Civic Design Review Phase 2 - SFGOVsfgov.org/arts/sites/default/files/Headworks_Presentation Phase...
Transcript of Civic Design Review Phase 2 - SFGOVsfgov.org/arts/sites/default/files/Headworks_Presentation Phase...
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 1
SEP 020 Headworks Project July 17th 2017
Civic Design Review Phase 2
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean.
Campus Plan Consolidate and Connect
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean.
Campus Plan Phase 1 New Buildings
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 4
Headworks Existing Conditions
Looking east from Rankin & Evans
Looking west along Evans
Looking west along Evans at Rankin
Project Site
Context. The headworks project is located at the SFPUC Southeast Plant which treats 80% of San Francisco’s wastewater. This project replaces the existing headworks which is at the end of its useful life. The project site is at the corner of Evans Avenue and Rankin Street in the Bayview neighborhood. On the plant side, the site is hemmed in by an above ground treatment basin.
3rd Street Commercial Corridor
Industrial Uses
Looking west at load out bay inside plant
Looking east at load out bay inside plant
Hwy 101
Residential Areas
Caltrain
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 5
Replacement Headworks & Functions
Extent of Art Wall
Electrical Building
Screenings Facility
Grit Tank Facility
Grit Handling Facility
Transformer Building
Odor Control Structure
Program: Influent from the City enters the Headworks via the Bruce Flynn Pump Station. The Screening Facility removes large objects and transfers them to Screenings Handling for trucks to haul away. The influent then enters the Grit Tanks to remove smaller particles, which are transferred to Grit Handling for trucks to haul away. All air is captured and routed back to Odor Control for filtering. Liquids and solids are piped to respective treatment areas at the plant.
1
2
3
4
5
6
7
1 4 5
6
7
6
Existing Headworks
A
B
Circosta Scrap Metal
C
A
B
C
Bruce Flynn Pump Station
Union Pacific Railway
Liquid Treatment Basin 8 8
8
3
2
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean.
Headworks Functions Building as Machine
6
Facility Tours. Visitors to the Headworks enter at the main entry stair and take the elevator to the 3rd floor, where they tour the control room before entering the Screenings area. Then they step out onto the Grit Tank roof before returning to the entry and head to the Biosolids tour route.
Odor Control
Screenings & Loadout
Grit Tank Grit Handling
Electrical & Control Rooms
Influent
To liquids treatment
1
2
3
Main Entry
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean.
Headworks Functions Evans Avenue
7
Grit Handling elevator &
stairs
Grit Tank
Hydraulics & Pipes Influent Pipes & Support Structure
Odor Control Structure
Electrical Conduits
Electrical Substation
Facility Functions. Headworks and Odor Control are sited along the plant property line at Evans Avenue. Multiple functions and structural components are adjacent to the public realm. Architectural cladding and screening, along with the Public Art Wall, work in conjunction to screen most of the functions.
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 8
Evans Ave. Landscape Streetscape Plan
Art Wall Extended Sidewalk Proposed Sycamore Tree
Pairs
Existing Magnolia Trees
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 9
Landscape Material Palette
London Planetree Platanus x acerfolia (Proposed)
Star Magnolia Magnolia stellata (Existing + Proposed)
Atlas Fescue Festuca mairei Cobblestone Decomposed Granite
TREE
S G
RO
UN
D P
LAN
E
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 10
Architectural Material Palette
Structural Concrete
Stainless Steel Mesh Zinc Panels Perforated Aluminum - Art wall
Channel Glass Concrete Reveals Stainless Steel Cable Rail
Aluminum Windows
replace
replace
replace
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 11
Evans Ave. Art WallConcept
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 12
Evans Ave. Art WallTransition to Architecture
Setback Art Wall Option Flush Art Wall Options
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 13
Design Progression Birdseye from Northwest
Phase 2 Informal
Phase 2
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 14
Interior plant road
Design Progression Birdseye from Southeast
Phase 2 Informal
Phase 2
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 15
Design Progression North Elevation
Phase 1
Phase 2
Evans Ave.
Phase 2 Informal
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 16
Phase 1
Design Progression South Elevation
Interior plant road
Phase 2
Phase 2 Informal
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 17
Design Progression East Elevation
Phase 2 Informal
Phase 1
Evans Ave.
Phase 2
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 18
Design Progression Electrical Building / Main Entry
Phase 2 Preferred
Phase 1
Phase 2 Informal
Phase 2 Options
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 19
Design Progression Screenings Handling
Phase 2
Phase 1
Phase 2 Informal
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 20
Screenings Washing Room
Screenings Loading Bay
Screenings Balcony
View from Screenings Balcony
Design Progression Screenings Handling
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 21
Design Progression Grit Handling
Phase 2 Informal Phase 2
Phase 1
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 22
Grit Loading Bay
Grit Hopper Room
Grit Washing Room
Grit Washing Mezzanine
View from Grit Washing Balcony
Design Progression Grit Handling
Grit Washing Balcony
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 23
Design Progression Grit Handling from Evans Avenue
Phase 2 Informal
Phase 2
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. Key Plan 24
Rendering
Concrete Reveals
Zinc Panel
Grit Handling looking Northwest
SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 25
Thank You