2020 Surtax Project Plan
APPROVED BY:
CITY COUNCIL:
Mayor – Mel Jurado
Vice Mayor – Frank Chillura
Member – James Chambers
Member– Cheri Donohue
Member – Andy Ross
Member – Gil Schisler
RESOLUTION:
Resolution 101-19
2020 Surtax Project PlanTable of Contents
Page Number Page Description1 Table of Contents2 City of Temple Terrace 2020 Surtax Plan Description3 Article XI Professional Engineer Certification4 Resolution 101-195 2020 Project Plan Overview Map6 2020 Project Plan Cost Estimates and 5-Year Schedule7 2020 Project Plan Cost Estimates and 5-Year Schedule8 2020 Project Plan Cost Estimates and 5-Year Schedule9 2020 Project Plan Summaries
10 2020 Project Plan Summaries11 2020 Project Plan Summaries12 2020 Project Plan Summaries13 2020 Surtax Project Plan Key Sheet
R-01 South of Temple Terrace Golf and Country Club FDR Pavement ImprovementsR-02 South of Temple Terrace Golf and Country Club M/O Pavement ImprovementsR-03 Cross Street M/O Pavement ImprovementsR-04 West and East River Drive Pavement ImprovmentsR-05 Raintree Oaks Micro Pavement ImprovementsR-06 Raintree Terrace M/O Pavement ImprovementsR-07 E Whiteway Drive M/O Pavement ImprovementsR-08 Druid Hills Road M/O Pavement ImprovementsR-09 Pavement Improvements between Whiteway Drive and Druid Hills RoadS-01 Design - Woodmont Charter Sidewalk ImprovementsS-02 Construction - Woodmont Charter Sidewalk ImprovementsS-03 Design - Temple Terrace Elementary Sidewalk ImprovementsS-04 Construction - Temple Terrace Elementary Sidewalk ImprovementsP-01 Riverside Park Pedestrian Bridge EnhancementP-02 Planning - Telecom Parkway Trail SystemP-03 Construction - Telecom Parkway Trail SystemP-04 Planning - Telecom Parkway #2 Trail SystemP-05 Construction - Telecom Parkway #2 Trail SystemP-06 Planning - Old Railway Trail SystemP-07 Construction - Old Railway Trail SystemB-01 Design - 122nd Bicycle EnhancementsB-02 Construction - 122nd Bicycle EnhancementsB-03 Design - 127th Bicycle EnhancementsB-04 Construction - 127th Bicycle Enhancements
MM-01 Design - Overlook Drive Multi-Modal EnhancementsMM-02 Construction - Overlook Drive Multi-Modal Enhancements
W-01 to W-05 Signage Replacement - Zones 10, 5, 11, 7, 9W-06 to W-10 Pavement Markings - Zone 10, 5, 11, 7, 9
City of Temple TerraceHillsborough County
2020 Surtax Project PlanThe City of Temple Terrace, a municipality within Hillsborough County, will beprovided a portion of the County’s Transportation Surtax fund to improvetransportation across the City. The funding source was approved in November 2018by the electorate of Hillsborough County to levy a one percent (1%) transportationsales surtax. The surtax intended use within the City of Temple Terrace is to be in thefollowing categories:
· Maintenance and Vulnerability Reduction: Improve repair and maintainexisting streets, roads, and bridges, including fixing potholes, or reducecongestion and transportation vulnerabilities.
· Congestion Reduction: To relieve rush hour bottlenecks and improve flow oftraffic on existing roads and streets and through intersections. May includeprojects that improve intersection capacity through the use of technology, theconstruction of new intersections, the redevelopment of existing intersections,and may include related infrastructure such as roundabouts and turn lanes.
· Transportation Safety Improvements: To promote transportation safetyimprovements on existing streets, roads and bridges.
· Transportation Network Improvements: To be expended on bicycle orpedestrian infrastructure and related improvements that make walking andbiking safer, to the extent the foregoing is or is planned to become part of thetransportation network within any Agency’s jurisdiction.
An interlocal agreement was entered into in January 2019 between multiple municipalorganizations within Hillsborough County, including the City of Temple Terrace. Thisagreement requires each municipality within the agreement to create a Surtax ProjectPlan to be submitted annually to the Independent Oversight Committee (IOC) on orbefore September 30th. The City of Temple Terrace has created the 2020 SurtaxProject Plan attached to this document explaining each project that the City intends toimplement with the provided Surtax funds.
Once the IOC has reviewed each agency’s project plan, the results of the annualaudit process and any findings made will be published in an annual report. Thisannual report shall be provided to each agency within the interlocal agreement andpublished online and in newspapers for public review. The IOC will hold a publichearing on each audit and annual report.
APPROVED BY:
CITY COUNCIL:
Mayor – Mel Jurado
Vice Mayor – Frank Chillura
Member – James Chambers
Member– Cheri Donohue
Member – Andy Ross
Member – Gil Schisler
RESOLUTION:
Resolution 101-19
HARNEY RD
N53
RDST
NUS
HIGH
WAY
301
N52
ND
ST
NR
IVER
HIL
LSD
RE 113TH AVE
TEMPLE TERRACE HWYBULLARD PKWY
WI L D
E RNE SS
P A RK
OLD
MO
RR
ISB
RID
GE
RD
MISSION HILLS AVE
TELE
COM
DR
SRIVERHILLS DR
HO
LLO
WST
UM
PRD
WEST RIVER DR
E FLETCHER AVE
GAIL DR
N78
THST
BRIG
HTWAT
ERBLV
D NT E
LECO
M PKWY
VAND
ENBER G
HAN
GAR
LN
N61
S TST
127TH AVE
OSPREY DR
E BUSCH BLVD
E JEAN ST
RID
GED
ALE
RD
RIVERGATE AVE
RIVERHILLS DR
E TELECOM PKWY
N60
THST
S ANCT UA
R
Y COVE DR
WOODST O RK RD
E 122ND AVE
TEMPLE HEIGHTS RD
DO
TTIE
DR
HAMPTONOAKSPKWY
E 120TH AVE
OLD TEMPLE TERRACE HWY
OAKHAVEN LN
VANDENBERG AIRPORT RD
RI VERFO
REST
LN
VENETIA PL
RID
GED
ALE
RD
MO
RR
ISBR
IDG
ER
D
N53
R DST
N52
ND
ST
E 122ND AVE
N5 8
