City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S...

42
City of Temple Terrace Hillsborough County 2020 Surtax Project Plan APPROVED BY: CITY COUNCIL: Mayor – Mel Jurado Vice Mayor – Frank Chillura Member – James Chambers Member– Cheri Donohue Member – Andy Ross Member – Gil Schisler RESOLUTION: Resolution 101-19

Transcript of City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S...

Page 1: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

City of Temple TerraceHillsborough County

2020 Surtax Project Plan

APPROVED BY:

CITY COUNCIL:

Mayor – Mel Jurado

Vice Mayor – Frank Chillura

Member – James Chambers

Member– Cheri Donohue

Member – Andy Ross

Member – Gil Schisler

RESOLUTION:

Resolution 101-19

Page 2: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

2020 Surtax Project PlanTable of Contents

Page Number Page Description1 Table of Contents2 City of Temple Terrace 2020 Surtax Plan Description3 Article XI Professional Engineer Certification4 Resolution 101-195 2020 Project Plan Overview Map6 2020 Project Plan Cost Estimates and 5-Year Schedule7 2020 Project Plan Cost Estimates and 5-Year Schedule8 2020 Project Plan Cost Estimates and 5-Year Schedule9 2020 Project Plan Summaries

10 2020 Project Plan Summaries11 2020 Project Plan Summaries12 2020 Project Plan Summaries13 2020 Surtax Project Plan Key Sheet

R-01 South of Temple Terrace Golf and Country Club FDR Pavement ImprovementsR-02 South of Temple Terrace Golf and Country Club M/O Pavement ImprovementsR-03 Cross Street M/O Pavement ImprovementsR-04 West and East River Drive Pavement ImprovmentsR-05 Raintree Oaks Micro Pavement ImprovementsR-06 Raintree Terrace M/O Pavement ImprovementsR-07 E Whiteway Drive M/O Pavement ImprovementsR-08 Druid Hills Road M/O Pavement ImprovementsR-09 Pavement Improvements between Whiteway Drive and Druid Hills RoadS-01 Design - Woodmont Charter Sidewalk ImprovementsS-02 Construction - Woodmont Charter Sidewalk ImprovementsS-03 Design - Temple Terrace Elementary Sidewalk ImprovementsS-04 Construction - Temple Terrace Elementary Sidewalk ImprovementsP-01 Riverside Park Pedestrian Bridge EnhancementP-02 Planning - Telecom Parkway Trail SystemP-03 Construction - Telecom Parkway Trail SystemP-04 Planning - Telecom Parkway #2 Trail SystemP-05 Construction - Telecom Parkway #2 Trail SystemP-06 Planning - Old Railway Trail SystemP-07 Construction - Old Railway Trail SystemB-01 Design - 122nd Bicycle EnhancementsB-02 Construction - 122nd Bicycle EnhancementsB-03 Design - 127th Bicycle EnhancementsB-04 Construction - 127th Bicycle Enhancements

MM-01 Design - Overlook Drive Multi-Modal EnhancementsMM-02 Construction - Overlook Drive Multi-Modal Enhancements

W-01 to W-05 Signage Replacement - Zones 10, 5, 11, 7, 9W-06 to W-10 Pavement Markings - Zone 10, 5, 11, 7, 9

Page 3: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

City of Temple TerraceHillsborough County

2020 Surtax Project PlanThe City of Temple Terrace, a municipality within Hillsborough County, will beprovided a portion of the County’s Transportation Surtax fund to improvetransportation across the City. The funding source was approved in November 2018by the electorate of Hillsborough County to levy a one percent (1%) transportationsales surtax. The surtax intended use within the City of Temple Terrace is to be in thefollowing categories:

· Maintenance and Vulnerability Reduction: Improve repair and maintainexisting streets, roads, and bridges, including fixing potholes, or reducecongestion and transportation vulnerabilities.

· Congestion Reduction: To relieve rush hour bottlenecks and improve flow oftraffic on existing roads and streets and through intersections. May includeprojects that improve intersection capacity through the use of technology, theconstruction of new intersections, the redevelopment of existing intersections,and may include related infrastructure such as roundabouts and turn lanes.

· Transportation Safety Improvements: To promote transportation safetyimprovements on existing streets, roads and bridges.

· Transportation Network Improvements: To be expended on bicycle orpedestrian infrastructure and related improvements that make walking andbiking safer, to the extent the foregoing is or is planned to become part of thetransportation network within any Agency’s jurisdiction.

An interlocal agreement was entered into in January 2019 between multiple municipalorganizations within Hillsborough County, including the City of Temple Terrace. Thisagreement requires each municipality within the agreement to create a Surtax ProjectPlan to be submitted annually to the Independent Oversight Committee (IOC) on orbefore September 30th. The City of Temple Terrace has created the 2020 SurtaxProject Plan attached to this document explaining each project that the City intends toimplement with the provided Surtax funds.

Once the IOC has reviewed each agency’s project plan, the results of the annualaudit process and any findings made will be published in an annual report. Thisannual report shall be provided to each agency within the interlocal agreement andpublished online and in newspapers for public review. The IOC will hold a publichearing on each audit and annual report.

APPROVED BY:

CITY COUNCIL:

Mayor – Mel Jurado

Vice Mayor – Frank Chillura

Member – James Chambers

Member– Cheri Donohue

Member – Andy Ross

Member – Gil Schisler

RESOLUTION:

Resolution 101-19

Page 4: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI
Page 5: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI
Page 6: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

