CITY OF OAKLAND - Amazon Web ServicesCITY OF OAKLAND DALZIEL BUILDING . 250 FRANK H. OGAWA PLAZA ....

6
CITY OF OAKLAND DALZIEL BUILDING . 250 FRANK H. OGAWA PLAZA . SUITE 4344 . OAKLAND . CALIFORNIA . 9 4612 Public Works Agency TEL: (510) 238-3466 Infrastructure Plans and Programming Division FAX: (510) 238-7415 This meeting will follow Robert's Rules of Order (see http://www.robertsrules.org/rulesintro.htm ). For more information, please call (510) 238-3983 or email [email protected] . Bicycle and Pedestrian Advisory Committee, Monthly Meeting Thursday, November 17, 2011; 5:30-7:30 pm Oakland City Hall, Sgt Daniel Sakai Hearing Room (aka Hearing Room 4), Second Floor AGENDA Time Item # Topic Topic Type * 5:30 1 Introductions, appointment of note taker (5 minutes) Ad 5:35 2 Approval of meeting minutes (5 minutes)—Seek motion to adopt the October meeting minutes or postpone adoption until December. A 5:40 3 Update on Alameda-Oakland Estuary Crossing Shuttle Service Link (25 minutes)—BikeAlameda members will explain the importance of this gap closure project, describe the status of the current service, and request feedback on the project’s effectiveness. I 6:05 4 Resurfacing update Attachment (20 minutes)—Staff will provide an overview of streets pending or scheduled for resurfacing and how the streets overlap with the existing/proposed bikeway network. I 6:25 5 Bikeway striping update (15 minutes)—Staff will give an update on bikeway striping in progress or scheduled. I 6:40 6 BPAC calendar / agenda for 2012 (40 minutes)—In 2011, staff prepared a framework for BPAC agenda setting to encourage fruitful and interesting meetings. Staff will review that framework and take comments on how to improve the agenda-setting process for 2012. A 7:20 7 Announcements, suggestions for next meeting topics (10 minutes) Ad * Topic Types: I=informational; A=action item; Ad=administrative Agenda online at: http://www2.oaklandnet.com/oakca/groups/pwa/documents/agenda/oak032129.pdf

Transcript of CITY OF OAKLAND - Amazon Web ServicesCITY OF OAKLAND DALZIEL BUILDING . 250 FRANK H. OGAWA PLAZA ....

Page 1: CITY OF OAKLAND - Amazon Web ServicesCITY OF OAKLAND DALZIEL BUILDING . 250 FRANK H. OGAWA PLAZA . SUITE 4344 . OAKLAND . CALIFORNIA . 94612 Public Works Agency TEL: (510) 238-3466

CITY OF OAKLAND

DALZIEL BUILDING . 250 FRANK H. OGAWA PLAZA . SUITE 4344 . OAKLAND . CALIFORNIA . 94612 Public Works Agency TEL: (510) 238-3466 Infrastructure Plans and Programming Division FAX: (510) 238-7415

This meeting will follow Robert's Rules of Order (see http://www.robertsrules.org/rulesintro.htm). For more information, please call (510) 238-3983 or email [email protected].

Bicycle and Pedestrian Advisory Committee, Monthly Meeting Thursday, November 17, 2011; 5:30-7:30 pm Oakland City Hall, Sgt Daniel Sakai Hearing Room (aka Hearing Room 4), Second Floor AGENDA

Time Item

# Topic

Topic Type *

5:30 1 Introductions, appointment of note taker (5 minutes) Ad

5:35 2 Approval of meeting minutes (5 minutes)—Seek motion to adopt the October meeting minutes or postpone adoption until December.

A

5:40 3

Update on Alameda-Oakland Estuary Crossing Shuttle Service Link (25 minutes)—BikeAlameda members will explain the importance of this gap closure project, describe the status of the current service, and request feedback on the project’s effectiveness.

I

6:05 4 Resurfacing update Attachment (20 minutes)—Staff will provide an overview of streets pending or scheduled for resurfacing and how the streets overlap with the existing/proposed bikeway network.

I

6:25 5 Bikeway striping update (15 minutes)—Staff will give an update on bikeway striping in progress or scheduled.

I

6:40 6

BPAC calendar / agenda for 2012 (40 minutes)—In 2011, staff prepared a framework for BPAC agenda setting to encourage fruitful and interesting meetings. Staff will review that framework and take comments on how to improve the agenda-setting process for 2012.

A

7:20 7 Announcements, suggestions for next meeting topics (10 minutes) Ad

* Topic Types: I=informational; A=action item; Ad=administrative Agenda online at: http://www2.oaklandnet.com/oakca/groups/pwa/documents/agenda/oak032129.pdf

Page 2: CITY OF OAKLAND - Amazon Web ServicesCITY OF OAKLAND DALZIEL BUILDING . 250 FRANK H. OGAWA PLAZA . SUITE 4344 . OAKLAND . CALIFORNIA . 94612 Public Works Agency TEL: (510) 238-3466

City of Oakland Bikeways/Resurfacing CoordinationDepartment of Engineering and Construction [JWP, 1‐Nov‐20011]

Project C317610 (Proposition 1B funding) Status: PCC in progress; base repair pending; overlay and striping anticipated in 2012

