    High Pressure Piping in Power Plants Water / Steam Cycles

    Capital Markets Day Power Services at Moorburg Power Plant

    December 2, 2010

    Ronald Diehl, Member of the Executive Board of BB Power Services GmbH

  • 8/7/2019 CMD_02122010_Diehl_final

    2/28

    A enda

    1. Overview division

    Piping Technology

    2. High-Pressure Piping Systems

    3. Service Range

    4. Market Structure

    5. Clients

    .

    7. Competitive differentiators

    and success factors

    8. References

    Page 2

    Bilfinger Berger Capital Markets Day December 2, 2010

  • 8/7/2019 CMD_02122010_Diehl_final

    3/28

    1. Overview division Piping Technology

    Fields of

    competence

    Service range

    DetailPro ectManufactu-

    Construction,Commission-

    BasicEngineering

    (ProcessQuality

    assurance,

    Steelconstruction,

    engineeringmanagementr ng,

    Fabrication

    Erectionng, rng ng

    into operation

    eng neer ng,

    E/I&C,Arrangementplanning)

    welding

    technology

    rocuremenman s,

    facades,hoists

    DeNOx

    Planning teams

    Electrostaticprecipitator

    DesulfurizationInduced draft fanForced draft fan

    Steam generator,firing system

    Components:coaling, mill, ash

    removal,heat recovery

    Constructionservices

    (Bilfinger BergerCivil)

    PipingHP systemIP systemLP system

    Page 3

    Bilfinger Berger Capital Markets Day December 2, 2010

  • 8/7/2019 CMD_02122010_Diehl_final

    4/28

    1. Overview division Piping Technology

    Bilfinger Berger Power Services GmbH

    Bilfinger Berger SE

    Steam GeneratorsEnergy and

    Environmental Piping TechnologyMechanical ApparatusSteam Generators

    Engineering

    Babcock Borsig ServiceGmbH

    BHR Hochdruck-Rohrleitungsbau GmbH

    Bilfinger Berger PowerHoldings (Pty) Ltd.

    Babcock Noell GmbHMCE Maschinen-und Apparatebau GmbH& Co. KG (Austria)

    Steinmller Instand-setzung KraftwerkeGesellschaft fr Energie-und Umwelttechnik mbH

    PKB PlanungsbroRohrleitungs- undAnlagentechnik GmbH

    BHR Piping Systems

    Steinmller Africa(Pty) Ltd.

    Steinmller Engineering

    MCE IndustrietechnikAschersleben GmbH

    Middle East FZE(UAE)

    Duro Dakovic Montazad.d. (Croatia)

    (Pty) Ltd. (South Africa).

    MCE Berlin GmbHKOG Group

    Page 4

    Bilfinger Berger Capital Markets Day December 2, 2010

    Rotring Engineering AG

    nterva ve ( ty) t . 50%

  • 8/7/2019 CMD_02122010_Diehl_final

    5/28

    1. Overview division Piping Technology

    600

    Orders received Output volume

    600 600 million million

    400

    500

    400

    500

    400

    500

    100

    200

    100

    200

    100

    200

    300

    00 0

    Orders received and output volume include between 120m and 150m / yearstandard business service .

    Page 5

    Bilfinger Berger Capital Markets Day December 2, 2010

  • 8/7/2019 CMD_02122010_Diehl_final

    6/28

    2. High-Pressure Piping Systems

    plants are the connections between

    the feed water pumps, the boiler / heat

    exchanger and the turbine.

    Coal-fired power plants Lignite-fired power plants

    Combined-cycle power stations

    Biomass power plants

    Surrogate fuel power plants

    Page 6

    Bilfinger Berger Capital Markets Day December 2, 2010

  • 8/7/2019 CMD_02122010_Diehl_final

    7/28

    2. High-Pressure Piping Systems

    RWE Neurath lignite-fired power plant(optimised plant design, BoA),1,100 MW

    Total material approx. 3,100 t / unit

    Pipes approx. 2,200 t

    .

