CLAIMNO. HOte NO. fOOTAGE DATE€¦ · claimno. hote no. footage date 1169818 - ivan56-01 206m...

16
l)! A . .......,..,,m l,——. 42B01NW8S79 13 IVANHOE 010 TQWNSHtPl ivanhoe REPORT NO: 13 WORK PERFORMED FOR: Falconbridge Ltd RECORDED HOLDER: SAME AS ABOVE U t t OTHER l ) CLAIMNO. HOte NO. fOOTAGE DATE 1169818 - IVAN56-01 206m 03/15/92 (1 )' NOTES;, d) REPORT OF WORK # 9360 00049 FILED ON MAY 31 ST 1993

Transcript of CLAIMNO. HOte NO. fOOTAGE DATE€¦ · claimno. hote no. footage date 1169818 - ivan56-01 206m...

Page 1: CLAIMNO. HOte NO. fOOTAGE DATE€¦ · claimno. hote no. footage date 1169818 - ivan56-01 206m 03/15/92 (1 )' notes;, d) report of work # 9360 00049 filed on may 31 st 1993. hole

l)! A . .......,..,,m

l,——. 42B01NW8S79 13 IVANHOE 010

TQWNSHtPl ivanhoe REPORT NO: 13

WORK PERFORMED FOR: Falconbridge Ltd

RECORDED HOLDER: SAME AS ABOVE Ut

t OTHER l )

CLAIMNO. HOte NO. fOOTAGE DATE

1169818 - IVAN56-01 206m 03/15/92 (1 )'

NOTES;, d) REPORT OF WORK # 9360 00049FILED ON MAY 31 ST 1993

Page 2: CLAIMNO. HOte NO. fOOTAGE DATE€¦ · claimno. hote no. footage date 1169818 - ivan56-01 206m 03/15/92 (1 )' notes;, d) report of work # 9360 00049 filed on may 31 st 1993. hole

HOLE NUMBER: IVAN56-01FALCONBRIDGE LIMITED DRILL HOLE RECORD

DATE:IMPERIAL UNITS:

03/09/1993 METRIC UNITS: X

PROJECT NAME: 8201 PROJECT NUMBER: 8201

CLAIM NUMBER: 1169818LOCATION: NE IVANHOE T SP

DATE STARTED: 03/13/1992DATE COMPLETED: 03/15/1992

DATE LOGGED: 04/07/1992

PLOTTING COORDS GRID: UTMNORTH: 5335920.OONEAST: 394885.OOEELEV: 330.00

COLLAR ASTRONOMIC AZIMUTH: 130* O 1 O"

ALTERNATE COORDS GRID: LINENORTH: 77* ON EAST: 58+80E ELEV: 330.00

GRID ASTRONOMIC AZIMUTH: 130* O 1 O"

COLLAR DIP: -50' O- O" LENGTH OF THE HOLE: 206.OOM

START DEPTH: O.OOM FINAL DEPTH: 204.OOM

COLLAR SURVEY: NOROD LOG: NO

HOLE MAKES WATER: NO

PULSE EM SURVEY: NOPLUGGED: NO

HOLE SIZE: BO

CONTRACTOR: NOREX DRILLINGCASING: 52m BU, all pulled.

CORE STORAGE: KIDD MINESITE UTM COORO.:

COMMENTS : To test Ivanhoe grid HLEM "A". WEDGES AT:

DIRECTIONAL DATA:

Depth Astronomic Dip Type of FLAG (M) Azimuth degrees Test

Comments

60.00 127' O' O" -49' O' O" S OK133.00 130' O' O" -49' O' O" S OK203.00 134' O 1 O" -47' O' O" S OK

Depth (M)

Astronomic Dip Type of Azimuth degrees Test

FLAG Comments

MOLE NUMBER: IVAN56-01 DRILL HOLE RECORD LOGGED BY: J. AULTMAN PAGE: 1

Page 3: CLAIMNO. HOte NO. fOOTAGE DATE€¦ · claimno. hote no. footage date 1169818 - ivan56-01 206m 03/15/92 (1 )' notes;, d) report of work # 9360 00049 filed on may 31 st 1993. hole

HOLE NUMBER: WAN56-01 DRILL HOLE RECORD DATE: 03/09/1993

FROM TO

0.00TO

49,65

49.65TO

109.40

109.40TO

159.00

ROCK TYPE

OVERBURDENHobL.

PILLOWEDHAFICS

x2pew(Cb)"

INTER MEDIATETUFF

"3tw(g)w

TEXTURE AND STRUCTURE

-buff-grey-green.-fine grained.

-moderate hardness (easily marked by a scribe).-patchy weak magnetism.-pillow selvages are 1-2cm wide and containchlorite and pillow/breccia fragments.-pillows have amygdutes (O.5X, 1-2mi indiameter).-unit is moderately foliated at 55-60VCA(foliation increases in strength downhole).

weak fracturing parallel to foliation, fracturesare carbonate filled.-sharp irregular lower contact.

