    Module : Civil Engineering Projects: General

    In this lecture,

    we shall enumerate the

    various civil engineering projects

    and

    discuss their characteristics.

    The art of construction has slowly developed into a science over the centuries. Civil engineers are involvedfrom conception to physical realization of the project. We shall first enumerate the different civil engineering

    projects.

    Building Project

    1. Residential building, town planning

    Govt Staff Quaters Residential Buildings

    Find out the height of the residential buildings in your locality. What are the materials used? What are thevarious functional requirements?

    2. Other buildings -

    Academic building such as institutes, university and schools, hospitals, temples, government and privateoffices, commercial complexes, recreational building such as auditorium, cinema hall, theaters, stores,warehouse, light manufacturing plants.

    PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com

    http://www.docudesk.com/http://www.docudesk.com/
  • 8/9/2019 Civil Engine Ring Project Management

    2/18

    Guest House School Hospital Temple

    Depending upon the level of development of a country, these construction projects constitute large share.Developed countries have more facilities in this area than porly developed countries.

    Transportation systems

    Bridges and flyover, roads, railways, airport, urban mass transit system such as mono railway and ropeways ,town planning, port and harbour, tunnel.

    Bridges & Flyover Airport Road

    These are basic infrastructural projects. Developing countries are spending major of its budget on theseprojects.

    Hydraulic structures

    Dam, barrage, canal, hydroelectric power plant, tunnel, embankment, flood control system.

    Dam Canal Barrage

    PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com

  • 8/9/2019 Civil Engine Ring Project Management

    3/18

    For a country whose economy is dependent on agriculture, these are major infrastructural projects. Indiaspent almost 1/5 th of its planning budget on these projects in first and second five year plan.

    Fossil fuel and Nuclear power plants

    Fossil fuel and Nuclear power plants

    Nuclear Plant

    Thermal Power Plants

    Energy is vital for survival. The generation of electricity is carried out from coal, petroleum and nuclear fuel.

    Offshore Stuctures

    Tension Legged Platform

    These are huge steel and concrete structure in sea, used usually for petroleum extraction.

    Space based and defense structure

    Army Cantonment, missile launch pad, bunkers

    PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com

  • 8/9/2019 Civil Engine Ring Project Management

    4/18

    Army Cantonment Missle Launch Pad

    Defence is an important part of any country. Thses are huge civil engineering construction projects related todefence. Technology involved is very sophisticated.

    Industrial Structures

    Petrochemical refinaries, small and large scale manufacturing plants, silos, bunker, mine developments.

    Refinary

    These are the backbone of modern growth of a country.

    Communication System

    Transmission line tower, communication network, TV Tower.

    PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com

  • 8/9/2019 Civil Engine Ring Project Management

    5/18

    Transmission Line TV Tower

    These structures are lifeline for present activities

    Water and waste project

    Water treatment plant Water distribution system - pipe, water tanks Sewage and storm water collection system Sewage treatment plants Sewage disposal system

    Water Treatment Waste Water Treatment Effulent Treatment

    These structures are important for environment friendly living and healthy life.

    Special Projects

    High altitude construction project, marine exploration project.

    PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com

  • 8/9/2019 Civil Engine Ring Project Management

    6/18

    High altitude construction

    These are used for scientific exploration, strategic importance.

    Summary

    Our basic purpose here is to introduce you about thetype of projects a civil engineer involves.

    We enumerated various projects

    Module : Civil Engineering Projects (Overview)

    In the following,

    we shall talk about

    Characteristics of Civil Engineering Projects

    and

    Group them .

    Classification Of Civil Engineering Projects:

    Civil Engineer Project manager or construction manager has to interact with various field of specializationsdepending upon the type of the project.

    A project manager involved in the construction of hospital has to interact with medical professional.

    PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com

  • 8/9/2019 Civil Engine Ring Project Management

    7/18

    Similarly, the construction of petroleum, refinery involves the complex interaction with chemical engineer,mechanical engineer, electrical engineers.

    Based on the intersection of knowledge and interaction with other disciplines, civil engineering projects can begrouped as follows.