HARNEY RD

N53

RDST

NUS

HIGH

WAY

301

N52

ND

ST

NR

IVER

HIL

LSD

RE 113TH AVE

TEMPLE TERRACE HWYBULLARD PKWY

WI L D

E RNE SS

P A RK

OLD

MO

RR

ISB

RID

GE

RD

MISSION HILLS AVE

TELE

COM

DR

SRIVERHILLS DR

HO

LLO

WST

UM

PRD

WEST RIVER DR

E FLETCHER AVE

GAIL DR

N78

THST

BRIG

HTWAT

ERBLV

D NT E

LECO

M PKWY

VAND

ENBER G

HAN

GAR

LN

N61

S TST

127TH AVE

OSPREY DR

E BUSCH BLVD

E JEAN ST

RID

GED

ALE

RD

RIVERGATE AVE

RIVERHILLS DR

E TELECOM PKWY

N60

THST

S ANCT UA

R

Y COVE DR

WOODST O RK RD

E 122ND AVE

TEMPLE HEIGHTS RD

DO

TTIE

DR

HAMPTONOAKSPKWY

E 120TH AVE

OLD TEMPLE TERRACE HWY

OAKHAVEN LN

VANDENBERG AIRPORT RD

RI VERFO

REST

LN

VENETIA PL

RID

GED

ALE

RD

MO

RR

ISBR

IDG

ER

D

N53

R DST

N52

ND

ST

E 122ND AVE

N5 8

T HS T

E 127TH AVE

N5 0

THS T

DA

VIS

RD

HILLSBOROUGH RIVER

HARNEY BYPASS CANAL

H ILLSBOROUGH RIVER

TERR

ACE RIDGE DR

E FOWLER AVE

WHITEWAY DR

DRUID HILLS RD

(/301

E RIVERHILLS DR

MORRIS BRIDGE RD

TERRACE

SPRI N

G

D R

N56

THST

N5 6

THST

N5 6

THS T

DAV

ISR

D

§̈¦75

SUN

NYS

IDE

RD

OVE

RLO

OK

DR

FLOTTO AVE

BRO

AD

WAY

AVE

SHADOW LN

SPR

ING

DA

LEP

L

BAH

AM

AS

AV

E

CROSS STSOARING AVE

RAIN

FORE

STST

E 130TH AVE

RAIN HOLLOW CTGRAPE FERN CT

OAK FERN CT

RAIN BRIAR CT

WOODDUCK PL

TANAGER PL

QUIETWATERS PL

PARADE ST

CHILKOOT ST MAROLDY DR

HIBISCU

SD

R

C A RO

LYNE

ST

CARRIAG

EH

ILLSD

R

LANTERN CR

COACH LN

HER

CHEL

DR

NAN

TUCKET

DR

ROYAN

GREEN

SD

R

TERRACE

HILL

DR

ST AUGUSTINE AVE

FERN CLIFF AVE

PINE HURST AVE

RIVERHILLS DR

EAST RIVER DR

BELLEMEADE AVE

City of Temple TerracePublic Works Utilities

GIS DepartmentSeptember 2019

0 800 1,600FeetMulti-Modal Improvements

Sidewalk Improvements

Roadway Improvements

Pedestrian Improvements

Bicycle Improvements

Hillsborough County Transportation Surtax2020 Project Plan

Overview Map ¯

City Limits

City of Temple Terrace

Page 7: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

MAINTENANCE &

VULNERABILITY

CONGESTION

REDUCTION

SAFETY

IMPROVEMENTS

NETWORK

IMPROVEMENTS

R-01South of Temple Terrace Golf and Country

Club FDR pavement improvements

2,260 LF of FDR along Springdale Place, Glen Oaks

Avenue and S. Glen Arven Avenue per the 2012

Pavement Management Plan

X X $190,000

R-02South of Temple Terrace Golf and Country

Club M/O pavement improvements

12,430 LF of M/O south of the Temple Terrace Golf

and Country Club per the 2012 Pavement

Management Plan

X X $715,000

R-03 Cross Street M/O pavement improvements550 LF of M/O on Cross Street shown in the 2012

Pavement Management PlanX X $32,000

R-04West and East River Drive Pavement

Improvements

8,930 LF of FDR along East and West River Drive,

Falmouth Street and Lamont Place per the 2012

Pavement management plan

X X $745,000

R-05Raintree Oaks Micro Pavement

Improvements

4,100 LF of Micro within Raintree Oaks per the 2012

Pavement Management PlanX X $123,000

R-06Raintree Terrace M/O pavement

improvements

6,500 LF of M/O in Raintree Terrace shown in the

2012 Pavement Management Plan X X $374,000

R-07E Whiteway Drive M/O Pavement

Improvements

5,300 LF of M/O along E Whiteway Drive from

Gillette Avenue to N 56th Street per the 2012

Pavement Management Plan

X X $305,000

R-08Druid Hills Road M/O Pavement

Improvements

8,000 LF of M/O along Druid Hills Road from River

Hills Drive to N 56th Street per the 2012 Pavement

Management Plan

X X $460,000

R-09Pavement Improvements between

Whiteway Drive and Druid Hills Road

12,100 LF of FDR between E Whiteway Drive and

Druid Hills Road and 2,700 LF of M/O between E

Whiteway Drive and Druid Hills Road per the 2012

Pavement Management Plan

X X $1,200,000

S-01Design - Woodmont Charter Sidewalk

Improvements

Design 1500 LF of sidewalk along the north side of E

Whiteway Drive, south side of Parade Street and

south side of Chilkoot Avenue, from N 53rd Street to

N 52nd Street

X X $5,000

S-02Construction - Woodmont Charter Sidewalk

Improvements

Design 1500 LF of sidewalk along the north side of E

Whiteway Drive, south side of Parade Street and

south side of Chilkoot Avenue, from N 53rd Street to

N 52nd Street

X X $150,000

S-03Design - Temple Terrace Elementary

Sidewalk Improvements

Design 1130 LF of sidewalk along the west side of

Broadway avenue from Bullard Parkway to Flotto

Avenue, the north and south sides of Flotto Avenue

from the elementary school to Ridgedale Avenue and

north on Ridgedale Avenue to Fillian Avenue

X X $5,000

S-04Construction - Temple Terrace Elementary

Sidewalk Improvements

1130 LF of sidewalk along the west side of Broadway

avenue from Bullard Parkway to Flotto Avenue, the

north and south sides of Flotto Avenue from the

elementary school to Ridgedale Avenue and north on

Ridgedale Avenue to Fillian Avenue

X X $113,000

P-01Riverside Park Pedestrian Bridge

Enhancement

50 feet of pedestrian bridge enhancements at the

Riverside Park, corner of S Riverhills Drive and

Springdale Place

X X $135,000

$715,000

$32,000

$150,000

$135,000

$745,000

2024 CALENDAR YEAR

$190,000

$123,000

$374,000

$305,000

$460,000

$1,200,000

TOTAL

ESTIMATED

COST ($)

$5,000

$113,000

PROJECT DESCRIPTION

SURTAX BUDGET CATEGORY

$5,000

City of Temple Terrace - Hillsborough County Transportation Surtax 2020 Project Plan

Project Cost Estimates and 5-year Schedule

PROJECT

NUMBER

Pedestrian Paths/Trails

PROJECT TITLE

Roadway Improvements/Maintenance

Sidewalk Improvements

FISCAL YEAR 22-23

2023 CALENDAR YEAR

FISCAL YEAR 19-20 FISCAL YEAR 20-21 FISCAL YEAR 21-22

2019 CALENDAR YEAR 2020 CALENDAR YEAR 2021 CALENDAR YEAR 2022 CALENDAR YEAR

FISCAL YEAR 23-24FISCAL YEAR 19-20

*Printing Directions: To be printed on 11"x17", if not possible see Project Summaries Sheet for details

Page 8: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

MAINTENANCE &

VULNERABILITY

CONGESTION

REDUCTION

SAFETY

IMPROVEMENTS

NETWORK

IMPROVEMENTS2024 CALENDAR YEAR

TOTAL

ESTIMATED

COST ($)

PROJECT DESCRIPTION

SURTAX BUDGET CATEGORY

City of Temple Terrace - Hillsborough County Transportation Surtax 2020 Project Plan

Project Cost Estimates and 5-year Schedule

PROJECT

NUMBERPROJECT TITLE

FISCAL YEAR 22-23

2023 CALENDAR YEAR

FISCAL YEAR 19-20 FISCAL YEAR 20-21 FISCAL YEAR 21-22

2019 CALENDAR YEAR 2020 CALENDAR YEAR 2021 CALENDAR YEAR 2022 CALENDAR YEAR

FISCAL YEAR 23-24FISCAL YEAR 19-20

P-02 Planning - Telecom Parkway Trail System

2 mile of trail system to be implemented for bicyclist

and pedestrian use. To connect to Telecom Parkway,

Fletcher Avenue and Fowler Avenue.