-medium grey to black.-fine to medium grained.-unit becomes coarser downhole.

-unit is moderately bedded at 55-60VCA.-graded bedding fines uphole (tops towards thewest).-unit is weakly to moderately foliated parallelto bedding.-slightly fractured at 50-70VCA, crosscuttingbedding. fractures are filled with carbonate.-unit is highly broken and fractured between109. 40- 123. 08m.-area has a large number of fault gouges.-109. 70-109. 75m, 109. 80-109. 81m gouge at 90VCA.-110. 0-113. Om -numerous small (cO.Scm wide) faultgouges at 70-90VCA.

-111. 0-115. Om, weak to moderate carbonaceousalteration - medium dark grey.

-113. 0-114. Om, fault gouges up to 3cm wide at60-80VCA.

-115. 0-117. 6m, 1-2X fault gouges (up to 1cm wide)at 70-80VCA.

-117.6-119.00m, lost core.-122. 15- 123. 08m, fault gouge, unable to determineorientation.

ANGLE TO CA ALTERATION

-moderate pervasive carbonatization.-weak to moderate chloritization.

MINERALIZATION

-trace pyrite and magnetite.

-119.0-121. 50m, 80-90X nodular pyrite(semi-massive).-10X graphitic argillite.

REMARKS

-100. 5-104. 5m, moderately fracture/broken core, groundwater weatheringalong the fractures.

-111. 0-115. Om, weakly conductive.

HOLE NUMBER: IVAN56-01 DRILL HOLE RECORD LOGGED BY: J. AULTMAN PAGE:

Page 4: CLAIMNO. HOte NO. fOOTAGE DATE€¦ · claimno. hote no. footage date 1169818 - ivan56-01 206m 03/15/92 (1 )' notes;, d) report of work # 9360 00049 filed on may 31 st 1993. hole

HOLE NUMBER: IVAN56-01 DRILL HOLE RECORD DATE: 03/09/1993

f ROM TO

159.00TO

206.00

206.00TO

206.00

ROCK TYPE

PILLOWEDMAFICS

*2pew(SO*

E.O.N.

TEXTURE AND STRUCTURE

-126.2S-128.10m, graphitic argillite, weaklyconductive.

-13S.88-136.16m, graphitic argillite, weaklyconductive.

-H3.0-159.0ra, 1-3X lapilli s i led fragments.-157.70-158.00m, graphitic argillite, weaklyconductive.

-buff-grey-green.-fine grained.

-pillowed unit, selvages contain pillow fragmentsand chlorite.-pillows have small (^mm wide) quartz filledamygdules.-unit is weakly fractured (irregularorientation).-fractures are filled with quartz and carbonate.

ANGLE TO CA ALTERATION

-moderate silicification.-weak carbonatization.

MINERALIZATION

trace to O.SX angular pyrrhotitefragments.

-157.70-158.00m, 1-3X fracturecontrolled pyrite.

-trace pyrite.

REMARKS

HOLE NUMBER: IVAN56-01 DRILL HOLE RECORD LOGGED BY: J. AULTMAN PAGE:

Page 5: CLAIMNO. HOte NO. fOOTAGE DATE€¦ · claimno. hote no. footage date 1169818 - ivan56-01 206m 03/15/92 (1 )' notes;, d) report of work # 9360 00049 filed on may 31 st 1993. hole

HOLE NUMBER : IVAN56-01 ASSAYS SHEET DATE! 09/03/1993

Sample

AN00326AN00327ANOOJ28AN00329AN00330AN00331AN00332AN00333AN00334AN003S5AN00336AN00337AN00338AN00339AN00340

From (M)

119.00120.00143.00144.50146.00147.50149.00150.50152.00153.50155.00156.50157.70158.00159.00

To Lm

120.00121.60144.50146.00147.50149.00150.50152.00153.50155.00156.50157.70158.00159.00160.50

ens. H)

.00

.60

.50

.50

.50

.50

.50

.50

.50

.50

.50

.205.30.00.50

Cu ppm

514765625958616057586255635636

Zn ppm

2321878876878577888582891033312963

Au Pf*

27210000000000000

A Pf

0.0.0.0.0.0.0.0.0.0.0.0.0.0.0.

