Clinisys Bid By Carmen Lee Cameron Lake Bello Sulieman Nish Chandradas Joss Coombes.

13
Clinisys Bid By Carmen Lee Cameron Lake Bello Sulieman Nish Chandradas Joss Coombes

Transcript of Clinisys Bid By Carmen Lee Cameron Lake Bello Sulieman Nish Chandradas Joss Coombes.

Page 1: Clinisys Bid By Carmen Lee Cameron Lake Bello Sulieman Nish Chandradas Joss Coombes.

Clinisys BidBy Carmen LeeCameron LakeBello Sulieman

Nish ChandradasJoss Coombes

Page 2: Clinisys Bid By Carmen Lee Cameron Lake Bello Sulieman Nish Chandradas Joss Coombes.

Work Break down Structure

Page 3: Clinisys Bid By Carmen Lee Cameron Lake Bello Sulieman Nish Chandradas Joss Coombes.

Gantt ChartDevelopment type

Software Size Team Size

Development life-cycle

Page 4: Clinisys Bid By Carmen Lee Cameron Lake Bello Sulieman Nish Chandradas Joss Coombes.

1. PLANNING: 15%

2. DESIGN: 14%

3. CODE: 45%

4. TEST: 19%

5. TRANS: 7%

Development cycleTeam Size

1. PLANNING: 13%

2. DESIGN: 16%

3. CODE: 42%

4. TEST:

25%

5. TRANS: 8%

Software Size1. PLANNING: 14%

2. DESIGN: 15%

3. CODE: 43.5%

4. TEST:

19%

5. TRANS: 8.5%

1. PLANNING: 14%

2. DESIGN: 12%

3. CODE: 48%

4. TEST:

18%

5. TRANS: 8%

Development Type

Page 5: Clinisys Bid By Carmen Lee Cameron Lake Bello Sulieman Nish Chandradas Joss Coombes.

Gantt Chart1. PLANNING: 14%

2. DESIGN:

14.25%

3. CODE:

44.625%

4. TEST:

20.25%

5. TRANS:

6.875%

4.6 months

4.7 months

14.7 months

6.7 months

2.2 months

Page 6: Clinisys Bid By Carmen Lee Cameron Lake Bello Sulieman Nish Chandradas Joss Coombes.

Gantt Chart

Page 7: Clinisys Bid By Carmen Lee Cameron Lake Bello Sulieman Nish Chandradas Joss Coombes.

Pert Chart

Page 8: Clinisys Bid By Carmen Lee Cameron Lake Bello Sulieman Nish Chandradas Joss Coombes.

CostsCost of labour:1 Project manager for 2.7 years = £288,457.201 Analyst for 4 months = £30,3942 Programmers for 14 months = £212,7581 Tester for 8 months = £31,666.664 Technicians for 2.5 months = £28,155Total salaries = £591,430.86 for whole project

Page 9: Clinisys Bid By Carmen Lee Cameron Lake Bello Sulieman Nish Chandradas Joss Coombes.

Cost of overheads:Average electricity costs = £1127 British Gas

standard tariff per year (electricityprices.org.uk)

Average rent cost of an office in London = £2000 pcm (ukbusinessforums.co.uk)

Total overheads for 2.7 years = £67,842.90

Cost of Overheads

Page 10: Clinisys Bid By Carmen Lee Cameron Lake Bello Sulieman Nish Chandradas Joss Coombes.

Overall costsLabour = £ 591,430.86Overheads = £67,842.90

Labour + Overheads = £659,273.76 for the whole project.

Overall Cost for Project

Page 11: Clinisys Bid By Carmen Lee Cameron Lake Bello Sulieman Nish Chandradas Joss Coombes.

Risk Management

• Risk Register– Identified Risks– Potential Impact and level of risk– Management Approach

• Monitoring by project manager– Daily– Reclassification and updates– Weekly risk status reports

Page 12: Clinisys Bid By Carmen Lee Cameron Lake Bello Sulieman Nish Chandradas Joss Coombes.

Primary Risks and Countermeasures

• Budget Limitation– PM will work with client to minimise costs and monitor

expenditure throughout project. • Disrupted service due to implementation/lack of familiarity

with systems– Staff will receive training plans before implementation.

Installation will be optimised to protect service• Loss of Key Staff

– Project team motivated by benefits. All positions covered by team member and contingency in event of unforeseen absence.