1
Non-Technical Data—Releasable to Foreign Persons
Closed Loop Requirements Verification Planning using Requirements Management Tools
![Page 2: Closed Loop Requirements Verification Planning using ...](https://reader036.fdocuments.in/reader036/viewer/2022062303/62a6057869eb6c02e83e6aba/html5/thumbnails/2.jpg)
2
Agenda
• Background
• Objective
• Approach
• Accomplishment
• Conclusion
Non-Technical Data—Releasable to Foreign Persons
![Page 3: Closed Loop Requirements Verification Planning using ...](https://reader036.fdocuments.in/reader036/viewer/2022062303/62a6057869eb6c02e83e6aba/html5/thumbnails/3.jpg)
3
What is Closed Loop Requirements Verification?
Bi-directional traceability of requirements to design features and A, D, I, T, activities that verify compliance of design with requirements.
Verification Plan
Compliance Report
Results
• Mapping of specification requirements to verification activities is basis for requirements verification plan; plan is supported by:
• Asset utilization matrix
• Requirements verification matrix
• Results of verification activities are captured in reports that evaluate performance against A, D, I, T objectives
• Compliance reports provide phase gate assessments of design compliance and culminate in final compliance report at FCA
A = Analysis D = Demonstration I = Inspection T = Test
FCA = Functional Configuration Audit
Non-Technical Data—Releasable to Foreign Persons
![Page 4: Closed Loop Requirements Verification Planning using ...](https://reader036.fdocuments.in/reader036/viewer/2022062303/62a6057869eb6c02e83e6aba/html5/thumbnails/4.jpg)
4
Agenda
• Background
• Objective
• Approach
• Accomplishment
• Conclusion
Non-Technical Data—Releasable to Foreign Persons
![Page 5: Closed Loop Requirements Verification Planning using ...](https://reader036.fdocuments.in/reader036/viewer/2022062303/62a6057869eb6c02e83e6aba/html5/thumbnails/5.jpg)
5
Project Objectives
Provide ability to map requirements to their verification plans and results bi-directionally
• Ensure each requirement supported by Verification Event
• Plan Verification Events to efficiently cover Verification Objectives
• Assess impact of requirements changes on Verification Plans
• Assess impact of Verification Plan changes on ability to verify requirements
• Ensure that each requirement traceable to verification results
• Evaluate risk due to product maturity
– Risk = maturity = level to which requirements have been verified
• Communicate
– All plan elements to all stakeholders (SE, Customer, Design, Test, and Analysis)
– Ensure use of consistent nomenclature throughout project
- No requirements corruptions during verification cycle
- Reworded requirement may be interpreted as different requirement
Non-Technical Data—Releasable to Foreign Persons
![Page 6: Closed Loop Requirements Verification Planning using ...](https://reader036.fdocuments.in/reader036/viewer/2022062303/62a6057869eb6c02e83e6aba/html5/thumbnails/6.jpg)
6
Agenda
• Background
• Objective
• Approach
• Accomplishment
• Conclusion
Non-Technical Data—Releasable to Foreign Persons
![Page 7: Closed Loop Requirements Verification Planning using ...](https://reader036.fdocuments.in/reader036/viewer/2022062303/62a6057869eb6c02e83e6aba/html5/thumbnails/7.jpg)
7
Project Approach
Build on Standard Tools and Processes
• Use existing Requirements Management Tool
• Support existing CMMI Level III, AS9100/ISO 9001 processes
• Develop automated reports to fill common needs
• Requirements Verification Matrix
• Requirements Verification Plan
• Verification event Objectives
• Functional Configuration Audit
CMMI = (Capability Maturity Model® Integration) ISO = International Standards Organization QMS = Quality Management System
Non-Technical Data—Releasable to Foreign Persons
![Page 8: Closed Loop Requirements Verification Planning using ...](https://reader036.fdocuments.in/reader036/viewer/2022062303/62a6057869eb6c02e83e6aba/html5/thumbnails/8.jpg)
8
Agenda
• Background
• Objective
• Approach
• Accomplishment
• Conclusion
Non-Technical Data—Releasable to Foreign Persons
![Page 9: Closed Loop Requirements Verification Planning using ...](https://reader036.fdocuments.in/reader036/viewer/2022062303/62a6057869eb6c02e83e6aba/html5/thumbnails/9.jpg)
9
Requirements Verification Matrix Development
Verification Plan
Compliance Report
Results
• Initial Program Plan
• Customer Technical Requirements
• Standard Capabilities
• Analyze Program Plan for verification timing (phase) needs
• Analyze Customer Technical Requirements for verification technical needs
• Analyze Program Plan and Standard Capabilities for availability of verification resources
Requirements Verification Matrix (see next slide)
Non-Technical Data—Releasable to Foreign Persons
![Page 10: Closed Loop Requirements Verification Planning using ...](https://reader036.fdocuments.in/reader036/viewer/2022062303/62a6057869eb6c02e83e6aba/html5/thumbnails/10.jpg)
10
Requirements Verification Matrix Outputs
Standard RVM for
Specification Documents
Analyst View in Systems
Engineering Tool
Export to EXCEL for