J Pbn ppm

i 5! 6

1111111

2019

1415

Co Hi Pt Pd ppm ppn ppb ppb

162222717275757374776878651009370

HOLE NUMBER: WAN56-01 ASSAYS SHEET PAGE:

Page 6: CLAIMNO. HOte NO. fOOTAGE DATE€¦ · claimno. hote no. footage date 1169818 - ivan56-01 206m 03/15/92 (1 )' notes;, d) report of work # 9360 00049 filed on may 31 st 1993. hole

HOLE NUMBER : IVAN56-01 GEOCHEMICAL ASSAY DATE: 09/03/1993

Smple

AN00211 AN00212 AN00213 AN00214 AN00215 AN00216

From To Leng.int \ni

56.00 59.00 3.00 74.00 77.00 3.00 92.00 95.00 3.00

137.00 140.00 3.00 167.00 170.00 3.00 200.00 203.00 3.00

SI02 AL203

60.22 15.12 59.82 15.00 58.89 15.00 57.51 15.32 61.49 15.50 60.17 15.72

CAO

3.86 5.44 5.68 7.49 6.37 6.01

MGO

3.78 3.81 4.00 3.40 3.45 3.97

NA20

4.10 4.01 3.87 2.30 2.93 3.08

K20 FE203

1.14 6.39 0.82 6.16 1.30 6.26 1.16 8.10 1.26 5.88 1.28 6.61

TI02

0.62 0.63 0.61 0.93 0.63 0.63

P205

0.22 0.22 0.20 0.20 0.16 0.20

MNO CR203

0.10 0.05 0.10 0.06 0.15 0.05 0.17 0.05 0.10 0.08 0.12 0.07

L01 SUM

2.45 98.06 3.22 99.28 4.08 100.09 3.27 99.90 2.47 100.35 2.34 100.20

If

18 16 14 20 18 16

ZR BA

122 128 128 122 124 126

RB SR C02 CU

40 40 40 45 55 30

ZN

80 75 80 95 60 75

Ml

70 70 70 50 80 90

CR HELD CHEM

2w 2w 2w 2w 2x 2w

ALUM

166 146 138 140 147 152

MOLE NUMBER: IVAN56-01 GEOCHEMICAL ASSAY PAGE: 5

Page 7: CLAIMNO. HOte NO. fOOTAGE DATE€¦ · claimno. hote no. footage date 1169818 - ivan56-01 206m 03/15/92 (1 )' notes;, d) report of work # 9360 00049 filed on may 31 st 1993. hole

HOLE NUMBER : IVAN56-01 GEOCHEMICAL ASSAYS DATE: 09/03/1993

Sample From To leng. (M) (M) (M)

AN00211 56.00 59.00 3.00AN00212 74.00 77.00 3.00AN002I3 92.00 95.00 3.00AN002U 137.00 140.00 3.00AN0021S 167.00 170.00 3.00AN0021A 200.00 203.00 3.00

AB AU CO PB S V AS SN CD SB 81 SE HF TA U HO TH U B CS LA CE MO SM EU GO PPM PPB PPM PPM PPM PPM PPM PPM PPM PPM PPM PPM PPM PPM PPM PPM PPM PPM PPM PPM PPM PPM PPM PPM PPM PPM

252020252025

HOLE NUMBER: IVAN56-01 GEOCHEMICAl ASSAYS PAGE: 6

Page 8: CLAIMNO. HOte NO. fOOTAGE DATE€¦ · claimno. hote no. footage date 1169818 - ivan56-01 206m 03/15/92 (1 )' notes;, d) report of work # 9360 00049 filed on may 31 st 1993. hole

HCH.E NUMBER : IVAN56-01 GEOCHEMICAL ASSAYS DATE: 09/03/1993

Sample From To (M) (H)

Leng. DY PPH

ER PPM

LU PPM

OS PPB

IR PPB

RU PPB

RH PPB

PT PPB

PO PPB

li PPM

BEPPM

MN PPM

GA PPM

GEPPM

INPPM

TL PPM

SC PPM

BR PPM

YB PPM

NB PPM

AN00211 AN00212 AN00213 AN002U AN00215 AN00216

56.0074.0092.00

137.00167.00200.00

59.00 77.00 95.00

KO.OO 170.00 203.00

3.003.003.003.003.003.00

t -

HOLE NUMBER: IVAN56-01 GEOCHEMICAL ASSAYS PAGE:

Page 9: CLAIMNO. HOte NO. fOOTAGE DATE€¦ · claimno. hote no. footage date 1169818 - ivan56-01 206m 03/15/92 (1 )' notes;, d) report of work # 9360 00049 filed on may 31 st 1993. hole

UJ

• J s 10

400m

200m

Om

-200ra

GeologyMAJOR ROCK

m m*1 a 1 Mim

| 7 | HVR

| 6 | ULUK

UJ

osin

*

UJ

(O

IVAN56-01

UJ

(O

^W/ ^^T- j^\ f?

^ ^\

LEGEND

DIVISIONS TEXTURAL/CEOCHEMICAL MODIFIERS

xniusM HOCKS nZf** MMJJT1

mn ttmoHi HOCKS 2JS*n-fc *"''llut

..^ — ——— . J- T. .?:k tJMRll S2SS7iT*. *—*

j 4 | FILK VOUMK MCKS JJJ^

| 3 | MIDMDMI VUOMC HOCKS ALTERATO

| 2 | wnc VOUCMK HOCKS *g* JJ

I 1 I ULHMHn: VOUMK ROCKS 38* CI

SK K

Co >WCO *pm .

