CIVMEC LIMITED - Singapore Exchange · • Continue to provide cost effective, intelligent...

26
CIVMEC LIMITED Investor Presentation – June 2018 Supporting Australian Industry

Transcript of CIVMEC LIMITED - Singapore Exchange · • Continue to provide cost effective, intelligent...

Page 1: CIVMEC LIMITED - Singapore Exchange · • Continue to provide cost effective, intelligent engineering solutions for our clients. • Maintain disciplined approach capital management.

CIVMEC LIMITED

Investor Presentation – June 2018Supporting Australian Industry

Page 2: CIVMEC LIMITED - Singapore Exchange · • Continue to provide cost effective, intelligent engineering solutions for our clients. • Maintain disciplined approach capital management.

2

Company Timeline

2009Acquired land at the AMC

2010Construction of 29,300m2

heavy engineering facility

2010Awarded first

fabrication package

2011Awarded major

modularisation and fabrication package for BHP Billiton – 24,000T

2013Office headquarters

officially opens – 6,500m2

2016Acquired 23-hectare

Newcastle Facility NSW

2017Construction begins on 60m

(H), 53,000m2 gross floor facility with 400T lifting capacity

2011Main workshop officially opened by the Premier

2011Awarded fabrication and modularisation package

for KJV – 28,000T

2012Civmec listed on the Singapore Exchange

2013New facility in Darwin,

NT

2014Commence SMP

construction activities, complemented by our civils operations – fleet

includes x 500T crawler crane and 2 x 275T

crawler crane

2016Commenced first EPC contract – providing full

vertical delivery

2015Established Defence

Business Unit

2018Awarded OPV Contract

Page 3: CIVMEC LIMITED - Singapore Exchange · • Continue to provide cost effective, intelligent engineering solutions for our clients. • Maintain disciplined approach capital management.

3

The Board

James FitzgeraldExecutive Chairman

Patrick TallonChief Executive Officer

Kevin DeeryChief Operating Officer

Chong Teck SinLead Independent Director

Douglas ChesterIndependent Director

Wong Fook Choy SunnyIndependent Director

Page 4: CIVMEC LIMITED - Singapore Exchange · • Continue to provide cost effective, intelligent engineering solutions for our clients. • Maintain disciplined approach capital management.

4

Executive Management

Justine CampbellChief Financial Officer

Rod BowesEGM - Proposals

Charles SweeneyEGM - Construction

Adam GoldsmithEGM – Commercial and Risk

Page 5: CIVMEC LIMITED - Singapore Exchange · • Continue to provide cost effective, intelligent engineering solutions for our clients. • Maintain disciplined approach capital management.

We are an Australian based multi-disciplinary construction and heavy engineering provider, with major facilities in Henderson, WA and Newcastle, NSW and satellite offices in Broome, Darwin, Gladstone and Sydney, offering an integrated turnkey solution to the oil and gas, metals and minerals, infrastructure, marine and defence, water and energy markets.

5

About Civmec

Page 6: CIVMEC LIMITED - Singapore Exchange · • Continue to provide cost effective, intelligent engineering solutions for our clients. • Maintain disciplined approach capital management.

6

Financial Performance

Page 7: CIVMEC LIMITED - Singapore Exchange · • Continue to provide cost effective, intelligent engineering solutions for our clients. • Maintain disciplined approach capital management.

7

Balance Sheet

March 2018A$m

June 2017A$m

June 2016A$m

Current assets 305.8 176.7 126.0

Non-current assets 141.2 130.9 132.1

Total assets 447.0 307.6 258.1

Current liabilities 203.4 85.0 69.7

Non-current liabilities 65.1 57.5 28.0

Total liabilities 268.5 142.5 97.7

Equity 178.5 165.1 160.4

Strong balance sheet underpinned by high quality asset base

Property, Plant & Equipment of $138.8m

Cash of $52.0m and minimal debt as at 31 March 2018

Debt to equity ratio of 38.2%

Bank guarantee and surety bond facilities of $291.8m

Page 8: CIVMEC LIMITED - Singapore Exchange · • Continue to provide cost effective, intelligent engineering solutions for our clients. • Maintain disciplined approach capital management.

8

SectorsWe are a multi-disciplinary construction and engineering service provider and are strongly focused on servicing the following sectors:

Page 9: CIVMEC LIMITED - Singapore Exchange · • Continue to provide cost effective, intelligent engineering solutions for our clients. • Maintain disciplined approach capital management.

9

Key Activities

Page 10: CIVMEC LIMITED - Singapore Exchange · • Continue to provide cost effective, intelligent engineering solutions for our clients. • Maintain disciplined approach capital management.

10

Revenue by Sector

23%

43%

34%

FY 15-16Oil & Gas

Metals & Minerals

Infrastructure

16%

55%

29%FY 16-17

Oil & Gas

Metals & Minerals

Infrastructure

20%

57%

23% FY 17-18Oil & Gas

Metals & Minerals

Infrastructure

Page 11: CIVMEC LIMITED - Singapore Exchange · • Continue to provide cost effective, intelligent engineering solutions for our clients. • Maintain disciplined approach capital management.

