Civil Work Punchlist

download Civil Work Punchlist

of 14

description

abc

Transcript of Civil Work Punchlist

CIVIL WORK PUNCHLIST

Date issue: 12/4/2015

FacilityNo.PlotDescription Picture before be rectifiedPicture after rectify be rectifiedDate StartDate completeCheck by SGSCheck by TAPRemark

Close sampling11Dn keo v ct vt cho 4 ng thot nc, bt thm ai gi ng

Fill the glue and chamfer 4 downspout pipeClosedBut the handover minutes TAP still kept, didn't handover to WEC

Close sampling21V sinh mng bm v nn nh (x l b tng khuyt tt)

Clean pump foundation and ground floorClosedBut the handover minutes TAP still kept, didn't handover to WEC

Technical pad14Trt li tng Bundwall cho Technical pad (b va)Finishing bundwall for Technical pad (surrounding curb)17-Dec-1519-Dec-15closed

Technical pad24V sinh, c ta mng bmCleaning, finishing pump foundation17-Dec-1519-Dec-15closed

Technical pad34V sinh cc ng cng ngh (chn ng)Cleaning bottom all pipes17-Dec-1519-Dec-15closed

Technical pad44T trt, hon thin li cc h gaFinishing the top wall of all manholes17-Dec-1519-Dec-15closed

Technical pad54c ta, t trt li cc mng gi ngFinishing all pipe supports17-Dec-1519-Dec-15closed

Technical pad64V sinh, c ta nn nhCleaning, finishing Technical pad floor17-Dec-1519-Dec-15TAP yu cu x l nc ng nn nh, gn bm RTP

Guard house -P111Make the tag name for MCB, supplement drawing at electrical panelK hiu MCB, s nguyn lClosedThe handover minutes TAP handover to WEC

Guard house -P414Clean, plaster and repair the flower bed (asphalt road wall side) (airport side) (axis 1)Dn dp, t trt li bn hoa, pha ng nha (gip vi sn bay)ClosedThe handover minutes TAP handover to WEC

Unloading place14Hon thin li mt o ti trc 1 (pha Technical pad)Finish the surface for Unloading island (Technical pad side)

Unloading place24V sinh chn tng ca cc o v chn b va ti trc 1, v cc o cn liClean the bottom of wall all Unloading islands and bottom of road curb at axis 1

Unloading place34V sinh chn cc ng cng ngh b bn do b tng ti tt c cc oClean the pipe (bottom) at all the Unloading islands

Unloading place44Thay 05 nt bt cho cng tc n chng chy nReplace 05 plug for Ex lighting switch

Unloading place54Kim tra mu sn v sn li ti nhng v tr lan can c lm thm (sn thao tc)Check the paint colour and fix the paint of Unloading platform handrall at additional positionok

Unloading place64Sn li sn lt ti nhng v tr b trc sn, sn xiFix the paint of Unloading folding stairok

Unloading place74Kim tra ri ca bng nCheck the illuminance of lighting

Unloading place84Gn ai ng thot nc trc 1ok

Fire building11V sinh chn ct thpClean the bottom of steel column15-Dec-1516-Dec-15closed

Fire building21Lp li gi cho ng k thut, trc 1, pha trong phng inFix the support for Pipe, axis No. 1, inside the Electrical room.15-Dec-15closed

Fire building31B tr li ng ng thot nc cho my lnh (thay bng ng uPVC, i mt trong phng in)Re-install the waste pipe of Air conditioner (replace by uPVC pipe, install inside the Electrical room)15-Dec-15closed

Fire building41Yu cu thm 03 n Emergency (bn PCCC yu cu) v 1 cm cng nghip 1 pha -16A ly t ngun MCC3Supplement 03 Emergency light (Firefighting department request) and 01 Industrial socket 1 phrase - 16A from MCC315-Dec-1516-Dec-15closed

Fire building51B sung Tag name cho t in, s nguyn l, CB, cng tc. Sit cht thm cc Cable glandSupplement Tag name for Electrical cabinet, single line diagram. Tighten the cable gland15-Dec-1516-Dec-15closed

Fire building61Tng ngoi nh sn cha hon chnhclosed

Fire building71Sn nn nh ngay ca ra voclosed

Bike parking11Thay cng tc n ngoi triReplace the lighting switch15-Dec-1516-Dec-15closed

Bike parking21Sit cht cable gland cho hp box bo chyTighten the cable gland for Fire nortifier15-Dec-1516-Dec-15closed

Bike parking31V sinh chn mng v ng thot ncClean the Stump and drain water downspout15-Dec-1516-Dec-15closed

Bike parking41Sn dm v nhng ch b r st kt cu thpFix the paint of steel structure15-Dec-1516-Dec-15closed

Bike parking51Hon thin li cc g cnh ca nn nhFix and finish the edge of ground floor15-Dec-1516-Dec-15closed

Pump pad11Thay 1 nt bt 1" NDT cho cng tt n (PVM)Replace 1 inch plug NDT for light switch

Pump pad21X l ron cho nn nhFinish the joint for ground floor

Pump pad31Chnh sa cc vng thp ca np h ga in (c, trm trt, g cho phng mt vi np h ga)Finishing the steel ring of Electrical manhole cover (clean, fix the concrete for level of ring same level of cover)closed