T HS T
E 127TH AVE
N5 0
THS T
DA
VIS
RD
HILLSBOROUGH RIVER
HARNEY BYPASS CANAL
H ILLSBOROUGH RIVER
TERR
ACE RIDGE DR
E FOWLER AVE
WHITEWAY DR
DRUID HILLS RD
(/301
E RIVERHILLS DR
MORRIS BRIDGE RD
TERRACE
SPRI N
G
D R
N56
THST
N5 6
THST
N5 6
THS T
DAV
ISR
D
§̈¦75
SUN
NYS
IDE
RD
OVE
RLO
OK
DR
FLOTTO AVE
BRO
AD
WAY
AVE
SHADOW LN
SPR
ING
DA
LEP
L
BAH
AM
AS
AV
E
CROSS STSOARING AVE
RAIN
FORE
STST
E 130TH AVE
RAIN HOLLOW CTGRAPE FERN CT
OAK FERN CT
RAIN BRIAR CT
WOODDUCK PL
TANAGER PL
QUIETWATERS PL
PARADE ST
CHILKOOT ST MAROLDY DR
HIBISCU
SD
R
C A RO
LYNE
ST
CARRIAG
EH
ILLSD
R
LANTERN CR
COACH LN
HER
CHEL
DR
NAN
TUCKET
DR
ROYAN
GREEN
SD
R
TERRACE
HILL
DR
ST AUGUSTINE AVE
FERN CLIFF AVE
PINE HURST AVE
RIVERHILLS DR
EAST RIVER DR
BELLEMEADE AVE
City of Temple TerracePublic Works Utilities
GIS DepartmentSeptember 2019
0 800 1,600FeetMulti-Modal Improvements
Sidewalk Improvements
Roadway Improvements
Pedestrian Improvements
Bicycle Improvements
Hillsborough County Transportation Surtax2020 Project Plan
Overview Map ¯
City Limits
City of Temple Terrace
MAINTENANCE &
VULNERABILITY
CONGESTION
REDUCTION
SAFETY
IMPROVEMENTS
NETWORK
IMPROVEMENTS
R-01South of Temple Terrace Golf and Country
Club FDR pavement improvements
2,260 LF of FDR along Springdale Place, Glen Oaks
Avenue and S. Glen Arven Avenue per the 2012
Pavement Management Plan
X X $190,000
R-02South of Temple Terrace Golf and Country
Club M/O pavement improvements
12,430 LF of M/O south of the Temple Terrace Golf
and Country Club per the 2012 Pavement
Management Plan
X X $715,000
R-03 Cross Street M/O pavement improvements550 LF of M/O on Cross Street shown in the 2012
Pavement Management PlanX X $32,000
R-04West and East River Drive Pavement
Improvements
8,930 LF of FDR along East and West River Drive,
Falmouth Street and Lamont Place per the 2012
Pavement management plan
X X $745,000
R-05Raintree Oaks Micro Pavement
Improvements
4,100 LF of Micro within Raintree Oaks per the 2012
Pavement Management PlanX X $123,000
R-06Raintree Terrace M/O pavement
improvements
6,500 LF of M/O in Raintree Terrace shown in the
2012 Pavement Management Plan X X $374,000
R-07E Whiteway Drive M/O Pavement
Improvements
5,300 LF of M/O along E Whiteway Drive from
Gillette Avenue to N 56th Street per the 2012
Pavement Management Plan
X X $305,000
R-08Druid Hills Road M/O Pavement
Improvements
8,000 LF of M/O along Druid Hills Road from River
Hills Drive to N 56th Street per the 2012 Pavement
Management Plan
X X $460,000
R-09Pavement Improvements between
Whiteway Drive and Druid Hills Road
12,100 LF of FDR between E Whiteway Drive and
Druid Hills Road and 2,700 LF of M/O between E
Whiteway Drive and Druid Hills Road per the 2012
Pavement Management Plan
X X $1,200,000
S-01Design - Woodmont Charter Sidewalk
Improvements
Design 1500 LF of sidewalk along the north side of E
Whiteway Drive, south side of Parade Street and
south side of Chilkoot Avenue, from N 53rd Street to
N 52nd Street
X X $5,000
S-02Construction - Woodmont Charter Sidewalk
Improvements
Design 1500 LF of sidewalk along the north side of E
Whiteway Drive, south side of Parade Street and
south side of Chilkoot Avenue, from N 53rd Street to
N 52nd Street
X X $150,000
S-03Design - Temple Terrace Elementary
Sidewalk Improvements
Design 1130 LF of sidewalk along the west side of
Broadway avenue from Bullard Parkway to Flotto
Avenue, the north and south sides of Flotto Avenue
from the elementary school to Ridgedale Avenue and
north on Ridgedale Avenue to Fillian Avenue
X X $5,000
S-04Construction - Temple Terrace Elementary
Sidewalk Improvements
1130 LF of sidewalk along the west side of Broadway
avenue from Bullard Parkway to Flotto Avenue, the
north and south sides of Flotto Avenue from the
elementary school to Ridgedale Avenue and north on
Ridgedale Avenue to Fillian Avenue
X X $113,000
P-01Riverside Park Pedestrian Bridge
Enhancement
50 feet of pedestrian bridge enhancements at the
Riverside Park, corner of S Riverhills Drive and
Springdale Place
X X $135,000
$715,000
$32,000
$150,000
$135,000
$745,000
2024 CALENDAR YEAR
$190,000
$123,000
$374,000
$305,000
$460,000
$1,200,000
TOTAL
ESTIMATED
COST ($)
$5,000
$113,000
PROJECT DESCRIPTION
SURTAX BUDGET CATEGORY
$5,000
City of Temple Terrace - Hillsborough County Transportation Surtax 2020 Project Plan
Project Cost Estimates and 5-year Schedule
PROJECT
NUMBER
Pedestrian Paths/Trails
PROJECT TITLE
Roadway Improvements/Maintenance
Sidewalk Improvements
FISCAL YEAR 22-23
2023 CALENDAR YEAR
FISCAL YEAR 19-20 FISCAL YEAR 20-21 FISCAL YEAR 21-22
2019 CALENDAR YEAR 2020 CALENDAR YEAR 2021 CALENDAR YEAR 2022 CALENDAR YEAR
FISCAL YEAR 23-24FISCAL YEAR 19-20
*Printing Directions: To be printed on 11"x17", if not possible see Project Summaries Sheet for details
MAINTENANCE &
VULNERABILITY
CONGESTION
REDUCTION
SAFETY
IMPROVEMENTS
NETWORK
IMPROVEMENTS2024 CALENDAR YEAR
TOTAL
ESTIMATED
COST ($)
PROJECT DESCRIPTION
SURTAX BUDGET CATEGORY
City of Temple Terrace - Hillsborough County Transportation Surtax 2020 Project Plan
Project Cost Estimates and 5-year Schedule
PROJECT
NUMBERPROJECT TITLE
FISCAL YEAR 22-23
2023 CALENDAR YEAR
FISCAL YEAR 19-20 FISCAL YEAR 20-21 FISCAL YEAR 21-22
2019 CALENDAR YEAR 2020 CALENDAR YEAR 2021 CALENDAR YEAR 2022 CALENDAR YEAR
FISCAL YEAR 23-24FISCAL YEAR 19-20
P-02 Planning - Telecom Parkway Trail System
2 mile of trail system to be implemented for bicyclist
and pedestrian use. To connect to Telecom Parkway,
Fletcher Avenue and Fowler Avenue.
