City of SomertonOrange Grove (OG) & Rancho Mesa Verde (RMV)
Water System ImprovementsCDBG Contract 110-15
ADDENDUM #2
Date: October 27, 2015
The purpose of this addendum is to inform the proposing parties regarding the Orange Grove (OG) & Rancho Mesa Verde (RMV) Water System Improvements. Reminder: Acknowledge receipt of this addendum on the Bid Form.
The Bid Due Date and Time have NOT been modified. Sealed bid shall be received until 4:00 PM Local Time, Thursday, November 12, 2015, Somerton City Hall, City Clerk, 110 N. State Ave, Somerton, AZ 85350.
Attachments:
1. Pre-bid conference sign-in sheet
2. Section 13110 Welded Steel Potable Water Storage Tank
General Modifications:
1. None
Questions & Clarifications:
1. Special Inspection Form, as required by Yuma County for testing and special inspections, is a deferred submittal and shall be in the Contractor’s scope of supply. Specifications Sections 14000 Quality Control and 01454 Testing & Laboratory Services shall be referenced. Contractor is responsible all inspections and testing with the exception of Electrical Inspections. Electrical inspection(s) will be contracted and paid for by the Owner (or Engineer), however, Contractor will be responsible for coordination for these inspection(s) with Owner (or Engineer).
Response: N/A
2. Can you please provide some clarification for us pertaining to the Orange Grove & Rancho Mesa Verde Water System Imps. Project? The specs state that this is a federally funded project, but I cannot find any reference to “Buy America” or “American Iron & Steel (A.I.S.)”, so can you please advise if there are any domestic requirements for this project?
Addendum #2 – OG & RMV Water System Improvements October 27, 2015PACE #9972 Page 2 of 2
Response: Because this is not an ARRA (American Recovery and Reinvestment Act) funded project, it is not tied to the “buy American” requirements.
3. Regarding Spec. Section: Division 13 – Special Construction, Section 13100 Bolted Steel Potable Water Storage Tanks. Can the steel potable water storage tanks be welded rather than bolted?
Response: Due to requests, a new specification section, Section 13110 Welded Steel Potable Water Storage Tank has been added to the project and it is attached to this addendum. Therefore, bid for tank must either be a Bolted Steel Potable Water Storage Tank per Specification Section 13100 or a Welded Steel Potable Water Storage Tank per new Section 13110. No other types will be accepted. At this time, contractor and/or tank suppliers must review the specifications and decide if a specific tank is considered an “or equal”, however Bidder must also understand that the final determination will not be made until after the project is awarded and the shop drawing submittals are reviewed.
Welded Steel Storage Tank
Orange Grove & Rancho Mesa Verde Water Infrastructure – 9972 Page 13100-1
SECTION 13110
WELDED STEEL POTABLE WATER STORAGE TANK
PART 1 -- GENERAL
1.1 THE REQUIREMENT
A. CONTRACTOR shall design, fabricate, and erect a welded steel water storage tank on a ring-type foundation,
including the steel tank, pipe connections, manways, ladders, hatches, safety masts, vents, overflow assemblies,
instrument nozzles, and other appurtenances shown on the drawings and specifications. The tank shall meet all
requirements and standards for storing potable water and shall be disinfected prior to being brought on line.
1.2 REFERENCES AND RELATED SECTIONS
1. AWWA D-103-09, D104-11, D106-10 & C652-11 Standards of the American Water Works Association
2. NFPA-22 Standards for Water Tanks for Private Fire Protection
3. Uniform Building Code
4. NSF 60 & 61
5. NACE SP0188 & 6A192
6. SSPC SP10
7. Section 09800 – Special Coatings
8. Section 09660 – Coating Systems for Water Storage Tanks
1.3 SUBMITTALS
A. Submittals shall be furnished in accordance with Sections 01300 - Submittals
B. CONTRACTOR shall provide complete design calculations and detailed drawings signed and stamped by a Civil
Engineer licensed in the state of California.
