CITY OF OAKLAND DEPARTMENT OF CONTRACTING AND PURCHASING CONTRACT ADMINISTRATION DIVISION CURRENT REQUEST FOR QUALIFICATIONS OPPORTUNITIES RFP for Zero Waste System Design Modeling/Testing and Procurement Technical Assistance License Required Project Number H63640 Fees $Free or $9.05 if mailed Pre-Proposal Meeting Thursday, April 30, 2009 at 10:00 a.m. One Frank H. Ogawa Plaza, Hearing Room 1 Proposals Due Wednesday, May 13, 2009 at 2:00 p.m. 250 Frank H. Ogawa Plaza, Suite 3341 Contract Administration Front Desk Engineer’s Estimate Not to Exceed $300,000.00 Number of Proposals Received Planholders list: RB Consulting Group, Inc., WIH Resource Group, Cascada Consulting Group, SERA, Inc., HF&H Consultants, Inc., R&M Environmental, Herrera Environmental Consultants, Economics, Inc., RJ Proto Consulting, Integrated Waste Mgmt., Alternate Resources, Sound Resource Mgmt Grp., Circle Point, Waste Sleuth, Environmental Innovations Corp., Cal Recovery, Inc., Synergis, Gershman, Brickner & Brohon, Inc., HDR Engineering, Environmental Planning Consultants, URS Corp., Sustainable Concepts Studio, Gary Liss & Assoc., ESA, AECOM, Pacific Waste Consulting Grp., MSE Grp., Brian Strrat & Assoc., 06/12/09

Transcript of CITY OF OAKLANDcces.oaklandnet.com/ContComp/PDF/RFP's and RFQ's...2009-2012 As-Needed Transportation...

CITY OF OAKLAND

DEPARTMENT OF CONTRACTING AND PURCHASING CONTRACT ADMINISTRATION DIVISION

CURRENT REQUEST FOR QUALIFICATIONS OPPORTUNITIES

RFP for Zero Waste System Design Modeling/Testing and Procurement Technical Assistance License Required Project Number H63640 Fees $Free or $9.05 if mailed Pre-Proposal Meeting Thursday, April 30, 2009 at 10:00 a.m.

One Frank H. Ogawa Plaza, Hearing Room 1

Proposals Due Wednesday, May 13, 2009 at 2:00 p.m. 250 Frank H. Ogawa Plaza, Suite 3341 Contract Administration Front Desk

Engineer’s Estimate Not to Exceed $300,000.00 Number of Proposals Received

Planholders list: RB Consulting Group, Inc., WIH Resource Group, Cascada Consulting Group, SERA, Inc., HF&H Consultants, Inc., R&M Environmental, Herrera Environmental Consultants, Economics, Inc., RJ Proto Consulting, Integrated Waste Mgmt., Alternate Resources, Sound Resource Mgmt Grp., Circle Point, Waste Sleuth, Environmental Innovations Corp., Cal Recovery, Inc., Synergis, Gershman, Brickner & Brohon, Inc., HDR Engineering, Environmental Planning Consultants, URS Corp., Sustainable Concepts Studio, Gary Liss & Assoc., ESA, AECOM, Pacific Waste Consulting Grp., MSE Grp., Brian Strrat & Assoc.,

06/12/09

2009-2012 As-Needed Transportation Planning Services License Required Employment Services/ Recreation Project Number N/A Fees $10.00 or $15.00 if mailed Pre-Proposal Meeting Thursday, March 19, 2009 at 2:00 p.m.

250 Frank H. Ogawa Plaza, Broadway Conference Room 4th Floor

Proposals Due Thursday, April 2, 2009 at 2:00 p.m. 250 Frank H. Ogawa Plaza, Suite 3341 Contract Administration Front Desk

Engineer’s Estimate $500,000 (Type A SOQ) $150,000 (Type B SOQ)

Number of Proposals Received

Planholders list: KOA Corporation, DKS Associates, JRDV Architects, Reconnection America, Arthulia, EMC Research, Inc., Hausrath Economics Group, CHS Consulting Group, Community Design & Architecture, Bottomley Design & Planning, HNTB, Alta Planning & Design, Watry Design, AECOM, EnviroTrans Solutions, MIG, Inc., Eisen/Letunic, Nelson/Nygaard, Moffatt & Nichol, Dowling Associates, Ecorp Consulting, Inc., DC&E, Strategic Economics, AE3 Partners, Fehr & Peers, Circle Point, Wilbur Smith Associates, Kimley Horn Associates, Woodrodgers, Questa Engineering, IPA Planning Solutions

06/12/09

RFP Keep Oakland Clean and Beautiful Division Team Oakland Program 2009-2010 PROJECT CANCELLED License Required Employment Services/ Recreation Project Number N/A Fees Free or $9.05 if mailed Pre-Proposal Meeting Friday, February 6, 2009 at 1:00 p.m.

250 Frank H. Ogawa Plaza, Suite 3341 Contract Administration Skyline Conference Room 3rd Floor

Proposals Due Friday, February 20, 2009 at 2:00 p.m. 250 Frank H. Ogawa Plaza, Suite 3341 Contract Administration Front Desk

Engineer’s Estimate $249, 000.00 Number of Proposals Received

Planholders list: KC Pierce & Associates, C&C Const. Delu

06/12/09

RFP Camera Surveillance Project License Required N/A Project Number N/A Fees $10.00 or $15.00 if mailed Pre-Proposal Meeting Thursday, October 23, 2008 at 10:00 a.m.

4th Floor Broadway Conference Room Proposals Due Friday, October 31, 2008 at 2:00 p.m.

250 Frank H. Ogawa Plaza, Suite 3341 Contract Administration Front Desk

Engineer’s Estimate Number of Proposals Received

5

Planholders list:

06/12/09

RFP to Provide Engineering Services for Assessment Districts License Required Engineering Services Project Number N/A Fees $10.00 or $15.00 if mailed Pre-Proposal Meeting Thursday, October 23, 2008 at 10:00 a.m.

6th Floor Large Conference Room Proposals Due Friday, October 31, 2008 at 2:00 p.m.

250 Frank H. Ogawa Plaza, Suite 3341 Contract Administration Front Desk

Engineer’s Estimate Number of Proposals Received

3

Planholders list: MMS Design Assoc., Nolte Associates, Inc.

06/12/09

RFP for State Lobbyist License Required Legislative Services Project Number N/A Fees $10.00 or $15.00 if mailed Pre-Proposal Meeting Monday, October 6, 2008 at 10:00 a.m.

1 Frank H. Ogawa Plaza 1st Floor Hearing Room 3

Proposals Due Monday, October 13, 2008 at 2:00 p.m. 250 Frank H. Ogawa Plaza, Suite 3341 Contract Administration Front Desk

Engineer’s Estimate Number of Proposals Received

3

Planholders list: Townsend Public Affairs, Strategic Counsel PLC

06/12/09

RFQ-2008-2011 As Needed Transportation Engineering Services License Required Transportation and Engineering Services Project Number N/A Fees $10.00 or $15.00 if mailed Pre-Proposal Meeting Thursday, October 16, 2008 at 2:00 p.m.

250 Frank H. Ogawa Plaza Broadway Conference Room

Proposals Due Monday, November 13, 2008 at 2:00 p.m. 250 Frank H. Ogawa Plaza, Suite 3341 Contract Administration Front Desk

Engineer’s Estimate Number of Proposals Received

Planholders list: T. Y. Lin International, Dowling Associates, MGE Engineering, Inc., URS Corp., DKS Associates, Fehr & Peers, Kimley-Horn, Wood Rodgers, Watry Design, Inc., LAN Engineering, BKF Engineers, CHS Consulting Group, Questa Engineering Corp., Walter P. Moore, Transpedia Consulting Engineers, KOA Corporation, K.C.Pierce & Assoc., DMJM Harris/AECOM., Questa Engineering, Transportation Engineering & Planning

06/12/09

RFP for the Central City East Commercial Security Pilot Program and the Coliseum Commercial Security Pilot Program Oakland California License Required Security Project Number N/A Fees $Free or $9.05 if mailed Pre-Proposal Meeting Thursday, September25, 2008 at 10:00 am

In Hearing Room 1 located at 1 Frank Ogawa Plaza Proposals Due Thursday, October 2, 2008 AT 2:00 PM.

250 Frank H. Ogawa Plaza, Suite 3341 Contract Administration Front Desk

Engineer’s Estimate Number of Proposals Received

Planholders list:

06/12/09

RFP for Temporary Employment Services License Required Employment Services Project Number N/A Fees $10.00 or $19.05 if mailed Pre-Proposal Meeting Friday, September12, 2008 at 9:00 am

in classroom 1 located on the 2nd floor Lionel Wilson Building 150 Frank Ogawa Plaza,

Proposals Due Friday, September 26, 2008 AT 2:00 PM. 250 Frank H. Ogawa Plaza, Suite 3341 Contract Administration Front Desk

Engineer’s Estimate Number of Proposals Received

Planholders list: Paradigm Staffing Solutions, Dynamic Office & Accounting Solutions, OUTSOURCE Consulting Services, Inc., RFI, Quality Staffing, Inc., Maxim Healthcare, Kelly Services, Bennatt-Pryor, Professional Staffing, ACT 1, Apple One Employment Services, Diversified Personnel, Professional Staffing Resources

06/12/09

RFP for the CEQA Environmental Documents/CEQA Consultanting Service License Required Environmental Services Consultants Project Number N/A Fees $FREE or $9.05 if mailed Pre-Proposal Meeting Tuesday, August 19, 2008 at 2:30pm

City Hall Hearing Room 3 1 Frank Ogawa Plaza,

Proposals Due Wednesday, September 3, 2008 AT 2:00 PM. 250 Frank H. Ogawa Plaza, Suite 3341 Contract Administration Front Desk

Engineer’s Estimate Number of Proposals Received

Planholders list: PMC, PBS &J, Lamphier-Gregory, Agilent Consulting

06/12/09

RFQ For Transportation Engineering Services on Intelligent Transportation Systems (ITS) Projects License Required Transportation Engineering Firms or Civil Engineering Project Number N/A Fees $10 or $15 if mailed Pre-Proposal Meeting Thursday, August 7, 2008 Proposals Due Thursday, August 28, 2008 @ 2:00 p.m.

250 Frank H. Ogawa Plaza, Suite 3341 Contract Administration Front Desk

Engineer’s Estimate Number of Proposals Received

3

Planholders list: DKS Associates, KOA Corporation, TJKM Transportation Consultants, Kimley-Horn Associates, Inc,, Dowling Associates, Access Design & Construction, FEHR & Peers

06/12/09

RFP/RFQ For the Oakland Police Department SEXUAL ASSAULT EXAMINATIONS License Required N/A Project Number N/A Fees Pre-Proposal Meeting PRE-PROPOSAL MEETING HAS BEEN WAIVED Proposals Due Wednesday June 25, 2008 @ 2:00 p.m.

250 Frank H. Ogawa Plaza, Suite 3341 Contract Administration Front Desk

Engineer’s Estimate Number of Proposals Received

2

Planholders list: VBS Services, Central Medical Laboratories

06/12/09

RFP/RFQ For the Oakland Police Department PERSONNEL DIVISION/PERSONNEL ASSESSMENT SYSTEM(PAS) License Required N/A Project Number N/A Fees Pre-Proposal Meeting PRE-PROPOSAL MEETING HAS BEEN WAIVED Proposals Due Wednesday June 25, 2008 @ 2:00 p.m.

250 Frank H. Ogawa Plaza, Suite 3341 Contract Administration Front Desk

Engineer’s Estimate Number of Proposals Received

1

Planholders list: Michael Palmertree, MFT

06/12/09

RFP for Special Inspection and Testing Services for the Oakland Museum of California Renovation Project* THIS IS NOT A CITY OF OAKLAND PROJECT* License Required N/A Project Number N/A Fees Pre-Proposal Meeting Proposals Due Monday June 16, 2008 @ 10:00 a.m.

Mr. David Zainer, ProPM, Inc. 3470 Mt. Diablo Blvd. Suite A-310 Lafayette, CA 94549 THIS IS NOT A CITY OF OAKLAND PROJECT

Engineer’s Estimate Number of Proposals Received

Planholders list:

06/12/09

RFP for Contract Auditing Services for the Public Works Agency-REVISED License Required N/A Project Number N/A Fees FREE- If Mailed $9.05 Pre-Proposal Meeting Monday, March 31, 2008 at 10:00 a.m.

City Hall, Hearing Room 3 First Floor

Proposals Due Tuesday April 11, 2008 @ 2:00 p.m. 250 Frank H. Ogawa Plaza, Suite 3341 Contract Administration Front Desk

Engineer’s Estimate Number of Proposals Received

4

Planholders list: MGT of America

06/12/09

RFP for Department of Human Services Multipurpose Senior Services Programs and Linkages License Required Human Services, Medical Project Number G307410 Fees FREE- If Mailed $9.05 Pre-Proposal Meeting Thursday March 20, 2008 at 2:30 p.m.

Skyline Conference Room, 3rd Floor Proposals Due Tuesday April 2, 2008 @ 2:00 p.m.

250 Frank H. Ogawa Plaza, Suite 3341 Contract Administration Front Desk

Engineer’s Estimate Number of Proposals Received

6

Planholders list: Community Care Services, Alta Bates Summit, Maxm Healthcare, Right at Home

06/12/09

RFP for Keep Oakland Clean and Beautiful Division Team Oakland Program 2008-2009 License Required N/A Project Number N/A Fees FREE- If Mailed $9.05 Pre-Proposal Meeting Thursday March 20, 2008 at 10:30 a.m.

Skyline Conference Room, 3rd Floor Proposals Due Thursday April 10, 2008 @ 2:00 p.m.

250 Frank H. Ogawa Plaza, Suite 3341 Contract Administration Front Desk

Engineer’s Estimate Number of Proposals Received

2

Planholders list: LAO Family Community, East Bay Conservation Corps.(Civiccorps Schools), Emile Durelde

06/12/09

RFP for Oakland Green Jobs Corps License Required N/A Project Number N/A Fees $10.00- If Mailed $15.00 Pre-Proposal Meeting Monday March 10, 2008 at 1:30 p.m.

City Hall Hearing Room, 1 Proposals Due Thursday April 3, 2008 @ 2:00 p.m.

250 Frank H. Ogawa Plaza, Suite 3341 Contract Administration Front Desk

Engineer’s Estimate Number of Proposals Received

3

Planholders list: Green Consultants, RTTC, Rising Sun Energy Center, Inter-

City Services, Inc., Cypress Mandela Training Center, Inc., Green Consulting Service, The Youth Employment Partnership, Presley & Associates

06/12/09

RFP for Security Guard Services-REBID License Required N/A Project Number N/A Fees $10.00- If Mailed $15.00 Pre-Proposal Meeting Thursday February 28, 2008 at 10:00 a.m.

Skyline Conference Room 3rd Floor Proposals Due Tuesday March 11, 2008 @ 2:00 p.m.

250 Frank H. Ogawa Plaza, Suite 3341 c/o Contract Administration

Engineer’s Estimate Number of Proposals Received

7

Planholders list: ANI Private Security & Patrol, Silicon Valley Security & Patrol, McCoy’s Patrol Service, Arrakis Prof. Svc., NCLN20., Inc., ABC Security, Allied Barton, Pride Security, National Security, International Services, Inc., Cypress Security, LLC, McCoy’s Patrol Service,

06/12/09

RFP for Security Guard Services License Required N/A Project Number N/A Fees $10.00- If Mailed $15.00 Pre-Proposal Meeting Wednesday January 2, 2008 at 10:00 a.m.

Skyline Conference Room 3rd Floor Proposals Due Wednesday January 16, 2008 @ 2:00 p.m.

250 Frank H. Ogawa Plaza, Suite 3341 c/o Contract Administration

Engineer’s Estimate Number of Proposals Received

7

Planholders list: AMI Private Security & Patrol, Inc., C.I.S.S.,Arrakis Prof. Serv., American Discount Security, Sidebar Security, Stowe Security Specialist, Cypress Sercurity, LLC., International Services, Inc., ABC Security Service, Inc., WSA & Associates, Inc.

06/12/09

RFP for Graphic Design Services License Required N/A Project Number N/A Fees $Free- If Mailed $9.05 Pre-Proposal Meeting Thursday December 13, 2007 at 9:00 a.m.

Broadway Conference Room 4th Floor Proposals Due Tuesday January 8, 2008 @ 2:00 p.m.

250 Frank H. Ogawa Plaza, Suite 3341 c/o Contract Administration

Engineer’s Estimate Not to Exceed $100,000 Number of Proposals Received

11

Planholders list: CED, Inc., Sue Kearny Graphic Craftwoman, O’Rorke, Inc., Badali Design, A Media, MMM Design, Circle Point, Liu-Johnson Design, L & D Printing, Sphinx Graphics, Schenker Design, Real Time Design, Jung Design, Gigantic Idea Studio, BE Graphics & Design, Winning Strategies, Pat Davis Design Group, Arrakis Professional Service, Cowan Communication Arts, Allegra Consulting, Inc.,

06/12/09

RFQ and RFP for Construction Manager at Risk/General Contractor Services for the City of Okaland for the Fire Station No.18 Project and or East Oakland Sports Center ProjectDesign Services License Required B Project Number N/A Fees $10.00- If Mailed $14.50 Pre-Proposal Meeting Mandatory Thursday December 6, 2007 at 9:30 a.m.

Hearing Room 2 City Hall One Frank Ogawa Plaza

Proposals Due Wednesday December 19, 2007 @ 10:00 a.m. 250 Frank H. Ogawa Plaza, Suite 3341 c/o Contract Administration

Engineer’s Estimate Fire Station 18-$7 million, East Oakland Sports Center-$11.7 million

Number of Proposals Received

Planholders list: Swinerton Builders, Turner Constuction, WE Lyons Construction, West Bay Builders, CED, Inc., BBI Construction, Access Design & Construction, K.O.O. Construction, Inc., Cooper Pugeda Mgmt, Inc., W.A. Thomas Co., Inc., Acumen Building Enterprises, Inc.,

06/12/09

RFP for OFD Emergency Medical Services Disaster Specialist License Required Consulting Training Firms Project Number G262710 Fees $Free- If Mailed $9.05 Pre-Proposal Meeting Thursday November 29, 2007 at 11:00 a.m.

Skyline Conference Room 3rd Floor Proposals Due Wednesday December 12, 2007 @ 2:00 p.m.

250 Frank H. Ogawa Plaza, Suite 3341 c/o Contract Administration

Engineer’s Estimate N/A Number of Proposals Received

Planholders list:

06/12/09

RFP for Hazardous and Universal Waste Services REVISED License Required N/A Project Number N/A Fees $10.00- If Mailed $19.05 Pre-Proposal Meeting Thursday October 25, 2007 at 10:00 p.m.

Fox Conference Room 5th Floor Proposals Due Friday November 16, 2007 @ 2:00 p.m.

250 Frank H. Ogawa Plaza, Suite 3341 c/o Contract Administration

Engineer’s Estimate Not to Exceed $149,000 Number of Proposals Received

2

Planholders list: Electronic Waste Management, Bayview Environmental, Morgan Environmental Services, Inc., Clean Harbors Environmental Services, Filter Recycling Service, Decon Environmental, General Environmental Management, Inc., Universal Waste Management, Inc., Electronic Waste Management, MSE , ARC International, CED, Inc.,

06/12/09

RFP for Asbestos/ Lead-Based Paint/Mold Consulting Services License Required N/A Project Number N/A Fees $10.00- If Mailed $19.05 Pre-Proposal Meeting Wednesday October 24, 2007 at 2 p.m.

Fox Conference Room 5th Floor Proposals Due Friday November 16, 2007 @ 2:00 p.m.

250 Frank H. Ogawa Plaza, Suite 3341 c/o Contract Administration

Engineer’s Estimate Not to Exceed $250,000 Number of Proposals Received

9

Planholders list: IHI Environmental, MACTEC, SCA Environmental RGA Environmental, ACC Environmental Schutze & Associates, Bayview Environmental, ATC Associates, Inc., Ninyo & Moore, Millennium Consulting, AEI Consultants, Winzler & Kelly, Vista Environmental Consulting, PSI, Inc. MSE, Kellco Macs, Bureau Veritas North America, Inc.,

06/12/09

RFP for Environmental Consulting Services License Required N/A Project Number N/A Fees $10.00- If Mailed $19.05 Pre-Proposal Meeting Wednesday October 24, 2007 at 10:00 a.m.

Fox Conference Room 5th Floor Proposals Due Friday November 16, 2007 @ 2:00 p.m.

250 Frank H. Ogawa Plaza, Suite 3341 c/o Contract Administration

Engineer’s Estimate Not to Exceed $750,000 Number of Proposals Received

19

Planholders list: OTG Enviroengineering Solutions, Inc., LFR, Inc., Kleinfelder, Inc., Strategic Engineering,& Science, Inc., MACTEC, Geomatrix Consultants, Weiss Associates, SCA Environmental, TRC, ACC, Treadwell & Rollo, Schutze & Associates, Bayview Environmental, Ninyo & Moore, The Source Group, Morgan Environmental Services, Inc., ENSR Millennium Consulting, Erler & Kalinonski, Inc., Nichols Consulting Engineering, Kennedy/Jenks Consultants, Winzler & Kelly, Terrasearch, Inc., ATC Associates, Inc., Baseline , R&M Environmental, PSI, Inc. MSE, Burns & McDonnell, Hygienetics Environmental Services, 4 Leaf , Inc., AEI Consultants, Northgate Environmental,SOMA Environmental, Weston Solutions, CED, Inc., Aliquot Associates

06/12/09

RFP Civil Engineering Design Services for 7th St. West Oakland Transit Village in Oakland, California License Required N/A Project Number G313120 Fees $Free- If Mailed $9. 05 Pre-Proposal Meeting Thursday October 25, 2007 at 9:00 a.m.

Skyline Conference Room 3rd Floor Proposals Due Friday November 9, 2007 @ 2:00 p.m.

250 Frank H. Ogawa Plaza, Suite 3341 c/o Contract Administration

Engineer’s Estimate $2,600.000 Number of Proposals Received

6

Planholders list: Kimley- Horn & Associates, BKF Engineers, Sandis, Amphion, TransSystems Corp., Bayview Environmental, Bruce Jett Associates, KOA Corporation, Robert La Rocca & Associates, MSE, Moffatt& Nichol, RBF Consulting, Keller Mitchell, ESI Engineers, Golden Associates, , BMB Construction Properties, Gates & Associates, WRT, Harris & Associates, Terrasearch, Inc., Winzler & Kelly, Sasaki Associates, Inc., Adrienne Wong Associates, CED, Inc.,

06/12/09

RFP /RFQ for the Oakland Police Department Counseling Program for Sworn Members/Dependents License Required N/A Project Number N/A Fees $Free- If Mailed $9.05 Pre-Proposal Meeting Wednesday October 17, 2007 at 10:00 a.m.

Skyline Conference Room 3rd Floor Proposals Due Wednesday October 24, 2007 @ 2:00 p.m.

250 Frank H. Ogawa Plaza, Suite 3341 c/o Contract Administration

Engineer’s Estimate $108,000.00 Number of Proposals Received

2

Planholders list: Magellan Health Services, Managed Health Network, Concern EAP

06/12/09

RFP for the Municipal Swimming Pools REVISED License Required N/A Project Number N/A Fees $10.00- If Mailed $19.05 Pre-Proposal Meeting Wednesday September 12, 2007 at 9:00 a.m.

Skyline Conference Room 3rd Floor Proposals Due Tuesday October 30, 2007 @ 2:00 p.m.

250 Frank H. Ogawa Plaza, Suite 3341 c/o Contract Administration

Engineer’s Estimate $250,000.00 Number of Proposals Received

0

Planholders list: Salas O’Brien Engineering, EMCOR Energy Services, MSE Group, Gutierrez Assoc., Rockridge Builders, Weiss Associates, Versar, Inc.

06/12/09

RFP for Civil Engineering Design Services for Adeline Street Overhead in Oakland California License Required N/A Project Number N/A Fees $FREE– If Mailed $19.05 Pre-Proposal Meeting Wednesday July 11, 2007 at 2:00 p.m.

Skyline Conference Room 3rd Floor Proposals Due Friday August 10, 2007 @ 2:00 p.m.

250 Frank H. Ogawa Plaza, Suite 3341 c/o Contract Administration

Engineer’s Estimate $160,000.00 to $170,000.00 Number of Proposals Received

3

Planholders list: Biggs Cardosa, Moffatt & Nichol, KPFF Consulting Engineers, ESI, MGE, Inc.Jacobs Engineering, Winzler & Kelly, URS Corporation

06/12/09

RFP for As Needed Civil Engineering Services for Various City of Oakland Projects License Required N/A Project Number N/A Fees $FREE– If Mailed $19.05 Pre-Proposal Meeting Thursday May 17, 2007 at 2:00 p.m.

City Hall, Hearing Room No.1 Proposals Due Friday June 8, 2007 @ 2:00 p.m.

250 Frank H. Ogawa Plaza, Suite 3341 c/o Contract Administration

Engineer’s Estimate $200,000.00 to $350,000.00 Number of Proposals Received

17

Planholders list: Greenwood & Moore, Inc., Biggs Cardosa Associates, Rajappan & Meyer, Wallace Group, Aliquot Associates, Inc., James Wong & Associates, Earthquake & Structures, Bay Construction Co.,Oberkamper & Associates, Winzler & Kelly Consulting Engineers, HHTEC, KCA Engineers, MACTEC , Van Maren & Associates, TRC, Eagle Engineering Construction , Inc., Triad/Holmes Associates, Testing Engineers, Rajappan & Meyer, Testing Engineers, Chaudhary & Associates, Phillip Williams & Associates Ltd., Cal Engineering & Geology, Luk and Associate, Harris & Associates, Katz, Okitsu & Associates, URS Corporation, Nichols Consulting Engineers MSE

06/12/09

RFP and RFQ for Construction Manager At Risk/General Contractor Services for the City of Oakland and Oakland Museum of California – Oakland Museum Renovation Project License Required N/A Project Number C239611 Fees $10.00– If Mailed $14.50 Pre-Proposal Meeting Thursday May 10, 2007 at 10:00 a.m.

Restaurant/Cafeteria of the Oakland Museum 1000 Oak Street, Second Floor Oakland, CA MANDATORY

Proposals Due Thursday May 22, 2007 @ 2:00 p.m. 250 Frank H. Ogawa Plaza, Suite 3341 c/o Contract Administration

Engineer’s Estimate 10.8+ million (estimated) Number of Proposals Received

3

Planholders list: Oliver & Co., BBI Construction, PROPM, Inc., Swinerton Builders, Museum, NBC General Contractors Corp., Vance Brown, Inc., MCA, Cahill Contractors, Inc., W.E. Lyons Construction MSE MWA , HQE, Inc.,

RFP for Lake Merritt Clean Lake Contract License Required N/A Project Number N/A Fees $FREE – If Mailed $9.05 Pre-Proposal Meeting Monday April 30, 2007 at 2:30p.m.

Fox Conference Room 5th Floor 250 Frank H. Ogawa Plaza

Proposals Due Thursday May 10, 2007 @ 2:00 p.m. 250 Frank H. Ogawa Plaza, Suite 3341 c/o Contract Administration

Engineer’s Estimate Not to exceed $300,000 Number of Proposals Received

1

Planholders list: Mike Farmer Janitorial, The Lake Merritt Institute, Drake & Drakes Pipeline Construction

06/12/09

RFP for As- Needed Civil Engineering License Required N/A Project Number N/A Fees $10.00 – If Mailed $19.05 Pre-Proposal Meeting Wednesday January 24, 2007 at 10:00 a.m.

Hearing Room 1, City Hall 1 Frank H. Ogawa Plaza

Proposals Due Friday February 16, 2007 @ 2:00 p.m. 250 Frank H. Ogawa Plaza, Suite 3341 c/o Contract Administration

Engineer’s Estimate $150,000-$350,000 Number of Proposals Received

11

Planholders list: Korve/DMJM Harris, MacTec, Moffatt & Nichol, Ty Lin International, DTN Engineers, Inc., Willdan, Kimley Horn & Assoc., Bellecci & Assoc., Winzler & Kelly, Rail Surveyors & Engineers, Inc., Sikaroudi & Assoc., Waterworks Engineers, Allquot Assoc.,BKF Engineers, WoodRodgers, DKS Assoc., TRC, Magdave Assoc. Inc., F.E., Jordan Assoc., Inc.,Kennedy Jenks, MSE Group, URS Corp.,

06/12/09

RFP for Work Management System License Required N/A Project Number N/A Fees Free – If Mailed $9.05 Pre-Proposal Meeting Monday November 13, 2006 at 10:00 a.m.

Skyline Conference Room, 250 Frank H. Ogawa Plaza, 3rd Floor

Proposals Due Tuesday December 12, 2006 @ 2:00 p.m. 250 Frank H. Ogawa Plaza, Suite 3341 c/o Contract Administration

Engineer’s Estimate N/A Number of Proposals Received

6

Planholders list: Symbol, MSA Systems, Inc., True Point Solutions, Accela Govt. Software, SPL WorldGroup, Inc., Hansen , Interlocsolutions, Walsh Wireless Solutions,Westib Solutions, Inc., Vestra Resources, Inc., Motorola, Inc., Farallon Geographics, Inc., AEKO Consulting, Environmental Systems Research Institute, Inc., Carter Burgess, Corrigo, Infor, Cingular Wireless, Westin Solutions Through Technology, Wennsoft, Woolpert, Inc.,Hansen Informations Technologies, God So Loved You Min, Inc., Azteca Systems, Inc.,AFKO Consulting, Drake& Drake Pipeline Consulting, Interloc Solutions, Inc., RJN Group, Inc.,

06/12/09

RFP for The Operation and Management of Thirteen City of Oakland Off-Street Parking Facilities License Required Qualified Parking Contractors Project Number N/A Fees $10.00 – If Mailed $19.05 Pre-Proposal Meeting Thursday, October 5, 2006 at 2:00 p.m.

Broadway Conference Room, 250 Frank H. Ogawa Plaza, 4th Floor

Proposals Due Tuesday October 24, 2006 @ 2:00 p.m. 250 Frank H. Ogawa Plaza, Suite 3341 c/o Contract Administration

Engineer’s Estimate N/A Number of Proposals Received

6

Planholders List: Parking Concepts, Express Parking Management, Bay Area Parking Douglas Parking Co., Pacific Park Management, Imperial Parking., NM Parking, Central Parking System, Standard Parking, Five Star Parking

RFP for As Needed Architectural Services for Various Capital Improvement Projects License Required Architectural Firms Project Number N/A Fees $10.00 – If Mailed $19.05 Pre-Bid Meeting Tuesday, September 5, 2006 at 2:00 p.m.

City Hall Hearing Room 1, One City Hall Plaza

Proposals Due Friday September 29, 2006 @ 2:00 p.m. 250 Frank H. Ogawa Plaza, Suite 3341 c/o Contract Administration

Engineer’s Estimate $150,000 to $350,000 Number of Proposals Received

21

Planholders list: Kirk Peterson & Associates, Guiterrez/Associates, Noll & Tam, Shah Kawasaki, Ratcliff, Komorous-Towney Architects, Kava Massih Architects, FMG Architects, Frank Architects, Byrens Associates, Jeffrey E. Wong Architects, KPA, RPR Architects, Colland Jang Architecture, VBN Architects, MacDonald Architects, Kenney and Associates, Don Dommer Associates, YHLA Architects, Famous Designs Architects, Inc., Claudia Falconer Architects, Salas O’brien Engineers, Greenbank Associates, Lowney Architecure, MWM Architects, Inc., Murakami/Nelson, SJ Engineers, Michael Willis Architects, Muller Caufield Architects,

06/12/09

RFP for As Needed Geotechnical Consultants License Required Geotechnical Engineering Firms Project Number N/A Fees $10.00 – If Mailed $15.00 Pre-Bid Meeting Wednesday, June 14, 2006 at 10:00 a.m.

City Hall Hearing Room 1, One City Hall Plaza

Proposals Due Thursday July 06, 2006 @ 2:00 p.m. 250 Frank H. Ogawa Plaza, Suite 3341 c/o Contract Administration

Engineer’s Estimate Number of Proposals Received

Planholders List RFP for As Needed Landscape Architects License Required Landscape Architectural Firms Project Number N/A Fees $10.00 – If Mailed $14.50 Pre-Bid Meeting Wednesday, June 21, 2006 at 10:00 a.m.

City Hall Hearing Room 1, One City Hall Plaza

Proposals Due Wednesday, July 12, 2006 @ 2:00 p.m. 250 Frank H. Ogawa Plaza, Suite 3341 c/o Contract Administration

Engineer’s Estimate Number of Proposals Received

Planholders List

06/12/09

RFP for Team Oakland Program License Required Youth Serving Organizations or Closely Related

Professionals Project Number P35510 Fees $10.00 – If Mailed $15.00 Pre-Bid Meeting Wednesday, February 22, 2006 at 10:00 a.m.

250 Frank H. Ogawa Plaza, 3rd Floor Skyline Conference Room

Proposals Due Thursday, March 23, 2006 @ 2:00 p.m. 250 Frank H. Ogawa Plaza, Suite 3341 c/o Contract Administration

Engineer’s Estimate Not to exceed $498,000.00 Number of Proposals Received

Planholders List RFP for The Business Recycling Technical Assistance Program License Required Environmental, Solid Waste Consultants Project Number N/A Fees $10.00 – If Mailed $15.00 Pre-Bid Meeting Tuesday, January 31, 2006 at 9:00 a.m.

250 Frank H. Ogawa Plaza, 5th Floor Fox Conference Room

Proposals Due Tuesday, February 14, 2006 @ 2:00 p.m. 250 Frank H. Ogawa Plaza, Suite 3341 c/o Contract Administration

Engineer’s Estimate $50,000.00 Number of Proposals Received

3

Planholders List

06/12/09

RFP for Time Clock Based Time and Attendance System License Required Time Clock System, Computers, Computer Software Project Number N/A Fees Pick-up Free – If Mailed $9.00 Pre-Bid Meeting Tuesday, November 1, 2005 at 10:00 a.m.

250 Frank H. Ogawa Plaza, Suite 3341 Skyline Conference Room

Proposals Due Tuesday, November 22, 2005 @ 2:00 a.m. 250 Frank H. Ogawa Plaza, Suite 3341 c/o Contract Administration

Engineer’s Estimate $50,000.00 Number of Proposals Received

Planholders List

Studio One Art Center Asbestos and Lead-Base Materials Abatement Project and Municipal Boathouse Rehabilitation and Lakeside Park Improvement Project License Required B Project Number C244710 and C241910 Fees Pick-up $10.00 – If Mailed $15.00 Pre-Bid Meeting N/A Proposals Due Tuesday, June 7, 2005 @ 4:00pm

250 Frank H. Ogawa Plaza, Suite 3341 c/o Contract Administration

Engineer’s Estimate $6,100,000.00 - $6,500,000.00 and $7,000,000.00 - $7,500,000.00

Number of Proposals Received

Planholders List Arnz Builders, BBI Construction, Thompson Pacific Construction, Inc., Vance Brown, Inc., West Bay Builder’s, Inc.

06/12/09

RFP Revive Chinatown Pedestrian-Oriented Improvements Project License Required Civil Engineering, Landscape Architectural Project Number N/A Fees Pick-up $10.00 – If Mailed $15.00 Pre-Bid Meeting Monday, May 10, 2005 @ 10:00 am

250 Frank H. Ogawa Plaza, Suite 3341 Skyline Conference Room

Proposals Due Tuesday, May 31, 2005 @ 2:00pm City Clerk’s Office, One Frank Ogawa Plaza, First Floor

Engineer’s Estimate N/A Number of Proposals Received

Planholders List

Lake Merritt Channel Improvement Project at the 7th Street Flood Control Station License Required Environmental Consultants Project Number N/A Fees Pick-up $10.00 – If Mailed $15.00 Pre-Bid Meeting Wednesday, April 6, 2005 @ 3:00 pm

One City Hall Plaza, City Hall Hearing Room 2

Qualifications Due Thursday, April 21, 2005 @ 2:00pm 250 Frank H. Ogawa Plaza, Suite 3341 c/o Contract Administration

Engineer’s Estimate $7,500,000.00 Number of Proposals Received

Planholders List

06/12/09

10th Street Bridge Project at the Lake Merritt Channel License Required Civil Engineering Project Number N/A Fees Pick-up $10.00 – If Mailed $14.50 Pre-Bid Meeting Wednesday, April 6, 2005 @ 3:00 pm

One City Hall Plaza, City Hall Hearing Room 2

Qualifications Due Wednesday, April 20, 2005 @ 2:00pm 250 Frank H. Ogawa Plaza, Suite 3341 c/o Contract Administration

Engineer’s Estimate $6,000,000.00 Number of Proposals Received

Planholders List Lake Merritt Clean Lake Services License Required N/A Project Number N/A Fees Pick-up $10.00 – If Mailed $14.50 Pre-Bid Meeting Tuesday, March 8, 2005 @ 1:00 pm

250 Frank H. Ogawa Plaza, Suite 5357 Fox Conference Room

Qualifications Due Wednesday, March 23, 2005 @ 2:00pm 250 Frank H. Ogawa Plaza, Suite 3341 c/o Contract Administration

Engineer’s Estimate $300,000.00 Number of Proposals Received

Planholders List

06/12/09

Citywide Street Survey and Pavement Management System Update License Required N/A Project Number N/A Fees Pick-up $10.00 – If Mailed $14.50 Pre-Proposal Meeting Thursday, January 27, 2005 at 10:00 am

250 Frank H. Ogawa Plaza, Suite 4304 Broadway Conference Room

Proposals Due Wednesday, February 16, 2005 @ 2:00pm PWA-Contract Administration, 250 Frank H. Ogawa Plaza, 3rd Fl, Suite 3341

Engineer’s Estimate $ 300,000.00 Number of Proposals Received

Planholders List Inspection and Condition Assessment of the Existing Sanitary Sewers in West Grand Avenue From San Pablo to Wood Street License Required N/A Project Number N/A Fees Pick-up $10.00 – If Mailed $15.00 Pre-Proposal Meeting Thursday, December 16, 2004 at 10:00 am

250 Frank H. Ogawa Plaza Skyline Conference Room

Proposals Due Tuesday, January 18, 2005 @ 2:00pm PWA-Contract Administration, 250 Frank H. Ogawa Plaza, 3rd Fl, Suite 3341

Engineer’s Estimate $ N/A Number of Proposals Received

Planholders List

06/12/09

Request For Qualifications (RFQ) for As-Needed Transportation Engineering Services License Required N/A Project Number N/A Fees Pick-up $10.00 – If Mailed $14.50 Pre-Proposal Meeting Wednesday, November 24, 2004 at 10:00 am

250 Frank H. Ogawa Plaza, 4th Floor Broadway Conference Room

Proposals Due Wednesday, December 15, 2004 @ 2:00pm PWA-Contract Administration, 250 Frank H. Ogawa Plaza, 3rd Fl, Suite 3341

Engineer’s Estimate $250,000.00 to $350,000.00 Number of Proposals Received

Planholders List Asbestos/Lead-Based Paint/Mold Consulting Services License Required A or C-42 Project Number N/A Fees Pick-up $10.00 – If Mailed $15.00 Pre-Proposal Meeting Wednesday, November 17, 2004 at 2:00 pm

250 Frank H. Ogawa Plaza Fox Conference Room

Proposals Due Wednesday, December 8, 2004 @ 2:00pm PWA-Contract Administration, 250 Frank H. Ogawa Plaza, 3rd Fl, Suite 3341

Engineer’s Estimate $200,000.00 Number of Proposals Received

Planholders List

06/12/09

Architectural Services for The Lake Merritt Sailboat House Renovation and the Related Retaining Walls Repairs, 568 Bellevue Avenue License Required Architectural and Engineering Design Services Project Number C242010 Fees Pick-up $10.00 – If Mailed $14.00 Pre-Proposal Meeting Thursday, September 30, 2004 @ 3:00pm

Hearing Room 2, City Hall Proposals Due Friday, October 22, 2004 @ 2:00pm

PWA-Contract Administration, 3rd Fl, Suite 3341 Engineer’s Estimate $3,100,000.00 Number of Proposals Received

Planholders List Environmental Consulting Services License Required Environmental Consulting Firms Project Number N/A Fees Pick-up $10.00 – If Mailed $14.00 Pre-Proposal Meeting Monday, October 4, 2004 @ 10:00am

Skyline Conference Room, 3rd FL, Suite 3341

Proposals Due Monday, November 1, 2004 @ 2:00pm PWA-Contract Administration, 3rd Fl, Suite 3341

Engineer’s Estimate $350,000.00 Number of Proposals Received

Planholders List

06/12/09