal transportation projects & activities. For project specific information contact the tribal government office.

Est. Proj. Cost: $7,489,410

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: Pueblo of Isleta

RT1

Length: 0Category: Hwy & Brg Pres

Remarks: AM-Mar-2016, R-15-06 & R-15-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301940

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FLHP-Tribal Trans Prog $1,298,235 $1,298,235 $1,298,235 $1,298,235 $5,192,940

$5,192,940$1,298,235 $1,298,235 $1,298,235 $1,298,235Totals

$0$0 $0 $0 $0State Match

$0$0 $0 $0 $0Local Match06 06 06 06

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 233CN: A301960Lead Agency: Pueblo of San Felipe

Est. Letting:Proj TTP-Pueblo of San FelipeFr: To:

Project Desc.: Various multimodal transportation projects & activities. For project specific information contact the tribal government office.

Est. Proj. Cost: $4,319,790

Project Phases:

NMDOT Dist.: 3 County: Sandoval Municipality: Pueblo of San Felipe

RT1

Length: 0Category: Hwy & Brg Pres

Remarks: R-15-06 & R-15-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301960

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FLHP-Tribal Trans Prog $719,965 $719,965 $719,965 $719,965 $2,879,860

$2,879,860$719,965 $719,965 $719,965 $719,965Totals

$0$0 $0 $0 $0State Match

$0$0 $0 $0 $0Local Match06 06 06 06

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 234CN: A301970Lead Agency: Pueblo of Sandia

Est. Letting:Proj TTP-Pueblo of SandiaFr: To:

Project Desc.: Various multimodal transportation projects & activities. For project specific information contact the tribal government office.

Est. Proj. Cost: $1,616,844

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: Pueblo of Sandia

RT1

Length: 0Category: Hwy & Brg Pres

Remarks: R-15-06 & R-15-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301970

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FLHP-Tribal Trans Prog $269,474 $269,474 $269,474 $269,474 $1,077,896

$1,077,896$269,474 $269,474 $269,474 $269,474Totals

$0$0 $0 $0 $0State Match

$0$0 $0 $0 $0Local Match06 06 06 06

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 235CN: A301980Lead Agency: Pueblo of Santa Ana

Est. Letting:Proj TTP-Pueblo of Santa AnaFr: To:

Project Desc.: Various multimodal transportation projects & activities. For project specific information contact the tribal government office.

Est. Proj. Cost: $1,634,700

Project Phases:

NMDOT Dist.: 3 County: Sandoval Municipality: Pueblo of Santa Ana

RT1

Length: 0Category: Hwy & Brg Pres

Remarks: R-15-06 & R-15-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301980

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FLHP-Tribal Trans Prog $272,450 $272,450 $272,450 $272,450 $1,089,800

$1,089,800$272,450 $272,450 $272,450 $272,450Totals

$0$0 $0 $0 $0State Match

$0$0 $0 $0 $0Local Match06 06 06 06

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 236CN: A301990Lead Agency: Pueblo of Santo Domingo

Est. Letting:Proj TTP-Pueblo of Santo DomingoFr: To:

Project Desc.: Various multimodal transportation projects & activities. For project specific information contact the tribal government office.

Est. Proj. Cost: $4,242,478

Project Phases:

NMDOT Dist.: 3 County: Sandoval Municipality: Pueblo of Santo Domingo

RT1

Length: 0Category: Hwy & Brg Pres

Remarks: R-15-06 & R-15-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A301990

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FLHP-Tribal Trans Prog $735,496 $735,496 $735,496 $735,496 $2,941,984

$2,941,984$735,496 $735,496 $735,496 $735,496Totals

$0$0 $0 $0 $0State Match

$0$0 $0 $0 $0Local Match06 06 06 06

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 141CN: A302030Lead Agency: City of Albuquerque-DMD

Est. Letting:Proj AMPA Wide Bicycle Facil. Prog. & ActivitiesFr: Albuquerque Metro Area To:

Project Desc.: Improvements to bicycle facilities, programs and activities.

Est. Proj. Cost: $204,822

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Bike/Ped

Remarks: AM-may-15 split from A300700 FFY 2018 allocation.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A302030

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

CMAQ-Flex $175,000 $175,000

$204,822$204,822Totals

$0$0State Match

$29,822$29,822Local Match28

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 141.1CN: A302031Lead Agency: City of Albuquerque-DMD

Est. Letting:Proj AMPA Wide Bicycle Facil. Prog. & ActivitiesFr: Albuquerque Metro Area To:

Project Desc.: Improvements to bicycle facilities, programs and activities.

Est. Proj. Cost: $204,822

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Bike/Ped

Remarks: AM-may-15 split from A300700 FFY 2019 allocation.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A302031

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

CMAQ-Flex $175,000 $175,000

$204,822$204,822Totals

$0$0State Match

$29,822$29,822Local Match28

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 142CN: A302040Lead Agency: City of Albuquerque-DMD

Est. Letting:Proj Albuquerque City-Wide Pavement Preservation (Collectors and Arterials)Fr: City Wide To:

Project Desc.: Plan, design and construction of pavement preservation activities including but not limited to mill and inlay, sidewalk/ramp ADA compliance, signage, striping, crack seal, re-surfacing and othr appurtenances as needed.

Est. Proj. Cost: $20,000,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Hwy & Brg Pres

Remarks: R-15-09.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A302040

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

$10,000,000$5,000,000 $5,000,000Totals

$10,000,000$5,000,000 $5,000,000Local Non-Match 06 06

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 260CN: A302100Lead Agency: NMDOT D-3

Est. Letting: 10/31/2022Proj District 3 Pavement Preservation - I-40 West of CoorsFr: MP 149.0 To: MP 154.7

Project Desc.: Pavement preservation including pavement markings, signage and other appurtenances as needed.