X $200,000
P-03Construction - Telecom Parkway Trail
System
2 mile of trail system to be implemented for bicyclist
and pedestrian use. To connect to Telecom Parkway,
Fletcher Avenue and Fowler Avenue.
X $2,000,000
P-04Planning - Telecom Parkway #2 Trail
System
0.46 miles of trail system to be planned for bicyclist
and pedestrian use. To connect Fletcher Avenue and
Telecom Parkway along Hollow Stump Road.
X $100,000
P-05Construction - Telecom Parkway #2 Trail
System
0.46 miles of trail system to be implemented for
bicyclist and pedestrian use. To connect Fletcher
Avenue and Telecom Parkway along Hollow Stump
Road.
X $1,000,000
P-06 Planning - Old Railway Trail System 1.3 miles of trail system be planned for bicyclists and
pedestrian use X $200,000
P-07 Construction - Old Railway Trail System 1.3 miles of trail system be implemented for
bicyclists and pedestrian use X $2,000,000
B-01 Design - 122nd Bicycle Enhancements
0.5 miles of bicycle enhancements/improvements to
be designed along 122nd Avenue and connect 122nd
to USF
X X X $10,000
B-02Construction - 122nd Bicycle
Enhancements
0.5 miles of bicycle enhancements/improvements to
be added along 122nd Avenue and connect 122nd to
USF
X X X $50,000
B-03 Design - 127th Bicycle Enhancements
0.5 miles of bicycle enhancements/improvements to
be designed along 127th Avenue and connect 127th
to USF
X X X $10,000
B-04 Construction - 127th Bicycle Enhancements
0.5 miles of bicycle enhancements/improvements to
be added along 127th Avenue and connect 127th to
USF
X X X $50,000
MM-01Design - Overlook Drive Multi-Modal
Enhancements
0.25 miles of multi-modal improvements (modify
vehicular lanes and add buffered bike lanes)
designed along Overlook Drive from Busch Blvd to
Temple Heights Rd.
X X $25,000
MM-02Construction - Overlook Drive Multi-Modal
Enhancements
0.25 miles of multi-modal improvements (modify
vehicular lanes and add buffered bike lanes) added
along Overlook Drive from Busch Blvd to Temple
Heights Rd.
X X $150,000
W-01 Signage Replacement - Zone 10 Replacing signage X X $25,000
W-02 Signage Replacement - Zone 5 Replacing signage X X $50,000
W-03 Signage Replacement - Zone 11 Replacing signage X X $50,000
W-04 Signage Replacement - Zone 7 Replacing signage X X $50,000
W-05 Signage Replacement - Zone 9 Replacing signage X X $50,000
W-06 Pavement Markings - Zone 10 Pavement Markings X X $50,000
W-07 Pavement Markings - Zone 5 Pavement Markings X X $50,000
W-08 Pavement Markings - Zone 11 Pavement Markings X X $50,000
Wayfinding
$50,000
$50,000
$150,000
$50,000
$25,000
$25,000
$50,000
$50,000
$50,000
$50,000
$2,000,000
$200,000
$2,000,000
$1,000,000
$50,000
$50,000
$10,000
$10,000
$200,000
$100,000
Bicycle Enhancements/Improvements
Multi-Modal Improvements
*Printing Directions: To be printed on 11"x17", if not possible see Project Summaries Sheet for details
MAINTENANCE &
VULNERABILITY
CONGESTION
REDUCTION
SAFETY
IMPROVEMENTS
NETWORK
IMPROVEMENTS2024 CALENDAR YEAR
TOTAL
ESTIMATED
COST ($)
PROJECT DESCRIPTION
SURTAX BUDGET CATEGORY
City of Temple Terrace - Hillsborough County Transportation Surtax 2020 Project Plan
Project Cost Estimates and 5-year Schedule
PROJECT
NUMBERPROJECT TITLE
FISCAL YEAR 22-23
2023 CALENDAR YEAR
FISCAL YEAR 19-20 FISCAL YEAR 20-21 FISCAL YEAR 21-22
2019 CALENDAR YEAR 2020 CALENDAR YEAR 2021 CALENDAR YEAR 2022 CALENDAR YEAR
FISCAL YEAR 23-24FISCAL YEAR 19-20
W-09 Pavement Markings - Zone 7 Pavement Markings X X $50,000
W-10 Pavement Markings - Zone 9 Pavement Markings X X $50,000
PD-01 Execution of Projects Means and methods to execute projects X X X X
TOTAL ANNUAL PROJECT COSTS:
PROJECTED FUNDING (Per Hillsborough County Discretionary Sales Surtax Revenue Projection):
BALANCE AVAILABLE (Inculding Rollover):
$2,422,462
$3,816,945
$2,422,462
$3,654,407
$2,422,462
$2,183,969
$1,773,709
$1,773,709
$2,422,462
$3,941,021
$2,422,462
$3,869,483
Project Delivery
$353,900
$255,150 $2,494,000 $2,475,000 $2,585,000 $3,892,900
$244,000 $225,000 $235,000
$50,000
$50,000
$12,150
*Printing Directions: To be printed on 11"x17", if not possible see Project Summaries Sheet for details
MAINTENANCE &VULNERABILITY
CONGESTIONREDUCTION
SAFETYIMPROVEMENTS
NETWORKIMPROVEMENTS
R-01South of Temple Terrace Golf and CountryClub FDR pavement improvements
2,260 LF of FDR along Springdale Place, Glen OaksAvenue and S. Glen Arven Avenue per the 2012Pavement Management Plan
X X
R-02South of Temple Terrace Golf and CountryClub M/O pavement improvements
12,430 LF of M/O south of the Temple Terrace Golfand Country Club per the 2012 PavementManagement Plan
X X
R-03 Cross Street M/O pavement improvements550 LF of M/O on Cross Street shown in the 2012Pavement Management Plan X X
R-04West and East River Drive PavementImprovments
8,930 LF of FDR along East and West River Drive,Falmouth Street and Lamont Place per the 2012Pavement management plan
X X
R-05Raintree Oaks Micro PavementImprovements
4,100 LF of Micro within Raintree Oaks per the 2012Pavement Management Plan X X
