Coal Mills Type - XRP 963 Make - C. E. Capacity - 48 TPH(100MW) Current - 50 amps No. of Coal Mills - 8 Feeder Type - Gravimetric Bunker Capacity - 800 T

Transcript of CM Presentation

Page 1: CM Presentation

Coal Mills

Type - XRP 963

Make - C. E.

Capacity - 48 TPH(100MW)

Current - 50 amps

No. of Coal Mills - 8

Feeder Type - Gravimetric

Bunker Capacity - 800 T

Page 2: CM Presentation

Coal Mills and Coal Feeders

• Pulveriser consists of grinding chamber with a classifier mounted above it. The pulverising takes place in a rotating bowl in which centrifugal force is utilised to move the coal, delivered by the feeder, outward against the grinding ring.

• Gravimetric coal feeders is provided to supply coal to coal burners in boiler. Feed rate is controlled by combustion control.

Page 3: CM Presentation
Page 4: CM Presentation
Page 5: CM Presentation

LUBRICATION SYSTEM OF COAL MILL

• The Pulveriser design uses separate oil lubrication system for the main gear case drive and bearings and for each journal.

• It consists of motor driven oil pump, a duplex oil filter, a supply header and the necessary piping and valves to distribute the oil to the bearings.

• Two lube oil coolers are installed on both sides of the gear housing.

Page 6: CM Presentation
Page 7: CM Presentation

SEAL AIR SYSTEM

• Pulveriser uses seal air to surround bowl-hub to prevent hot air and coal dust from escaping to the atmosphere or contaminating the gear housing

• Feeder seal air system is used to prevent air and coal dust from escaping to the atmosphere

• 6 seal air fans (Two low capacity and one hi capacity each side)

Page 8: CM Presentation
Page 9: CM Presentation
Page 10: CM Presentation
Page 11: CM Presentation

COAL MILL PROTECTIONS

1.Emergency lockout operated2.PA header pressure lo-lo3.Seal air to PA header pressure low4.Lube oil pump tripping5.MDV (Mill Discharge Valve) closed6.Bowl DP high7.Coal air temp high

Page 12: CM Presentation

COAL MILL START PERMISSIVES

1.Pulveriser / feeder permit (Ignition Permit)2.Pulveriser temperature ok3.Feeder switch in remote4.PA permit 5.No pulveriser trip command6.Mill discharge valve open7.Cold air gate open8.Lube oil pressure ok9.Lube oil level adequate

Page 13: CM Presentation

COAL MILL ELECTRICAL SUPPLY

CM 5A/C/E/G - 6.6kV UNIT BUS 5ACM 5B/D/F/H - 6.6kV UNIT BUS 5BLOP 5A/B/C/D - EMERGENCY SWGR 5ALOP 5E/F/G/H - EMERGENCY SWGR 5B