CLS Control System Progress Report Elder Matias Canadian Light Source University of Saskatchewan...

10
CLS Control System Progress Report Elder Matias Canadian Light Source University of Saskatchewan Saskatoon Saskatchewan

Transcript of CLS Control System Progress Report Elder Matias Canadian Light Source University of Saskatchewan...

Page 1: CLS Control System Progress Report Elder Matias Canadian Light Source University of Saskatchewan Saskatoon Saskatchewan.

CLS Control SystemProgress Report

Elder Matias

Canadian Light Source

University of Saskatchewan

Saskatoon Saskatchewan

Page 2: CLS Control System Progress Report Elder Matias Canadian Light Source University of Saskatchewan Saskatoon Saskatchewan.

• EPICS Environment– EPICS 3.14

– Development: RedHat Linux 7.2

– Servers: RedHat Linux 7.2

– OPI: RedHat Linux 7.2MS-Windows 2000

– IOC: RTEMSRedHat Linux 7.2

- PLC: MODICON MomentumS7/300 or S7/400

Page 3: CLS Control System Progress Report Elder Matias Canadian Light Source University of Saskatchewan Saskatoon Saskatchewan.

• Linac – Complete– Old CAMAC and NeXT hardware replaced.– Modulator control and most vacuum control

converted to MODICON Momentum PLC hardware• IOC connection: MODBUS over Ethernet

– Old Power supplies upgraded with single board computers running IOC software.

– NI FieldPoint used for slow parameters• IOC Connection: RS-232

Page 4: CLS Control System Progress Report Elder Matias Canadian Light Source University of Saskatchewan Saskatoon Saskatchewan.

• Booster– Nearly complete– Vacuum control using MODICON Momentum– Diagnostics using VME hardware and

PowerEdge Server/Linux– RF Control using S7/300 hardware

• link to EPICS still under development

– Magnet Power Supplies controlled over RS232

Page 5: CLS Control System Progress Report Elder Matias Canadian Light Source University of Saskatchewan Saskatoon Saskatchewan.

• Storage Ring, Beamlines– System Design and Implementation has started– Based on similar technologies and design

strategies to linac and booster

– Motor control on beamlines will be based on the CLS standard motor control hardware

Page 6: CLS Control System Progress Report Elder Matias Canadian Light Source University of Saskatchewan Saskatoon Saskatchewan.

• Control Room Software– The Canadian Nuclear Safety Commission

requires CLS to conduct detailed task analysis, this activity is driving our operator screen layouts

– EDM has been selected for operator consoles under Linux

– Standard EPICS applications (strip tool, alarm handler etc.) are being used

– Augmented with some customizations or custom applications

– Some specialised applications running under MS-Windows 2000

Page 7: CLS Control System Progress Report Elder Matias Canadian Light Source University of Saskatchewan Saskatoon Saskatchewan.

• Services– HVAC and Cooling Towers with Invensys DMS

complete, integration with EPICS postponed– Secondary Cooling System - MODICON

Momentum and NI FieldPoint – complete– Power Metering/Transformer Control – under

development– Cryogenics Plant - S7/400 - under development

Page 8: CLS Control System Progress Report Elder Matias Canadian Light Source University of Saskatchewan Saskatoon Saskatchewan.
Page 9: CLS Control System Progress Report Elder Matias Canadian Light Source University of Saskatchewan Saskatoon Saskatchewan.

1. E-gun and 1. E-gun and Linear Linear

AcceleratorAccelerator

2. Transfer Line 2. Transfer Line & Booster ring& Booster ring

3. Storage ring3. Storage ring

4. Beamline & 4. Beamline & end stationend station

Page 10: CLS Control System Progress Report Elder Matias Canadian Light Source University of Saskatchewan Saskatoon Saskatchewan.

Existing Linear Accelerator