R-06Raintree Terrace M/O pavementimprovements
6,500 LF of M/O in Raintree Terrace shown in the2012 Pavement Management Plan X X
R-07E Whiteway Drive M/O PavementImprovements
5,300 LF of M/O along E Whiteway Drive fromGillette Avenue to N 56th Street per the 2012Pavement Management Plan
X X
R-08Druid Hills Road M/O PavementImprovements
8,000 LF of M/O along Druid Hills Road from RiverHills Drive to N 56th Street per the 2012 PavementManagement Plan
X X
Roadway Improvements/Maintenance
PROJECT DESCRIPTION
SURTAX BUDGET CATEGORY
City of Temple Terrace - Hillsborough County Transportation Surtax 2020 Project PlanProject Summaries
PROJECTNUMBER PROJECT TITLE
MAINTENANCE &VULNERABILITY
CONGESTIONREDUCTION
SAFETYIMPROVEMENTS
NETWORKIMPROVEMENTS
PROJECT DESCRIPTION
SURTAX BUDGET CATEGORY
City of Temple Terrace - Hillsborough County Transportation Surtax 2020 Project PlanProject Summaries
PROJECTNUMBER PROJECT TITLE
R-09Pavement Improvements betweenWhiteway Drive and Druid Hills Road
12,100 LF of FDR between E Whiteway Drive andDruid Hills Road and 2,700 LF of M/O between EWhiteway Drive and Druid Hills Road per the 2012Pavement Management Plan
X X
S-01Design - Woodmont Charter SidewalkImprovements
Design 1500 LF of sidewalk along the north side of EWhiteway Drive, south side of Parade Street andsouth side of Chilkoot Avenue, from N 53rd Street toN 52nd Street
X X
S-02Construction - Woodmont Charter SidewalkImprovements
Design 1500 LF of sidewalk along the north side of EWhiteway Drive, south side of Parade Street andsouth side of Chilkoot Avenue, from N 53rd Street toN 52nd Street
X X
S-03 Design - Temple Terrace ElementarySidewalk Improvements
Design 1130 LF of sidewalk along the west side ofBroadway avenue from Bullard Parkway to FlottoAvenue, the north and south sides of Flotto Avenuefrom the elementary school to Ridgedale Avenue andnorth on Ridgedale Avenue to Fillian Avenue
X X
S-04 Construction - Temple Terrace ElementarySidewalk Improvements
1130 LF of sidewalk along the west side of Broadwayavenue from Bullard Parkway to Flotto Avenue, thenorth and south sides of Flotto Avenue from theelementary school to Ridgedale Avenue and north onRidgedale Avenue to Fillian Avenue
X X
P-01Riverside Park Pedestrian BridgeEnhancement
50 feet of pedestrian bridge enhancements at theRiverside Park, corner of S Riverhills Drive andSpringdale Place
X X
P-02 Planning - Telecom Parkway Trail System2 mile of trail system to be implemented for bicyclistand pedestrian use. To connect to Telecom Parkway,Fletcher Avenue and Fowler Avenue.
X
Sidewalk Improvements
Pedestrian Paths/Trails
MAINTENANCE &VULNERABILITY
CONGESTIONREDUCTION
SAFETYIMPROVEMENTS
NETWORKIMPROVEMENTS
PROJECT DESCRIPTION
SURTAX BUDGET CATEGORY
City of Temple Terrace - Hillsborough County Transportation Surtax 2020 Project PlanProject Summaries
PROJECTNUMBER PROJECT TITLE
P-03Construction - Telecom Parkway TrailSystem
2 mile of trail system to be implemented for bicyclistand pedestrian use. To connect to Telecom Parkway,Fletcher Avenue and Fowler Avenue.
X
P-04 Planning - Telecom Parkway #2 Trail System0.46 miles of trail system to be planned for bicyclistand pedestrian use. To connect Fletcher Avenue andTelecom Parkway along Hollow Stump Road.
X
P-05Construction - Telecom Parkway #2 TrailSystem
0.46 miles of trail system to be implemented forbicyclist and pedestrian use. To connect FletcherAvenue and Telecom Parkway along Hollow StumpRoad.
X
P-06 Planning - Old Railway Trail System1.3 miles of trail system be planned for bicyclists andpedestrian use X
P-07 Construction - Old Railway Trail System1.3 miles of trail system be implemented for bicyclistsand pedestrian use X
B-01 Design - 122nd Bicycle Enhancements0.5 miles of bicycle enhancements/improvements tobe designed along 122nd Avenue and connect 122ndto USF
X X X
B-02 Construction - 122nd Bicycle Enhancements0.5 miles of bicycle enhancements/improvements tobe added along 122nd Avenue and connect 122nd toUSF
X X X
B-03 Design - 127th Bicycle Enhancements0.5 miles of bicycle enhancements/improvements tobe designed along 127th Avenue and connect 127thto USF
X X X
Bicycle Enhancements/Improvements
MAINTENANCE &VULNERABILITY
CONGESTIONREDUCTION
SAFETYIMPROVEMENTS
NETWORKIMPROVEMENTS
PROJECT DESCRIPTION
SURTAX BUDGET CATEGORY
City of Temple Terrace - Hillsborough County Transportation Surtax 2020 Project PlanProject Summaries
PROJECTNUMBER PROJECT TITLE
B-04 Construction - 127th Bicycle Enhancements0.5 miles of bicycle enhancements/improvements tobe added along 127th Avenue and connect 127th toUSF
X X X
MM-01Design - Overlook Drive Multi-ModalEnhancements
0.25 miles of multi-modal improvements (modifyvehicular lanes and add buffered bike lanes) designedalong Overlook Drive from Busch Blvd to TempleHeights Rd.
X X
MM-02Construction - Overlook Drive Multi-ModalEnhancements
0.25 miles of multi-modal improvements (modifyvehicular lanes and add buffered bike lanes) addedalong Overlook Drive from Busch Blvd to TempleHeights Rd.
