CLIC Stabilisation meeting 8
description
Transcript of CLIC Stabilisation meeting 8
![Page 1: CLIC Stabilisation meeting 8](https://reader035.fdocuments.in/reader035/viewer/2022062500/56815aab550346895dc846cd/html5/thumbnails/1.jpg)
CLIC Stabilisation meeting 88/12/2009
Welcome
Newcomers
Some news from the CDR and Module WG
paper “Active control of quadrupole motion for future linear particle colliders” C.Collette et al. , IASTED Intelligent systems and control, November 2009, Cambridge, USA
Vibration Measurements at CESR (USA-Ithaca) in 2009 , M. SylteEDMS 1004462
Ground vibration measurements and Experiment parts motion measurement at CMS, A.KUZMIN, EDMS 1027459
Info:
![Page 2: CLIC Stabilisation meeting 8](https://reader035.fdocuments.in/reader035/viewer/2022062500/56815aab550346895dc846cd/html5/thumbnails/2.jpg)
CLIC Stabilisation meeting 88/12/2009
Special session: Vibration isolation and nano-positioning
Call for papers
Contact: Christophe Collette
![Page 3: CLIC Stabilisation meeting 8](https://reader035.fdocuments.in/reader035/viewer/2022062500/56815aab550346895dc846cd/html5/thumbnails/3.jpg)
CLIC Stabilisation meeting 88/12/2009
• CDR draft writing March-June 2010
• Means providing technical documentation “state of the art” on :• Sensors: performance and measurement techniques• Actuators and precision guiding• Controller• Characterisation Ground motion and vibrations + Characterisation of support and
floor
• Demonstration of technical feasibility
Main goal: Demonstrate technical feasibility of stabilisation
of the CLIC Main beam quadrupoles to 1 nm R.M.S. Integrated displacement at 1 Hz and 5 nm Lateral
![Page 4: CLIC Stabilisation meeting 8](https://reader035.fdocuments.in/reader035/viewer/2022062500/56815aab550346895dc846cd/html5/thumbnails/4.jpg)
CLIC Stabilisation meeting 88/12/2009
CDR 2010 >>>> TDR 2015 TEST MODULE CLEXAccelerator environment
Integration stabilisation in
module
![Page 5: CLIC Stabilisation meeting 8](https://reader035.fdocuments.in/reader035/viewer/2022062500/56815aab550346895dc846cd/html5/thumbnails/5.jpg)
5
Test program
IN LAB(mock-ups with real interface)
IN CLEX(real components)
2010
2011
2012
IN CLEX
IN LAB
3 TEST MODULES
4
1
0
Installation of Three Test Modules requires space of 6030 mm (3x2010)
alignment test
Total – 4 modules Total – 3 modules
B252
B162
Anastasiya Solodko
![Page 6: CLIC Stabilisation meeting 8](https://reader035.fdocuments.in/reader035/viewer/2022062500/56815aab550346895dc846cd/html5/thumbnails/6.jpg)
CLIC Stabilisation meeting 88/12/2009
• Some parts will be dummy parts in the test module and CLEX but the active parts for the stabilisation are considered independent (double)