Cluster D Outbrief GENI Engineering Conference 5 Seattle, WA

6
Sponsored by the National Science Foundation Cluster D Outbrief GENI Engineering Conference 5 Seattle, WA July 22, 2009 www.geni.net

description

Cluster D Outbrief GENI Engineering Conference 5 Seattle, WA. July 22, 2009 www.geni.net. Cluster D Projects. ORCA-BEN (RENCI, Duke) ORCA control framework, clearinghouse BEN experimental optical network DOME (UMass – Amherst) Outdoor, mobile testbed ViSE (UMass – Amherst) - PowerPoint PPT Presentation

Transcript of Cluster D Outbrief GENI Engineering Conference 5 Seattle, WA

Page 1: Cluster D Outbrief GENI Engineering Conference 5 Seattle, WA

Sponsored by the National Science Foundation

Cluster D OutbriefGENI Engineering Conference 5

Seattle, WA

July 22, 2009www.geni.net

Page 2: Cluster D Outbrief GENI Engineering Conference 5 Seattle, WA

Sponsored by the National Science Foundation 2March 31, 2009

Cluster D Projects• ORCA-BEN (RENCI, Duke)

– ORCA control framework, clearinghouse– BEN experimental optical network

• DOME (UMass – Amherst)– Outdoor, mobile testbed

• ViSE (UMass – Amherst)– Wireless sensor and actuator network

• Kansei (Ohio State, Wayne State)– Sensor networks

• Embedded Real-Time Measurements– Cross-layer, real-time measurements– Recently joined cluster, ready to begin prototyping

phase

Page 3: Cluster D Outbrief GENI Engineering Conference 5 Seattle, WA

Sponsored by the National Science Foundation 3March 31, 2009

Cluster D Tasks to End of Spiral 1

• Overall: on track to end of Spiral 1

• ORCA– Release ORCA code (completed)– Setup clearinghouse at RENCI (due 8/1, on track)

Page 4: Cluster D Outbrief GENI Engineering Conference 5 Seattle, WA

Sponsored by the National Science Foundation 4March 31, 2009

Cluster D Tasks to End of Spiral 1 • Each substrate project (BEN, DOME, ViSE, Kansei)

– Setup local container of ORCA actors, including broker (completed)

– Formulate resource description and policies for substrate (completed)

– Integrate researcher portal and substrate with ORCA actors (completed) (BEN includes stitching with NLR)

– Move broker to RENCI (on track, due 8/1 – 9/1) (Kansei has separate broker at Wayne State)

– Layer 2 connection to I2 backbone (due 10/1, some issues) (BEN has connection to NLR)

– Allow other GENI researchers (due 10/1, on track)

Page 5: Cluster D Outbrief GENI Engineering Conference 5 Seattle, WA

Sponsored by the National Science Foundation 5March 31, 2009

Cluster D Spiral 2 Roadmap Process

• Aim for GENI Spiral 2 goals– Most important: “Live Experiments”

• Roadmap for Spiral 2 completed• Each item rated

– Critical– Important– Not Important

Page 6: Cluster D Outbrief GENI Engineering Conference 5 Seattle, WA

Sponsored by the National Science Foundation 6March 31, 2009

ORCA Spiral 2 Roadmap Items

• ORCA code (one C, four I items)• ORCA clearinghouse (one C, one I items)• Resource description mechanisms (C) (early Spiral 2)• Resource discovery mechanism (I) (mid Spiral 2)• VLAN connections to I2 (I) (early Spiral 2)• VLANs stitched between multiple testbeds (I) (mid

Spiral 2)• Experiment control tools (portals) and Srvc Mgr for

experiments across multiple testbeds (I)• Interface on Srvc Mgr for external exp cntrl tools (I)• Instrumentation improvements, repository (I) (end

Spiral 2)