X X
W-01 Signage Replacement - Zone 10 Replacing signage X X
W-02 Signage Replacement - Zone 5 Replacing signage X X
W-03 Signage Replacement - Zone 11 Replacing signage X X
W-04 Signage Replacement - Zone 7 Replacing signage X X
W-05 Signage Replacement - Zone 9 Replacing signage X X
W-06 Pavement Markings - Zone 10 Pavement Markings X X
W-07 Pavement Markings - Zone 5 Pavement Markings X X
W-08 Pavement Markings - Zone 11 Pavement Markings X X
W-09 Pavement Markings - Zone 7 Pavement Markings X X
W-10 Pavement Markings - Zone 9 Pavement Markings X X
PD-01 Execution of Projects Means and methods to execute projects X X X X
Wayfinding
Project Delivery
Multi-Modal Improvements
City of Temple Terrace
Hillsborough County
2020 Surtax Project Plan Key Sheet
Project Type
Project Number
Project Name
R-01 South of Temple Terrace Golf and Country Club FDR Pavement Improvements R-02 South of Temple Terrace Golf and Country Club M/O Pavement Improvements R-03 Cross Street M/O Pavement Improvements R-04 West and East River Drive Pavement Improvments R-05 Raintree Oaks Micro Pavement Improvements R-06 Raintree Terrace M/O Pavement Improvements R-07 E Whiteway Drive M/O Pavement Improvements R-08 Druid Hills Road M/O Pavement Improvements R-09 Pavement Improvements between Whiteway Drive and Druid Hills Road S-01 Design - Woodmont Charter Sidewalk Improvements S-02 Construction - Woodmont Charter Sidewalk Improvements S-03 Design - Temple Terrace Elementary Sidewalk Improvements S-04 Construction - Temple Terrace Elementary Sidewalk Improvements P-01 Riverside Park Pedestrian Bridge Enhancement P-02 Planning - Telecom Parkway Trail System P-03 Construction - Telecom Parkway Trail System P-04 Planning - Telecom Parkway #2 Trail System P-05 Construction - Telecom Parkway #2 Trail System P-06 Planning - Old Railway Trail System P-07 Construction - Old Railway Trail System B-01 Design - 122nd Bicycle Enhancements B-02 Construction - 122nd Bicycle Enhancements B-03 Design - 127th Bicycle Enhancements B-04 Construction - 127th Bicycle Enhancements MM-01 Design - Overlook Drive Multi-Modal Enhancements MM-02 Construction - Overlook Drive Multi-Modal Enhancements W-01 Signage Replacement - Zone 10 W-02 Signage Replacement - Zone 5 W-03 Signage Replacement - Zone 11 W-04 Signage Replacement - Zone 7 W-05 Signage Replacement - Zone 9 W-06 Pavement Markings - Zone 10 W-07 Pavement Markings - Zone 5 W-08 Pavement Markings - Zone 11 W-09 Pavement Markings - Zone 7 W-10 Pavement Markings - Zone 9
Roadway Improvements/Maintenance
Sidewalk Improvements
Pedestrian Paths/Trails
Bicycle Enhancements/Improvements
Multi Modal Improvements
R-01
CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN
PROJECT NUMBER: R-01 | PROJECT YEAR: 2021
PROJECT SURTAX
CATEGORY(S):
☒ Maintenance and
Vulnerability
☐ Congestion Reduction
☒ Safety Improvements
☐ Network Improvements
PROJECT
DESCRIPTION:
2,260 LF of Full Depth
Restoration (FDR) along
Springdale Place, Glen
Oaks Avenue and S. Glen
Arven Avenue per the
Temple Terrace 2012
Pavement Management
Plan
PROJECT NAME: SOUTH OF TEMPLE TERRACE GOLF AND
COUNTRY CLUB FULL DEPTH RECLAMATION (FDR) PAVEMENT
IMPROVEMENTS
PROJECT TYPE: ROADWAY IMPROVEMENTS/MAINTENANCE
PROJECT COST ESTIMATE: $190,000.00
PROJECT GOALS:
To remediate current
conditions of the existing
pavement and create a
safe roadway for the
citizens of the City of
Temple Terrace.
R-02
CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN
PROJECT NUMBER: R-02 | PROJECT YEAR: 2021
PROJECT SURTAX
CATEGORY(S):
☒ Maintenance and
Vulnerability
☐ Congestion Reduction
☒ Safety Improvements
☐ Network Improvements
PROJECT
DESCRIPTION:
12,430 LF of Mill and
Overlay (M/O) south of
the Temple Terrace Golf
and Country Club per the
Temple Terrace 2012
Pavement Management
Plan
PROJECT NAME: SOUTH OF TEMPLE TERRACE GOLF AND
COUNTRY CLUB M/O PAVEMENT IMPROVEMENTS
PROJECT TYPE: ROADWAY IMPROVEMENTS/MAINTENANCE
PROJECT COST ESTIMATE: $715,000.00
PROJECT GOALS:
To remediate current
conditions of the existing
pavement and create a
safe roadway for the
citizens of the City of
Temple Terrace.
R-03
CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN
PROJECT NUMBER: R-03 | PROJECT YEAR: 2021
PROJECT SURTAX
CATEGORY(S):
☒ Maintenance and
Vulnerability
☐ Congestion Reduction
☒ Safety Improvements
☐ Network Improvements
PROJECT
DESCRIPTION:
550 LF of Mill and
Overlay (M/O) east on
Cross Street from the
stop sign to Telecom
Drive per the Temple
Terrace 2012 Pavement
Management Plan
PROJECT NAME: CROSS STREET MILL AND OVERLAY
PAVEMENT IMPROVEMENTS
PROJECT TYPE: ROADWAY IMPROVEMENTS/MAINTENANCE
PROJECT COST ESTIMATE: $32,000.00
PROJECT GOALS:
To remediate current
conditions of the existing
pavement and create a
safe roadway for the
citizens of the City of
Temple Terrace.
R-04
CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN
PROJECT NUMBER: R-04 | PROJECT YEAR: 2021
PROJECT SURTAX
CATEGORY(S):
☒ Maintenance and
Vulnerability
☐ Congestion Reduction
☒ Safety Improvements
☐ Network Improvements
PROJECT
DESCRIPTION:
8,930 LF of Full Depth
Restoration (FDR) along
East and West River
Drive, Falmouth Street
and Lamont Place per the
Temple Terrace 2012
Pavement Management
Plan
PROJECT NAME: WEST AND EAST RIVER DRIVE PAVEMENT
IMPROVEMENTS
PROJECT TYPE: ROADWAY IMPROVEMENTS/MAINTENANCE
PROJECT COST ESTIMATE: $745,000.00
PROJECT GOALS:
To remediate current
conditions of the existing
pavement and create a
safe roadway for the
citizens of the City of
Temple Terrace.
R-05
CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN
PROJECT NUMBER: R-05 | PROJECT YEAR: 2021
PROJECT SURTAX
CATEGORY(S):
☒ Maintenance and
Vulnerability
☐ Congestion Reduction
☒ Safety Improvements
☐ Network Improvements
PROJECT
DESCRIPTION:
4,100 LF of Micro
pavement restoration
within Raintree Oaks
neighborhood along
Soaring Ave, Wood Duck
Pl, and Tanager Pl per
the Temple Terrace 2012
Pavement Management
Plan
PROJECT NAME: RAINTREE OAKS MICRO PAVEMENT
IMPROVEMENTS
PROJECT TYPE: ROADWAY IMPROVEMENTS/MAINTENANCE
PROJECT COST ESTIMATE: $123,000.00
PROJECT GOALS:
To remediate current
conditions of the existing
pavement and create a
safe roadway for the
citizens of the City of
Temple Terrace.