C. CONTRACTOR shall supply detailed tank drawings and supplemental information including the following:
1. Tank dimensional drawings
2. Foundation design
3. Cathodic protection
4. Accessories and appurtenances
5. Coatings
1.4 QUALIFICATIONS OF FABRICATORS
A. The materials shall be furnished by one supplier who is regularly engaged in the manufacturer of steel water
storage tanks and has experienced factory-qualified representatives that can supervise the field assembly.
B. All materials shall be new and of current manufacturer and shall be guaranteed against defects in workmanship in
accordance with other sections of these Specifications.
1.5 QUALIFICATIONS OF INSTALLERS
A. For the fabrication, erection and testing of the work in this Section, use only thoroughly trained and experienced
personnel who are completely familiar with the requirements for this work and with the installation
recommendations of the manufacturers and these Specifications.
Welded Steel Storage Tank
Orange Grove & Rancho Mesa Verde Water Infrastructure – 9972 Page 13100-2
B. All welders shall be certified for the particular type of welding required prior to starting welding on the site,
including equipment to be used, positions, procedures, base metals and electrodes or base filler wires from the
same specifications, classifications, or group number that will be encountered on their assignment.
C. Certification testing shall be performed by an approved testing laboratory. Costs of such testing shall be borne by
the Contractor. The Contractor shall maintain current records of all welding certifications. A copy of each welding
certification shall be submitted to the Owner for approval a minimum of 48 hours in advance of any welding to be
performed.
D. Qualifications of welding procedures, welders and welding operators shall comply with Section 8 of AWWA
Dl00.
1.6 DELIVERY, STORAGE, HANDLING
A. All plates, supports, members, and miscellaneous parts shall be packaged for shipment in such a manner to prevent
abrasion or scratching of the finish coating.
B. In the event of damage, immediately make all repairs and replacements necessary for the approval of the Owner
and at no additional cost to the Owner.
C. When damaged material cannot be repaired to the satisfaction of the Owner, it shall be removed from the jobsite at
no additional cost to the Owner.
D. Material shall be stored in a safe location protected from the elements where damage could result.
1.7 WARRANTY
A. The tank manufacturer shall warrant the tank against any defects in workmanship and materials for a period of five
(5) years from date of shipment.
B. The tank erector shall warrant the tank against any defects in workmanship for a period of five (5) years from date
of shipment.
PART 2 -- PRODUCTS
2.1 ACCEPTABLE SUPPLIERS
A. Superior Tank Company Inc.
B. Engineer-approved equal
2.2 WELDED TANK STRUCTURE
A. The materials, design, fabrication, and erection of the welded steel tank shall conform to applicable local, state and
federal generations, including AWWA Standard for Welded Carbon Steel Tanks for Water Storage D-100-11 and
local seismic and building codes.
B. Design shall provide for easy painting of structural and appurtenant members after erection. Beams of standard
structural shapes with columns shall be used rather than long-span roof trusses. Where design for ease of painting
after erection is not feasible, steel shall be shop sand blasted and shall receive shop applied primer, intermediate and
finish coatings.
Welded Steel Storage Tank
Orange Grove & Rancho Mesa Verde Water Infrastructure – 9972 Page 13100-3
C. Detailed drawings and supporting structural analyses signed by an Arizona registered civil or structural engineer
shall be submitted by the Contractor for approval not later than 30 calendar days after award of the contract. The
drawings shall show the following information:
• Plate thickness and width,
• Number and size of structural members,
• Construction and erection details of all accessories and related work,
• Size and spacing of hold-down anchorages, if required,
• Adequacy of bearing pressures under the center column footing and other column footings, where
required, and
• All other pertinent data concerning the construction of the tank.
D. The standard height and diameter shall meet or exceed the capacity requirement of 180,000 gallons of usable
volume.