M Ilium dill4MMCOTWMI

(N MODIFIERSMMIon

K amelin*fcttMfaoMtfliriUMVmJOttMUMMMK

b HOW , la XW PI* . *( )I4 *pm , H) XOO Hud . M X40 W"

;*

Vs^

S

l /J/'^. W/

UJ

1to

FALCONBRIDGE LIMITED tlv

Enplorotlo* DlvUlo TlMlit .ONTARIO j^

400m

200m

Om

200(n

400m

SIVANHOE /KEITH Twps. CLAIMS

DIAMOND DRILL SECTION L 7700 N (V-50m)LOOXING NORDCAST (040') IVNHE 1*.

TrwW : tmeS AW*} NTS : ff^ffiOI PROJECT No: OV/

Oro : /if X Mt/tytJ kttPNo: FILE:*V/^

Sop*-.Utd : tfMrf/t W/M Sc'U : t : SOOO (wtrw) 20(j

Page 10: CLAIMNO. HOte NO. fOOTAGE DATE€¦ · claimno. hote no. footage date 1169818 - ivan56-01 206m 03/15/92 (1 )' notes;, d) report of work # 9360 00049 filed on may 31 st 1993. hole

tmW-X&TiWkZ®*IVANHOE-KEITH

r-i ATM*:

FALCONBRIDGE LIMITED

O.R.E. GROUPNORTH SWAYZE LOCATION

Figure 6Figure 6Ivanhoe-Keith Claims

PN 8201

Page 11: CLAIMNO. HOte NO. fOOTAGE DATE€¦ · claimno. hote no. footage date 1169818 - ivan56-01 206m 03/15/92 (1 )' notes;, d) report of work # 9360 00049 filed on may 31 st 1993. hole

' -

.4 J

^ J

. .* .

L. l ̂

j-,^

4 . ̂

" '-"

. 41

-9

^t

\JI'

-'1 •

Q

Lj.JL

BJtiy fr

vi

f'

Vr:-

^r.M

l*,-

.8

,*

!*v

-

' A

l- -

fi

" V

' * -^

'i*'

- ii

——

J'r

fa—

- ."'.

I--J-

' l A fclr:

r^~

V^*

*:

f' fF

t5

T

SI

:'l

*fe'

s

i '1

..'^

Page 12: CLAIMNO. HOte NO. fOOTAGE DATE€¦ · claimno. hote no. footage date 1169818 - ivan56-01 206m 03/15/92 (1 )' notes;, d) report of work # 9360 00049 filed on may 31 st 1993. hole

Ministry ofNorthern Developmentand Mines

Ontario

Report of Work Conducted After Recording Claim

Mining Act

ersonal Information collected on this form Is obtained under the authority of the Mlr its collection should be directed to the Provincial Manager, Mining Lands, Minis sudbury, Ontario, P3E 6A5, telephone (705) 670-7264.

•43B01NW8579 13 IVANHOE 900

nstructlons: - Please type or print and submit in duplicate.- Refer to the Mining Act and Regulations for requirements of filing assessment work or consult the Mining

Recorder.- A separate copy of this form must be completed for each Work Group.- Technical reports and maps must accompany this form In duplicate.- A sketch, showing the claims the work Is assigned to, must accompany this form.

Recorded HokJer(j)

Falconbridge LimitedVddress

P.O. Box 1140, 571 Moneta Avenue,fining Division

Porcupine

Km* Ff0m: March 2' 1992

Timnins, ON, P4N 7H9Township/Area

Keith and Ivanhoe

Client No, 130679

Telephone No. (705)267-1188

M or Q Plan No. G3238, G-1102

To: * April 7, 1992

/ork Performed (Check One Work Group Only)Work Qrpup Type

Geotechnical Survey Diamond Drilling with Assays and WRA -~\

Physical Work, Including Drilling

RehabilitationRECORDEDOther Authorized

Work

Assays MAR l 9 1993Assignment from Reserve Receipt.

3tal Assessment Work Claimed on the Attached Statement of Costs $ 67,600.00ote: The Minister may reject for assessment work credit all or part of the assessment work submitted If the recorded

holder cannot verify expenditures claimed in the statement of costs within 30 days of a request for verification.

Ktons and Survey Company Who Performed the Work (Give Name and Address of Author of Report)Name

Alex Gagnon Norex Drilling LimitedR. E. Gadzala Falconbridge Limited

Address

P.O. Box 88, Porcupine, ON, PON 100

P.O. Box 1140, 571 Moneta Avenue, Timmins/ ON, P4N 7H9

ttaoh a schedule If necessary)

notification of Beneficial Interest * See Note No. 1 on reverse side

Certify that at the time the work was performed, the claims covered In this work•port wen) recorded In the current holder's name or held under a beneficial Interest•y the current recorded holder.