X $200,000

P-03Construction - Telecom Parkway Trail

System

2 mile of trail system to be implemented for bicyclist

and pedestrian use. To connect to Telecom Parkway,

Fletcher Avenue and Fowler Avenue.

X $2,000,000

P-04Planning - Telecom Parkway #2 Trail

System

0.46 miles of trail system to be planned for bicyclist

and pedestrian use. To connect Fletcher Avenue and

Telecom Parkway along Hollow Stump Road.

X $100,000

P-05Construction - Telecom Parkway #2 Trail

System

0.46 miles of trail system to be implemented for

bicyclist and pedestrian use. To connect Fletcher

Avenue and Telecom Parkway along Hollow Stump

Road.

X $1,000,000

P-06 Planning - Old Railway Trail System 1.3 miles of trail system be planned for bicyclists and

pedestrian use X $200,000

P-07 Construction - Old Railway Trail System 1.3 miles of trail system be implemented for

bicyclists and pedestrian use X $2,000,000

B-01 Design - 122nd Bicycle Enhancements

0.5 miles of bicycle enhancements/improvements to

be designed along 122nd Avenue and connect 122nd

to USF

X X X $10,000

B-02Construction - 122nd Bicycle

Enhancements

0.5 miles of bicycle enhancements/improvements to

be added along 122nd Avenue and connect 122nd to

USF

X X X $50,000

B-03 Design - 127th Bicycle Enhancements

0.5 miles of bicycle enhancements/improvements to

be designed along 127th Avenue and connect 127th

to USF

X X X $10,000

B-04 Construction - 127th Bicycle Enhancements

0.5 miles of bicycle enhancements/improvements to

be added along 127th Avenue and connect 127th to

USF

X X X $50,000

MM-01Design - Overlook Drive Multi-Modal

Enhancements

0.25 miles of multi-modal improvements (modify

vehicular lanes and add buffered bike lanes)

designed along Overlook Drive from Busch Blvd to

Temple Heights Rd.

X X $25,000

MM-02Construction - Overlook Drive Multi-Modal

Enhancements

0.25 miles of multi-modal improvements (modify

vehicular lanes and add buffered bike lanes) added

along Overlook Drive from Busch Blvd to Temple

Heights Rd.

X X $150,000

W-01 Signage Replacement - Zone 10 Replacing signage X X $25,000

W-02 Signage Replacement - Zone 5 Replacing signage X X $50,000

W-03 Signage Replacement - Zone 11 Replacing signage X X $50,000

W-04 Signage Replacement - Zone 7 Replacing signage X X $50,000

W-05 Signage Replacement - Zone 9 Replacing signage X X $50,000

W-06 Pavement Markings - Zone 10 Pavement Markings X X $50,000

W-07 Pavement Markings - Zone 5 Pavement Markings X X $50,000

W-08 Pavement Markings - Zone 11 Pavement Markings X X $50,000

Wayfinding

$50,000

$50,000

$150,000

$50,000

$25,000

$25,000

$50,000

$50,000

$50,000

$50,000

$2,000,000

$200,000

$2,000,000

$1,000,000

$50,000

$50,000

$10,000

$10,000

$200,000

$100,000

Bicycle Enhancements/Improvements

Multi-Modal Improvements

*Printing Directions: To be printed on 11"x17", if not possible see Project Summaries Sheet for details

Page 9: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

MAINTENANCE &

VULNERABILITY

CONGESTION

REDUCTION

SAFETY

IMPROVEMENTS

NETWORK

IMPROVEMENTS2024 CALENDAR YEAR

TOTAL

ESTIMATED

COST ($)

PROJECT DESCRIPTION

SURTAX BUDGET CATEGORY

City of Temple Terrace - Hillsborough County Transportation Surtax 2020 Project Plan

Project Cost Estimates and 5-year Schedule

PROJECT

NUMBERPROJECT TITLE

FISCAL YEAR 22-23

2023 CALENDAR YEAR

FISCAL YEAR 19-20 FISCAL YEAR 20-21 FISCAL YEAR 21-22

2019 CALENDAR YEAR 2020 CALENDAR YEAR 2021 CALENDAR YEAR 2022 CALENDAR YEAR

FISCAL YEAR 23-24FISCAL YEAR 19-20

W-09 Pavement Markings - Zone 7 Pavement Markings X X $50,000

W-10 Pavement Markings - Zone 9 Pavement Markings X X $50,000

PD-01 Execution of Projects Means and methods to execute projects X X X X

TOTAL ANNUAL PROJECT COSTS:

PROJECTED FUNDING (Per Hillsborough County Discretionary Sales Surtax Revenue Projection):

BALANCE AVAILABLE (Inculding Rollover):

$2,422,462

$3,816,945

$2,422,462

$3,654,407

$2,422,462

$2,183,969

$1,773,709

$1,773,709

$2,422,462

$3,941,021

$2,422,462

$3,869,483

Project Delivery

$353,900

$255,150 $2,494,000 $2,475,000 $2,585,000 $3,892,900

$244,000 $225,000 $235,000

$50,000

$50,000

$12,150

*Printing Directions: To be printed on 11"x17", if not possible see Project Summaries Sheet for details

Page 10: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

MAINTENANCE &VULNERABILITY

CONGESTIONREDUCTION

SAFETYIMPROVEMENTS

NETWORKIMPROVEMENTS

R-01South of Temple Terrace Golf and CountryClub FDR pavement improvements

2,260 LF of FDR along Springdale Place, Glen OaksAvenue and S. Glen Arven Avenue per the 2012Pavement Management Plan

X X

R-02South of Temple Terrace Golf and CountryClub M/O pavement improvements

12,430 LF of M/O south of the Temple Terrace Golfand Country Club per the 2012 PavementManagement Plan

X X

R-03 Cross Street M/O pavement improvements550 LF of M/O on Cross Street shown in the 2012Pavement Management Plan X X

R-04West and East River Drive PavementImprovments

8,930 LF of FDR along East and West River Drive,Falmouth Street and Lamont Place per the 2012Pavement management plan

X X

R-05Raintree Oaks Micro PavementImprovements

4,100 LF of Micro within Raintree Oaks per the 2012Pavement Management Plan X X

R-06Raintree Terrace M/O pavementimprovements

6,500 LF of M/O in Raintree Terrace shown in the2012 Pavement Management Plan X X

R-07E Whiteway Drive M/O PavementImprovements

5,300 LF of M/O along E Whiteway Drive fromGillette Avenue to N 56th Street per the 2012Pavement Management Plan

X X

R-08Druid Hills Road M/O PavementImprovements

8,000 LF of M/O along Druid Hills Road from RiverHills Drive to N 56th Street per the 2012 PavementManagement Plan

X X

Roadway Improvements/Maintenance

PROJECT DESCRIPTION

SURTAX BUDGET CATEGORY

City of Temple Terrace - Hillsborough County Transportation Surtax 2020 Project PlanProject Summaries

PROJECTNUMBER PROJECT TITLE

Page 11: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

MAINTENANCE &VULNERABILITY

CONGESTIONREDUCTION

SAFETYIMPROVEMENTS

NETWORKIMPROVEMENTS

PROJECT DESCRIPTION

SURTAX BUDGET CATEGORY

City of Temple Terrace - Hillsborough County Transportation Surtax 2020 Project PlanProject Summaries

PROJECTNUMBER PROJECT TITLE

R-09Pavement Improvements betweenWhiteway Drive and Druid Hills Road

12,100 LF of FDR between E Whiteway Drive andDruid Hills Road and 2,700 LF of M/O between EWhiteway Drive and Druid Hills Road per the 2012Pavement Management Plan

X X

S-01Design - Woodmont Charter SidewalkImprovements

Design 1500 LF of sidewalk along the north side of EWhiteway Drive, south side of Parade Street andsouth side of Chilkoot Avenue, from N 53rd Street toN 52nd Street

X X

S-02Construction - Woodmont Charter SidewalkImprovements

Design 1500 LF of sidewalk along the north side of EWhiteway Drive, south side of Parade Street andsouth side of Chilkoot Avenue, from N 53rd Street toN 52nd Street

X X

S-03 Design - Temple Terrace ElementarySidewalk Improvements

Design 1130 LF of sidewalk along the west side ofBroadway avenue from Bullard Parkway to FlottoAvenue, the north and south sides of Flotto Avenuefrom the elementary school to Ridgedale Avenue andnorth on Ridgedale Avenue to Fillian Avenue

X X

S-04 Construction - Temple Terrace ElementarySidewalk Improvements

1130 LF of sidewalk along the west side of Broadwayavenue from Bullard Parkway to Flotto Avenue, thenorth and south sides of Flotto Avenue from theelementary school to Ridgedale Avenue and north onRidgedale Avenue to Fillian Avenue

X X

P-01Riverside Park Pedestrian BridgeEnhancement

50 feet of pedestrian bridge enhancements at theRiverside Park, corner of S Riverhills Drive andSpringdale Place

X X

P-02 Planning - Telecom Parkway Trail System2 mile of trail system to be implemented for bicyclistand pedestrian use. To connect to Telecom Parkway,Fletcher Avenue and Fowler Avenue.

X

Sidewalk Improvements

Pedestrian Paths/Trails

Page 12: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

MAINTENANCE &VULNERABILITY

CONGESTIONREDUCTION

SAFETYIMPROVEMENTS

NETWORKIMPROVEMENTS

PROJECT DESCRIPTION

SURTAX BUDGET CATEGORY

City of Temple Terrace - Hillsborough County Transportation Surtax 2020 Project PlanProject Summaries

PROJECTNUMBER PROJECT TITLE

P-03Construction - Telecom Parkway TrailSystem

2 mile of trail system to be implemented for bicyclistand pedestrian use. To connect to Telecom Parkway,Fletcher Avenue and Fowler Avenue.

X

P-04 Planning - Telecom Parkway #2 Trail System0.46 miles of trail system to be planned for bicyclistand pedestrian use. To connect Fletcher Avenue andTelecom Parkway along Hollow Stump Road.

X

P-05Construction - Telecom Parkway #2 TrailSystem

0.46 miles of trail system to be implemented forbicyclist and pedestrian use. To connect FletcherAvenue and Telecom Parkway along Hollow StumpRoad.

X

P-06 Planning - Old Railway Trail System1.3 miles of trail system be planned for bicyclists andpedestrian use X

P-07 Construction - Old Railway Trail System1.3 miles of trail system be implemented for bicyclistsand pedestrian use X

B-01 Design - 122nd Bicycle Enhancements0.5 miles of bicycle enhancements/improvements tobe designed along 122nd Avenue and connect 122ndto USF

X X X

B-02 Construction - 122nd Bicycle Enhancements0.5 miles of bicycle enhancements/improvements tobe added along 122nd Avenue and connect 122nd toUSF

X X X

B-03 Design - 127th Bicycle Enhancements0.5 miles of bicycle enhancements/improvements tobe designed along 127th Avenue and connect 127thto USF

X X X

Bicycle Enhancements/Improvements

Page 13: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

MAINTENANCE &VULNERABILITY

CONGESTIONREDUCTION

SAFETYIMPROVEMENTS

NETWORKIMPROVEMENTS

PROJECT DESCRIPTION

SURTAX BUDGET CATEGORY

City of Temple Terrace - Hillsborough County Transportation Surtax 2020 Project PlanProject Summaries

PROJECTNUMBER PROJECT TITLE

B-04 Construction - 127th Bicycle Enhancements0.5 miles of bicycle enhancements/improvements tobe added along 127th Avenue and connect 127th toUSF

X X X

MM-01Design - Overlook Drive Multi-ModalEnhancements

0.25 miles of multi-modal improvements (modifyvehicular lanes and add buffered bike lanes) designedalong Overlook Drive from Busch Blvd to TempleHeights Rd.

X X

MM-02Construction - Overlook Drive Multi-ModalEnhancements

0.25 miles of multi-modal improvements (modifyvehicular lanes and add buffered bike lanes) addedalong Overlook Drive from Busch Blvd to TempleHeights Rd.