E. The foundation shall be ring-type, not anchored, and supported by structural fill per the Geotechnical Report.
F. Allowable soil bearing pressure for supporting loads shall be per Geotechnical Report.
2.3 ACCESSORIES
A. All exterior accessories shall be painted and coated by the manufacturer to match tank exterior. Accessories and
appurtenances shall be supplied in locations shown on the plans and as specified below:
1. Locking roof hatch 36’ x 36”
2. Inlet and outlet connections
3. Screened stainless steel mushroom vent
4. Shell Manway 24’ diameter
5. Exterior galvanized ladder meeting OSHA requirements
6. Overflow assembly
7. Drain
8 Nozzles for instruments
9. Fill down comer
10. Valve, valve riser, and sample port assembly, as shown on the plans
11. Galvanized guardrail and toeboards
12. Aluminum exterior level indicator with stainless steel float, float cable, guide wires, anchors, tensioner
assemblies, and target pulley
2.4 DIELECTRIC BARRIERS:
A. There shall be a dielectric barrier wherever stainless steel and carbon steel touch.
B. No welding of stainless steel to carbon steel will be permitted below the water level.
PART 3 -- EXECUTION
3.1 ERECTION AND INSPECTION
A. Inspection and testing shall conform to AWWA D100-11. Testing equipment and the cost thereof shall be
furnished by the Contractor.
B. Welds in the tank shell and roof shall be tested by the Contractor by means of spot radiographic inspection where
required by AWWA D100 and as directed by the Owner.
Welded Steel Storage Tank
Orange Grove & Rancho Mesa Verde Water Infrastructure – 9972 Page 13100-4
C. All radiographs shall be performed by an independent testing laboratory approved by the Owner. The radiographs
shall become the property of the Owner, and the Owner shall have the right to review all information obtained.
D. The first 10 feet of each welder’s work shall be checked, and then up to 5 percent of all the welding shall be
radiographed as directed by the Owner.
E. The Contractor shall provide logs of each welders work throughout the project.
F. All welds in the tank bottom shall be tested by the Contractor and repaired as required by AWWA Standard
Specification by vacuum, using soap suds, linseed oil, or other suitable materials for detection of leaks. Joint may
also be tested by the magnetic-particle method.
G. In vacuum testing, the gauge should register partial vacuum of at least 5 in. Hg.
H. Tank coatings shall be applied in accordance with Section 09800 - Special Coatings and Section 09960 - Coating Systems for Water Storage Tanks.
3.2 TESTING
A. Following completion and erection and cleaning of the tank, the tank shall be tested for liquid tightness by filling
the tank to its overflow elevation. Any leaks disclosed by this test shall be corrected by the erection contractor in
accordance with the tank manufacturer’s recommendations. If repairs are required, the interior and exterior coatings
shall be protected during repairs, coatings shall be touched up as necessary, and the tank shall be retested to the
satisfaction of the Engineer before the work is accepted.
B. Filling and emptying the tank shall be the responsibility of the CONTRACTOR. For hydrostatic testing purposes,
untreated water from the onsite well can be used, provided the well WORK is complete, distribution piping in the
road is installed (Not a Part), site piping is installed, and the non-potable wharf hydrant is operable. Pumping rate
from well is estimated at 10 GPM. If additional water is needed, CONTRACTOR shall provide water by hauling
or other means.
C. External pumping may need to be provided for pressurized spray application of well water. The well pump will
NOT supply adequate pressure for spraying at the treatment site.
D. After completion of hydrostatic testing, the tank shall be disinfected in accordance with the requirements of
AWWA standard C652-11.
E. Prior to emptying the tank, the hydrostatic testing water shall be de-chlorinated with NSF-approved Captor
Solution (Calcium Thiosulfate), or other Engineered-approved means.
F. De-chlorinated hydrostatic testing water can be applied onsite as irrigation or used onsite for dust control.
F. Tank shall be emptied of all non-potable hydrostatic testing water prior to bringing reverse osmosis system online
and filling the tank with potable water.
- END OF SECTION -