other groups
Non-Technical Data—Releasable to Foreign Persons
![Page 11: Closed Loop Requirements Verification Planning using ...](https://reader036.fdocuments.in/reader036/viewer/2022062303/62a6057869eb6c02e83e6aba/html5/thumbnails/11.jpg)
11
Requirements Verification Plan Development
Verification Plan
Compliance Report
Results
• Detailed Program Schedules
• Requirements Verification Matrix
• Preliminary Design Information
• Update verification timing needs analysis
• Update verification technical needs analysis
• Create Verification Objectives for requirements
• Assign Verification Objectives to Verification Events
• Requirements Verification Plan
• Verification Objectives
Non-Technical Data—Releasable to Foreign Persons
![Page 12: Closed Loop Requirements Verification Planning using ...](https://reader036.fdocuments.in/reader036/viewer/2022062303/62a6057869eb6c02e83e6aba/html5/thumbnails/12.jpg)
12
Requirements Verification Plan Report
Method, Verification Event by Phase
Methods, identified in RVM but not used,
flagged
Non-Technical Data—Releasable to Foreign Persons
![Page 13: Closed Loop Requirements Verification Planning using ...](https://reader036.fdocuments.in/reader036/viewer/2022062303/62a6057869eb6c02e83e6aba/html5/thumbnails/13.jpg)
13
Objectives Matrix Report
Insert Objectives at beginning of plan and report:
•Analysis •Demonstration •Inspection or •Test
Non-Technical Data—Releasable to Foreign Persons
![Page 14: Closed Loop Requirements Verification Planning using ...](https://reader036.fdocuments.in/reader036/viewer/2022062303/62a6057869eb6c02e83e6aba/html5/thumbnails/14.jpg)
14
Requirements Verification Execution
• Requirements Verification Plan
• Verification Objectives
• Prepare Verification Event Plan
• Verification Objectives
• Special equipment needs
• Staffing • Facilities required • Security
considerations • Safety
considerations
• Perform the verification • Analysis • Demonstration • Inspection or • Test
• Requirements Verification Report
• Verification Objectives
• Verification Results
Non-Technical Data—Releasable to Foreign Persons
![Page 15: Closed Loop Requirements Verification Planning using ...](https://reader036.fdocuments.in/reader036/viewer/2022062303/62a6057869eb6c02e83e6aba/html5/thumbnails/15.jpg)
15
Functional Configuration Audit
• Requirements in Database
• Verification Events & Objectives in Database
• Verification Reports in Configuration Management
• Run the tool
• Functional Configuration Audit Report
Non-Technical Data—Releasable to Foreign Persons
![Page 16: Closed Loop Requirements Verification Planning using ...](https://reader036.fdocuments.in/reader036/viewer/2022062303/62a6057869eb6c02e83e6aba/html5/thumbnails/16.jpg)
16
Functional Configuration Audit Report
Click the link to go to configuration managed report
Non-Technical Data—Releasable to Foreign Persons
![Page 17: Closed Loop Requirements Verification Planning using ...](https://reader036.fdocuments.in/reader036/viewer/2022062303/62a6057869eb6c02e83e6aba/html5/thumbnails/17.jpg)
17
Agenda
• Background
• Objective
• Approach
• Accomplishment
• Conclusion
Non-Technical Data—Releasable to Foreign Persons
![Page 18: Closed Loop Requirements Verification Planning using ...](https://reader036.fdocuments.in/reader036/viewer/2022062303/62a6057869eb6c02e83e6aba/html5/thumbnails/18.jpg)
18
Conclusion
Provide ability to map requirements to their verification plans and results bi-directionally
Ensure each requirement supported by Verification Event
Plan Verification Events to efficiently cover Verification Objectives
Assess impact of requirements changes on Verification Plans
Assess impact of Verification Plan changes on ability to verify requirements
Ensure that each requirement traceable to verification results
Evaluate risk due to product maturity
Risk = maturity = level to which requirements have been verified
Ensure use of consistent nomenclature throughout project
No requirements corruptions during verification cycle
Reworded requirement may be interpreted as different requirement
Non-Technical Data—Releasable to Foreign Persons
![Page 19: Closed Loop Requirements Verification Planning using ...](https://reader036.fdocuments.in/reader036/viewer/2022062303/62a6057869eb6c02e83e6aba/html5/thumbnails/19.jpg)
19
Acknowledgements
•Project Sponsor: Mr James Kalberer •Teamcenter Systems Engineering Technical Wizardry: Ms Krista Vilandre
Non-Technical Data—Releasable to Foreign Persons
![Page 20: Closed Loop Requirements Verification Planning using ...](https://reader036.fdocuments.in/reader036/viewer/2022062303/62a6057869eb6c02e83e6aba/html5/thumbnails/20.jpg)
20
Closed Loop Requirements Verification Planning
Verification Plan
Compliance Report
Results
Non-Technical Data—Releasable to Foreign Persons
![Page 21: Closed Loop Requirements Verification Planning using ...](https://reader036.fdocuments.in/reader036/viewer/2022062303/62a6057869eb6c02e83e6aba/html5/thumbnails/21.jpg)
21
Contact information: • Name: Robert S. Hunter • Phone Number: 763-744-5013 • Company: ATK Advanced Weapons Abstract ID Number: