CL 604, 605, 650 Training Center - CAE Inc. · • Transport Canada - Aircraft Certification Office...

32
CL 604, 605, 650 Training Center 2018 Maintenance Programs TLMC/MPD Familiarization

Transcript of CL 604, 605, 650 Training Center - CAE Inc. · • Transport Canada - Aircraft Certification Office...

Page 1: CL 604, 605, 650 Training Center - CAE Inc. · • Transport Canada - Aircraft Certification Office (ACO) • Foreign Airworthiness Authority ACO • 2 star (**) - CMR • Tasks •

CL 604, 605, 650Training Center

2018

Maintenance ProgramsTLMC/MPD Familiarization

Page 2: CL 604, 605, 650 Training Center - CAE Inc. · • Transport Canada - Aircraft Certification Office (ACO) • Foreign Airworthiness Authority ACO • 2 star (**) - CMR • Tasks •

PRIVATE AND CONFIDENTIAL. © Bombardier Inc. or its subsidiaries. All rights reserved.

Agenda

1. Scheduled Maintenance Manual Overview

2. MRB Process – Sustaining

3. TLMC Format

4. Available Internal Extension’s

5. Flexible Maintenance vs Task Tolerance

6. Customized Maintenance Programs

Page 3: CL 604, 605, 650 Training Center - CAE Inc. · • Transport Canada - Aircraft Certification Office (ACO) • Foreign Airworthiness Authority ACO • 2 star (**) - CMR • Tasks •

3 PRIVATE AND CONFIDENTIAL. © Bombardier Inc. or its subsidiaries. All rights reserved.3

Scheduled Maintenance Manual Overview

Page 4: CL 604, 605, 650 Training Center - CAE Inc. · • Transport Canada - Aircraft Certification Office (ACO) • Foreign Airworthiness Authority ACO • 2 star (**) - CMR • Tasks •

PRIVATE AND CONFIDENTIAL. © Bombardier Inc. or its subsidiaries. All rights reserved.

Approvals of TLMC/MPD/STLMC Manuals

1. Time Limits / Maintenance Checks (TLMC)• Approved by Transport Canada (TC), FAA and EASA

2. Maintenance Planning Document (MPD)• Not Approved, therefore it is not a requirements document

3. Completion Maintenance Program (STL/MC)• Approved by Local Authority of STC Holder• Each STC may have a separate STLMC

TLMC is the only approved manual, the MPD contains all tasks from the TLMC

4

Page 5: CL 604, 605, 650 Training Center - CAE Inc. · • Transport Canada - Aircraft Certification Office (ACO) • Foreign Airworthiness Authority ACO • 2 star (**) - CMR • Tasks •

PRIVATE AND CONFIDENTIAL. © Bombardier Inc. or its subsidiaries. All rights reserved.

Time Limits/Maintenance Checks - Overview

All maintenance tasks are approved

5

Part 1General

Part 2Airworthiness

Limitations

Part 3Maintenance

ReviewBoard Report

(MRBR)

• Scope/Description/Definitions/Acronyms

Approved by TC – Aircraft Certification Office (ACO)• Life Limits - Systems and Structures (excluding Engines)• Airworthiness Limitation Items (ALI)• Certification Maintenance Requirements (CMR)• Tasks by Aircraft Effectively – Custom Installations/Repairs• RVSM

Approved by TC/FAA/EASA – Maintenance ReviewBoard (MRB)• Avionics, Systems, Propulsion, Structures, Zonal and

Lightning/High Intensity Radiated Fields (L/HIRF)

Page 6: CL 604, 605, 650 Training Center - CAE Inc. · • Transport Canada - Aircraft Certification Office (ACO) • Foreign Airworthiness Authority ACO • 2 star (**) - CMR • Tasks •

PRIVATE AND CONFIDENTIAL. © Bombardier Inc. or its subsidiaries. All rights reserved.