    Building Projects Heavy engineering Project Industrial Projects

    Building construction projects can be further divided into Residential Buildings and commercial buildings. Weshall discuss the nature of the project next :

    A. Building Construction:

    During design phase, building design is coordinated by architect who works with other engineeringdisciplines such as structure engineer, electrical engineer whereas construction phase is coordinatedby the civil engineers. But group leader in the building projects is generally architect. Building projectcan further be classified into

    o Residential Buildingo Commercial and other buildings.

    Residential buildings in India are primarily single or double storey building. Multi-storied residentialbuildings are also getting constructed. Other building project produces variety of building ranging fromhospital, temples, and small stores to commercial office tower, theatres and cinema hall, governmentbuildings, recreational facilities, small schools to new institute like IIT or university.

    Economically building project accounts for around 60 to 70 percent of construction project in acountry. But most of the constructions are carried out in an unorganized way. In India, buildingconstruction projects are very fragmented and majority of construction in rural and semi urban area iscarried out by non-engineering ways. Building construction in India is highly labour ?intensive. Most of

    the labourers employed for building projects are semi-skilled and untrained. Uses of heavyequipments are very rare. Building projects are governed by many local as well as general laws, suchas municipal laws, building laws etc.

    B. Heavy Engineering Construction:

    Heavy engineering construction includes primary infrastructural facilities such as transportationsystem railways, road, bridges, mass transit system, hydraulic structure (Dam, barrage, flood controlsystem, hydro electric power, irrigation system) water treatment and water supply system, waste watertreatment and its disposal, power line transmission.

    Heavy engineering construction accounts for around 25-30 percent of total construction.

    Construction is carried out by reputed big company.

    Heavy engineering projects are mostly financed by government. These are primarily infrastucturalprojects.

    Design as well as construction in these projects is the primary job of civil engineers although inputsfrom other departments play an important role.

    Heavy engineering project are highly equipment intensive and large quantities of materials are used.

    PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com

  • 8/9/2019 Civil Engine Ring Project Management

    8/18

    C. Industrial Project:

    Industrial Projects are highly specialized projects and it is dominated by large construction firms.

    These projects include power plants(fossile fuel, nuclear power), petroleum refineries and petro-chemical plants, fertilizer plants, large steel plants, heavy manufacturing plants, aircraft industry.

    Industrial projects accounts for only 10 percent of the total construction projects, but it requires highestlevel of engineering expertise from various engineering disciplines, such as chemical, mechanical,electrical engineering.

    Industrial constructions are very specialized job and consists of large complex mechanical, electrical,instrumentation work.

    Construction is dominated by skilled labour and quite labour intensive compared to heavy engineeringbut large equipments are also used

    Summary

    We have talked about some aspects of Civil

    Engineering projects and

    Grouped them

    in building projects, heavy projects and industrial

    projectsModule : Civil Engineering Projects (Useful Terms)

    In the subsequend discussions,

    we shall be using certain terms

    of ManagementLet us define them now

    Planning :

    Predetermined course of action to obtain the desired project activities. It also involves the formulation ofalternatives and chooses the best suitable. During planning phase, project is required to be split up into welldefinable work in terms of time and resources.

    PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com

  • 8/9/2019 Civil Engine Ring Project Management

    9/18

    Scheduling:

    It is the arranging of the work plan in the sequence of time.

    Scoping :

    Scoping is the defining the object of the project. Thus, the project must be stated in the definite endmeasurable terms, which include costs, schedule or quality of performance. Thus we obtain realistic andspecific objective of the project during scoping.

    Organizing :

    Integrating the resources in the project is termed as organizing. Money, equipment, time, technology,manpower, materials are resources. Putting them together to obtain desired result in organizing.

    Controlling :

    Controlling is the monitoring, influencing and directing the project.

    The progress of project is assessed through suitable measure; deviations are discovered and correctivemeasures are taken to rectify the deviation.

    Following steps are involved in controlling a project.

    Assess the progress of the project, measure quality and flow of money. Compare with original schedule, specification, design. Also obtain the quality of conformance. Take necessary action to correct if there is any deviation from the earlier plans.