R-06
CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN
PROJECT NUMBER: R-06 | PROJECT YEAR: 2024
PROJECT SURTAX
CATEGORY(S):
☒ Maintenance and
Vulnerability
☐ Congestion Reduction
☒ Safety Improvements
☐ Network Improvements
PROJECT
DESCRIPTION:
6,500 LF of Mill and
Overlay in Raintree
Terrace along Rainforest
Street and west side
streets per the Temple
Terrace 2012 Pavement
Management Plan
PROJECT NAME: RAINTREE TERRACE MILL AND OVERLAY
PAVEMENT IMPROVEMENTS
PROJECT TYPE: ROADWAY IMPROVEMENTS/MAINTENANCE
PROJECT COST ESTIMATE: $374,000.00
PROJECT GOALS:
To remediate current
conditions of the existing
pavement and create a
safe roadway for the
citizens of the City of
Temple Terrace.
R-07
CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN
PROJECT NUMBER: R-07 | PROJECT YEAR: 2024
PROJECT SURTAX
CATEGORY(S):
☒ Maintenance and
Vulnerability
☐ Congestion Reduction
☒ Safety Improvements
☐ Network Improvements
PROJECT
DESCRIPTION:
5,300 LF of Mill and
Overlay along E
Whiteway Drive from
Gillette Avenue to N 56th
Street per the Temple
Terrace 2012 Pavement
Management Plan
PROJECT NAME: E WHITEWAY DRIVE MILL AND OVERLAY
PAVEMENT IMPROVEMENTS
PROJECT TYPE: ROADWAY IMPROVEMENTS/MAINTENANCE
PROJECT COST ESTIMATE: $305,000.00
PROJECT GOALS:
To remediate current
conditions of the existing
pavement and create a
safe roadway for the
citizens of the City of
Temple Terrace.
R-08
CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN
PROJECT NUMBER: R-08 | PROJECT YEAR: 2024
PROJECT SURTAX
CATEGORY(S):
☒ Maintenance and
Vulnerability
☐ Congestion Reduction
☒ Safety Improvements
☐ Network Improvements
PROJECT
DESCRIPTION:
8,000 LF of Mill and
Overlay along Druid Hills
Road from Riverhills Drive
to N 56th Street per the
Temple Terrace 2012
Pavement Management
Plan
PROJECT NAME: DRUID HILLS ROAD MILL AND OVERLAY
PAVEMENT IMPROVEMENTS
PROJECT TYPE: ROADWAY IMPROVEMENTS/MAINTENANCE
PROJECT COST ESTIMATE: $460,000.00
PROJECT GOALS:
To remediate current
conditions of the existing
pavement and create a
safe roadway for the
citizens of the City of
Temple Terrace.
R-09
CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN
PROJECT NUMBER: R-09 | PROJECT YEAR: 2024
PROJECT SURTAX
CATEGORY(S):
☒ Maintenance and
Vulnerability
☐ Congestion Reduction
☒ Safety Improvements
☐ Network Improvements
PROJECT
DESCRIPTION:
12,100 LF of Full Depth
Restoration and 2,700 LF
of Mill and Overlay
between E Whiteway
Drive and Druid Hills
Road from N 56th Street
to N Riverhills Drive per
the Temple Terrace 2012
Pavement Management
Plan
PROJECT NAME: PAVEMENT IMPROVEMENTS BETWEEN E
WHITEWAY DRIVE AND DRUID HILLS ROAD
PROJECT TYPE: ROADWAY IMPROVEMENTS/MAINTENANCE
PROJECT COST ESTIMATE: $1,200,000.00
PROJECT GOALS:
To remediate current
conditions of the existing
pavement and create a
safe roadway for the
citizens of the City of
Temple Terrace.
S-01
CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN
PROJECT NUMBER: S-01 | PROJECT YEAR: 2020
PROJECT SURTAX
CATEGORY(S):
☐ Maintenance and
Vulnerability
☐ Congestion Reduction
☒ Safety Improvements
☒ Network Improvements
PROJECT
DESCRIPTION:
1,500 LF of sidewalk
along the north side of E
Whiteway Drive, south
side of Parade Street and
south side of Chilkoot
Avenue is to be designed
from N 53rd street to N
52nd Street
PROJECT NAME: DESIGN- WOODMONT CHARTER SCHOOL
SIDEWALK IMPROVEMENTS
PROJECT TYPE: SIDEWALK IMPROVEMENTS
PROJECT COST ESTIMATE: $5,000.00
PROJECT GOALS:
To improve the safety of
pedestrians walking to
and from a school area
and make schools more
accessible by improving
the pedestrian
transportation network
S-02
CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN
PROJECT NUMBER: S-02 | PROJECT YEAR: 2021
PROJECT SURTAX
CATEGORY(S):
☐ Maintenance and
Vulnerability
☐ Congestion Reduction
☒ Safety Improvements
☒ Network Improvements
PROJECT
DESCRIPTION:
1,500 LF of sidewalk
along the north side of E
Whiteway Drive, south
side of Parade Street and
south side of Chilkoot
Avenue is to be installed
from N 53rd street to N
52nd Street
PROJECT NAME: CONSTRUCTION - WOODMONT CHARTER
SCHOOL SIDEWALK IMPROVEMENTS
PROJECT TYPE: SIDEWALK IMPROVEMENTS
PROJECT COST ESTIMATE: $150,000.00
PROJECT GOALS:
To improve the safety of
pedestrians walking to
and from a school area
and make schools more
accessible by improving
the pedestrian
transportation network
S-03
CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN
PROJECT NUMBER: S-03 | PROJECT YEAR: 2020
PROJECT SURTAX
CATEGORY(S):
☐ Maintenance and
Vulnerability
☐ Congestion Reduction
☒ Safety Improvements
☒ Network Improvements
PROJECT
DESCRIPTION:
1,130 LF of sidewalk to be
designed along the west
side of Broadway Ave
from Bullard Pkwy to
Flotto Ave, the north and
south sides of Flotto Ave
from the elementary
school to Ridgedale Ave
and north on Ridgedale
Ave to Fillian Ave
PROJECT NAME: DESIGN- TEMPLE TERRACE ELEMENTARY
SCHOOL SIDEWALK IMPROVEMENTS
PROJECT TYPE: SIDEWALK IMPROVEMENTS
PROJECT COST ESTIMATE: $5,000.00
PROJECT GOALS:
To improve the safety of
pedestrians walking to
and from a school area
and make schools more
accessible by improving
the pedestrian
transportation network
S-04
CITY OF TEMPLE TERRACEHILLSBOROUGH COUNTY SURTAX PROJECT PLAN
PROJECT NUMBER: S-04 | PROJECT YEAR: 2020
PROJECT SURTAXCATEGORY(S):
☐ Maintenance andVulnerability
☐ Congestion Reduction
☒ Safety Improvements
☒ Network Improvements
PROJECTDESCRIPTION:
1,130 LF of sidewalk to beinstalled along the westside of Broadway Avefrom Bullard Pkwy toFlotto Ave, the north andsouth sides of Flotto Avefrom the elementaryschool to Ridgedale Aveand north on RidgedaleAve to Fillian Ave
PROJECT NAME: CONSTRUCTION - TEMPLE TERRACEELEMENTARY SCHOOL SIDEWALK IMPROVEMENTS
PROJECT TYPE: SIDEWALK IMPROVEMENTS
PROJECT COST ESTIMATE: $113,000.00
PROJECT GOALS:
To improve the safety ofpedestrians walking toand from a school areaand make schools moreaccessible by improvingthe pedestriantransportation network
P-01
CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN
PROJECT NUMBER: P-01 | PROJECT YEAR: 2021
PROJECT SURTAX
CATEGORY(S):
☒ Maintenance and
Vulnerability
☐ Congestion Reduction
☒ Safety Improvements
☐ Network Improvements
PROJECT
DESCRIPTION:
50 LF of pedestrian bridge
enhancements at
Riverside Park, corner of
S Riverhills Drive and
Springdale Place
PROJECT NAME: RIVERSIDE PARK PEDESTRIAN BRIDGE
ENHANCEMENT
PROJECT TYPE: PEDESTRIAN PATHS/TRAILS
PROJECT COST ESTIMATE: $135,000.00
PROJECT GOALS:
To improve the safety of
pedestrians walking to
and from Riverside Park
by replacing the existing
pedestrian bridge with a
safer alternative.
