Client Logo Panther Creek Pool October 4, 2010 2010 Annual Meeting President’s Report.
-
Upload
philippa-adams -
Category
Documents
-
view
214 -
download
1
Transcript of Client Logo Panther Creek Pool October 4, 2010 2010 Annual Meeting President’s Report.
Client Logo
Panther Creek PoolOctober 4, 2010
2010 Annual Meeting
President’s Report
2
Table Of Contents
Summary of Past Year
– Change in Homeowner Assessment Amount
– Maintenance
– Landscape
– Bexar Met Right-of-Way Easement Purchase
– Speed Bumps
– Recycle Program, TDS
Outlook for Upcoming Year
3
Change in Homeowner Assessment Amount
Study conducted to determine appropriate level of annual contribution to reserve account which is used to pay for anticipated maintenance costs such as: Replacement of street lights, pool pump, gates, etc. Repaving streets and parking lots Sidewalk and curb repairs Landscape replacement Other anticipated maintenance
Study indicated need to fund reserve with $75k in 2010
Assessments had to be raised 25% to achieve this level of funding (increase went into effect with January 2010 assessment cycle)
4
Maintenance Performed
Pressure washing of curbs and sidewalks along entry and in front of pool area
Painting and repair to exterior of guard house (work performed compliments of DR Horton)
Repainting of street signs
Installation of Security Cameras in the Pool
Other pool, street light, irrigation, and misc. repairs
5
Landscaping
Removal of dead Bradford pear along entry Replacement is intended but has been delayed due to troubles
finding an appropriately sized tree
Tree trimming (all trees at entry, and inside/around pool and sports court areas
Drainage Ditch Added to Quarterly Maintenance
6
Bexar Met Right-of-Way Easement Purchase
Easement purchase BexarMet Permanent right-of-way easement (approx. 20 ft strip of land
running along Blanco Rd north of Calico Landing) Temporary construction easement along Blanco Rd. north of Calico
Chase Right-of-way easement will be utilized to install a new water main to
convey drinking water from new storage tank near Timberwood Park to northern Stone Oak area
Total purchase price = $2,189.00
7
Aerial of Parcel Sold to Bexar Met for Right-of-Way Easement
8
Speed Bumps
We have records dating back since the inception of the neighborhood with requests for speed bumps
Petition was submitted in July
Caution signs installed at entrance
9
Recycle Program, TDS
Contract was set to expire with Allied, prices were to increase
Numerous complaints about Allied
Many requests for recycling program
Survey done with Allied
Less than 50% of households used the Saturday trash pickup
The average household used 75 gallons of trash
TDS provides “partially automated service”
Service commitments in the contract
10
Outlook for Coming Year
Builder is wrapping up
Sign on Blanco
Pool Furniture
Basketball Court
Committees
Social, Communications, Landscape, Budget, Violations
Increasing board from 3 to 5
11
To receive community updates, please register on our community website at www.panthercreekatstoneoak.com
President Contact Information:
Joe Mann
Mobile: 816.918.8816
Email: [email protected]