    Fittings approx. 190 t

    Supports/hangers approx. 600 t

    Total pipe length approx. 11,000 m

    Main piping approx. 4,400 m

    Total circumferential welds

    approx. 7,000

    Total circumferential welds

    Page 7

    Bilfinger Berger Capital Markets Day December 2, 2010

    . ,

  • 8/7/2019 CMD_02122010_Diehl_final

    8/28

    2. High-Pressure Piping Systems

    RWE Neurath li nite-fired ower lant 172 m level

    (optimised plant design, BoA),1,100 MW

    Feed water430 bar, 250 C, 588 mm, w.th. 44

    Main steam295 bar, 610 C, 549 mm, w.th. 97

    Cold reheat75 bar, 435 C, 824 mm, w.th. 31

    Hot reheat70 bar, 615 C, 806 mm, w.th. 43

    Page 8

    Bilfinger Berger Capital Markets Day December 2, 2010

  • 8/7/2019 CMD_02122010_Diehl_final

    9/28

    3. Service range,

    Fabrication of pipingspoolsFabrication of pipingspools

    Assembly of theprefabricated pipeAssembly of theprefabricated pipe

    Plant maintenanceconsulting service

    Plant maintenanceconsulting service

    Pi in conce tual / Pi in conce tual /

    Bending

    Welding

    Bending

    Welding

    spoo s an angers

    Power plant newbuilds

    spoo s an angers

    Power plant newbuilds

    Plant maintenanceengineering

    Plant maintenanceengineering

    basic design Piping detail design

    basic design Piping detail design

    Heat treatment

    Machining

    Heat treatment

    Machining

    Replacement duringpower plant outages

    Replacement duringpower plant outages

    ant opt m zat on

    Power plant retrofits

    ant opt m zat on

    Power plant retrofits

    System analysis

    Stress calcluation

    System analysis

    Stress calcluation

    Destructive and non-destructive material

    testing

    Destructive and non-destructive material

    testing

    ssessmen oresidual service life

    ssessmen oresidual service life

    ProcurementProcurement

    Expediting

    Specifications

    Expediting

    Specifications

    Pipe hangerdesign

    Pipe hangerdesign

    Quality Assurance

    Scheduling

    Quality Assurance

    Scheduling

    Page 9

    Bilfinger Berger Capital Markets Day December 2, 2010

  • 8/7/2019 CMD_02122010_Diehl_final

    10/28

    4. Market Structure

    -

    Market leader in Europe

    Market leader in South Africa

    One of six leading contractors worldwide

    Piping Systems in Nuclear Power Plants

    Market leader in Europe

    Main Coolant Piping in Nuclear Power Plants

    nterna y c a e p pes

    One of three contractors worldwide

    Page 10

    Bilfinger Berger Capital Markets Day December 2, 2010

  • 8/7/2019 CMD_02122010_Diehl_final

    11/28

    4. Market Structure

    BIP (Babcock Industry and Power)

    E.ON AnlagenserviceWWV Wrmeverwertun

    Europe YIT (Industrial and Network Services), FinlandFives Nordon France

    Fabricom (Suez Gaz de France), BelgiumBoccard, FranceBassi, Italyn egra , us r a

    World Shaw / Stone & Webster, USA,

    ATE (Atomtech Energy & Industrials), TaiwanBHEL (Bharat Heavy Electricals Ltd.), IndiaSeongwha Industrial, Korea

    Page 11

    Bilfinger Berger Capital Markets Day December 2, 2010

    Fabricom / Endel (Suez Gaz de France), Belgium/France

  • 8/7/2019 CMD_02122010_Diehl_final

    12/28

    5. Clients

    Page 12

    Bilfinger Berger Capital Markets Day December 2, 2010

  • 8/7/2019 CMD_02122010_Diehl_final

    13/28

    .

    Billing on basis of hours and

    material spent according to unit rate list

    Service contract

    en

    Lump sum fixed price for exactly defined

    scope of supplies and services

    e. . water/steam c clesLump sum

    ClientBBPS

    Unit rate lists with defined quantities

    e.g. major contract OL3 FinlandClientBBPS

    AREVA reactor building SIEMENS turbine hall

    Hours s ent with hour char e rates

    all materials and third-party services (cost plus fee)

    no major contracts Cost plus fee

    Page 13

    Bilfinger Berger Capital Markets Day December 2, 2010

  • 8/7/2019 CMD_02122010_Diehl_final

    14/28

    7. Competitive differentiators and success factors-

    Coal-Fired Power Plants

    g er processtemperatures and

    pressures er

    kWh

    Process temperature

    nc

    y

    increase netEfficiency andreduce CO2 emissions. m

    CO2

    effici

    require better materialswith higher demandsfor develo ment

    g

    r

    manufacturing andfabrication.