Dale Recorded Holder or Agent (Signature)

irtlflcatlon of Work Reportcertify that 1 have a personal knowledge of the facts set forth In this Work report, having performed the work or witnessed same during and/or after

tt completion and annexed report Is true.me and Address of Person Certifying R.E. Gadzala, c/o Falconbridge Limited, P.O. Box 1140, 571 Moneta Avenue, Timmins, ON, P4N

ieponeNo.

(705)267-1188

Date .

tft,tL 19/K7

Certified By (Signature) ^ /J f A ^~wAt/J^r Office Use Onlyout value cr. Recorded Date Recorded

e TJollce tor Amendments Sent

(0*91)

Page 13: CLAIMNO. HOte NO. fOOTAGE DATE€¦ · claimno. hote no. footage date 1169818 - ivan56-01 206m 03/15/92 (1 )' notes;, d) report of work # 9360 00049 filed on may 31 st 1993. hole

g 00

H

M 10

rOto

I ir̂ g 1 fi ifP t 8 "*Sl

•to

M

to CO * 8 Tg

j

•to i t 8 Tg

j

•w Ut

xj CD s 8 T

gj

t•W 8 t 8 T

gl

tilt B 9

9 *

*

ft. 4

IK f

I- l ** 8

, H

10 10 to 8

- •to

H H K 8

, •^ ^^i

""••J

00 8

- g g 8

W V 9-'

Cred

its yo

u ar

e cla

iming

In th

is re

port

may

be

cut b

ack.

In or

der t

o m

inim

ize th

e ad

vers

e ef

fects

of s

uch

delet

ions,

pleas

e In

dicat

e fro

m

which

clai

ms

you

wish

to p

rioriz

e th

e de

letion

of c

redit

s. Pl

ease

mar

k (s

) on

e of

the

follo

wing

:1.

D C

redit

s ar

e to

be

cut b

ack

starti

ng w

ith th

e cla

im li

sted

last,

work

ing b

ackw

ards

.2.

8X C

redit

s ar

e to

be

cut b

ack

equa

lly o

ver a

ll clai

ms

cont

ained

In th

is re

port

of w

ork.

3.

D C

redit

s ar

e to

be^

cut b

ack

as p

riorlz

ed o

n th

e at

tach

ed a

ppen

dix.

In th

e ev

ent t

hat y

ou h

ave

not s

pecif

ied y

our c

hoice

of p

riorit

y, op

tion

one

will

be Im

plem

ente

d.

Me

1: Ex

ample

s of b

enef

icial

Inte

rest

are

unre

cord

ed tr

ansf

ers,

opt

ion

agre

emen

ts, m

emor

andu

m o

f agr

eem

ents,

etc.

, with

resp

ect

to th

e m

inin

g cla

ims.

ote

2:

If wo

rk h

as b

een

perfo

rmed

on

pate

nted

or l

ease

d la

nd, p

lease

com

plet

e th

e fo

llowi

ng:

l cer

tify

that

the

reco

rded

hol

der h

ad a

ben

efici

al In

tere

st In

the

pate

nted

or

leas

ed la

nd a

t the

tim

e th

e wo

rk w

as p

erfo

rmed

.Si

gnat

ure

Date

Page 14: CLAIMNO. HOte NO. fOOTAGE DATE€¦ · claimno. hote no. footage date 1169818 - ivan56-01 206m 03/15/92 (1 )' notes;, d) report of work # 9360 00049 filed on may 31 st 1993. hole

Ontario

Northern Development and Mines

M/n/sfere du Developpement du Nord el des mines

Statement of Costs for Asaessmant Creditttat des coOts aux fins du credit devaluation

Mining Act/Lol sur les mines

Transaction No./N* de treniaclicr.

Personal Information collected on this form Is obtained under Ihe aulhorlty of the Mlnlnjj Act. This Information will be used lo maintain a record and ongoing status of the mining clalm(s). Questions about this collection should be directed lo the Provincial Manager, Minings Lands, Ministry of Northern Development and Mines, 4lh Floor, 159 Cedar Street, Sudbury Ontario P3E 6A5, telephone (705) 870-7264.

Lei renselgnemanls personnel* conlenus dans la presenle formula sonl reeuelllls en vertu de la Lol sur les mines el servlront a lenir a jour un reglstre des concessions mlnleres, Adresser toute question sur la collece de ces renselgnemenls au chef provincial des terrains mlnlers, mlnlslere du Oeveloppemenl du Nord et des Mines, 159, rue Cedar, 4* etage. Sudbury (Ontario) P36 6A5, telephone (705) 670-7264.

1. Direct Costs/CoOts directs

Type

Wages Salalrea

Contractor'* and Consultant's FeesDrolls de ('entrepreneur et de ('expert-consell

——————— ,. tSupplies Used Fournllure* utilities

Equipment Rental Location de materiel

Description

Labour Maln-d'oeuvreField Supervision Supervision sur la terrain

Typ. Drilling

Assays fi WRA

Type

Typ.

Amount Monlanl

siooo.oc$63,006.

$2,448.