Maintenance Not Found in TLMC / MPD

Not all maintenance required to be complied with byindividual operators is found in the TLMC:Examples of Maintenance not found in TLMC / MPD:

National requirements• Requirements from country to country vary, and would be impossible to ensure the

latest requirements are listed in the TLMC

Vendor/OEM Recommended Maintenance• Vendor manuals are reviewed during MSG-3 process and only tasks accepted by

ISC are recommended to MRB for inclusion in the TLMC• Maintenance from a OEM manual may be required by the OEM if an operators is

following an OEM warranty program

Service Bulletin Maintenance Recommendations• Required maintenance until a specific condition is met

Unscheduled Maintenance ie: Inspections after Hard Landing, Lightning Strike etc• Refer to: AMM Chapter 5

6

1. ISC: Industry Steering Committee: Group of operators that review changes to the Maintenance Review Board Report (MRBR) (TLMC Part 3)2. MRB: Maintenance Review Board: Representatives of Transport Canada, FAA & EASA3. OEM: Original Equipment Manufacturer

Page 7: CL 604, 605, 650 Training Center - CAE Inc. · • Transport Canada - Aircraft Certification Office (ACO) • Foreign Airworthiness Authority ACO • 2 star (**) - CMR • Tasks •

PRIVATE AND CONFIDENTIAL. © Bombardier Inc. or its subsidiaries. All rights reserved.

CDCCL Defined

7

CRITICAL DESIGN CONFIGURATION CONTROL LIMITATIONS

Critical design features that must be maintained in exactly the samemanner throughout the life of the aircraft in order to comply with thetype certificate and maintain airworthiness

CDCCL instructions ensure critical features are present throughoutthe life of the aircraft and are Inspected and verified whenalterations, repairs or maintenance actions occur in the area

CDCCL Design features defined and controlled by Special FederalAviation Regulation 88 (SFAR) preserves critical features neededfor Flammability Reduction Means

Page 8: CL 604, 605, 650 Training Center - CAE Inc. · • Transport Canada - Aircraft Certification Office (ACO) • Foreign Airworthiness Authority ACO • 2 star (**) - CMR • Tasks •

PRIVATE AND CONFIDENTIAL. © Bombardier Inc. or its subsidiaries. All rights reserved.

CDCCL and EWIS Maintenance

Maintenance related to CDCCL (SFAR 88) andElectrical Wiring Interconnect System (EWIS)

Applies to transport category, turbine-powered aircraft where thetype certificate (TC) was issued after January 1, 1958 and has:

• A maximum type-certificated passenger capacity of 30 or moreAnd / Or

• A maximum type-certificated payload capacity of 7500 pounds ormore

CL604, CL605 and CL650 are not required to be CDCCL or EWIS Compliant

8

Page 9: CL 604, 605, 650 Training Center - CAE Inc. · • Transport Canada - Aircraft Certification Office (ACO) • Foreign Airworthiness Authority ACO • 2 star (**) - CMR • Tasks •

PRIVATE AND CONFIDENTIAL. © Bombardier Inc. or its subsidiaries. All rights reserved.

Maintenance Planning Document (MPD)

MPD packages tasks by interval, provides various maintenance approaches

9

Section 1Introduction

• Introduction• Program Rules• Master Task List

Section 2Task Planning

Section 3Optional

MaintenanceSection 4Flexible

MaintenanceSection 5Equalized

Maint Program

• List of tasks by Interval Type (Hour, Month, Landing)• List of tasks by each Interval (600 H, 12 M, 7800 L)

• Walk-Around• Servicing

• Program Rules

• Program Rules

Page 10: CL 604, 605, 650 Training Center - CAE Inc. · • Transport Canada - Aircraft Certification Office (ACO) • Foreign Airworthiness Authority ACO • 2 star (**) - CMR • Tasks •

PRIVATE AND CONFIDENTIAL. © Bombardier Inc. or its subsidiaries. All rights reserved.

TLMC – MPD- AMM/NDI Relationship

10

EngineeringReports

Life Limits(Systems)

Life Limits(Structures)

AirworthinessLimitations

CertificationMaintenanceRequirements

MSG-3Analyses

MaintenanceReview Board

Report

TLMCSource MPD AMM / NDI

Tasks byInterval

AMTOSS / NDIX-Ref

OptionalMaintenance

FlexibleMaintenance

EqualizedMaintenance

Procedures

Page 11: CL 604, 605, 650 Training Center - CAE Inc. · • Transport Canada - Aircraft Certification Office (ACO) • Foreign Airworthiness Authority ACO • 2 star (**) - CMR • Tasks •

11 PRIVATE AND CONFIDENTIAL. © Bombardier Inc. or its subsidiaries. All rights reserved.11

MRB Process Sustaining

Page 12: CL 604, 605, 650 Training Center - CAE Inc. · • Transport Canada - Aircraft Certification Office (ACO) • Foreign Airworthiness Authority ACO • 2 star (**) - CMR • Tasks •

PRIVATE AND CONFIDENTIAL. © Bombardier Inc. or its subsidiaries. All rights reserved.

