Cluster D Projects• ORCA-BEN (RENCI, Duke)
– ORCA control framework, clearinghouse– BEN experimental optical network
• DOME (UMass – Amherst)– Outdoor, mobile testbed
• ViSE (UMass – Amherst)– Wireless sensor and actuator network
• Kansei (Ohio State, Wayne State)– Sensor networks
• Embedded Real-Time Measurements– Cross-layer, real-time measurements– Recently joined cluster, ready to begin prototyping
phase
Sponsored by the National Science Foundation 3March 31, 2009
Cluster D Tasks to End of Spiral 1
• Overall: on track to end of Spiral 1
• ORCA– Release ORCA code (completed)– Setup clearinghouse at RENCI (due 8/1, on track)
Sponsored by the National Science Foundation 4March 31, 2009
Cluster D Tasks to End of Spiral 1 • Each substrate project (BEN, DOME, ViSE, Kansei)
– Setup local container of ORCA actors, including broker (completed)
– Formulate resource description and policies for substrate (completed)
– Integrate researcher portal and substrate with ORCA actors (completed) (BEN includes stitching with NLR)
– Move broker to RENCI (on track, due 8/1 – 9/1) (Kansei has separate broker at Wayne State)
– Layer 2 connection to I2 backbone (due 10/1, some issues) (BEN has connection to NLR)
– Allow other GENI researchers (due 10/1, on track)
Sponsored by the National Science Foundation 5March 31, 2009
Cluster D Spiral 2 Roadmap Process
• Aim for GENI Spiral 2 goals– Most important: “Live Experiments”
• Roadmap for Spiral 2 completed• Each item rated
– Critical– Important– Not Important
Sponsored by the National Science Foundation 6March 31, 2009
ORCA Spiral 2 Roadmap Items
• ORCA code (one C, four I items)• ORCA clearinghouse (one C, one I items)• Resource description mechanisms (C) (early Spiral 2)• Resource discovery mechanism (I) (mid Spiral 2)• VLAN connections to I2 (I) (early Spiral 2)• VLANs stitched between multiple testbeds (I) (mid
Spiral 2)• Experiment control tools (portals) and Srvc Mgr for
experiments across multiple testbeds (I)• Interface on Srvc Mgr for external exp cntrl tools (I)• Instrumentation improvements, repository (I) (end
Spiral 2)