Total Direct Costs Total des couts xJIrects

Totals Total global

r*##3#

00

00

8^3/434.

i

'"i :^-: : . . .-' ..y . , '. V '

; 66; 454.

00

X)

2, Indirect Costs/CoQts indlrects' * Note: When claiming Rehabilitation work Indirect cost* are not

allowable as assessment work. Pour le remboursemenl de* Iravaux de rehabilitation, les coots Indirect* ne sont pas admlsslbles en tanl que travaux devaluation.

Type

Transportation Transport

Food and Lodging Nourrlture el MbergemenlMobilization and Demobilization Mobilisation el demobilisation

Description^-- —————————

Truck Rental

Gas

Amount Montanl

$1000.0

146.0

Sub Total of Indirect Coste Total partlef dei coOts Indirect* '

Amount Allowable (not greater than 20H of Direct Costs) Montan! admissible (n'exctdant pas 20 H dss coOts directs)Tolsl Value of Assessment Credit Valeur tola!* du cridll , (Told of Dlrtct *nd Allowtbl* d'tvslustlon ! Indlrtcl eoili) rTolil d*i cadli dtraelt

Total* Total global

)

)

1146.00

67,600. 10*l Mlrteli idmliilbln

Note: The recorded holder will be required to verify expenditures claimed In this statement of costs within 30 days of a request for verification. If verification Is not made, the Minister may reject for assessment work all or part of Ihe assessment work submitted.

Nota : Le lilulalre anreglslre sera lenu de verifier les depenaes demandees dans le present etal des coOis dans les 30 (ours sulvant une demande a eel effet. SI la verification n'esl pas effectue'e, le mlnlstre peut refeter tout ou une partle des Iravaux d evaluation presence.

Filing Discounts

1. Work filed within two years of completion is claimed at tOO^fa of the above Total Value of Assessment Credit.

2. Work filed three, four or five years after completion Is claimed at SQVo of the above Total Value of Assessment Credit. See calculations below:

Total Value ol Assessment Credit Total Assessment Claimedx 0.50

Remises pour dlpdt

1. Les Iravaux de'pose's dans les deux ans suivanl leur achevemenl sont remboursas a 100 "ft de la valeur totale susmenltonne'e du credit devaluation.

2. Les travaux ddposes trois, quatre ou cinq ans apres leur achievement son! rembourses a 60 W de la valeur tolale du crddit devaluation susmenllonne'. Volr les catculs cl-dessous.

Valeur lolaie du credit devaluationx 0,60

Evaluation lolaie demandee

Certification Verifying Statement of Costs

l hereby certify:that Ihe amounts shown are as accurate as possible and these costs were Incurred while conducting assessment work on the lands shown on the accompanying Report of Work form.

R.E. Gadzala (Sr. Field Geologist) that as . ______________ l am aphorized

(Recorded Holdar, Agent, Position In Company)

lo make this certification

Attestation de I'dtat des couts

J'allesle par la prlsente :quo les montanls Indlques sont le plus exact possible et que ces defenses ont M engagers poi/r effectuer les travaux devaluation sur les terrains Indlquis dans la formula de rapport de travail cl-Jolnt.

El qu'a litre de je suls autorlse1(iliulilr* enreglilre', repr4i(nlanl, potle occup* dim l* compagnlt)

a falre cede attestation.

Slgnalur* ~~* 7"

Nota : Dans celte formule, lorsqu'll daslgna des penonnes, le masculln esl utllls* su sens neulre.

Page 15: CLAIMNO. HOte NO. fOOTAGE DATE€¦ · claimno. hote no. footage date 1169818 - ivan56-01 206m 03/15/92 (1 )' notes;, d) report of work # 9360 00049 filed on may 31 st 1993. hole

REFERENCES

AR

EA

S

WIT

HD

RA

WN

FR

OM

D

ISP

OS

ITIO

N

M.R

.O. - M

ININ

G R

IGH

TS

ON

LY

S.R

.O. - S

UR

FA

CE

RIG

HT

S O

NLY

M.+

S. - M

ININ

G A

ND

SU

RF

AC

E R

IGH

TS

OM

crip

tion

Old

er N

o.

Dat

e D

ispo

sitio

n

(^)

22

/12

/60

(g)

30/7

/71

M.a

S.

(g)

(5

/2/7

2

M.S

S

(g)

27/7

/72

(g)

Z6

/7/6

7

(C)

MN

R

RE

SE

RV

E

M.8

S.

S R

.O,

File

16

3O

O3

16 3

00

2

16

30

02

vo

l.3

163002

16

30

03

Ball

Can

ad

a

Sati

n,

C w

t) l.

FO

LE

YE

T

TO

WN

SH

IP

48

M

47

M

46

M

X C/)

45M

cc

< o

44M

:-, l

MAY

42B

81N

W85

79

13

IVA

NH

OE

20

0

43 M

42 M

4IM

Q.