X X

W-01 Signage Replacement - Zone 10 Replacing signage X X

W-02 Signage Replacement - Zone 5 Replacing signage X X

W-03 Signage Replacement - Zone 11 Replacing signage X X

W-04 Signage Replacement - Zone 7 Replacing signage X X

W-05 Signage Replacement - Zone 9 Replacing signage X X

W-06 Pavement Markings - Zone 10 Pavement Markings X X

W-07 Pavement Markings - Zone 5 Pavement Markings X X

W-08 Pavement Markings - Zone 11 Pavement Markings X X

W-09 Pavement Markings - Zone 7 Pavement Markings X X

W-10 Pavement Markings - Zone 9 Pavement Markings X X

PD-01 Execution of Projects Means and methods to execute projects X X X X

Wayfinding

Project Delivery

Multi-Modal Improvements

Page 14: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

City of Temple Terrace

Hillsborough County

2020 Surtax Project Plan Key Sheet

Project Type

Project Number

Project Name

R-01 South of Temple Terrace Golf and Country Club FDR Pavement Improvements R-02 South of Temple Terrace Golf and Country Club M/O Pavement Improvements R-03 Cross Street M/O Pavement Improvements R-04 West and East River Drive Pavement Improvments R-05 Raintree Oaks Micro Pavement Improvements R-06 Raintree Terrace M/O Pavement Improvements R-07 E Whiteway Drive M/O Pavement Improvements R-08 Druid Hills Road M/O Pavement Improvements R-09 Pavement Improvements between Whiteway Drive and Druid Hills Road S-01 Design - Woodmont Charter Sidewalk Improvements S-02 Construction - Woodmont Charter Sidewalk Improvements S-03 Design - Temple Terrace Elementary Sidewalk Improvements S-04 Construction - Temple Terrace Elementary Sidewalk Improvements P-01 Riverside Park Pedestrian Bridge Enhancement P-02 Planning - Telecom Parkway Trail System P-03 Construction - Telecom Parkway Trail System P-04 Planning - Telecom Parkway #2 Trail System P-05 Construction - Telecom Parkway #2 Trail System P-06 Planning - Old Railway Trail System P-07 Construction - Old Railway Trail System B-01 Design - 122nd Bicycle Enhancements B-02 Construction - 122nd Bicycle Enhancements B-03 Design - 127th Bicycle Enhancements B-04 Construction - 127th Bicycle Enhancements MM-01 Design - Overlook Drive Multi-Modal Enhancements MM-02 Construction - Overlook Drive Multi-Modal Enhancements W-01 Signage Replacement - Zone 10 W-02 Signage Replacement - Zone 5 W-03 Signage Replacement - Zone 11 W-04 Signage Replacement - Zone 7 W-05 Signage Replacement - Zone 9 W-06 Pavement Markings - Zone 10 W-07 Pavement Markings - Zone 5 W-08 Pavement Markings - Zone 11 W-09 Pavement Markings - Zone 7 W-10 Pavement Markings - Zone 9

Roadway Improvements/Maintenance

Sidewalk Improvements

Pedestrian Paths/Trails

Bicycle Enhancements/Improvements

Multi Modal Improvements

Page 15: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

R-01

CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN

PROJECT NUMBER: R-01 | PROJECT YEAR: 2021

PROJECT SURTAX

CATEGORY(S):

☒ Maintenance and

Vulnerability

☐ Congestion Reduction

☒ Safety Improvements

☐ Network Improvements

PROJECT

DESCRIPTION:

2,260 LF of Full Depth

Restoration (FDR) along

Springdale Place, Glen

Oaks Avenue and S. Glen

Arven Avenue per the

Temple Terrace 2012

Pavement Management

Plan

PROJECT NAME: SOUTH OF TEMPLE TERRACE GOLF AND

COUNTRY CLUB FULL DEPTH RECLAMATION (FDR) PAVEMENT

IMPROVEMENTS

PROJECT TYPE: ROADWAY IMPROVEMENTS/MAINTENANCE

PROJECT COST ESTIMATE: $190,000.00

PROJECT GOALS:

To remediate current

conditions of the existing

pavement and create a

safe roadway for the

citizens of the City of

Temple Terrace.

Page 16: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

R-02

CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN

PROJECT NUMBER: R-02 | PROJECT YEAR: 2021

PROJECT SURTAX

CATEGORY(S):

☒ Maintenance and

Vulnerability

☐ Congestion Reduction

☒ Safety Improvements

☐ Network Improvements

PROJECT

DESCRIPTION:

12,430 LF of Mill and

Overlay (M/O) south of

the Temple Terrace Golf

and Country Club per the

Temple Terrace 2012

Pavement Management

Plan

PROJECT NAME: SOUTH OF TEMPLE TERRACE GOLF AND

COUNTRY CLUB M/O PAVEMENT IMPROVEMENTS

PROJECT TYPE: ROADWAY IMPROVEMENTS/MAINTENANCE

PROJECT COST ESTIMATE: $715,000.00

PROJECT GOALS:

To remediate current

conditions of the existing

pavement and create a

safe roadway for the

citizens of the City of

Temple Terrace.

Page 17: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

R-03

CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN

PROJECT NUMBER: R-03 | PROJECT YEAR: 2021

PROJECT SURTAX

CATEGORY(S):

☒ Maintenance and

Vulnerability

☐ Congestion Reduction

☒ Safety Improvements

☐ Network Improvements

PROJECT

DESCRIPTION:

550 LF of Mill and

Overlay (M/O) east on

Cross Street from the

stop sign to Telecom

Drive per the Temple

Terrace 2012 Pavement

Management Plan

PROJECT NAME: CROSS STREET MILL AND OVERLAY

PAVEMENT IMPROVEMENTS

PROJECT TYPE: ROADWAY IMPROVEMENTS/MAINTENANCE

PROJECT COST ESTIMATE: $32,000.00

PROJECT GOALS:

To remediate current

conditions of the existing

pavement and create a

safe roadway for the

citizens of the City of

Temple Terrace.

Page 18: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

R-04

CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN

PROJECT NUMBER: R-04 | PROJECT YEAR: 2021

PROJECT SURTAX

CATEGORY(S):

☒ Maintenance and

Vulnerability

☐ Congestion Reduction

☒ Safety Improvements

☐ Network Improvements

PROJECT

DESCRIPTION:

8,930 LF of Full Depth

Restoration (FDR) along

East and West River

Drive, Falmouth Street

and Lamont Place per the

Temple Terrace 2012

Pavement Management

Plan

PROJECT NAME: WEST AND EAST RIVER DRIVE PAVEMENT

IMPROVEMENTS

PROJECT TYPE: ROADWAY IMPROVEMENTS/MAINTENANCE

PROJECT COST ESTIMATE: $745,000.00

PROJECT GOALS:

To remediate current

conditions of the existing

pavement and create a

safe roadway for the

citizens of the City of

Temple Terrace.

Page 19: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

R-05

CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN

PROJECT NUMBER: R-05 | PROJECT YEAR: 2021

PROJECT SURTAX

CATEGORY(S):

☒ Maintenance and

Vulnerability

☐ Congestion Reduction

☒ Safety Improvements

☐ Network Improvements

PROJECT

DESCRIPTION:

4,100 LF of Micro

pavement restoration

within Raintree Oaks

neighborhood along

Soaring Ave, Wood Duck

Pl, and Tanager Pl per

the Temple Terrace 2012

Pavement Management

Plan

PROJECT NAME: RAINTREE OAKS MICRO PAVEMENT

IMPROVEMENTS

PROJECT TYPE: ROADWAY IMPROVEMENTS/MAINTENANCE

PROJECT COST ESTIMATE: $123,000.00

PROJECT GOALS:

To remediate current

conditions of the existing

pavement and create a

safe roadway for the

citizens of the City of

Temple Terrace.