Pump pad41Lp t li gi ng cho ng cha chy (gn Slop tank)Re-install the pipe support for Firefighting pipe (near slop tank)closed

Car parking14Lm kn cng tc nuSeal lighting switchclosed

Car parking24Ct thp tha v sn li b m ctclosed

Truck repair shop14Adjust 3 discharge pipes through drainage trench coverBm chm: iu chnh 3 ng thot nc cho bm chm, xuyn np y mng thot nc.closed

Test house14V sinh nn nhClean the floor (ground floor)closed

Control building11Nt tng ti v tr Access control phng lm vic Ch u tCrack the wall at Access control system p- TAP's office room (1st floor).okDng silicon seal nt nht ACS

Control building21Thiu n Exit ti cu thang Tng 1Missing the Exit light at stair (1st floor)

Control building31Hng kha ca chnh pha cu thang ngoi phng lm vic SGS (phng c trn lu 1)Spoil the lock of door at external stair - SGS's office room (1st floor)ok

Control building41Sn hon thin tng ti v tr di my lnh phng iu khin (lu 1)Paint the wall at below the Air conditioner - Control room (1st floor)ok

Control building51Kim tra pin sc n Emergency light tt c cc phng (khng sng hoc sng mt thi gian ngn)Check the batery for Emergency light all rooms (can not open or open in sort time)

Control building61Hng ca phng v sinh tng trtSpoil the lock of door WC room - Ground floowok

Control building71Lp t thiu qut ht phng k thut (tng trt)Supplement exhausting fan - Technical room - ground floor

Control building81Phng k thut tng trt: b sung np y mng cp, v x l vt nt tng di my lnhTechnical room ground floor: supplement cover for cable trench and fix the wall cracking below the Air conditioner?

Control building91Hng nam chm gi ca ti v tr ca chnh ra voFix the magnet latch at Entrance door - ground floorok

Control building101V sinh mt Granit b bn do b tngClean the granit impure by concreteok

Control building111Hon thin li mt ch p chn tng ti mt sau nh (b ri khi tng)Fix the coping stone at bottom of external face of wall behind buildingok

Control building121Dy in cho my bm ti tng mi ti v tr thang lng ngoi nh, ch u t yu cu phi c t trong ng in bng thp.Electrical wire of booster pump at roof floor (external ladder), TAP request the wire must put in steel pipe

Control building131n trong phng Toilet n khng sngSpoil the light in Female WC

Control building141Hon thnh v bn giao h thng Access controlFinish and hand over the Access control system

Control building151Hng kha ca s phng ra - trong phng th nghim

ok

Control building161n phng ra, cng tc chung vi cng tc phng nh

Control building171Thiu n Emergency phng in

Control building181Lm gn li cp in sau t RIO + V sinh

Electrical building11V sinh nn nhClean the floor inside builidngWait Phu Thai T&C genset to finally clean this building

Electrical building21Gn tag name cho CB v dy in trong t chiu sngSupplement tag name for CB, wire in Lighting cabinet

Electrical building31B sung np bt cho cng tc in (gn Fire notifier)Supplement cover for Electrical socket (near Fire notifier)

Electrical building41B sung Terminal cho hp u ni ca t DBL-ESupplement terminal for Connecter DBL-E

Electrical building51Kim tra v chnh n Emergency cho khng nghingCheck and horizonetal align the Emergency light.

Electrical building61B sung Remote v gi cho my lnhSupplement remore control and support for Air conditioner26-Dec-15TAP/SGS will re-inspected to clear punch list

Electrical building71Trt li tng ti phng my phtFix the wall at Generator room25-Dec-15TAP/SGS will re-inspected to clear punch list

Electrical building81Sa cha, thay th Granit mt bc thangFix, replace the granite for tread of stair15-Dec-15closed

Electrical building91Phng bin th trn lu: sn li tng ti v tr n Emergency (lu 1)Transformer room first floor: fix the paint at Emergency light

Electrical building101X l vt nt tng mt ngoi phng in tng 1Fix the wall cracking outside Electrical room - First floor

Electrical building111Trm li cc mch ca gch chng nngFill the joint of Terra-cotta floor tile25-Dec-15TAP/SGS will re-inspected to clear punch list

Electrical building121Np y cho l xuyn sn t tng 1 xung tng trtSupplement the cover for slab opening from first floor to ground floor21-Dec-15TAP/SGS will re-inspected to clear punch list

Electrical building131B sung granit cho chn tng cu thang ngoi (ti mp ca)Supplement granite tile at bottom of wall outside external staircase (at outsite the door)15-Dec-15closed

Electrical building141Thay cover cho cng tc n phng my bin pReplace the cover for Lighting switch at Transformer room15-Dec-15closed

Electrical building151Sn dm v li tng ngoi pha bn nc cha chy.Fix the paint outiste building - Fire water tank site25-Dec-15TAP/SGS will re-inspected to clear punch list

Electrical building161Chnh li cht ca (ca chng chy)25-Dec-15TAP/SGS will re-inspected to clear punch list

Electrical building171Gn thm cht ca cho cc ca thp25-Dec-15TAP/SGS will re-inspected to clear punch list

Electrical building181V sinh, em vt t tha ra ngoi phng my pht25-Dec-15TAP/SGS will re-inspected to clear punch list

Electrical building191Lm li cht ca cho phng phn phi tng 125-Dec-15TAP/SGS will re-inspected to clear punch list