    Directing:

    It is function of project leader to give instructions to subordinates, supervise their work and corresponds to the

    report when they give as feedback. Basically directing is linked with organization setup of projectmanagement team.

    Staffing:

    This is the process of dividing the project work and placing suitable person at the appropriate positions.Recruitment, training and their assessment are part of staffing.

    Coordinating:

    This is the process of interaction between different departments or functionalities in the project managementgroup which generally follows pyramidal structure.

    Estimation:

    Estimation evaluates the resources in terms of cost. Planning evaluates the resources in terms of time.Adding both together as is necessary to obtain thecash flow.

    Summary

    PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com

  • 8/9/2019 Civil Engine Ring Project Management

    10/18

    We shall be using these terms frequently.

    We shall introduce

    Life Cycle Of a ProjectThe Life Cycle of a Civil Engineering Project

    Civil Engineering project starts with idea, requirement to fulfill demands, will to provide basic amenities to thecitizen by the state. Project ends with the infrastructure of facilities, recreational amenities, industrial plants inoperation as reality.

    The phases through which a civil engineering project passes are:

    1. Conceptual and Feasibility Studies.2. Engineering Design.3. Contracting and Procurement4. Construction.5. Commissioning of a project Start-up and Implementation6. Utilization and Maintenance.

    Every civil engineering project is unique in its character and varies with respect to time and degree ofemphasis with respect to the aforementioned phases during its life cycle but these projects certainly passesthrough these phases. A bar-chart is shown for a typical project is show in the next slide.

    PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com

  • 8/9/2019 Civil Engine Ring Project Management

    11/18

    Depending upton the contractual relations and way of project management, design and construction canoverlap to the various degrees

    1. Conceptual and Feasibility Studies- In this stage, ideas generated by indivviduals / a group ofpeople are studied. Following important points are carried out to establish the viability of the project.

    o Conceptual development of the model and its studieso Technical and economic feasibility studieso Enviromental impact assesmento Social Impact assesmento Land and geological survey-location of the projecto Enumeration of major problems in translating the project to reality

    Example: Suppose a state highway is crossing the railway line. The idea is to construct a fly over .This is situated in a small district level town. Here the project is the construction of the flyover. In thisphase, the following points are examined-

    g. Based upton the level of traffic, the basic model of the fly over is prepared, withrespect to width, length of the approach road, etc.

    h. The cost of construction is roughly estimated and source of money discussed.i. Is it necessary to have a fly over now ? This point is studied with regard to the level of traffic on theroad as well as on the railway line. If the traffic load is low, the project may be discarded based on cost-benifitanalysis.

    j. How to relocate any power line comming in the construction area.k. Preliminary soil investigation

    These points basically come under the conceptual model & technical and educational studies.Environment project assesment is not very important for this project. But a thorough study ofthe environment project impact has also to be carried out for the construction of Dam, Nuclearpower plant, etc. In out country many of bitg dams such as Narmada and Tehri Dam has beendelayed due to the object of enviromental impact. In the USA, many of the Nuclear powerplants were discarded due to the enviromental assesmsent or either got converted to fossilfuel plants.

    Outcome of this stage: A report dealing with investigation and studies concerning theproblems to be encountered and its solution.

    PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com

  • 8/9/2019 Civil Engine Ring Project Management

    12/18

    o Engineering Design - In this stage, project takes the definite shape. All the technical issuesrelated to the project are carried out. Engineers come out with the best alternatives available.Design phase of project is carried out in two phases -

    Preliminary design Detailed design Preliminary design This stage involves primarily the studies of various design

    alternative, their economic comparitive studies and architectural aspect. Also, in thisstage, detailed field investigation such as soil testing, geological, hydrological data

    collection, market survey, etc are carried out. Depending on the nature of the project,various data is collected. It is difficult to say the end of feasibility study and the start ofpreliminary design. These steps are also a part of feasibility study.Example:In the example of a flyover, this steps involve selection of the bridge deck type, i.e.wheather a steel or concrete, boxgrider bridge or prestress. Also the exact dimensionof the flyover is fixed, i.e.

    number of piers, width of foot path, architectural aspect, etc. Also detailed soil investigation and siteinvestigation are carried out to get the idea of method of construction.

