Page 1: CLIMATE CHANGE – WASTE MINIMISATION IN  THERMAL POWER GENERATION

CLIMATE CHANGE – WASTE MINIMISATION IN THERMAL POWER GENERATION

ByDr V S S BHASKARA MURTY

Former Director & Advisor (Env Mgt)NATIONAL PRODUCTIVITY COUNCIL

CHENNAI

January 20. 2012

NATIONAL POWER TRAINING INSTITIUTE, NAGPUR1

Page 2: CLIMATE CHANGE – WASTE MINIMISATION IN  THERMAL POWER GENERATION

V.S.S.Bhaskara Murty M.Tech (Chem Engg)

Former Director & Advisor (Env Mgt) Ambedkar Institute of Productivity

National Productivity Council, Chennai

Advanced Training inEnvironmental Protection at W GermanyPedagogic Training at AIT, BangkokEnvironmental Audit and ISO14000

More than 35 Years experience in consultancy and Man Power Training2

Page 3: CLIMATE CHANGE – WASTE MINIMISATION IN  THERMAL POWER GENERATION

ENVIRONMENTAL PROTECTIONPRINCIPLE

VSSB

Law of Thermodynamics ……

ENERGY NEITHER CAN BE CREATED NOR CAN BEDESTROYED. IT CHANGES FROM ONE FORM TO OTHER..

Law of Environmental protection ……

POLLUTION CAN BE CREATED BUT CANNOT BE DESTROYED. POLLUTION CONTROL AT ONE PART ENVIRONMENT MAY CREATE POLLUTION AT ANOTHER PART OF ENVIRONMENT.

3

Page 4: CLIMATE CHANGE – WASTE MINIMISATION IN  THERMAL POWER GENERATION

ProductNaturalResources

AirEmissions

LandDischarges

Industrial Process

Air

Water

4

Page 5: CLIMATE CHANGE – WASTE MINIMISATION IN  THERMAL POWER GENERATION

THERMAL POWER GENERATION

5

Page 6: CLIMATE CHANGE – WASTE MINIMISATION IN  THERMAL POWER GENERATION

MATERIAL BALANCE

6

Page 7: CLIMATE CHANGE – WASTE MINIMISATION IN  THERMAL POWER GENERATION

COAL QUALITY – INDIAN & USA

7

Page 8: CLIMATE CHANGE – WASTE MINIMISATION IN  THERMAL POWER GENERATION

8

Page 9: CLIMATE CHANGE – WASTE MINIMISATION IN  THERMAL POWER GENERATION

9

Page 10: CLIMATE CHANGE – WASTE MINIMISATION IN  THERMAL POWER GENERATION

Supercritical Pressure Coal-Fired Thermal Power Plant

10

Page 11: CLIMATE CHANGE – WASTE MINIMISATION IN  THERMAL POWER GENERATION

SO2 – Dry Scrubbing Flow Diagram of CFBC Boiler

11

Page 12: CLIMATE CHANGE – WASTE MINIMISATION IN  THERMAL POWER GENERATION

SO2 – Wet Scrubbing

12

Page 13: CLIMATE CHANGE – WASTE MINIMISATION IN  THERMAL POWER GENERATION

Super Thermal Power Station – Franken AG, Nürnberg, Germany

Boiler Capacity: 2 x 200 MWFlue Gas Volume: 15,00,000 M3/hrSulfur Dioxide at Inlet: 2,000 – 2,500 mg/M3

Sulfur Dioxide at Outlet: < 200 mg/M3

Sulfur Dioxide Removal y: 90 %Lime Stone Consumption: 3,500 kg/hrGypsum Production: 5,800 kg/hr

13

Page 14: CLIMATE CHANGE – WASTE MINIMISATION IN  THERMAL POWER GENERATION

14

Page 15: CLIMATE CHANGE – WASTE MINIMISATION IN  THERMAL POWER GENERATION

VOLKLINGEN POWER STATION, GERMANY

15

Page 16: CLIMATE CHANGE – WASTE MINIMISATION IN  THERMAL POWER GENERATION

CleanFlue Gases

Flue GasDesulfuri -sation Unit

Atmospheric Air Atmospheric Air

Flue Gasesfrom ESP

LimeGypsum

100 m

16

Page 17: CLIMATE CHANGE – WASTE MINIMISATION IN  THERMAL POWER GENERATION

17

Page 18: CLIMATE CHANGE – WASTE MINIMISATION IN  THERMAL POWER GENERATION

SCR Reactor

Heater

Steam

SO2 Converter

Clean Gas

Air

Sulfuric Acid

Combustion Air

Cooling WaterAcid Condenser

Acid Recycle Vessel

WSACondenser

Flue Gas

Bag Filter

Air

Fuel

Start up Burner

Heat Exchanger

Mixer

Air

NH3

Fly Ash

2 NO + 2 NH3 + ½ O2 2 N2 + 3 H2O

2 SO2 + O2 SO3

SO3 + H2O H2SO4

18

Page 19: CLIMATE CHANGE – WASTE MINIMISATION IN  THERMAL POWER GENERATION

SNOX Process – Data(Vendsysselvaerket Power Station, Northern Jutland, Denmark)

Boiler Capactiy: 300 MWFlue Gas Volume: 9,00,000 M3/hrCoal/Oil Sulfur Content: 0.5% to 2.5%Desulfurisation Efficiency: 95%DeNOx: 90%Clean Gas Particulate

Matter Concentration: <1 mg/M3

Ammonia Consumption: 0.4 T/hrH2SO4 (95%) Production: 5.2 T/hr

19

Page 20: CLIMATE CHANGE – WASTE MINIMISATION IN  THERMAL POWER GENERATION

WASTE MINIM

ISATION

20

Page 21: CLIMATE CHANGE – WASTE MINIMISATION IN  THERMAL POWER GENERATION

THANK YOU

Bhasakara Murty

[email protected]

21