P-02
CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN
PROJECT NUMBER: P-02 | PROJECT YEAR: 2021
PROJECT SURTAX
CATEGORY(S):
☐ Maintenance and
Vulnerability
☐ Congestion Reduction
☐ Safety Improvements
☒ Network Improvements
PROJECT
DESCRIPTION:
2 miles of trail system to
be planned for bicyclist
and pedestrian use, to
connect Telecom
Parkway to Fletcher
Avenue and Fowler
Avenue.
PROJECT NAME: PLANNING – TELECOM PARKWAY TRAIL
SYSTEM
PROJECT TYPE: PEDESTRIAN PATHS/TRAILS
PROJECT COST ESTIMATE: $200,000.00
PROJECT GOALS:
To improve the
pedestrian and bicyclist
network through Temple
Terrace with the
implementation of a trails
system, solely for
pedestrians and
bicyclists.
P-03
CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN
PROJECT NUMBER: P-03 | PROJECT YEAR: 2022
PROJECT SURTAX
CATEGORY(S):
☐ Maintenance and
Vulnerability
☐ Congestion Reduction
☐ Safety Improvements
☒ Network Improvements
PROJECT
DESCRIPTION:
2 miles of trail system to
be implemented for
bicyclist and pedestrian
use, to connect Telecom
Parkway to Fletcher
Avenue and Fowler
Avenue.
PROJECT NAME: CONSTRUCTION – TELECOM PARKWAY TRAIL
SYSTEM
PROJECT TYPE: PEDESTRIAN PATHS/TRAILS
PROJECT COST ESTIMATE: $2,000,000.00
PROJECT GOALS:
To improve the
pedestrian and bicyclist
network through Temple
Terrace with the
implementation of a trails
system, solely for
pedestrians and
bicyclists.
P-04
CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN
PROJECT NUMBER: P-04 | PROJECT YEAR: 2023
PROJECT SURTAX
CATEGORY(S):
☐ Maintenance and
Vulnerability
☐ Congestion Reduction
☐ Safety Improvements
☒ Network Improvements
PROJECT
DESCRIPTION:
0.46 miles of trail system
to be planned for bicyclist
and pedestrian use, to
connect Fletcher Avenue
and Telecom Parkway
along Hollow Stump Road
PROJECT NAME: PLANNING – TELECOM PARKWAY #2 TRAIL
SYSTEM
PROJECT TYPE: PEDESTRIAN PATHS/TRAILS
PROJECT COST ESTIMATE: $100,000.00
PROJECT GOALS:
To improve the
pedestrian and bicyclist
network through Temple
Terrace with the
implementation of a trails
system, solely for
pedestrians and
bicyclists.
P-05
CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN
PROJECT NUMBER: P-05 | PROJECT YEAR: 2024
PROJECT SURTAX
CATEGORY(S):
☐ Maintenance and
Vulnerability
☐ Congestion Reduction
☐ Safety Improvements
☒ Network Improvements
PROJECT
DESCRIPTION:
0.46 miles of trail system
to be implemented for
bicyclist and pedestrian
use, to connect Fletcher
Avenue and Telecom
Parkway along Hollow
Stump Road
PROJECT NAME: CONSTRUCTION – TELECOM PARKWAY #2
TRAIL SYSTEM
PROJECT TYPE: PEDESTRIAN PATHS/TRAILS
PROJECT COST ESTIMATE: $1,000,000.00
PROJECT GOALS:
To improve the
pedestrian and bicyclist
network through Temple
Terrace with the
implementation of a trails
system, solely for
pedestrians and
bicyclists.
P-06
CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN
PROJECT NUMBER: P-06 | PROJECT YEAR: 2022
PROJECT SURTAX
CATEGORY(S):
☐ Maintenance and
Vulnerability
☐ Congestion Reduction
☐ Safety Improvements
☒ Network Improvements
PROJECT
DESCRIPTION:
1.3 miles of trail system to
be designed for bicyclist
and pedestrian use, to
connect Temple Terrace
Highway to the
Hillsborough River along
the old railroad tracks.
PROJECT NAME: PLANNING – OLD RAILWAY TRAIL SYSTEM
PROJECT TYPE: PEDESTRIAN PATHS/TRAILS
PROJECT COST ESTIMATE: $200,000.00
PROJECT GOALS:
To improve the
pedestrian and bicyclist
network through Temple
Terrace with the
implementation of a trails
system, solely for
pedestrians and
bicyclists.
P-07
CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN
PROJECT NUMBER: P-07 | PROJECT YEAR: 2023
PROJECT SURTAX
CATEGORY(S):
☐ Maintenance and
Vulnerability
☐ Congestion Reduction
☐ Safety Improvements
☒ Network Improvements
PROJECT
DESCRIPTION:
1.3 miles of trail system to
be implemented for
bicyclist and pedestrian
use, to connect Temple
Terrace Highway to the
Hillsborough River along
the old railroad tracks.
PROJECT NAME: CONSTRUCTION – OLD RAILWAY TRAIL
SYSTEM
PROJECT TYPE: PEDESTRIAN PATHS/TRAILS
PROJECT COST ESTIMATE: $2,000,000.00
PROJECT GOALS:
To improve the
pedestrian and bicyclist
network through Temple
Terrace with the
implementation of a trails
system, solely for
pedestrians and
bicyclists.