Est. Proj. Cost: $10,500,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1 I00040

Length: 5.7Category: Hwy & Brg Pres

Remarks: AM-Jan-18, R-17-04, R-17-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A302100

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Signif.Work Zone:

RT2

Rt 1 BMP 149 Rt 2 BMP: 0 Rt 1 EMP: 154.7 Rt 2 EMP: 0

NHPP $1,708,800 $7,262,400$1,708,800

$2,000,000$2,000,000 $8,500,000Totals

$291,200$291,200 $1,237,600State Match

$0$0 $0Local Match05 05

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 651.4CN: A302101Lead Agency: NMDOT D-3

Est. Letting: 10/31/2023Proj District 3 Pavement Preservation: I-25 SB LanesFr: MP 194.0 To: MP 197.0

Project Desc.: Perform pavement preservation on I-25 SB lanes.

Est. Proj. Cost: $3,000,000

Project Phases:

NMDOT Dist.: 3 County: Valencia Municipality: City of Belen

RT1 I00025

Length: 3Category: Hwy & Brg Pres

Remarks: R-17-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A302101

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Signif.Work Zone:

RT2

Rt 1 BMP 194 Rt 2 BMP: 0 Rt 1 EMP: 197 Rt 2 EMP: 0

NHPP $2,563,200$0

$0 $3,000,000Totals

$0 $436,800State Match

$0 $0Local Match05

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 651.5CN: A302102Lead Agency: NMDOT D-3

Est. Letting: 10/31/2023Proj District 3 Pavement Preservation - I-40 and I-25 (Big I)Fr: I-25 Fr. Lomas to Comanche To: I-40 Fr. 6th St. to Carlisle

Project Desc.: Perform pavement preservation and other construction as necessary to I-40 and I-25 within the Big I interchange.

Est. Proj. Cost: $15,000,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1 I00025

Length: 4.9Category: Hwy & Brg Pres

Remarks: R-17-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A302102

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Signif.Work Zone:

RT2 I00040

Rt 1 BMP 225.2 Rt 2 BMP: 158.2 Rt 1 EMP: 227.7 Rt 2 EMP: 160.6

NHPP $12,816,000$0

$0 $15,000,000Totals

$0 $2,184,000State Match

$0 $0Local Match05

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 651.7CN: A302103Lead Agency: NMDOT D-3

Est. Letting: 10/1/2023Proj District 3 Pavement Preservation - I-25 North of Algodones BridgeFr: New TIP Dev. To: New TIP Dev.

Project Desc.: Pavement preservation to include pavement markings, signage and other appurtenances as necessary.

Est. Proj. Cost: $3,144,233

Project Phases:

NMDOT Dist.: 3 County: Sandoval Municipality: Pueblo of San Felipe

RT1 I00025

Length: 2Category: Hwy & Brg Pres

Remarks: R-17-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A302103

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP 248.5 Rt 2 BMP: 0 Rt 1 EMP: 250.5 Rt 2 EMP: 0

NHPP $2,686,433$0

$0 $3,144,233Totals

$0 $457,800State Match

$0 $0Local Match05

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 262.1CN: A302111Lead Agency: Town of Bernalillo

Est. Letting: 10/31/2018Proj Rail Corridor Pedestrian Safety Improvements Phase IIFr: Lucero Ave To: 1/2 mile north of US 550

Project Desc.: Construct at-grade pedestrian crossings and multi-use trail with barrier fencing and other appurtenances as needed. PE, ROW & Utilities done under A302110.

Est. Proj. Cost: $2,099,840

Project Phases:

NMDOT Dist.: 3 County: Sandoval Municipality: Town of Bernalillo

RT1

Length: 0Category: Safety

Remarks: R-16-07.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A302111

Construction■Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

Safety (HSIP) $1,889,856 $1,889,856

$2,099,840$2,099,840Totals

$209,984$209,984State Match

$0$0Local Match21

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 359.2CN: A302120Lead Agency: NMDOT D-3

Est. Letting: 10/31/2022Proj I-40 Canyon Pavement RehabilitationFr: Carnuel To: Sedillo

Project Desc.: Pavement rehabilitation and miscellaneous construction as needed.

Est. Proj. Cost: $15,000,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: Unincorporated Area

RT1 I00040

Length: 10Category: Hwy & Brg Pres

Remarks: R-17-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A302120

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Signif.Work Zone:

RT2

Rt 1 BMP 170.2 Rt 2 BMP: 0 Rt 1 EMP: 180.2 Rt 2 EMP: 0

NHPP $12,816,000$0

$0 $15,000,000Totals

$0 $2,184,000State Match

$0 $0Local Match05

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 242CN: A302130Lead Agency: City of Rio Rancho

Est. Letting: 6/1/2018Proj Nicklaus Dr Pedestrian ImprovementsFr: Chianti Rd. To: Southern Blvd.

Project Desc.: Install pedestrian facilities to provide additional connectivity to the MLK Elementary school. This project fills a gap in the safe pedestrian facilities for this school.

Est. Proj. Cost: $346,142

Project Phases:

NMDOT Dist.: 3 County: Sandoval Municipality: City of Rio Rancho

RT1 FL0000

Length: 0.584Category: Bike/Ped

Remarks: AM-aug-17, R-17-03 and R-17-04.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A302130

Construction■Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0.584 Rt 2 EMP: 0

TAP-Lg Urb $62,838 $62,838

TAP-Lg Urb $48,451 $48,451

TAP-Lg Urb $184,454 $184,454

$346,141$130,254 $215,887Totals

$0$0 $0State Match

$50,398$18,965 $31,433Local Match15

16

28

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 160CN: A302140Lead Agency: NMDOT D-3

Est. Letting: 3/1/2018Proj AMPA Wide Access Management and Corridor Study Non-Interstate RoutesFr: New Project To:

Project Desc.: Corridor study for access management NM 47, NM 500, NM 314, West Central, NM 6, BL 13

Est. Proj. Cost: $901,012

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: Misc

Remarks: R-18-01.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A302140

Construction□Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

STP-Flex $769,825 $769,825

$901,012$901,012Totals

$131,187$131,187State Match

$0$0Local Match18

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 160.1CN: A302141Lead Agency: NMDOT D-3

Est. Letting: 3/1/2018Proj AMPA Wide Corridor Study Interstate and other NHS routesFr: New Project To:

Project Desc.: Corridor study for congestion management.