X o e?

o a.4

0M

O

VA

NH

OE

LEG

END

"V S

ii iisj

[),v-

"

IT

,

m H X O) x

- -

l '/

2 M

8M

SIL

K

TO

WN

SH

IP

AS

,

SVMB

OL T

OC

A

- fi

'

l •f r

s c

A "L

TO

WN

SH

IP

IVAN

HOE

MN

R

AD

MIN

IST

RA

TIV

E

DIS

TR

ICT

CH

AP

LEA

UM

ININ

G

DIV

ISIO

N

PO

RC

UP

INE

LA

ND

T

ITL

ES

/ R

EG

IST

RY

D

IVIS

ION

SUD

BUR

Y

f M

inis

try

of

Nat

ural

No

rthe

rn D

evel

opm

ent

Res

ourc

es

and

Min

esO

ntar

io

Da"

OC

TO

BE

R,

I9ft6

Num

b*

ac

G-I

I02

Page 16: CLAIMNO. HOte NO. fOOTAGE DATE€¦ · claimno. hote no. footage date 1169818 - ivan56-01 206m 03/15/92 (1 )' notes;, d) report of work # 9360 00049 filed on may 31 st 1993. hole

5338000mN

5335000mN

MU

SK

EG

O

LAK

E

MU

SK

EG

O

LAK

E

LE

GE

ND

Geo

logy

MA

JOR

R

OC

K D

IVIS

ION

S

DIA

BASE

FELS

IC

INTR

USIV

E RO

CKS

INTE

RM

EDIA

TE

INTR

USI

VE

RO

CKS

MAR

C IN

TRUS

IVE

ROCK

S

ULT

RAM

AFIC

IN

TRU

SIVE

R

OC

KS

SEDI

MEN

TARY

R

OC

KS

FELS

IC V

OLCA

NIC

ROCK

S

INTE

RMED

IATE

VO

LCAN

IC

ROCK

S

MAR

C

VOLC

ANIC

R

OC

KS

ULTR

AMAF

IC

VOLC

ANIC

RO

CKS

Sy

mb

ols

CO

NTA

CTS

TEX

TUR

AL/

GE

OC

HE

MIC

AL

a Fi

ne

Gra

ined

b M

ediu

m

Gro

ined

bx

Bre

ccia

c C

oars

e G

rain

edd

Qua

rtz-

Fel

dspa

r P

hyric

e A

myg

dalo

id a

l/Ves

icul

arf

Prim

ary

Fra

gmen

talS

g G

raphiti

c/A

rgill

ace

ous

h T

hole

iitic

i A

lkal

icj

Col

e—A

lkal

ick

Kom

otiiU

cl

Flow

sm

M

assi

ven

Var

iolit

ic/S

pher

ilitic

p P

illow

edq

Qua

rtz

Phy

ricr

Oxi

de

Iron

F

orm

atio

ns

Sul

phid

es,

Exh

alite

st

Pyr

ocla

stic

u H

igh

Mg

v H

igh

Few

H

igh

Alx

And

esite

y Ic

elan

dite

z ALT

ER

ATI

ON

M

OD

IFIE

RS

MO

DIF

IER

SA

P

rim

itiv

eB

Evo

lved

(1

02

0^6

0)

C H

eter

olith

icD

F

elds

par

Phy

ricE

Che

rtF

Wac

keG

Leuc

oxen

e B

earin

gH

Bas

altic

K

om

atii

te

J P

yrox

enite

K N

et

Tex

ture

dL

Per

idot

iteM

D

unite

N

Oph

itic

P P

orph

yriti

cQ R

Pol

ysut

ured

S F

ract

ured

T G

abbr

oic

Text

ured

U P

yrox

ene

Spi

nife

xV

O

livin

e S

pini

fex

W

Ske

leta

l/Cre

scu

mu

late

X A

dcum

ulat

eY

Mes

ocum

ulat

eZ

Ort

hocu

mul

ate

Out

crop

(sm

all,

ob

serv

ed,

infe

rred

, bould

er/

floot)

Geo

logi

cal

Bou

ndar

y(o

bser

ved,

ap

prox

imat

e,

assu

med

)G

eolo

gica

l B

ound

ary

(gra

datio

nol,

geop

hysi

colly

in

ferr

ed)

Flow

C

onta

ct

(def

ined

, a

pp

roxi

ma

te)

ME

AS

UR

EM

EN

TS,/

B

eddi

ng

with

to

ps

know

n f

(hor

izon

tal,

incl

ined

, ve

rtic

al,

over

turn

ed,

dip

unkn

own)

PH

YS

ICA

L W

OR

KM

iner

al

Occ

urre

nce

Tre

nch

(1:2

0,0

00

-K

1:5,

000

-)