Page 20: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

R-06

CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN

PROJECT NUMBER: R-06 | PROJECT YEAR: 2024

PROJECT SURTAX

CATEGORY(S):

☒ Maintenance and

Vulnerability

☐ Congestion Reduction

☒ Safety Improvements

☐ Network Improvements

PROJECT

DESCRIPTION:

6,500 LF of Mill and

Overlay in Raintree

Terrace along Rainforest

Street and west side

streets per the Temple

Terrace 2012 Pavement

Management Plan

PROJECT NAME: RAINTREE TERRACE MILL AND OVERLAY

PAVEMENT IMPROVEMENTS

PROJECT TYPE: ROADWAY IMPROVEMENTS/MAINTENANCE

PROJECT COST ESTIMATE: $374,000.00

PROJECT GOALS:

To remediate current

conditions of the existing

pavement and create a

safe roadway for the

citizens of the City of

Temple Terrace.

Page 21: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

R-07

CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN

PROJECT NUMBER: R-07 | PROJECT YEAR: 2024

PROJECT SURTAX

CATEGORY(S):

☒ Maintenance and

Vulnerability

☐ Congestion Reduction

☒ Safety Improvements

☐ Network Improvements

PROJECT

DESCRIPTION:

5,300 LF of Mill and

Overlay along E

Whiteway Drive from

Gillette Avenue to N 56th

Street per the Temple

Terrace 2012 Pavement

Management Plan

PROJECT NAME: E WHITEWAY DRIVE MILL AND OVERLAY

PAVEMENT IMPROVEMENTS

PROJECT TYPE: ROADWAY IMPROVEMENTS/MAINTENANCE

PROJECT COST ESTIMATE: $305,000.00

PROJECT GOALS:

To remediate current

conditions of the existing

pavement and create a

safe roadway for the

citizens of the City of

Temple Terrace.

Page 22: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

R-08

CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN

PROJECT NUMBER: R-08 | PROJECT YEAR: 2024

PROJECT SURTAX

CATEGORY(S):

☒ Maintenance and

Vulnerability

☐ Congestion Reduction

☒ Safety Improvements

☐ Network Improvements

PROJECT

DESCRIPTION:

8,000 LF of Mill and

Overlay along Druid Hills

Road from Riverhills Drive

to N 56th Street per the

Temple Terrace 2012

Pavement Management

Plan

PROJECT NAME: DRUID HILLS ROAD MILL AND OVERLAY

PAVEMENT IMPROVEMENTS

PROJECT TYPE: ROADWAY IMPROVEMENTS/MAINTENANCE

PROJECT COST ESTIMATE: $460,000.00

PROJECT GOALS:

To remediate current

conditions of the existing

pavement and create a

safe roadway for the

citizens of the City of

Temple Terrace.

Page 23: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

R-09

CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN

PROJECT NUMBER: R-09 | PROJECT YEAR: 2024

PROJECT SURTAX

CATEGORY(S):

☒ Maintenance and

Vulnerability

☐ Congestion Reduction

☒ Safety Improvements

☐ Network Improvements

PROJECT

DESCRIPTION:

12,100 LF of Full Depth

Restoration and 2,700 LF

of Mill and Overlay

between E Whiteway

Drive and Druid Hills

Road from N 56th Street

to N Riverhills Drive per

the Temple Terrace 2012

Pavement Management

Plan

PROJECT NAME: PAVEMENT IMPROVEMENTS BETWEEN E

WHITEWAY DRIVE AND DRUID HILLS ROAD

PROJECT TYPE: ROADWAY IMPROVEMENTS/MAINTENANCE

PROJECT COST ESTIMATE: $1,200,000.00

PROJECT GOALS:

To remediate current

conditions of the existing

pavement and create a

safe roadway for the

citizens of the City of

Temple Terrace.

Page 24: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

S-01

CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN

PROJECT NUMBER: S-01 | PROJECT YEAR: 2020

PROJECT SURTAX

CATEGORY(S):

☐ Maintenance and

Vulnerability

☐ Congestion Reduction

☒ Safety Improvements

☒ Network Improvements

PROJECT

DESCRIPTION:

1,500 LF of sidewalk

along the north side of E

Whiteway Drive, south

side of Parade Street and

south side of Chilkoot

Avenue is to be designed

from N 53rd street to N

52nd Street

PROJECT NAME: DESIGN- WOODMONT CHARTER SCHOOL

SIDEWALK IMPROVEMENTS

PROJECT TYPE: SIDEWALK IMPROVEMENTS

PROJECT COST ESTIMATE: $5,000.00

PROJECT GOALS:

To improve the safety of

pedestrians walking to

and from a school area

and make schools more

accessible by improving

the pedestrian

transportation network

Page 25: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

S-02

CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN

PROJECT NUMBER: S-02 | PROJECT YEAR: 2021

PROJECT SURTAX

CATEGORY(S):

☐ Maintenance and

Vulnerability

☐ Congestion Reduction

☒ Safety Improvements

☒ Network Improvements

PROJECT

DESCRIPTION:

1,500 LF of sidewalk

along the north side of E

Whiteway Drive, south

side of Parade Street and

south side of Chilkoot

Avenue is to be installed

from N 53rd street to N

52nd Street

PROJECT NAME: CONSTRUCTION - WOODMONT CHARTER

SCHOOL SIDEWALK IMPROVEMENTS

PROJECT TYPE: SIDEWALK IMPROVEMENTS

PROJECT COST ESTIMATE: $150,000.00

PROJECT GOALS:

To improve the safety of

pedestrians walking to

and from a school area

and make schools more

accessible by improving

the pedestrian

transportation network

Page 26: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

S-03

CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN

PROJECT NUMBER: S-03 | PROJECT YEAR: 2020

PROJECT SURTAX

CATEGORY(S):

☐ Maintenance and

Vulnerability

☐ Congestion Reduction

☒ Safety Improvements

☒ Network Improvements

PROJECT

DESCRIPTION:

1,130 LF of sidewalk to be

designed along the west

side of Broadway Ave

from Bullard Pkwy to

Flotto Ave, the north and

south sides of Flotto Ave

from the elementary

school to Ridgedale Ave

and north on Ridgedale

Ave to Fillian Ave

PROJECT NAME: DESIGN- TEMPLE TERRACE ELEMENTARY

SCHOOL SIDEWALK IMPROVEMENTS

PROJECT TYPE: SIDEWALK IMPROVEMENTS

PROJECT COST ESTIMATE: $5,000.00

PROJECT GOALS:

To improve the safety of

pedestrians walking to

and from a school area

and make schools more

accessible by improving

the pedestrian

transportation network

Page 27: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

S-04

CITY OF TEMPLE TERRACEHILLSBOROUGH COUNTY SURTAX PROJECT PLAN

PROJECT NUMBER: S-04 | PROJECT YEAR: 2020

PROJECT SURTAXCATEGORY(S):

☐ Maintenance andVulnerability

☐ Congestion Reduction

☒ Safety Improvements

☒ Network Improvements

PROJECTDESCRIPTION:

1,130 LF of sidewalk to beinstalled along the westside of Broadway Avefrom Bullard Pkwy toFlotto Ave, the north andsouth sides of Flotto Avefrom the elementaryschool to Ridgedale Aveand north on RidgedaleAve to Fillian Ave