Est. Proj. Cost: $1,000,000

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: Misc

Remarks: R-18-01.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A302141

Construction□Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

NHPP $854,400 $854,400

$1,000,000$1,000,000Totals

$145,600$145,600State Match

$0$0Local Match18

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 258CN: A302150Lead Agency: Village of Los Ranchos de Albuquerque

Est. Letting: 2/1/2018Proj Fourth Street Improvements Phase 1Fr: Schulte Rd. To: Pueblo Solano Rd.

Project Desc.: Reconstruct 4th Street from four to three lanes with center turn lane, LED drainage, Variable width sidewalks (4 to 6 foot widths), actuated crosswalks, pedestrian lighting, and landscaping.

Est. Proj. Cost: $6,831,614

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: Village of Los Ranchos de Albuquerque

RT1

Length:Category: Capacity Proj

Remarks: R-18-01.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: A302150

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP Rt 2 BMP: 0 Rt 1 EMP: Rt 2 EMP: 0

$6,831,614$2,752,388 $4,079,226Totals

$767,640$767,640Severance Tax

$6,063,974$1,984,748 $4,079,226Local Non-Match 04 04

04

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 121.8CN: TA00058Lead Agency: City of Albuquerque-ABQ Ride

Est. Letting:Proj ABQ Ride - Vehicles & Equip. PurchaseFr: ABQ Ride System Wide To:

Project Desc.: Auquire buses and associated equipment including fare boxes, debt service and manufacturing inspections. FFY 2018 5310 funds were apportioned in FFY 2016.

Est. Proj. Cost: $10,659,311

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Transit

Remarks: AM-Apr-18, R-15-09, R-13-05. (FY 2018 Revenue Vehicles)

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00058

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Urban) $7,734,000 $7,734,000

FTA 5310 (Capital Awards) $72,991 $72,991

FTA 5339 (MAP-21 Bus/Facil)

$1,000,000 $1,000,000

$10,659,311$10,659,311Totals

$0$0State Match

$1,852,320$1,852,320Local Match23

23

23

Wednesday, April 18, 2018

Administrative Modification April 2018. Added FFY 2016 apportioned FTA 5310 funds to FFY 2018 to reflect the project's actual award amount. This administrative modification does not utilize the "one-time rule" since all the funds are FTA funds and the administrative modification is an effort to reflect the actual amount awarded.

Mid-Region MPO Rec Num: 121.9CN: TA00059Lead Agency: City of Albuquerque-ABQ Ride

Est. Letting:Proj ABQ Ride - Vehicles & Equip. PurchaseFr: ABQ Ride System Wide To:

Project Desc.: Aquire buses and associated equipment including fare boxes, debt service and manufacturing inspections.

Est. Proj. Cost: $46,176,205

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Transit

Remarks: R-17-03, R-15-09, R-15-05. R-13-05. (FY 2019-2021Rev. Vehicles)

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00059

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Urban) $4,132,000 $9,072,000 $6,124,000 $8,006,000 $4,706,000$19,328,000

FTA 5309 (Bus/Facil) $1,300,000 $1,300,000$0

FTA 5339 (MAP-21 Bus/Facil)

$1,000,000 $1,300,000 $1,300,000 $3,600,000

$27,728,013$6,228,313 $12,496,386 $9,003,314 $11,212,048 $7,236,144Totals

$0$0 $0 $0 $0 $0State Match

$4,800,013$1,096,313 $2,124,386 $1,579,314 $1,906,048 $1,230,144Local Match23 23 23 23 23

23 23

23 23 23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 431.5CN: TA00064Lead Agency: City of Albuquerque-ABQ Ride

Est. Letting:Proj ABQ Ride - Bus Stop Facilities ImprovementsFr: ABQ Ride System Wide To:

Project Desc.: Rehabilitate, upgrade and/or construct bus stop infrastructure including access, paving, signage, lighting, shelters and other amenities & associated equipment.

Est. Proj. Cost: $625,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Transit

Remarks: R-15-05 (FY 2020 Allocation).

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00064

Construction■Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other■

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Urban) $500,000 $500,000

$625,000$625,000Totals

$0$0State Match

$125,000$125,000Local Match23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 431.6CN: TA00065Lead Agency: City of Albuquerque-ABQ Ride

Est. Letting: 5/1/2022Proj ABQ Ride - Bus Stop Facilities ImprovementsFr: ABQ Ride System Wide To: New TIP Dev.

Project Desc.: Rehabilitate, upgrade and/or construct bus stop infrastructure including access, paving, signage, lighting, shelters and other amenities & associated equipment.

Est. Proj. Cost: $625,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Transit

Remarks: R-17-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00065

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Urban) $500,000$0

$0 $625,000Totals

$0 $0State Match

$0 $125,000Local Match23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 431.7CN: TA00066Lead Agency: City of Albuquerque-ABQ Ride

Est. Letting: 6/1/2023Proj Yale Transit Facility RenovationFr: New TIP Dev To: New TIP Dev.

Project Desc.: Plan and design phased renovation of Yale garages and operations buildings.

Est. Proj. Cost: $2,500,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Transit

Remarks: R-17-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00066

Construction□Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Urban) $2,000,000$0

$0 $2,500,000Totals

$0 $0State Match

$0 $500,000Local Match15

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 120.4CN: TA00085Lead Agency: City of Albuquerque-ABQ Ride

Est. Letting:Proj ABQ Ride - Coors Corridor Park & RideFr: location t.b.d. To:

Project Desc.: Construct park & ride facility in the Coors Corridor to support current and future transit service focused on river crossing trips.

Est. Proj. Cost: $3,218,633

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Transit

Remarks: AM-oct-15, R-13-05. (FFY 2018 Allocation)

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00085

Construction■Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

CMAQ-Flex $601,207 $601,207

STP-U $2,148,793 $2,148,793

$3,218,633$3,218,633Totals

$0$0State Match

$468,633$468,633Local Match23

23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 120.5CN: TA00086Lead Agency: City of Albuquerque-ABQ Ride

Est. Letting:Proj Coors Corridor Park & Ride Phase 2Fr: Sequoia To: Paseo del Norte

Project Desc.: Construct phase 2 of a park and ride facility in the Coors Corridor to support current and future transit service focused on river crossing trips.