11

Revenue by Geography

3.8% 2.2%0.1%

93.9%

FY 15-16

NSW

NT

18.9%

5.2% 3.1%

0.1%

72.8%

FY16-17

NSW

NT

QLD

SA

WA

11.8%

17.2%

12.1%

0.8%

58.1%

FY17-18 (9mths)

NSW

NT

QLD

SA

WA

Page 12: CIVMEC LIMITED - Singapore Exchange · • Continue to provide cost effective, intelligent engineering solutions for our clients. • Maintain disciplined approach capital management.

Our Locations and Major Projects

12

PROJECT MARKET LOCATION

1 Offshore Patrol Vessels Marine and Defence Henderson, WA

2 Amrun – Processing Plant Metals and Minerals Weipa, QLD

3 Gruyere Gold Project Metals and Minerals Yamarna, WA

4 Altura – Pilgangoora Lithium Metals and Minerals Port Hedland, WA

5 Pinjarra Filtration Project Metals and Minerals Pinjarra, WA

6 Sydney Light Rail Infrastructure Sydney, NSW

7 Northwest Rail Link Infrastructure Sydney, NSW

8 Woodman Point Wastewater Treatment Plant

Infrastructure Woodman Point, WA

9 Ichthys LNG Project Oil and Gas Darwin, NT

10 Jemena Northern Gas Pipeline Oil and Gas Tennent Creek, NT

Order Book in excess A$800m (March 2018)

Page 13: CIVMEC LIMITED - Singapore Exchange · • Continue to provide cost effective, intelligent engineering solutions for our clients. • Maintain disciplined approach capital management.

13

Current Major Projects

PILGANGOORA LITHIUM PLANT• Contracted for the concrete,

civils, fabrication, structural, mechanical and piping, electrical and instrumentation packages for the 1.5Mtpa lithium plant

• Completion due August 2018

OFFSHORE PATROL VESSELS• Supply and processing of steel for

all 12 Offshore Patrol Vessels. Fabrication and construction for 10 Offshore Patrol Vessels.

• Completion due 2029

GRUYERE GOLD PROJECT• Engineering, Procurement and

Construction (EPC) contract for the Gruyere Gold Project, Located approximately 1200 kilometres east of Perth. (in JV with Wood Group)

• Completion due March 2019

PINJARRA ALUMINA REFINERY• Engineering, Procurement and

Construction (EPC) contract of a filter building facility, a materials handling system and associated supporting services infrastructure.

• Completion due March 2019

Page 14: CIVMEC LIMITED - Singapore Exchange · • Continue to provide cost effective, intelligent engineering solutions for our clients. • Maintain disciplined approach capital management.

14

Current Major Projects

Gorgon LNG Project• Total supply of 28,000T site wide

structural steel, pipe spools, Subsea Pig Launcher/Receiver (SSPLR), 1000T of drill casings, refurbishment and 50,000m3 precast concrete.

• Ongoing works since 2011 to present

NORTHERN GAS PIPELINE• Contracted to carry out site civil

works, earthworks, structural mechanical and piping, electrical and instrumentation work for the Phillip Creek Compressor Station.

• Completion due August 2018

ICHTHYS CCPP• Contracted for trenching and

inground services, formwork reinforcement and placement of in-situ concrete, civil works, onsite painting, industrial insulation / cladding, erosion and sediment control and grouting

• Completion due September 2018

AMRUN PROJECT (two contracts)• Supply of stacker and tripper,

reclaimer and ship loader.

• Supply, fabrication, surface treatment, modular assembly, site civil, SMP, E&I works for the process plant.

• Completion due Oct 2018

Page 15: CIVMEC LIMITED - Singapore Exchange · • Continue to provide cost effective, intelligent engineering solutions for our clients. • Maintain disciplined approach capital management.

15

Past Major Projects

Jimblebar Expansion Project Perth Stadium

Prelude FLNG Project

Yandicoogina Sustaining Project

Wheatstone LNG ProjectMatagarup Bridge

Page 16: CIVMEC LIMITED - Singapore Exchange · • Continue to provide cost effective, intelligent engineering solutions for our clients. • Maintain disciplined approach capital management.

16

West Coast Facility

Site Support Logistics Base– 2,300m2

Office Headquarters– 6,500m2

6,000T Wharf

3,000T Wharf

15,000T Wharf

12,000T Floating Dock

Heavy Engineering Facility – 29,300m2

Surface Treatment Facility – 4,800m2

Exotic Materials Facility – 1,200m2Shipbuilding Facility- 53,000m2 Gross

Multi-level Carpark

Paint and Blast Facility- 2,400m2

Green = New Facilities

Page 17: CIVMEC LIMITED - Singapore Exchange · • Continue to provide cost effective, intelligent engineering solutions for our clients. • Maintain disciplined approach capital management.

17

Newcastle Development

Current Facility Proposed Long-term Development

Heavy Engineering Facility

Surface Treatment Facility

Production Facility

Ship Lift - 2018

Marine Maintenance - 2018

Page 18: CIVMEC LIMITED - Singapore Exchange · • Continue to provide cost effective, intelligent engineering solutions for our clients. • Maintain disciplined approach capital management.