MRB Sustaining Process

Process typically takes 9-12 months

12

1. Process typically takes 9-12 months

ReceivesChangeRequest

ReviewChange

DetermineAnalyses

to beChanged

CompleteAnalyses

PresentChange

ISC AcceptChange

AuthorMRBR

ChangeMRB

ApprovesChange

Page 13: CL 604, 605, 650 Training Center - CAE Inc. · • Transport Canada - Aircraft Certification Office (ACO) • Foreign Airworthiness Authority ACO • 2 star (**) - CMR • Tasks •

Industry Steering Committee (ISC) Format

Industry Steering Committee (ISC) participants:• Operators• Regulatory Authorities (TC, FAA, EASA)• Vendors• Bombardier

Page 14: CL 604, 605, 650 Training Center - CAE Inc. · • Transport Canada - Aircraft Certification Office (ACO) • Foreign Airworthiness Authority ACO • 2 star (**) - CMR • Tasks •

Operator Participation in ISC Meetings

• Operator participation is required• Ideally 6 to 8 operators

• One or Two face-to-face meetings per year• Typically in March and/or September

• Guests are welcome

• Contact Bombardier for meeting information

[email protected]

Page 15: CL 604, 605, 650 Training Center - CAE Inc. · • Transport Canada - Aircraft Certification Office (ACO) • Foreign Airworthiness Authority ACO • 2 star (**) - CMR • Tasks •

15 PRIVATE AND CONFIDENTIAL. © Bombardier Inc. or its subsidiaries. All rights reserved.15

TLMC Format

Page 16: CL 604, 605, 650 Training Center - CAE Inc. · • Transport Canada - Aircraft Certification Office (ACO) • Foreign Airworthiness Authority ACO • 2 star (**) - CMR • Tasks •

PRIVATE AND CONFIDENTIAL. © Bombardier Inc. or its subsidiaries. All rights reserved.

Chapter 5 Task Numbering Formats

16

Task format XX−XX−XX−YZZ where :• XX−XX−XX is the ATA number• ZZ is the task sequential number identifier 01 to 99• Y is as follows:

1ZZ* (one star) or 1ZZ**: (two star)Mandatory ALI or CMR Task

2ZZ:MRB Task from MSG3 Analysis

3ZZ:Optional Task

4ZZ:Repair or Modification

6ZZNon-Production Equipment and Furnishings (Completion STC Tasks)

Task format XX−ZL−00−2ZZ where:

ZL indicates a Zonal task

Page 17: CL 604, 605, 650 Training Center - CAE Inc. · • Transport Canada - Aircraft Certification Office (ACO) • Foreign Airworthiness Authority ACO • 2 star (**) - CMR • Tasks •

PRIVATE AND CONFIDENTIAL. © Bombardier Inc. or its subsidiaries. All rights reserved.

1ZZ* Star & 2ZZ** Star TasksDifferences between a 1 star (*) and 2 star (**) task:• 1 star (*) - ALI &/or CMR

• Tasks and/or Intervals:• Are Mandatory• Cannot be changed, escalated or deleted without approval of :

• Transport Canada - Aircraft Certification Office (ACO)• Foreign Airworthiness Authority ACO

• 2 star (**) - CMR• Tasks

• Are Mandatory• Cannot be changed or deleted with out the prior approval of:

• Local Airworthiness Authority’s ACO

• Intervals• May be adjusted in accordance with:

• Operators approved escalation practice or• Approved reliability program

17

Page 18: CL 604, 605, 650 Training Center - CAE Inc. · • Transport Canada - Aircraft Certification Office (ACO) • Foreign Airworthiness Authority ACO • 2 star (**) - CMR • Tasks •

PRIVATE AND CONFIDENTIAL. © Bombardier Inc. or its subsidiaries. All rights reserved.18

Available Internal Extension’s

Page 19: CL 604, 605, 650 Training Center - CAE Inc. · • Transport Canada - Aircraft Certification Office (ACO) • Foreign Airworthiness Authority ACO • 2 star (**) - CMR • Tasks •

PRIVATE AND CONFIDENTIAL. © Bombardier Inc. or its subsidiaries. All rights reserved.