Est. Proj. Cost: $585,206

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Transit

Remarks: R-17-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00086

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

STP-U $500,000$0

$0 $585,206Totals

$0 $0State Match

$0 $85,206Local Match23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 124.8CN: TA00098Lead Agency: City of Albuquerque-ABQ Ride

Est. Letting:Proj ABQ Ride - Transit Enhancements (FY 2018 Allocation)Fr: ABQ Ride Service Area To:

Project Desc.: Construct bus shelters, landscaping, bike/ped access, signage, public art.

Est. Proj. Cost: $132,500

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Transit

Remarks: R-15-06, R-13-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00098

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Urban) $106,000 $106,000

$132,500$132,500Totals

$0$0State Match

$26,500$26,500Local Match23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 124.9CN: TA00099Lead Agency: City of Albuquerque-ABQ Ride

Est. Letting:Proj ABQ Ride - Transit Enhancements (FY 2019 Allocation)Fr: ABQ Ride Service Area To:

Project Desc.: Construct bus shelters, landscaping, bike/ped access, signage, public art.

Est. Proj. Cost: $132,500

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Transit

Remarks: R-15-06, R-13-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00099

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Urban) $106,000 $106,000

$132,500$132,500Totals

$0$0State Match

$26,500$26,500Local Match23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 126.3CN: TA00113Lead Agency: City of Albuquerque-ABQ Ride

Est. Letting:Proj ABQ Ride - Transit Planning (FY 2019)Fr: ABQ Ride System Wide To:

Project Desc.: Facilities & Operations Planning. Includes short, medium and long range planning activities.

Est. Proj. Cost: $4,500,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Transit

Remarks: R-13-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00113

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Urban) $3,600,000 $3,600,000

$4,500,000$4,500,000Totals

$0$0State Match

$900,000$900,000Local Match27

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 126.4CN: TA00114Lead Agency: City of Albuquerque-ABQ Ride

Est. Letting:Proj ABQ Ride - Transit PlanningFr: ABQ Ride System Wide To:

Project Desc.: Facilities & Operations Planning. Includes short, medium and long range planning activities.

Est. Proj. Cost: $4,812,500

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Transit

Remarks: R-15-05 (FY 2021 Allocation).

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00114

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Urban) $3,850,000 $3,850,000

$4,812,500$4,812,500Totals

$0$0State Match

$962,500$962,500Local Match23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 126.5CN: TA00115Lead Agency: City of Albuquerque-ABQ Ride

Est. Letting: 10/1/2022Proj ABQ Ride - Transit PlanningFr: ABQ Ride System Wide To: New TIP Dev

Project Desc.: Facilities & Operations Planning. Includes short, medium and long range planning activities.

Est. Proj. Cost: $5,000,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Transit

Remarks: R-17-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00115

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Urban) $4,000,000$0

$0 $5,000,000Totals

$0 $0State Match

$0 $1,000,000Local Match23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 429.2CN: TA00122Lead Agency: City of Albuquerque-ABQ Ride

Est. Letting:Proj ABQ Ride - Transit Security Equipment UpgradeFr: ABQ Ride System Wide To:

Project Desc.: Acquisition & installation of security related equipment.

Est. Proj. Cost: $135,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Transit

Remarks: R-15-05 (FY 2020 Allocation)

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00122

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Urban) $108,000 $108,000

$135,000$135,000Totals

$0$0State Match

$27,000$27,000Local Match23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 429.3CN: TA00123Lead Agency: City of Albuquerque-ABQ Ride

Est. Letting:Proj ABQ Ride - Transit Security Equipment UpgradeFr: ABQ Ride System Wide To:

Project Desc.: Acquisition & installation of security related equipment.

Est. Proj. Cost: $137,500

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Transit

Remarks: R-15-05 (FY 2021 Allocation)

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00123

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Urban) $110,000 $110,000

$137,500$137,500Totals

$0$0State Match

$27,500$27,500Local Match23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 429.4CN: TA00124Lead Agency: City of Albuquerque-ABQ Ride

Est. Letting: 6/1/2023Proj Transit Security Equipment UpgradeFr: ABQ Ride System Wide To:

Project Desc.: Acquisition & installation of security related equipment.

Est. Proj. Cost: $121,250

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Transit

Remarks: R-17-03. (FFY 2022 Allocation)

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00124

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Urban) $97,000$0

$0 $121,250Totals

$0 $0State Match

$0 $24,250Local Match23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 429.5CN: TA00125Lead Agency: City of Albuquerque-ABQ Ride

Est. Letting: 6/30/2023Proj Transit Security Equipment UpgradeFr: ABQ Ride System Wide To:

Project Desc.: Acquisition & installation of security related equipment.

Est. Proj. Cost: $121,250

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Transit

Remarks: R-17-03. (FFY 2023 Allocation)

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00125

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Urban) $97,000$0

$0 $121,250Totals

$0 $0State Match

$0 $24,250Local Match23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 130.8CN: TA00138Lead Agency: City of Albuquerque-ABQ Ride

Est. Letting:Proj ABQ Ride - Transit Technology Upgrade (FY 2018-2019 Allocation)Fr: ABQ Ride System Wide To:

Project Desc.: Rehabilitate, upgrade and expand transit technologies.

Est. Proj. Cost: $625,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Transit

Remarks: R-13-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00138

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Urban) $500,000 $500,000

$625,000$625,000Totals

$0$0State Match

$125,000$125,000Local Match23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 130.9CN: TA00139Lead Agency: City of Albuquerque-ABQ Ride

Est. Letting:Proj ABQ Ride - Transit Technology UpgradeFr: ABQ Ride System Wide To:

Project Desc.: Rehabilitate, upgrade and expand transit technologies.

Est. Proj. Cost: $2,000,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Transit

Remarks: R-17-03. R-15-05. (FFY 2021-2023 Allocation)

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00139

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Urban) $800,000 $800,000$800,000

$1,000,000$1,000,000 $1,000,000Totals

$0$0 $0State Match

$200,000$200,000 $200,000Local Match23 23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 432.3CN: TA00142Lead Agency: City of Albuquerque-ABQ Ride

Est. Letting:Proj ABQ Ride - Transit Facility Rehabilitation (FY 2018-2019)Fr: ABQ Ride System Wide To:

Project Desc.: Rehabilitate & Remodel Transit Facilities. New CN will be issued for each FY as needed.