    Detailed Design- In this stage, the project is broken down into its components and each of the

    elements are analysed and designated, such that the engineer renders the explicit drawings andspecifications which is used for construction.

    This phase is traditionally involved with designers.

    Outcome of this design phase : The following are the outcome of this phase -

    o Drawing of the structures/facilities to be constructedo Specifications of component to be employed which contain detailed description of the

    amenities to be constructed

    3. Contracting and Procurement In this stage, the bill of quantities are prepared, final cost estinate isworked out. Most of the agreements are signed and relationships between different parties involved isdefined following points are generally addresed during this time. The project has to be executedaccording to the drawing and specification.Also -

    PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com

  • 8/9/2019 Civil Engine Ring Project Management

    13/18

    o Tender notices are advertisedo Qualification of contractor / suppliers is

    studied.o Contract is awarded to execute the worko For many of the projects, such as

    industrial projects, industrial material andequipment to be installed is purchasedOutcome of this stage: Contract

    document, which is a legal documentdescribing the terms and conditions toexecute the project.

    The figure shows the life cycle of an engineeringproject

    4. Construction -This is the most important phase of a civil engineering project, where the major portionof the money is invested. A lot of issues of project management are invloved during this phase. Theproject is realized in the real world. The main work involved during construction is to answer thefollowing questions -

    1. How to do the particular construction (Construction Methods)

    2. How to organize labour and equpmetns to accomplish the construction(Labour and equipments Management)

    3. How to manage materials for constructions

    (Material Management)4. How to breakdown the overall work into small identifiable work called activity and put them in

    sequence(Construction Planning)

    5. How to calculate the time and resources required to complet the activity and obtain thecriricality of the activity(Construction Scheduling)

    6. How to distribute the labour and equipments, in order to accomplish the work in the given time(Labour, equipment, allocation, resource allocation)

    7. How to prepare the bill for the money invested in the construction to get the payment from theclient(Construction Finance)

    8. How to conform the construction is according to drawing the specifications(Quality of conformance)

    9. How to implement the safety measure taken during construction(Construction safety)

    10. How to organize the different personals or the company involved in the construction anddefine relations among them(Constructional Organization management, construction sub contracting, constructionSupervision and method of reporting)

    11. How to check whether the project is accroding to construction schedule and quality(Construction supervision)

    PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com

  • 8/9/2019 Civil Engine Ring Project Management

    14/18

    12. What to do if things are not moving according to plan(Disputes anr arbitration, Labour laws, Penalty)

    13. How to avoid redundancy in the system(Value engineering)Outcome of this stage : Facility or structures

    5. Commissioning of a project - Aim of this phase is to check that the project has been carried outaccording to the contract document. All the facilities developed should function properly as envisagedin the design. Also during this stage changes in the design during the construction is properlydocumented for the purpose of technical performance and financial implications. Following activitiesare carried out during this stage -

    o Check if each component is functioning according to design and specificationo Check if the entire system is functioning accordingly as desiredo To remove the defect if any during construction worko Dream has come to reality

    This is one of the main stage, in the bigger project such as power plant, industrial project,dam, etc, The commissioning in large project is carried out in several stages and then thecomplete system is tested. Testing of components are generally carried out during

    construction phase. Operational and maintanance instruction manuals are also preparedduring this phase.6. Utilization and maintanance -

    o Basic infrastructure facilities created should be utilized to its fullest capacityo Regular repair of the part gettign damaged has to be accomplished

    This stage has become a very important stage in dealing with project when we talk about the life cyclecost of the project.

    Module : Civil Engineering Projects ( Construction as industry )

    Construction as Industry :

    Provides employment on large scale. Developing country ? Labour intensive style of construction If construction project schedules are not maintained, the cost increases by leaps and bounds. Use of machine and equipments in construction industry increases the quality of construction. The art of construction has slowly developed as a science through ages. In our country, building

    construction in rural and semi-urban areas is more or less an art.

    Nature of the Construction industry:

    We can group he various industries into main classes:

    a. Manufacturing Industryb. Services Industry

    In the manufacturing industry, we have a product whose quality is dependent on the process used. There willbe many patients which guides the product. Products are developed as assembly line. The industry is moregoverned by the process and techniques used rather than the quality of work process in generating the capitalinvested are very large .

    PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com

  • 8/9/2019 Civil Engine Ring Project Management

    15/18

    In the service industry, the quality of the job completed is more dependent upon the quality of the personal.Such as in school, the teaching depends more on the quality of teachers rather than anything else. Similarservices of a bank depends on the behavior of the employee of the bank.

    Construction has many characteristics common to both manufacturing and service industries. There is agigantic product, which is building, bridges or dams. Somebody invest for these products but most of theconstruction companies should not be worried about the money invested.

    Also as in other service industries, success or failure in construction is by far more dependent on the qualitiesof its people than it is on technologies protected by patents or by the shear availability of capital facilities, thelatter in particular, is often also very important. So, we can say that construction industry has commoncharacteristics of both manufactures as well as service industries. But construction company constructioncompany works more like services industry, which constitute major partner. Major partner.

    Construction is highly fragmented and sometimes divisive. There are hundreds or thousands of registeredcontractors in particular states with net transaction very less.

    Construction industry is very custom-oriented.

    The construction industry is almost completely incentive oriented.

    Profit in the construction industry is very less. Generally profit in the construction industry is 5 to 10% of theconstruction carried out.

    Research and development expenditure in construction industry is much more less. We can say 0.1 % or lesswhereas in other sector such as electronics industry it may exceed up to 30%. The reason for less R and D isscope for maintaining secrecy. The technique developed by one company will be known to other companywithin a few months. Also there is no unique way to accomplish the work. With minor modifications, things canbe carried to achieve the target.

    Assets of the construction companies are very less as compared to manufacturing companies. Although

    transaction of money involved is very high. Generally a company which is carrying out construction of 100crore will not have permanent assets of more than 20 crore.

    Modern Trends in Construction Industry:

    Information technology has revolutionized the construction industry in terms of use of data; drawing andoperation. Ways of communication have also been affected. Due to advances in the field of Internet, webbased construction management is developing. Early all the data used to be in printed form. Now, these are interms of file or database. These developments have emerged as automated construction managementtechniques.

    Module : Civil Engineering Projects ( Challanges In Construction

    The Challenges of Construction :

    There are three components of project

    a. cost of the project (Budget)b. Quality and quality of construction facilities (Scope)c. Time of completion of the project (Schedule)

    PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com

  • 8/9/2019 Civil Engine Ring Project Management

    16/18

    The job of a project manage is toestablish the balance between theaforementioned three components of theproject. In other ways, challenge inconstruction is to have a Trade-offamong cost, time and quality. Cost, timeand quality depends upon various factorwhich are shown in the figure (3).

    Figure 1

    Following main parties are involved in the construction

    a. Ownerb. Designerc. Contractors

    The relation between these are shown in the figure (2)

    The challenge of projectmanager is to have coordinationamong the owner, designer andcontractor. There is only onegoal of the project to haveconstruction facility. All the three

    should work a as a team inamenable manner.Among the various operationsduring the project, planning,design and construction areprominent activity. One of thechallenge of the project manageis to establish the coordinationand control between planning,design and construction. Hencethese depends upon manyfactors. These features areenumerated in the diagram.

    Figure 2

    In the civil engineering project, depending upon the nature of the work, one has to accomplish some of theactivity. In civil engineering project, the type of management involved are

    a. Functional managementb. Project management

    PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com

  • 8/9/2019 Civil Engine Ring Project Management

    17/18

    The functional management involve in the coordination of repeated work of various nature whereas projectmanagement is the organization of one fine work. Actually in civil engineering project, both type ofmanagement are followed.

    Figure 3

    Module : Civil Engineering Projects(Learning Requirements)

    PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com

  • 8/9/2019 Civil Engine Ring Project Management

    18/18

    Civil engineers in construction industry start their l ife as so called site engineers. There are various jobs to becarried out at the site. In the diagram we have shown the value of the job to be carried out and the learningrequirements of a construction engineer. The diagram also shows the principles behind these activities. Thepurpose of the table is to give an overview of what a construction engineer needs to know.