B-01
CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN
PROJECT NUMBER: B-01 | PROJECT YEAR: 2020
PROJECT SURTAX
CATEGORY(S):
☒ Maintenance and
Vulnerability
☐ Congestion Reduction
☒ Safety Improvements
☒ Network Improvements
PROJECT
DESCRIPTION:
0.5 miles of bicycle
enhancements and
improvements to be
designed along 122nd
Avenue, connecting 122nd
Avenue to USF
PROJECT NAME: DESIGN - 122ND BICYCLE ENHANCEMENTS
PROJECT TYPE: BICYCLE ENHANCEMENTS/IMPROVEMENTS
PROJECT COST ESTIMATE: $10,000.00
PROJECT GOALS:
To improve the bicyclist
network through Temple
Terrace with the
implementation bike
paths and updates to
existing bike paths.
B-02
CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN
PROJECT NUMBER: B-02 | PROJECT YEAR: 2021
PROJECT SURTAX
CATEGORY(S):
☒ Maintenance and
Vulnerability
☐ Congestion Reduction
☒ Safety Improvements
☒ Network Improvements
PROJECT
DESCRIPTION:
0.5 miles of bicycle
enhancements and
improvements to be
implemented along 122nd
Avenue, connecting 122nd
Avenue to USF
PROJECT NAME:CONSTRUCTION-122ND BICYCLE ENHANCEMENTS
PROJECT TYPE: BICYCLE ENHANCEMENTS/IMPROVEMENTS
PROJECT COST ESTIMATE: $50,000.00
PROJECT GOALS:
To improve the bicyclist
network through Temple
Terrace with the
implementation bike
paths and updates to
existing bike paths.
B-03
CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN
PROJECT NUMBER: B-03 | PROJECT YEAR: 2020
PROJECT SURTAX
CATEGORY(S):
☒ Maintenance and
Vulnerability
☐ Congestion Reduction
☒ Safety Improvements
☒ Network Improvements
PROJECT
DESCRIPTION:
0.5 miles of bicycle
enhancements and
improvements to be
designed along 127th
Avenue, connecting 127th
Avenue to USF
PROJECT NAME: DESIGN-127TH BICYCLE ENHANCEMENTS
PROJECT TYPE: BICYCLE ENHANCEMENTS/IMPROVEMENTS
PROJECT COST ESTIMATE: $10,000.00
PROJECT GOALS:
To improve the bicyclist
network through Temple
Terrace with the
implementation bike
paths and updates to
existing bike paths.
B-04
CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN
PROJECT NUMBER: B-04 | PROJECT YEAR: 2021
PROJECT SURTAX
CATEGORY(S):
☒ Maintenance and
Vulnerability
☐ Congestion Reduction
☒ Safety Improvements
☒ Network Improvements
PROJECT
DESCRIPTION:
0.5 miles of bicycle
enhancements and
improvements to be
implemented along 127th
Avenue, connecting 127th
Avenue to USF
PROJECT NAME: CONSTRUCTION-127TH BICYCLE
ENHANCEMENTS
PROJECT TYPE: BICYCLE ENHANCEMENTS/IMPROVEMENTS
PROJECT COST ESTIMATE: $50,000.00
PROJECT GOALS:
To improve the bicyclist
network through Temple
Terrace with the
implementation bike
paths and updates to
existing bike paths.
MM-01
CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN
PROJECT NUMBER: MM-01 | PROJECT YEAR: 2020
PROJECT SURTAX
CATEGORY(S):
☐ Maintenance and
Vulnerability
☐ Congestion Reduction
☒ Safety Improvements
☒ Network Improvements
PROJECT
DESCRIPTION:
0.25 Miles of multi-modal
improvements to be
designed along Overlook
Drive from Busch Blvd to
Temple Heights Rd.
Improvements are to
include lane modifications
and buffered bike lanes.
PROJECT NAME: DESIGN – OVERLOOK DRIVE MULTI-MODAL
ENHANCEMENTS
PROJECT TYPE: MULTI-MODAL IMPROVEMENTS
PROJECT COST ESTIMATE: $25,000.00
PROJECT GOALS:
To improve the safety of
both vehicles and
bicycles, making a safe
way for multiple modes of
transportation to share
the roadway.
MM-02
CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN
PROJECT NUMBER: MM-02 | PROJECT YEAR: 2023
PROJECT SURTAX
CATEGORY(S):
☐ Maintenance and
Vulnerability
☐ Congestion Reduction
☒ Safety Improvements
☒ Network Improvements
PROJECT
DESCRIPTION:
0.25 Miles of multi-modal
improvements to be
implemented along
Overlook Drive from
Busch Blvd to Temple
Heights Rd.
Improvements are to
include lane modifications
and buffered bike lanes.
PROJECT NAME: CONSTRUCTION – OVERLOOK DRIVE MULTI-
MODAL ENHANCEMENTS
PROJECT TYPE: MULTI-MODAL IMPROVEMENTS
PROJECT COST ESTIMATE: $150,000.00
PROJECT GOALS:
To improve the safety of
both vehicles and
bicycles, making a safe
way for multiple modes of
transportation to share
the roadway.
WW-01 to WW-05
CITY OF TEMPLE TERRACEHILLSBOROUGH COUNTY SURTAX PROJECT PLAN
PROJECT NUMBER: W-01 TO W-05 | PROJECT YEARS: 2020 TO 2024
PROJECT SURTAXCATEGORY(S):
☒ Maintenance andVulnerability
☐ Congestion Reduction
☒ Safety Improvements
☐ Network Improvements
PROJECTDESCRIPTION:
Signage replacement tooccur throughout thelisted zones to improvethe safety and wayfindingof City residents andvisitors.
PROJECT NAME: SIGNAGE REPLACEMENT – ZONES 10,5,11,7,9
PROJECT TYPE: WAYFINDING
PROJECT COST ESTIMATE: $225,000.00 PROJECT GOALS:
To improve the safety andwayfinding throughout thecity.
WW-06 to WW-10
CITY OF TEMPLE TERRACE HILLSBOROUGH COUNTY SURTAX PROJECT PLAN
PROJECT NUMBER: W-06 TO W-10 | PROJECT YEARS: 2020 TO 2024
PROJECT SURTAX
CATEGORY(S):
☒ Maintenance and
Vulnerability
☐ Congestion Reduction
☒ Safety Improvements
☐ Network Improvements
PROJECT
DESCRIPTION:
Pavement marking and
remarking to occur
throughout the listed
zones to improve the
safety and wayfinding of
City residents and visitors.
PROJECT NAME: PAVEMENT MARKINGS – ZONES 10,5,11,7,9
PROJECT TYPE: WAYFINDING
PROJECT COST ESTIMATE: $250,000.00
PROJECT GOALS:
To improve the safety and
wayfinding throughout the
city.