Est. Proj. Cost: $625,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Transit

Remarks: R-13-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00142

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Urban) $500,000 $500,000

$625,000$625,000Totals

$0$0State Match

$125,000$125,000Local Match23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 432.4CN: TA00143Lead Agency: City of Albuquerque-ABQ Ride

Est. Letting:Proj ABQ Ride - Transit Facility RehabilitationFr: ABQ Ride System Wide To:

Project Desc.: Rehabilitate & Remodel Transit Facilities.

Est. Proj. Cost: $1,250,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Transit

Remarks: R-15-05 (FY 2020-2021).

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00143

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Urban) $1,000,000 $1,000,000

$1,250,000$1,250,000Totals

$0$0State Match

$250,000$250,000Local Match23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 432.5CN: TA00144Lead Agency: City of Albuquerque-ABQ Ride

Est. Letting: 4/1/2022Proj ABQ Ride - Transit Facility RehabilitationFr: ABQ Ride System Wide To:

Project Desc.: Rehabilitate & Remodel Transit Facilities.

Est. Proj. Cost: $1,250,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Transit

Remarks: R-17-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00144

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Urban) $1,000,000$0

$0 $1,250,000Totals

$0 $0State Match

$0 $250,000Local Match23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 129.8CN: TA00208Lead Agency: Rio Metro Transit Dist

Est. Letting:Proj Rio Metro Transit 5311 FundingFr: Rio Metro Regional Transit District To: outside ABQ & Los Lunas UZAs

Project Desc.: Capital, operating & administrative funds for bus service in rural areas.

Est. Proj. Cost: $1,490,570

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: Transit

Remarks: R-14-09, AM-sep-15, R-13-05. (FFY 2018 Alloation)

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00208

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5311 Capital $70,055 $70,055

FTA 5311 Operating $701,068 $701,068

$1,489,705$1,489,705Totals

$0$0State Match

$718,582$718,582Local Match23

23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 129.9CN: TA00209Lead Agency: Rio Metro Transit Dist

Est. Letting:Proj Rio Metro Transit 5311 FundingFr: Rio Metro Regional Transit District To: outside ABQ & Los Lunas UZAs

Project Desc.: Capital, operating & administrative funds for bus service in rural areas.

Est. Proj. Cost: $1,513,371

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: Transit

Remarks: R-17-04, AM-sep-15, R-13-05. (FFY 2019 Allocation)

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00209

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5311 Capital $71,106 $71,106

FTA 5311 Operating $711,584 $711,584

$1,512,051$1,512,051Totals

$0$0State Match

$729,361$729,361Local Match23

23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 134.6CN: TA00266Lead Agency: Rio Metro NMRRX

Est. Letting:Proj Commuter Rail Maint of Eqiup & Maint of Way.Fr: NMRRX Service Area To:

Project Desc.: Capital maintenance of equipment and capital maintenance of way (track improvements, etc.) including 1% for security, transit operations and Positive Train Control (PTC) debt service.

Est. Proj. Cost: $14,410,551

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: Transit

Remarks: R-18-01, R-17-04, AM-sep-15, AM-jan-14 split to TA00324, R-13-05. (FY 2018 Alloc)

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00266

Construction■Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other■

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Urban) $8,886,041 $8,886,041

FTA 5337 $1,922,400 $1,922,400

$14,410,551$14,410,551Totals

$0$0State Match

$3,602,110$3,602,110Local Match23

23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 134.7CN: TA00267Lead Agency: Rio Metro NMRRX

Est. Letting:Proj Commuter Rail Maint of Eqiup & Maint of WayFr: NMRRX Service Area To:

Project Desc.: Capital maintenance of equipment and capital maintenance of way (track improvements, etc.) including 1% for security, transit operations and Positive Train Control (PTC) debt service.

Est. Proj. Cost: $14,798,703

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: Transit

Remarks: R-18-01, R-17-04, AM-sep-15, AM-jan-14 Split to TA00325. R-13-05. (FY 2019 Alloc)

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00267

Construction■Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other■

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Urban) $9,063,762 $9,063,762

FTA 5337 $2,055,200 $2,055,200

$14,798,703$14,798,703Totals

$0$0State Match

$3,679,741$3,679,741Local Match23

23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 134.9CN: TA00269Lead Agency: Rio Metro NMRRX

Est. Letting:Proj Commuter Rail Maint of Eqiup & Way & Transit OperFr: NMRRX Service Area To:

Project Desc.: Capital maintenance of equipment and capital maintenance of way (track improvements, etc.) including 1% for security, transit operations and Positive Train Control (PTC) debt service.

Est. Proj. Cost: $14,859,297

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: Transit

Remarks: R-18-01, R-17-04, AM-oct-15, R-15-05. (FY 2020 Alloc)

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00269

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Urban) $9,245,038 $9,245,038

FTA 5337 $1,922,400 $1,922,400

$14,859,297$14,859,297Totals

$0$0State Match

$3,691,859$3,691,859Local Match23

23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 136.4CN: TA00314Lead Agency: Rio Metro Transit Dist

Est. Letting:Proj Rio Metro - Los Lunas Small Urban Transit ServicesFr: Rio Metro Regional Tranist District To: Los Lunas Small Urban Area/Valencia Co.

Project Desc.: Capital, operating & administrative funds for bus and rail services for the Los Lunas Small Urban Area.

Est. Proj. Cost: $1,574,991

Project Phases:

NMDOT Dist.: 3 County: Valencia Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: Transit

Remarks: R-17-04, AM-sep-15, R-13-05. (FFY 2017 Alloc)

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00314

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Sm Urb Oper) $746,545 $746,545

FTA 5339 (Sm Urb Bus/Facil) $65,521 $65,521

$1,574,991$1,574,991Totals

$0$0State Match

$762,925$762,925Local Match23

23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 136.5CN: TA00315Lead Agency: Rio Metro Transit Dist

Est. Letting:Proj Rio Metro - Los Lunas Small Urban Transit ServicesFr: Rio Metro Regional Tranist District To: Los Lunas Small Urban Area/Valencia Co.

