1DESCRIPTION CI TO F 1CY 29,000
LENGTH LFNo Equip Each Total GAL/HR
1 FM $99 $99
2 GC $84 $168
LABORER $61 $0 0
4 CAT 657 $254 $1,016 128
CAT 637 $184 $0 0 WATER TRUCK CALCULATIONCAT 11 R/T $309 $0 0 CY/Hr Gal/CY Gal/Truck LPH # Trucks
1 CAT D10T $214 $214 20 2,365 20 3800 4 3.11
CAT D10N PUSH $204 $0 0
CAT D9T $195 $0 0
CAT D8R/T $184 $0 0 Cut Area Cut CY/FT
1 CAT 834 $145 $145 17 Fill Area Fill CY/FTCAT 824 $135 $0 0
1 CAT 16G $150 $150 8
1 5X5 $8 $8 0
DISK $48 $0 0
4000 GAL WT $90 $0 0
CAT 651 WP $156 $0 0 Grade Variance
CAT 657 WP $166 $0 0 Cut Elevation to = 380
CAT 773 $179 $0 0 Fill Elevation to = 305
CAT 950 $109 $0 0
CAT 966 $123 $0 0 PRODUCTION
CAT 980 $154 $0 0 Min. 55.0 Min's/Cycle 2.60 LDS/HR 21.1CAT 990 $259 $0 0 TYPE 657 NO. 4 YIELD 28.0 LDS/HR 21.1 2365 CY/HR
CAT 345 $140 $0 0 Min. 55.0 Min's/Cycle 2.60 LDS/HR 21.1CAT 365 $174 $0 0 TYPE NO. YIELD LDS/HR 21.1 0 CY/HR
Elev. Cycle Dist Gear MPH % Total
TOTAL $1,800 173 St/Stop Load 1.00
380 380 Haul 400 5th 12 15.0% 0.38
COST/HR CY/HR COST/CY 200 6th 15 7.5% 0.15
$1,800 2,365 $0.76
HOURS
12
GALLONS
2,121
Dump 0.60305 Return 200 6th 15 7.5% 0.15
400 5th 14 15.0% 0.32
1200 2.60
HAUL #
CYCLE TIMEHAUL LENGTH
UNIT COST
1200
HAUL SHEET