• A further $80 million investment in the new ship building and maintenance facility completed with surface treatment capability

• Providing additional jobs for up to 1,000 craft and up to 100 trainees and apprentices

• Offering innovative and cost saving initiatives

• Rival the best shipyards in the world

• Partnering with Luerssen to grow capability and allow technology transfer

• A new joint venture established Australian Marine Shipbuilding Export Group (AMSEG)

18

Future In Australian Shipbuilding

Page 19: CIVMEC LIMITED - Singapore Exchange · • Continue to provide cost effective, intelligent engineering solutions for our clients. • Maintain disciplined approach capital management.

• Direct workforce of approximately 2,600 employees.

• Current apprentices, trainees, graduates approximately 80.

• Never Assume culture program relates to the principals and values adopted by all and underpins the culture of Civmec.

• Ongoing commitment to indigenous employment and business procurement, implemented inaugural Reconciliation Action Plan.

19

Health, Safety and People

Page 20: CIVMEC LIMITED - Singapore Exchange · • Continue to provide cost effective, intelligent engineering solutions for our clients. • Maintain disciplined approach capital management.

20

Investing in our People

‘Success is growing and developing a loyal, highly skilled and competent workforce.’

Page 21: CIVMEC LIMITED - Singapore Exchange · • Continue to provide cost effective, intelligent engineering solutions for our clients. • Maintain disciplined approach capital management.

21

Civtrac – Our Operational Management System

Design Input > Fabrication > Assembly > Transport > Installation > Commissioning

Material Trace / BarcodingProgress Tracking in the Field

Productivity Tracking

Engineering Change ControlFinancial Control

Client Transparency

A single platform capturing project delivery data from design to commissioning. Providing key insights and controls to ensure delivery of a quality product, on time and on budget.

Page 22: CIVMEC LIMITED - Singapore Exchange · • Continue to provide cost effective, intelligent engineering solutions for our clients. • Maintain disciplined approach capital management.

22

Business Management SystemA documented business management system encompassing all aspects of our business, available to employees via the company intranet.

Consistent and Efficient ProcessesCommunication and Engagement Tool

Management of RiskCompliance with Legal Obligations

ACCREDITATIONS

ISO 9001 Quality

OHSAS 18001 Health & Safety

Federal Safety Accreditation

ISO 14001 Environmental

ASI Enviro Sustainability Charter

ISO 3834-2 Welding

SCA-031 Structural Steel

Page 23: CIVMEC LIMITED - Singapore Exchange · • Continue to provide cost effective, intelligent engineering solutions for our clients. • Maintain disciplined approach capital management.

OUTLOOK

Data combined from sources: BIS Shrapnel – October 2017, Defence - 2016 Department of Defence Integrated Investment Program, BCI Australia

Note: Opportunities in regions across the markets we operate. According to the Australia Defence White Paper a further $195bn will be allocated over the following decade.

Total ~A$800b

23

$190b

$30b

$58b

$205b

$205b

$116b

• Forecast capital spending metals and minerals, oil and gas and infrastructure over the next 10 years is very strong in Australia. (~A$800b)

• Targeting further involvement in future Naval Defence Acquisition Program.

• Tendering activity is strong across the sectors.

• Positive order book providing solid platform –in excess of A$800M (as at March 2018).

• Positive about the medium to long-term outlook for the group.

Page 24: CIVMEC LIMITED - Singapore Exchange · • Continue to provide cost effective, intelligent engineering solutions for our clients. • Maintain disciplined approach capital management.

We have established a comprehensive strategy to diversify through a broadening of services and extending reach into new markets.

• Continue to provide cost effective, intelligent engineering solutions for our clients.

• Maintain disciplined approach capital management.

• Further grow and expand our capabilities and secure work in the defence and water and energy markets.

• Complete construction of state-of-the-art shipbuilding and maintenance facility which will play a major role in the company’s long term future, align with the Australian Governments Defence Integrated Investment Program.

• Pursue other initiatives to advance long-term growth strategies that deliver sustainable earnings

24

FUTURE STRATEGY

Page 25: CIVMEC LIMITED - Singapore Exchange · • Continue to provide cost effective, intelligent engineering solutions for our clients. • Maintain disciplined approach capital management.

EGM held to amend the company constitution to clear the way for dual listing – 100 % yes vote.

Information Memorandum lodged with ASX for approval.

An ASX dual listing will –

• Increase Civmec’s profile in the Australian market

• Open up new opportunities in the Australian market where our business is focused

• Significantly broaden Civmec’s shareholder base

• Expose Civmec to the large pool of funds available for investment in Australia

25

DUAL LISTING ON ASX

Page 26: CIVMEC LIMITED - Singapore Exchange · • Continue to provide cost effective, intelligent engineering solutions for our clients. • Maintain disciplined approach capital management.

THANK YOU

26

JAMES FITZGERALDExecutive Chairman

16 Nautical Drive, Henderson WA 6166T: +61 8 9437 6288E: [email protected]

KEVIN DEERYChief Operating Officer

16 Nautical Drive, Henderson WA 6166T: +61 8 9437 6288E: [email protected]