Project Desc.: Capital, operating & administrative funds for bus and rail services for the Los Lunas Small Urban Area.

Est. Proj. Cost: $1,606,082

Project Phases:

NMDOT Dist.: 3 County: Valencia Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: Transit

Remarks: R-17-04, AM-sep-15, R-13-05. (FY 2018 Alloc)

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00315

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Sm Urb Oper) $761,476 $761,476

FTA 5339 (Sm Urb Bus/Facil) $66,504 $66,504

$1,606,082$1,606,082Totals

$0$0State Match

$778,102$778,102Local Match23

23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 136.6CN: TA00316Lead Agency: Rio Metro Transit Dist

Est. Letting:Proj Rio Metro - Los Lunas Small Urban Transit Services (FY 2019 Alloc)Fr: Rio Metro Regional Tranist District To: Los Lunas Small Urban Area/Valencia Co.

Project Desc.: Capital, operating & administrative funds for bus and rail services for the Los Lunas Small Urban Area.

Est. Proj. Cost: $1,637,790

Project Phases:

NMDOT Dist.: 3 County: Valencia Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: Transit

Remarks: R-17-04, AM-oct-15, R-15-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00316

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Sm Urb Oper) $776,706 $776,706

FTA 5339 (Sm Urb Bus/Facil) $67,502 $67,502

$1,637,790$1,637,790Totals

$0$0State Match

$793,582$793,582Local Match23

23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 136.7CN: TA00317Lead Agency: Rio Metro Transit Dist

Est. Letting:Proj Rio Metro - Los Lunas Small Urban Transit Services (FY 2020 Alloc)Fr: Rio Metro Regional Tranist District To: Los Lunas Small Urban Area/Valencia Co.

Project Desc.: Capital, operating & administrative funds for bus and rail services for the Los Lunas Small Urban Area.

Est. Proj. Cost: $1,670,123

Project Phases:

NMDOT Dist.: 3 County: Valencia Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: Transit

Remarks: R-17-04, AM-oct-15, R-15-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00317

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Sm Urb Oper) $792,240 $792,240

FTA 5339 (Sm Urb Bus/Facil) $68,514 $68,514

$1,670,123$1,670,123Totals

$0$0State Match

$809,369$809,369Local Match23

23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 136.8CN: TA00318Lead Agency: Rio Metro Transit Dist

Est. Letting: 10/31/2021Proj Rio Metro - Los Lunas Small Urban Transit Services (FY 2021 Alloc)Fr: Rio Metro Regional Tranist District To: Los Lunas Small Urban Area/Valencia Co.

Project Desc.: Capital, operating & administrative funds for bus and rail services for the Los Lunas Small Urban Area.

Est. Proj. Cost: $1,703,098

Project Phases:

NMDOT Dist.: 3 County: Valencia Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: Transit

Remarks: R-17-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00318

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Sm Urb Oper) $808,085$0

FTA 5339 (Sm Urb Bus/Facil) $69,542$0

$0 $1,703,098Totals

$0 $0State Match

$0 $825,471Local Match23

23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 136.9CN: TA00319Lead Agency: Rio Metro Transit Dist

Est. Letting: 10/31/2021Proj Rio Metro - Los Lunas Small Urban Transit Services (FY 2022 Alloc)Fr: Rio Metro Regional Tranist District To: Los Lunas Small Urban Area/Valencia Co.

Project Desc.: Capital, operating & administrative funds for bus and rail services for the Los Lunas Small Urban Area.

Est. Proj. Cost: $1,736,725

Project Phases:

NMDOT Dist.: 3 County: Valencia Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: Transit

Remarks: R-17-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00319

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Sm Urb Oper) $824,247$0

FTA 5339 (Sm Urb Bus/Facil) $70,585$0

$0 $1,736,725Totals

$0 $0State Match

$0 $841,893Local Match23

23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 137.4CN: TA00324Lead Agency: Rio Metro Transit Dist

Est. Letting:Proj Rio Metro Community TransportationFr: AMPA Wide To:

Project Desc.: Provide transit services, which may include taxi services, circulators, vanpool programs, etc., operating within or connecting to the albuquerque Urbanized Area.

Est. Proj. Cost: $397,433

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: Transit

Remarks: AM-sep-15, AM-jan-14 split from TA00266. (Job Access 2018)

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00324

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Urban) $198,716 $198,716

$397,432$397,432Totals

$0$0State Match

$198,716$198,716Local Match23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 137.5CN: TA00325Lead Agency: Rio Metro Transit Dist

Est. Letting:Proj Rio Metro Community TransportationFr: AMPA Wide To:

Project Desc.: Provide transit services, which may include taxi services, circulators, vanpool programs, etc., operating within or connecting to the albuquerque Urbanized Area.

Est. Proj. Cost: $405,381

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: Transit

Remarks: AM-sep-15, AM-jan-14 split from TA00267. (Job Access 2019)

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00325

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Urban) $202,691 $202,691

$405,382$405,382Totals

$0$0State Match

$202,691$202,691Local Match23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 137.6CN: TA00326Lead Agency: Rio Metro Transit Dist

Est. Letting:Proj Rio Metro Community TransportationFr: AMPA Wide To:

Project Desc.: Provide transit services, which may include taxi services, circulators, vanpool programs, etc., operating within or connecting to the Albuquerque Urbanized Area.

Est. Proj. Cost: $413,489

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: Transit

Remarks: AM-oct-15, R-15-05. (Job Access 2020)

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00326

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Urban) $206,745 $206,745

$413,490$413,490Totals

$0$0State Match

$206,745$206,745Local Match23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 137.7CN: TA00327Lead Agency: Rio Metro Transit Dist

Est. Letting:Proj Rio Metro Community TransportationFr: AMPA Wide To:

Project Desc.: Provide transit services, which may include taxi services, circulators, vanpool programs, etc., operating within or connecting to the albuquerque Urbanized Area.

Est. Proj. Cost: $421,759

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: Transit

Remarks: AM-oct-15, R-15-05. (Job Access 2021)

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00327

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Urban) $210,879 $210,879

$421,758$421,758Totals

$0$0State Match

$210,879$210,879Local Match23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 137.8CN: TA00328Lead Agency: Rio Metro Transit Dist

Est. Letting: 10/31/2021Proj Rio Metro Community Transportation (FFY 2022)Fr: AMPA Wide To:

Project Desc.: Provide transit services, which may include taxi services, circulators, vanpool programs, etc., operating within or connecting to the albuquerque Urbanized Area.