    Page 14

    Bilfinger Berger Capital Markets Day December 2, 2010

  • 8/7/2019 CMD_02122010_Diehl_final

    15/28

    7. Competitive differentiators and success factors

    know-how from

    Mannesmann Anlagenbau (MAB),

    Babcock Rohrbau, today BHR

    Vallourec & Mannesmann (V&M), formerlyMannesmann Rhrenwerke

    Global leader in e ui in ower lants with

    seamless pipes for high-pressure piping systems

    Joint research ro ects with Vallourec &Mannesmann (V&M)

    Ongoing development and improvement of pipe

    materials (V&M) and their process technologies

    Page 15

    Bilfinger Berger Capital Markets Day December 2, 2010

    (BHR)

  • 8/7/2019 CMD_02122010_Diehl_final

    16/28

    7. Competitive differentiators and success factors

    Pressure sur e calculation

    Process engineering and design calculation

    of the main steam piping system

    max. 150 milliseconds

    approx. 210 km/h

    Page 16

    Bilfinger Berger Capital Markets Day December 2, 2010

  • 8/7/2019 CMD_02122010_Diehl_final

    17/28

    7. Competitive differentiators and success factors

    Control of forces and loads

    Detail engineering and calculation

    Transfer of forces and loads into the

    building steel structure by means of Lisega

    Rigids

    Constantangers

    Shock absorbers

    Spring hangers

    Page 17

    Bilfinger Berger Capital Markets Day December 2, 2010

  • 8/7/2019 CMD_02122010_Diehl_final

    18/28

    7. Competitive differentiators and success factors

    The key technologies

    Inductive bending

    SAW socket welding

    Submerged arc welding (SAW)

    SAW-narrow gap welding

    Weld claddin

    Inert- as tun sten-arc weldin TIG

    Manual arc welding

    TIG pulse orbital narrow gap welding

    Material testing non-destructive / destructive

    Page 18

    Bilfinger Berger Capital Markets Day December 2, 2010

  • 8/7/2019 CMD_02122010_Diehl_final

    19/28

    7. Competitive differentiators and success factors

    Pipe bends

    Production of bends with

    flow optimised radii

    = minimised pressure loss

    Reduction of number of welds

    = increased benefit

    Page 19

    Bilfinger Berger Capital Markets Day December 2, 2010

  • 8/7/2019 CMD_02122010_Diehl_final

    20/28

    7. Competitive differentiators and success factors

    Movie Inductive Bending

    Page 20

    Bilfinger Berger Capital Markets Day December 2, 2010

  • 8/7/2019 CMD_02122010_Diehl_final

    21/28

    7. Competitive differentiators and success factors

    Coal- and lignite-fired big sized

    Number of power plant units (14)

    power plant new builds in Germany

    Number of BHR projects (12)

    Page 21

    Bilfinger Berger Capital Markets Day December 2, 2010

  • 8/7/2019 CMD_02122010_Diehl_final

    22/28

    8. References-

    Olkiluoto 3, Finland, EPR 1,600 MWe

    Page 22

    Bilfinger Berger Capital Markets Day December 2, 2010

  • 8/7/2019 CMD_02122010_Diehl_final

    23/28

    8. References-

    Olkiluoto 3, Finland, EPR 1,600 MWe

    Page 23

    Bilfinger Berger Capital Markets Day December 2, 2010

  • 8/7/2019 CMD_02122010_Diehl_final

    24/28

    8. References-

    Olkiluoto 3, Finland, EPR 1,600 MWe

    main steamsilencer

    steam generator

    pressurization system

    safety injection system

    feed water

    nuclear reactor containment

    reactor coolant system

    Page 24

    Bilfinger Berger Capital Markets Day December 2, 2010

  • 8/7/2019 CMD_02122010_Diehl_final

    25/28

    8. References-

    Water / Steam Cycles

    Page 25

    Bilfinger Berger Capital Markets Day December 2, 2010

    Photo: Siemens press release

  • 8/7/2019 CMD_02122010_Diehl_final

    26/28

    8. References-

    Water / Steam Cycles

    Page 26

    Bilfinger Berger Capital Markets Day December 2, 2010

  • 8/7/2019 CMD_02122010_Diehl_final

    27/28

    8. References

    Steel pipes for offshore foundations

    Page 27

    Bilfinger Berger Capital Markets Day December 2, 2010

  • 8/7/2019 CMD_02122010_Diehl_final

    28/28

    Strong arguments for a successful expansionof the share in the worldwide power piping market

    Thank you for your attention