ALI & CMR Extension

ALI & CMR Tasks, TLMC § 5-10-30/5-10-40

Plan ahead, extensions are costly, take time to process and obtain approval

19

100 Series Tasks 1 Star (*) 2 Star (**)Extension Published Yes - Not for all Task Yes - Short term

Extension Available Yes - ACO Approval Yes

How Raise SRPSA Raise SRPSA

Lead time ALI (including ALI from BA STC)• 5 working days

CMR ¤• 15 working days

ALI• 5 working days

CMR ¤• 15 working days

“Bad planning on your part does not constitute an emergency on my part.”

¤ Authorities are strict on providing extensions on CMR tasks.Per operators approved escalation practices or an approved reliability program

Page 20: CL 604, 605, 650 Training Center - CAE Inc. · • Transport Canada - Aircraft Certification Office (ACO) • Foreign Airworthiness Authority ACO • 2 star (**) - CMR • Tasks •

PRIVATE AND CONFIDENTIAL. © Bombardier Inc. or its subsidiaries. All rights reserved.

Tasks with a “Component” Interval

COMPONENT Interval• Interval may be calculated from:

• Installed Date• Date noted in the component’s certification documentation• As specified on component (Stamped / Inked)• Or as otherwise stated

Take Away: Component Intervals differ from Airframe Intervals

20

Page 21: CL 604, 605, 650 Training Center - CAE Inc. · • Transport Canada - Aircraft Certification Office (ACO) • Foreign Airworthiness Authority ACO • 2 star (**) - CMR • Tasks •

PRIVATE AND CONFIDENTIAL. © Bombardier Inc. or its subsidiaries. All rights reserved.

MRB & Engine Task Extensions• MRB & Engine Tasks

• MPD: refer to TLMC 5-21-10• Engine: Refer to Engine Service Manual

• Engine Life Limit Components• Contact Engine OEM or FSR

• MRB & Engine Extension Requests• Raise SRPSA• Reviewed on a case-by-case basis• May require local regulatory authority approval

• Lead Time:• MRB: 5 working days• Engine: Per Engine OEM

21

Page 22: CL 604, 605, 650 Training Center - CAE Inc. · • Transport Canada - Aircraft Certification Office (ACO) • Foreign Airworthiness Authority ACO • 2 star (**) - CMR • Tasks •

PRIVATE AND CONFIDENTIAL. © Bombardier Inc. or its subsidiaries. All rights reserved.22

Flexible Maintenance vs Task Tolerance

Page 23: CL 604, 605, 650 Training Center - CAE Inc. · • Transport Canada - Aircraft Certification Office (ACO) • Foreign Airworthiness Authority ACO • 2 star (**) - CMR • Tasks •

PRIVATE AND CONFIDENTIAL. © Bombardier Inc. or its subsidiaries. All rights reserved.

Flexible Maintenance Program

Requirements to use the Flexible Maintenance Program• FAR 91 Operators,

• Update logbook to note that Flex Maintenance rules are being followed

• For all other operators,• Apply to your local authority• May be subject to national / local regulatory approval

Also: Notify your Computerized Maintenance Management Systemanalyst

23

Page 24: CL 604, 605, 650 Training Center - CAE Inc. · • Transport Canada - Aircraft Certification Office (ACO) • Foreign Airworthiness Authority ACO • 2 star (**) - CMR • Tasks •

PRIVATE AND CONFIDENTIAL. © Bombardier Inc. or its subsidiaries. All rights reserved.

Allowable Tolerance vs Flexible Maintenance

24

ALI CMRMRB (Inc. Engine/APU)

Completion< 400 H or12 M

> 400 H or12 M

AllowableTolerance No

YesNoted per

task

Yes10% of

publishedinterval

± 40 H± 1 M± 40 L

Same asMRB

FlexibleMaintenance No

YesNoted per

task

Yes10% of

publishedinterval

± 40 H± 2 M± 40 L

Same asMRB

Flexible Maintenance:• Program by which maintenance is spread out over 80 H (± 40 H) 4 M, or 80 L, as

applicable

Allowable Tolerance:• Provides a one-off opportunity to schedule one or more tasks or inspections without

requesting an extension and maintain the alignment of interval multiples

Page 25: CL 604, 605, 650 Training Center - CAE Inc. · • Transport Canada - Aircraft Certification Office (ACO) • Foreign Airworthiness Authority ACO • 2 star (**) - CMR • Tasks •

PRIVATE AND CONFIDENTIAL. © Bombardier Inc. or its subsidiaries. All rights reserved.