\\\

©

-X

X X

^F

4-

X X

S

X

X

<A

b>

<C>>

<C

b>

<Ep>

<K

>>

<

Se>

<

Si>

<

Sr>

Alb

itiza

tion

Ble

ache

dC

arbo

nace

ous

Carb

onatiz

atio

nC

hlor

itiza

tion

Epi

dotiz

atio

nH

emat

izot

ion

Pot

assi

c A

ltera

tion

Ser

iciti

zatio

nS

ilici

ficat

ion

Ser

pent

iniz

atio

nT

alc

-Ca

rbo

na

tize

d

-vw

v -w

-w

^ -v

-vyyy

Bed

ding

w

ith

tops

un

know

n (in

clin

ed,

vert

ical

, di

p un

know

n)

Pill

ow

top

(horizo

nta

l, in

clin

ed,

vert

ical

, ov

ertu

rned

, di

p un

know

n)

Spi

nife

x to

p

Sch

isto

sity

, gn

eiss

osity

, cl

eava

ge

or

folia

tion

(h

orizo

nta

l, in

clin

ed,

vert

ical

, di

p un

know

n^

(No.

of

ticks

=

ge

nera

tion

-

SI,

S

2,

S3)

Join

ting

(horizo

nta

l, in

clin

ed,

vert

ical

, di

p un

know

n)

Line

otio

n(h

orizo

nta

l, in

clin

ed,

vert

ical

)

Fol

ding

de

fined

fo

lds

S fo

ld,

Z fo

ld,

mul

tiple

S,

m

ultip

le

Z)

Fol

ding

un

dete

rmin

ed

type

Fau

lt(d

efin

ed,

appr

oxim

ate,

as

sum

ed)

(Inc

lined

, ve

rtic

al,

mov

emen

t w

/circl

e

on

dow

nthr

ow

side

)

Fau

lt(G

eoph

ysic

olly

in

ferr

ed.

Line

amen

t in

ferr

ed)

Thr

ust

Fau

lt(d

efin

ed,

appr

oxim

ate,

as

sum

ed)

(te

eth

in

dica

te

up

thru

st

side

)

She

ar

zone

Dyk

e,

vein

(def

ined

, ap

prox

imat

e,

assu

med

)

Ant

iclin

e.

Ant

iform

(with

or

with

out

plun

ge,

over

turn

ed)

Syn

clin

e,

Syn

form

(with

or

with

out

plun

ge,

over

turn

ed)

Gla

cial

st

riae

(ice

mov

emen

t kn

own,

un

know

n)(n

umbe

rs

indi

cate

re

lativ

e ag

e)

Lim

it of

G

eolo

gica

l M

appi

ng

Dia

mon

d D

rill

Hol

e(c

olla

r su

rvey

ed,

colla

r lo

cate

d,co

llar

unlo

cate

d)O

verb

urde

n D

rill

Hol

e

Min

e,

quar

ry

or

glor

y ho

le

(act

ive,

ab

ando

ned)

Sha

ft(v

ertic

al,

incl

ined

, ra

ise,

w

inze

)

Adi

t, R

omp

Jj-

Roc

k D

ump.

T

ailin

gs

Gra

vel

Pit

(act

ive,

ab

ando

ned)

CU

LTU

RA

L A

ND

P

HY

SIO

GR

AP

HIC

FE

ATU

RE

S

-—m

——

B—a

All

wea

ther

ro

ad

(pav

ed,

grav

el)

Fou

r w

heel

dr

ive

road

Tra

ckTr

ail

Bui

ldin

gs

Cam

psite

Pow

er

Line

(maj

or

line,

re

gula

r lin

e)Te

leph

one

Line

(u

sabl

e,

unus

able

)R

ailro

ad

Trac

k

Tow

erB

ridge

Riv

er(o

pen,

ra

pids

)In

term

itten

t S

trea

m

Lake

Sw

amp

Esk

erC

laim

Po

st(O

LS

surv

eyed

, in

spec

ted

surv

ey.

loca

ted,

un

loca

ted,

w

itnes

s,

in

wat

er)

Grid

s(c

urre

nt

grid

, ol

d gr

id)

Sur

vey

Pin

(loca

ted,

un

loca

ted)

Lo

t/C

on

cess

ion

C

omer

P

in

(loca

ted,

gove

rnm

ent

de

fine

d)

UTM

N

OR

TH40

0531

7H

OR

WO

OD

IND

EX

M

AP

10km

AS

- M

OM

ICFA

LCO

NB

R D

GE

UM

TED

Exp

lora

tion

Div

isio

nT

imm

ins

ON

TAR

IO

IVAN

HO

E /

KEI

TH

Twps

. C

LAiiv

ISIV

AN

HO

E

5c

KE

ITH

Tw

o

DIA

MO

ND

D

HO

LE

SH

EE

T O

RIE

NTE

D

UTM

N

OR

TH

A2 U

UTH

35

8Sd

52

'

TRAC

ED:

PR

OD

ES

DA

TE.-

15

/U3

/93

DR

AWN

; d

e l

DATE

; 15/0

3/9

3

RP

iflS

ED

PRO

J t

MA

P

N-;

FIL

E:

42

B0

1N

W6

57

9

t 3

lVA

MH

OE

210