CMS Week, CERN, 07-11 June 2004 08 Jun 2004CMS Week - Bonding WGSalvatore Costa - Catania...

11
CMS Week, CERN, 07-11 June 2004 08 Jun 2004 CMS Week - Bonding WG Salvatore Costa - Catania Documentation of the loop of the to-be-pull-tested bonds placed in the PA Test areas in Catania Salvatore Costa Università di Catania and INFN – Sezione di Catania

Transcript of CMS Week, CERN, 07-11 June 2004 08 Jun 2004CMS Week - Bonding WGSalvatore Costa - Catania...

Page 1: CMS Week, CERN, 07-11 June 2004 08 Jun 2004CMS Week - Bonding WGSalvatore Costa - Catania Documentation of the loop of the to-be-pull-tested bonds placed.

CMS Week, CERN, 07-11 June 2004

08 Jun 2004CMS Week - Bonding WGSalvatore Costa - Catania

Documentation of the loopof the to-be-pull-tested bonds placed

in the PA Test areasin Catania

Salvatore CostaUniversità di Catania and INFN – Sezione di Catania

Page 2: CMS Week, CERN, 07-11 June 2004 08 Jun 2004CMS Week - Bonding WGSalvatore Costa - Catania Documentation of the loop of the to-be-pull-tested bonds placed.

08 Jun 2004CMS Week - Bonding WG 2 Salvatore Costa - Catania

Procedure

Uses a few of the identical symmetrical bonds we place on the PA Tests areas, currently pull-tested on a sampling basis.1. Document the original bond

2. Straighten a bond to (near) triangular shape

3. Measure the angle at the bond foot

4. Determine correction factor for pull strengths

Page 3: CMS Week, CERN, 07-11 June 2004 08 Jun 2004CMS Week - Bonding WGSalvatore Costa - Catania Documentation of the loop of the to-be-pull-tested bonds placed.

08 Jun 2004CMS Week - Bonding WG 3 Salvatore Costa - Catania

1. Document the original bond

• Gently push bond over with the pull tester hook until it rests flat on the PA surface, but taking care that its shape is not significantly altered.

• Take snapshot of bond under Mitutoyo measuring machine.

Page 4: CMS Week, CERN, 07-11 June 2004 08 Jun 2004CMS Week - Bonding WGSalvatore Costa - Catania Documentation of the loop of the to-be-pull-tested bonds placed.

08 Jun 2004CMS Week - Bonding WG 4 Salvatore Costa - Catania

2. Make bond triangular• Gently pull bond up at mid-span with the pull tester hook until it takes a

(nearly) triangular shape (figure below).

• Gently push bond over with the pull tester hook until it rests flat on the PA surface, but taking care that its now triangular shape is not significantly altered.

Page 5: CMS Week, CERN, 07-11 June 2004 08 Jun 2004CMS Week - Bonding WGSalvatore Costa - Catania Documentation of the loop of the to-be-pull-tested bonds placed.

08 Jun 2004CMS Week - Bonding WG 5 Salvatore Costa - Catania

3. Measure angle at bond foot

• Take snapshot of triangularized bond under Mitutoyo.• Measure angle with Mitutoyo.

Page 6: CMS Week, CERN, 07-11 June 2004 08 Jun 2004CMS Week - Bonding WGSalvatore Costa - Catania Documentation of the loop of the to-be-pull-tested bonds placed.

08 Jun 2004CMS Week - Bonding WG 6 Salvatore Costa - Catania

4. Determine correction factor (1)

Page 7: CMS Week, CERN, 07-11 June 2004 08 Jun 2004CMS Week - Bonding WGSalvatore Costa - Catania Documentation of the loop of the to-be-pull-tested bonds placed.

08 Jun 2004CMS Week - Bonding WG 7 Salvatore Costa - Catania

4. Determine correction factor (2)

Correction factor:a = 1 / (2 sin)

(º) corr. factor a

10 2.88

20 1.46

30 1

40 0.79

50 0.65

60 0.58

70 0.53

80 0.51

90 0.5

For symmetrical bond:

Page 8: CMS Week, CERN, 07-11 June 2004 08 Jun 2004CMS Week - Bonding WGSalvatore Costa - Catania Documentation of the loop of the to-be-pull-tested bonds placed.

CMS Week, CERN, 07-11 June 2004

08 Jun 2004CMS Week - Bonding WGSalvatore Costa - Catania

Salvatore Costa

Bondingin

CATANIA

Università di Catania and INFN – Sezione di Catania

Page 9: CMS Week, CERN, 07-11 June 2004 08 Jun 2004CMS Week - Bonding WGSalvatore Costa - Catania Documentation of the loop of the to-be-pull-tested bonds placed.

08 Jun 2004CMS Week - Bonding WG 9 Salvatore Costa - Catania

Catania: bond accounting

Module Type IB34 IB12phi Total

Received from Gantry

71 34 105

Bonded 45 33 78

ARC tested 44 33 77

OK 44 31 75

bad 2 2

Page 10: CMS Week, CERN, 07-11 June 2004 08 Jun 2004CMS Week - Bonding WGSalvatore Costa - Catania Documentation of the loop of the to-be-pull-tested bonds placed.

08 Jun 2004CMS Week - Bonding WG 10 Salvatore Costa - Catania

Catania: (bond) faults

• 2 Modules (30200020035289, …303) fail ARC Fast Tests Low Voltage test: I(V2.50)=804 mA (max 750 mA)Still not understood

• 1 Module (30200020035305) can’t power up 2 APVs – Damage to connector? False alarm: misplugged connector

• In one recent group of 11 modules (bias bonded, readout not bonded yet), 5 anomalous IV curves

Page 11: CMS Week, CERN, 07-11 June 2004 08 Jun 2004CMS Week - Bonding WGSalvatore Costa - Catania Documentation of the loop of the to-be-pull-tested bonds placed.

08 Jun 2004CMS Week - Bonding WG 11 Salvatore Costa - Catania

Catania: new tool type

• We reached more than 40,000 bonds with one tool

• Changed tool and tool type to one suggested by Palomar Tech engineer– Designed specifically for

Hughes (Palomar) 2470 wedge bonder

• Last (1) Module bonded with new tool– Par not yet optimized– Much higher pull forces (13-

15g), but lift-offs/cratering