Est. Proj. Cost: $430,194

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: Transit

Remarks: R-17-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00328

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Urban) $215,097$0

$0 $430,194Totals

$0 $0State Match

$0 $215,097Local Match23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 137.9CN: TA00329Lead Agency: Rio Metro Transit Dist

Est. Letting: 10/31/2021Proj Rio Metro Community Transportation (2023)Fr: AMPA Wide To:

Project Desc.: Provide transit services, which may include taxi services, circulators, vanpool programs, etc., operating within or connecting to the albuquerque Urbanized Area.

Est. Proj. Cost: $438,798

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: Transit

Remarks: R-17-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00329

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Urban) $219,399$0

$0 $438,798Totals

$0 $0State Match

$0 $219,399Local Match23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 345.4CN: TA00351Lead Agency: City of Albuquerque-ABQ Ride

Est. Letting: 2/1/2016Proj Central Ave BRT - Phase IBFr: Coors To: Louisiana

Project Desc.: Planning, engineering, ROW, utilities, vehicle acquisitions, multi-modal improvements, operations & construction with other appurtenances as necessary.

Est. Proj. Cost: $116,047,622

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1 FL4016

Length: 8.744Category: Transit

Remarks: AM-may-17, R-17-04, AM-nov-16, R-15-09 (Approval of the FTA 5309 Small Starts funding is contingent upon award of FTA 5309 funding to this project by the Federal Transit Administration) (Added FFY 2015 FTA 5307 funds from TA00063), R-15-05, R-15-02 also see TA00350. (Additionally $500,000 of CMAQ-M has already been transferred to FTA under

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00351

Construction■Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other■

TIP Informational Years

TIP Amendment Pending? □

Signif.Work Zone:

RT2

Rt 1 BMP 4.719 Rt 2 BMP: 0 Rt 1 EMP: 13.463 Rt 2 EMP: 0

CMAQ-Flex $3,125,894 $3,194,107 $3,643,326 $3,610,326 $13,573,653

FTA 5309 (Small Starts) $19,023,577 $19,023,577

STP-U $1,885,204 $1,493,452 $3,378,656

$43,620,656$27,438,055 $3,738,421 $6,470,658 $5,973,523Totals

$0$0 $0 $0 $0State Match

$7,644,770$5,288,584 $544,314 $942,128 $869,745Local Match23 23 23 23

23

23 23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 645.2CN: TA00370Lead Agency: Rio Metro NMRRX

Est. Letting:Proj Commuter Rail: Railroad Sidings Improvements-Alameda SidingFr: Alameda Blvd To: Vicinity of Sandia Pueblo Station

Project Desc.: Construct new siding between Alameda Blvd and vicinity of Sandia Pueblo Station.

Est. Proj. Cost: $1,600,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: Unincorporated Area

RT1

Length: 0Category: Transit

Remarks: R-17-04, AM-April-16, R-15-05.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00370

Construction■Right-of-way■Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design■Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

Reg. Sig.Work Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

STP-U $258,731 $258,731

$302,822$302,822Totals

$0$0State Match

$44,091$44,091Local Match23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 200CN: TA00380Lead Agency: City of Albuquerque-ABQ Ride

Est. Letting:Proj ABQ Ride - Transit EnhancementsFr: ABQ Ride Service Area To:

Project Desc.: Construct bus shelters, landscaping, bike/ped access, signage, public art, and other enhancements.

Est. Proj. Cost: $135,000

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Transit

Remarks: R-15-05. (FY 2020 Allocation)

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00380

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Urban) $108,000 $108,000

$135,000$135,000Totals

$0$0State Match

$27,000$27,000Local Match23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 200.1CN: TA00381Lead Agency: City of Albuquerque-ABQ Ride

Est. Letting:Proj ABQ Ride - Transit EnhancementsFr: ABQ Ride Service Area To:

Project Desc.: Construct bus shelters, landscaping, bike/ped access, signage, public art, and other enhancements.

Est. Proj. Cost: $137,500

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Transit

Remarks: R-15-05. (FY 2021 Allocation)

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00381

Construction■Right-of-way□Prel. Engr.■

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document■ Other□

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Urban) $110,000 $110,000

$137,500$137,500Totals

$0$0State Match

$27,500$27,500Local Match23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 200.2CN: TA00382Lead Agency: City of Albuquerque-ABQ Ride

Est. Letting: 3/1/2023Proj ABQ Ride - Transit EnhancementsFr: ABQ Ride Service Area To:

Project Desc.: Construct bus shelters, landscaping, bike/ped access, signage, public art, and other enhancements.

Est. Proj. Cost: $121,250

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Transit

Remarks: R-17-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00382

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Urban) $97,000$0

$0 $121,250Totals

$0 $0State Match

$0 $24,250Local Match23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 200.3CN: TA00383Lead Agency: City of Albuquerque-ABQ Ride

Est. Letting: 3/1/2023Proj Transit EnhancementsFr: ABQ Ride Service Area To:

Project Desc.: Construct bus shelters, landscaping, bike/ped access, signage, public art, and other enhancements.

Est. Proj. Cost: $121,250

Project Phases:

NMDOT Dist.: 3 County: Bernalillo Municipality: City of Albuquerque

RT1

Length: 0Category: Transit

Remarks: R-17-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00383

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Urban) $97,000$0

$0 $121,250Totals

$0 $0State Match

$0 $24,250Local Match23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 135CN: TA00390Lead Agency: Rio Metro NMRRX

Est. Letting:Proj Commuter Rail Maint of Eqiup & Way & Transit OperFr: NMRX Service Area To:

Project Desc.: Capital maintenance of equipment and capital maintenance of way (track improvements, etc.) including 1% for security, transit operations and Positive Train Control (PTC) debt service.