Flexible Maintenance Program

Provided for operators who have in-house maintenance teams

25

Provides Window to complete maintenance• Keep maintenance packages ‘in-phase’

Maint Due

+2 M-2 M

Task 1 Task 3Task 2

Last task - signoff packagehere

Page 26: CL 604, 605, 650 Training Center - CAE Inc. · • Transport Canada - Aircraft Certification Office (ACO) • Foreign Airworthiness Authority ACO • 2 star (**) - CMR • Tasks •

PRIVATE AND CONFIDENTIAL. © Bombardier Inc. or its subsidiaries. All rights reserved.

Flex and Task Tolerance: Early compliance

26

For any task(s) done before the scheduled maintenance ‘window’ opens, anew ‘window’ will need to be established for the next due of the task(s).

Example: A 1200 H task due at 2400 H is completed at 2300 H or 60 H beforethe window opened at 2360 H.The next time this task is due will be at 3540 H ± 40 H, however it can start whenthe window opens, which in this case, is at 3500 H

Inspection doneat 2300 H

60 H

Inspection Dueat 2400 H

+/- 40 H

2360 H 2440 H

1200 H

1200 H

Next InspectionDue at 3540 H

3500 H 3580 H

+/- 40 H

3600 H

+/- 40 H

Page 27: CL 604, 605, 650 Training Center - CAE Inc. · • Transport Canada - Aircraft Certification Office (ACO) • Foreign Airworthiness Authority ACO • 2 star (**) - CMR • Tasks •

PRIVATE AND CONFIDENTIAL. © Bombardier Inc. or its subsidiaries. All rights reserved.27

Customized Maintenance Programs

27

Page 28: CL 604, 605, 650 Training Center - CAE Inc. · • Transport Canada - Aircraft Certification Office (ACO) • Foreign Airworthiness Authority ACO • 2 star (**) - CMR • Tasks •

PRIVATE AND CONFIDENTIAL. © Bombardier Inc. or its subsidiaries. All rights reserved.

Customized Maintenance Programs

28

Converts all MRB Tasks to Monthly IntervalSome tasks will be done fewer times in a calendar year

Available Customized Maintenance Programs• Very High Utilization Maintenance Program (VHUMP)

• High Utilization Maintenance Program (HUMP)

• Low Utilization Maintenance Program (LUMP)

• Equalized Maintenance Program (EMP)

Raise an SRPSA for Customized programKey word: HUMP or LUMP as applicable

Page 29: CL 604, 605, 650 Training Center - CAE Inc. · • Transport Canada - Aircraft Certification Office (ACO) • Foreign Airworthiness Authority ACO • 2 star (**) - CMR • Tasks •

PRIVATE AND CONFIDENTIAL. © Bombardier Inc. or its subsidiaries. All rights reserved.

Equalized Maintenance Program

29

EMP provides the following benefits:Distributes workload to shorten downtime, increase aircraftavailability

RulesMay require Phase-In for in-service aircraftMay be subject to national and/or local regulatory approval

To sign up, contact Bombardier for a copy of the program

[email protected]

Page 30: CL 604, 605, 650 Training Center - CAE Inc. · • Transport Canada - Aircraft Certification Office (ACO) • Foreign Airworthiness Authority ACO • 2 star (**) - CMR • Tasks •

PRIVATE AND CONFIDENTIAL. © Bombardier Inc. or its subsidiaries. All rights reserved.

Maintenance Programs Contact Info

For any questions or clarifications please send anemail to :

[email protected]

30

Page 31: CL 604, 605, 650 Training Center - CAE Inc. · • Transport Canada - Aircraft Certification Office (ACO) • Foreign Airworthiness Authority ACO • 2 star (**) - CMR • Tasks •

Q&A?

Page 32: CL 604, 605, 650 Training Center - CAE Inc. · • Transport Canada - Aircraft Certification Office (ACO) • Foreign Airworthiness Authority ACO • 2 star (**) - CMR • Tasks •

Exceptionalby design

PRIVATE AND CONFIDENTIAL. © Bombardier Inc. or its subsidiaries. All rights reserved.