PROJECT NAME: CONSTRUCTION - TEMPLE TERRACEELEMENTARY SCHOOL SIDEWALK IMPROVEMENTS

PROJECT TYPE: SIDEWALK IMPROVEMENTS

PROJECT COST ESTIMATE: $113,000.00

PROJECT GOALS:

To improve the safety ofpedestrians walking toand from a school areaand make schools moreaccessible by improvingthe pedestriantransportation network

Page 28: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

P-01

CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN

PROJECT NUMBER: P-01 | PROJECT YEAR: 2021

PROJECT SURTAX

CATEGORY(S):

☒ Maintenance and

Vulnerability

☐ Congestion Reduction

☒ Safety Improvements

☐ Network Improvements

PROJECT

DESCRIPTION:

50 LF of pedestrian bridge

enhancements at

Riverside Park, corner of

S Riverhills Drive and

Springdale Place

PROJECT NAME: RIVERSIDE PARK PEDESTRIAN BRIDGE

ENHANCEMENT

PROJECT TYPE: PEDESTRIAN PATHS/TRAILS

PROJECT COST ESTIMATE: $135,000.00

PROJECT GOALS:

To improve the safety of

pedestrians walking to

and from Riverside Park

by replacing the existing

pedestrian bridge with a

safer alternative.

Page 29: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

P-02

CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN

PROJECT NUMBER: P-02 | PROJECT YEAR: 2021

PROJECT SURTAX

CATEGORY(S):

☐ Maintenance and

Vulnerability

☐ Congestion Reduction

☐ Safety Improvements

☒ Network Improvements

PROJECT

DESCRIPTION:

2 miles of trail system to

be planned for bicyclist

and pedestrian use, to

connect Telecom

Parkway to Fletcher

Avenue and Fowler

Avenue.

PROJECT NAME: PLANNING – TELECOM PARKWAY TRAIL

SYSTEM

PROJECT TYPE: PEDESTRIAN PATHS/TRAILS

PROJECT COST ESTIMATE: $200,000.00

PROJECT GOALS:

To improve the

pedestrian and bicyclist

network through Temple

Terrace with the

implementation of a trails

system, solely for

pedestrians and

bicyclists.

Page 30: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

P-03

CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN

PROJECT NUMBER: P-03 | PROJECT YEAR: 2022

PROJECT SURTAX

CATEGORY(S):

☐ Maintenance and

Vulnerability

☐ Congestion Reduction

☐ Safety Improvements

☒ Network Improvements

PROJECT

DESCRIPTION:

2 miles of trail system to

be implemented for

bicyclist and pedestrian

use, to connect Telecom

Parkway to Fletcher

Avenue and Fowler

Avenue.

PROJECT NAME: CONSTRUCTION – TELECOM PARKWAY TRAIL

SYSTEM

PROJECT TYPE: PEDESTRIAN PATHS/TRAILS

PROJECT COST ESTIMATE: $2,000,000.00

PROJECT GOALS:

To improve the

pedestrian and bicyclist

network through Temple

Terrace with the

implementation of a trails

system, solely for

pedestrians and

bicyclists.

Page 31: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

P-04

CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN

PROJECT NUMBER: P-04 | PROJECT YEAR: 2023

PROJECT SURTAX

CATEGORY(S):

☐ Maintenance and

Vulnerability

☐ Congestion Reduction

☐ Safety Improvements

☒ Network Improvements

PROJECT

DESCRIPTION:

0.46 miles of trail system

to be planned for bicyclist

and pedestrian use, to

connect Fletcher Avenue

and Telecom Parkway

along Hollow Stump Road

PROJECT NAME: PLANNING – TELECOM PARKWAY #2 TRAIL

SYSTEM

PROJECT TYPE: PEDESTRIAN PATHS/TRAILS

PROJECT COST ESTIMATE: $100,000.00

PROJECT GOALS:

To improve the

pedestrian and bicyclist

network through Temple

Terrace with the

implementation of a trails

system, solely for

pedestrians and

bicyclists.

Page 32: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

P-05

CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN

PROJECT NUMBER: P-05 | PROJECT YEAR: 2024

PROJECT SURTAX

CATEGORY(S):

☐ Maintenance and

Vulnerability

☐ Congestion Reduction

☐ Safety Improvements

☒ Network Improvements

PROJECT

DESCRIPTION:

0.46 miles of trail system

to be implemented for

bicyclist and pedestrian

use, to connect Fletcher

Avenue and Telecom

Parkway along Hollow

Stump Road

PROJECT NAME: CONSTRUCTION – TELECOM PARKWAY #2

TRAIL SYSTEM

PROJECT TYPE: PEDESTRIAN PATHS/TRAILS

PROJECT COST ESTIMATE: $1,000,000.00

PROJECT GOALS:

To improve the

pedestrian and bicyclist

network through Temple

Terrace with the

implementation of a trails

system, solely for

pedestrians and

bicyclists.

Page 33: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

P-06

CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN

PROJECT NUMBER: P-06 | PROJECT YEAR: 2022

PROJECT SURTAX

CATEGORY(S):

☐ Maintenance and

Vulnerability

☐ Congestion Reduction

☐ Safety Improvements

☒ Network Improvements

PROJECT

DESCRIPTION:

1.3 miles of trail system to

be designed for bicyclist

and pedestrian use, to

connect Temple Terrace

Highway to the

Hillsborough River along

the old railroad tracks.

PROJECT NAME: PLANNING – OLD RAILWAY TRAIL SYSTEM

PROJECT TYPE: PEDESTRIAN PATHS/TRAILS

PROJECT COST ESTIMATE: $200,000.00

PROJECT GOALS:

To improve the

pedestrian and bicyclist

network through Temple

Terrace with the

implementation of a trails

system, solely for

pedestrians and

bicyclists.

Page 34: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

P-07

CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN

PROJECT NUMBER: P-07 | PROJECT YEAR: 2023

PROJECT SURTAX

CATEGORY(S):

☐ Maintenance and

Vulnerability

☐ Congestion Reduction

☐ Safety Improvements

☒ Network Improvements

PROJECT

DESCRIPTION:

1.3 miles of trail system to

be implemented for

bicyclist and pedestrian

use, to connect Temple

Terrace Highway to the

Hillsborough River along

the old railroad tracks.

PROJECT NAME: CONSTRUCTION – OLD RAILWAY TRAIL

SYSTEM

PROJECT TYPE: PEDESTRIAN PATHS/TRAILS

PROJECT COST ESTIMATE: $2,000,000.00

PROJECT GOALS:

To improve the

pedestrian and bicyclist

network through Temple

Terrace with the

implementation of a trails

system, solely for

pedestrians and

bicyclists.