Est. Proj. Cost: $23,899,637

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: Transit

Remarks: R-18-01, R-17-04, AM-oct-15, R-15-05. (FY 2021 Alloc)

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00390

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Urban) $9,429,938 $9,429,938

FTA 5337 $8,969,772 $8,969,772

$23,899,637$23,899,637Totals

$0$0State Match

$5,499,927$5,499,927Local Match23

23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 135.1CN: TA00391Lead Agency: Rio Metro NMRRX

Est. Letting: 10/31/2021Proj Commuter Rail Maint of Eqiup & Way & Transit Oper (FY 2022 Alloc)Fr: NMRX Service Area To:

Project Desc.: Capital maintenance of equipment and capital maintenance of way (track improvements, etc.) including 1% for security, transit operations and Positive Train Control (PTC) debt service.

Est. Proj. Cost: $24,403,578

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: Transit

Remarks: R-18-01, R-17-04 and R-17-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00391

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Urban) $9,618,537$0

FTA 5337 $9,104,319$0

$0 $24,403,570Totals

$0 $0State Match

$0 $5,680,714Local Match23

23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 135.2CN: TA00392Lead Agency: Rio Metro NMRRX

Est. Letting: 10/31/2021Proj Commuter Rail Maint of Eqiup & Way & Transit Oper (FY 2023 Alloc)Fr: NMRX Service Area To:

Project Desc.: Capital maintenance of equipment and capital maintenance of way (track improvements, etc.) including 1% for security, transit operations and Positive Train Control (PTC) debt service.

Est. Proj. Cost: $24,714,739

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: Transit

Remarks: R-18-01, R-17-03.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00392

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

RoutineWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5307 (Urban) $9,810,907$0

FTA 5337 $9,240,884$0

$0 $24,714,739Totals

$0 $0State Match

$0 $5,662,948Local Match23

23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 151CN: TA00400Lead Agency: Rio Metro Transit Dist

Est. Letting:Proj Rio Metro Transit 5311 FundingFr: Rio Metro Regioanl Transit District To: outside ABQ& Los Lunas UZAs

Project Desc.: Capital, operating and administrative funds for bus service in rural areas.

Est. Proj. Cost: $1,536,522

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: Transit

Remarks: R-17-04, AM-oct-15, R-15-05. (FFY 2020)

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00400

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5311 Capital $72,173 $72,173

FTA 5311 Operating $722,258 $722,258

$1,534,732$1,534,732Totals

$0$0State Match

$740,301$740,301Local Match23

23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 151.1CN: TA00401Lead Agency: Rio Metro Transit Dist

Est. Letting:Proj Rio Metro Transit 5311 FundingFr: Rio Metro Regioanl Transit District To: outside ABQ& Los Lunas UZAs

Project Desc.: Capital, operating and administrative funds for bus service in rural areas.

Est. Proj. Cost: $1,560,030

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: Transit

Remarks: R-17-04, AM-oct-15, R-15-05. (FY 2021)

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00401

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5311 Capital $73,255 $73,255

FTA 5311 Operating $733,092 $733,092

$1,557,753$1,557,753Totals

$0$0State Match

$751,406$751,406Local Match23

23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 151.2CN: TA00402Lead Agency: Rio Metro Transit Dist

Est. Letting: 10/31/2021Proj Rio Metro Rural Transit ServicesFr: Rio Metro Regioanl Transit District To: outside ABQ& Los Lunas UZAs

Project Desc.: Capital, operating and administrative funds for bus service in areas outside the census-defined Albuquerque and Los Lunas Urbanized areas.

Est. Proj. Cost: $1,581,119

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: Transit

Remarks: R-17-03. (FFY 2022)

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00402

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5311 Capital $74,354$0

FTA 5311 Operating $744,088$0

$0 $1,581,119Totals

$0 $0State Match

$0 $762,677Local Match23

23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 151.3CN: TA00403Lead Agency: Rio Metro Transit Dist

Est. Letting: 10/31/2021Proj Rio Metro Rural Transit ServicesFr: Rio Metro Regioanl Transit District To: outside ABQ& Los Lunas UZAs

Project Desc.: Capital, operating and administrative funds for bus service in areas outside the census-defined Albuquerque and Los Lunas Urbanized areas.

Est. Proj. Cost: $1,604,836

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: Transit

Remarks: R-17-03. (FFY 2023)

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00403

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

ExemptWork Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5311 Capital $75,469$0

FTA 5311 Operating $755,250$0

$0 $1,604,836Totals

$0 $0State Match

$0 $774,117Local Match23

23

Thursday, April 12, 2018

Mid-Region MPO Rec Num: 256.1CN: TA00411Lead Agency: Rio Metro NMRRX

Est. Letting: 10/31/2017Proj NMRX Positive Train ControlFr: Belen Station To: Santa Fe Depot

Project Desc.: Complete environmental, design, construction and implementation of a PTC system on the NMRX corridor, including, but not limited to, back office, locomotive, and wayside segments.

Est. Proj. Cost: $55,000,000

Project Phases:

NMDOT Dist.: 3 County: Various Municipality: Various Multiple Jurisd.

RT1

Length: 0Category: Transit

Remarks: R-18-01 (Project cost includes $4.5 million from FFY 2017 PTC Grant, $352,338 (STP-U) from TA00410, and $8,058,156 (FTA 5337 + Local Match) from TA00265. SIB Loan will be paid back with FTA 5337 and local Non-Match funds. Financing secured from private lender will be paid back with local other funds). R-17-07.

PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category

Fed ID: TA00411

Construction□Right-of-way□Prel. Engr.□

FUND SOURCE 2018 2019 2020 2021 2022 20234 Yr. TOTALS

Albuquerque Metropolitan Planning Area Mid-Region Metropolitan Planning Organization Transportation Improvement Program (TIP)

Miles

Design□Environ. Document□ Other■

TIP Informational Years

TIP Amendment Pending? □

Signif.Work Zone:

RT2

Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 EMP: 0

FTA 5337 $6,655,546 $6,651,415 $6,914,814 $20,221,775

$42,089,506$25,131,720 $8,314,269 $8,643,518Totals

$0$0 $0 $0State Match

$5,055,444$1,663,887 $1,662,854 $1,728,704Local Match

$4,309,762$4,309,762Local Non-Match

$12,502,525$12,502,525Local Other