Page 35: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

B-01

CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN

PROJECT NUMBER: B-01 | PROJECT YEAR: 2020

PROJECT SURTAX

CATEGORY(S):

☒ Maintenance and

Vulnerability

☐ Congestion Reduction

☒ Safety Improvements

☒ Network Improvements

PROJECT

DESCRIPTION:

0.5 miles of bicycle

enhancements and

improvements to be

designed along 122nd

Avenue, connecting 122nd

Avenue to USF

PROJECT NAME: DESIGN - 122ND BICYCLE ENHANCEMENTS

PROJECT TYPE: BICYCLE ENHANCEMENTS/IMPROVEMENTS

PROJECT COST ESTIMATE: $10,000.00

PROJECT GOALS:

To improve the bicyclist

network through Temple

Terrace with the

implementation bike

paths and updates to

existing bike paths.

Page 36: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

B-02

CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN

PROJECT NUMBER: B-02 | PROJECT YEAR: 2021

PROJECT SURTAX

CATEGORY(S):

☒ Maintenance and

Vulnerability

☐ Congestion Reduction

☒ Safety Improvements

☒ Network Improvements

PROJECT

DESCRIPTION:

0.5 miles of bicycle

enhancements and

improvements to be

implemented along 122nd

Avenue, connecting 122nd

Avenue to USF

PROJECT NAME:CONSTRUCTION-122ND BICYCLE ENHANCEMENTS

PROJECT TYPE: BICYCLE ENHANCEMENTS/IMPROVEMENTS

PROJECT COST ESTIMATE: $50,000.00

PROJECT GOALS:

To improve the bicyclist

network through Temple

Terrace with the

implementation bike

paths and updates to

existing bike paths.

Page 37: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

B-03

CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN

PROJECT NUMBER: B-03 | PROJECT YEAR: 2020

PROJECT SURTAX

CATEGORY(S):

☒ Maintenance and

Vulnerability

☐ Congestion Reduction

☒ Safety Improvements

☒ Network Improvements

PROJECT

DESCRIPTION:

0.5 miles of bicycle

enhancements and

improvements to be

designed along 127th

Avenue, connecting 127th

Avenue to USF

PROJECT NAME: DESIGN-127TH BICYCLE ENHANCEMENTS

PROJECT TYPE: BICYCLE ENHANCEMENTS/IMPROVEMENTS

PROJECT COST ESTIMATE: $10,000.00

PROJECT GOALS:

To improve the bicyclist

network through Temple

Terrace with the

implementation bike

paths and updates to

existing bike paths.

Page 38: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

B-04

CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN

PROJECT NUMBER: B-04 | PROJECT YEAR: 2021

PROJECT SURTAX

CATEGORY(S):

☒ Maintenance and

Vulnerability

☐ Congestion Reduction

☒ Safety Improvements

☒ Network Improvements

PROJECT

DESCRIPTION:

0.5 miles of bicycle

enhancements and

improvements to be

implemented along 127th

Avenue, connecting 127th

Avenue to USF

PROJECT NAME: CONSTRUCTION-127TH BICYCLE

ENHANCEMENTS

PROJECT TYPE: BICYCLE ENHANCEMENTS/IMPROVEMENTS

PROJECT COST ESTIMATE: $50,000.00

PROJECT GOALS:

To improve the bicyclist

network through Temple

Terrace with the

implementation bike

paths and updates to

existing bike paths.

Page 39: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

MM-01

CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN

PROJECT NUMBER: MM-01 | PROJECT YEAR: 2020

PROJECT SURTAX

CATEGORY(S):

☐ Maintenance and

Vulnerability

☐ Congestion Reduction

☒ Safety Improvements

☒ Network Improvements

PROJECT

DESCRIPTION:

0.25 Miles of multi-modal

improvements to be

designed along Overlook

Drive from Busch Blvd to

Temple Heights Rd.

Improvements are to

include lane modifications

and buffered bike lanes.

PROJECT NAME: DESIGN – OVERLOOK DRIVE MULTI-MODAL

ENHANCEMENTS

PROJECT TYPE: MULTI-MODAL IMPROVEMENTS

PROJECT COST ESTIMATE: $25,000.00

PROJECT GOALS:

To improve the safety of

both vehicles and

bicycles, making a safe

way for multiple modes of

transportation to share

the roadway.

Page 40: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

MM-02

CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN

PROJECT NUMBER: MM-02 | PROJECT YEAR: 2023

PROJECT SURTAX

CATEGORY(S):

☐ Maintenance and

Vulnerability

☐ Congestion Reduction

☒ Safety Improvements

☒ Network Improvements

PROJECT

DESCRIPTION:

0.25 Miles of multi-modal

improvements to be

implemented along

Overlook Drive from

Busch Blvd to Temple

Heights Rd.

Improvements are to

include lane modifications

and buffered bike lanes.

PROJECT NAME: CONSTRUCTION – OVERLOOK DRIVE MULTI-

MODAL ENHANCEMENTS

PROJECT TYPE: MULTI-MODAL IMPROVEMENTS

PROJECT COST ESTIMATE: $150,000.00

PROJECT GOALS:

To improve the safety of

both vehicles and

bicycles, making a safe

way for multiple modes of

transportation to share

the roadway.

Page 41: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

WW-01 to WW-05

CITY OF TEMPLE TERRACEHILLSBOROUGH COUNTY SURTAX PROJECT PLAN

PROJECT NUMBER: W-01 TO W-05 | PROJECT YEARS: 2020 TO 2024

PROJECT SURTAXCATEGORY(S):

☒ Maintenance andVulnerability

☐ Congestion Reduction

☒ Safety Improvements

☐ Network Improvements

PROJECTDESCRIPTION:

Signage replacement tooccur throughout thelisted zones to improvethe safety and wayfindingof City residents andvisitors.

PROJECT NAME: SIGNAGE REPLACEMENT – ZONES 10,5,11,7,9

PROJECT TYPE: WAYFINDING

PROJECT COST ESTIMATE: $225,000.00 PROJECT GOALS:

To improve the safety andwayfinding throughout thecity.

Page 42: City of Temple Terrace - Plan Hillsborough · 2019-09-30 · MISSION HILLS AVE T E L E C O M D R S R I V E R H I L L S D R H O L L O W S T U M P R D WEST RIVE RD EFL TCH R AVE G AI

WW-06 to WW-10

CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN

PROJECT NUMBER: W-06 TO W-10 | PROJECT YEARS: 2020 TO 2024

PROJECT SURTAX

CATEGORY(S):

☒ Maintenance and

Vulnerability

☐ Congestion Reduction

☒ Safety Improvements

☐ Network Improvements

PROJECT

DESCRIPTION:

Pavement marking and

remarking to occur

throughout the listed

zones to improve the

safety and wayfinding of

City residents and visitors.

PROJECT NAME: PAVEMENT MARKINGS – ZONES 10,5,11,7,9

PROJECT TYPE: WAYFINDING

PROJECT COST ESTIMATE: $250,000.00

PROJECT GOALS:

To improve the safety and

wayfinding throughout the

city.