Street Name Begin Location End LocationExisting Bikeway

Proposed Bikeway

Bike Plan Priority

Included Bikeway

Notes

105 AV RUSSET ST INTERNATIONAL BLVD 3 2 X X Bikeway included as proposed106 AV FOOTHILL BV PERALTA OAKS DR 0 0 No proposed bikewayALAMEDA AV FRUITVALE AV E 8 ST 2 2 X Restriping project with minor improvementsARDLEY AV E 31 ST HWY 580 BRIDGE 0 3A X Bikeway being developed as separate projectCLAREMONT AV CITY LIMIT ALVARADO RD 0 2.1 Project would require roadway wideningCOLISEUM WY 66TH AV CREEK BRIDGE 0 0 No proposed bikewayE 33 ST BEAUMONT AV 14 AV 0 2 X X Bikeway included as proposedEXCELSIOR AV KINGSLEY ST MACARTHUR BV 0 3B X X Bikeway included as proposedGOLF LINKS RD BURGOS AV MOUNTAIN BV 0 2.1 Project would require roadway wideningHARRISON ST WB HAMILTON PL 27 ST 0 3A X X Bikeway being developed as separate projectINTERNATIONAL BLVD 21 AV 14 AV 0 0 No proposed bikewayLINK ST 104 AV 106 AV 3 2 X X Bikeway included as proposedMACARTHUR (SB) PARK BV BEAUMONT AV 0 2 X X Bikeway included as proposedMACARTHUR BV GREENACRE RD HIGH ST 0 2 X X Bikeway included as proposedS COLISEUM WY CREEK BRIDGE HEGENBERGER RD 0 0 No proposed bikewaySTANFORD AV S MARKET ST CITY LIMIT 0 0 No proposed bikewaySUNNYMERE AV SEMINARY AV VAN MOURIK AV 3 3B Paving project only 535 feet of roadwayW GRAND AV CAMPBELL ST MANDELA PKWY 0 2 Paving project only 416 feet of roadwayW MACARTHUR BV BROADWAY MANILA AV 0 2 X X Bikeway being developed as separate project

KEY

Existing Bikeway/Proposed Bikeway: 2.1 = bicycle lane in one direction only0 = no bikeway 3 = bicycle route1 = bicycle path 3A = arterial bicycle route2 = bicycle lane 3B = bicycle boulevard

Bike Plan Priority = Priority project as per the Bicycle Master Plan (2007)Included Project = Bikeway project proposed for inclusion with resurfacing.

1 of 4

Page 3: CITY OF OAKLAND - Amazon Web ServicesCITY OF OAKLAND DALZIEL BUILDING . 250 FRANK H. OGAWA PLAZA . SUITE 4344 . OAKLAND . CALIFORNIA . 94612 Public Works Agency TEL: (510) 238-3466

Project C376410 (Federal Stimulus funding) Status: Paving completed, striping completed, striping punch list in progress

Street Name Begin Location End LocationExisting Bikeway

Proposed Bikeway

Bike Plan Priority

Included Bikeway

Notes

98 AV STANLEY AVE THERMAL ST 0 0 No proposed bikewayADELINE ST W GRAND AV 36 ST 0 2 Low priority: close to Market St, Mandela PkwyBEAUMONT AV E 38 ST E 31 ST 0 0 No proposed bikewayCLAREMONT AV HUDSON ST CITY LIMIT 0 2 Low priority, would require study for road dietFOOTHILL BV 14 AV LAKESHORE AV 0 2 X Arterial bike route instead of bike lanes (39' ROW)KELLER AV MOUNTAIN BV RILEA WY 0 3 No proposed bikeway stripingMACARTHUR BV MILLSVIEW AV ENOS AV 0 2 X Included for Enos Ave to Buell St onlySAN LEANDRO ST 53 AV SEMINARY AV 0 1 Pending East Bay GreenwaySANTA CLARA AV GRAND AV HARRISON ST 2 2 X Restriping project with geometric improvementsSTANFORD AV S SAN PABLO AV MARKET ST 0 0 No proposed bikewayW GRAND AV MARKET ST SAN PABLO AV 2 2 X Restriping project with geometric improvements

Project C388010 (Federal Stimulus funding) Status: Base repair and crack seal completed; micro‐surfacing in November; striping in November‐December

Street Name Begin Location End LocationExisting Bikeway

Proposed Bikeway

Bike Plan Priority

Included Bikeway

Notes

BROADWAY (EB) EMBARCADERO HWY 580 2 2/3A X Bikeway included as proposed (above Grand Ave)FOOTHILL BV 23 AVE SEMINARY AVE 0 3A X Bikeway included as proposedM L KING WAY EMBARCADERO W GRAND AVE 3 2 Low priority, would require study for road dietSAN PABLO AV 16 ST 36 ST 3 3A X Bikeway included as proposed (16th to 32nd)

Project C396810 (Federal Stimulus funding) Status: Completed summer 2011

Street Name Begin Location End LocationExisting Bikeway

Proposed Bikeway

Bike Plan Priority

Included Bikeway

Notes

Adeline St. 19th St. West Grand Ave. 0 2 Two blocks of paving; requires study for road dietPleasant Valley Ave. Broadway City Limit 0 3A Low priority sharrow projectSanta Clara Ave. (WB) Grand Ave. Santa Clara Ave. 0 2 X Bikeway included as proposedStanford Ave. (NB) San Pablo Ave. Market St. 0 0 No proposed bikewayWest MacArthur Blvd. MLK Jr Way 580 Freeway 0 2 X Feasibility study results require EIR

Project G427410 (Federal block grant funds) Status: Completing environmental, beginning design; construction planned for 2013

Street Name Begin Location End LocationExisting Bikeway

Proposed Bikeway

Bike Plan Priority

Included Bikeway

Notes

Alcatraz Ave College Ave City Limit 0 2 X Bikeway included as proposedBroadway 38th St Broadway Ter 0 2 X X Pending final design and City Council approvalE 12th St 12th Ave 40th Ave 0 2 X X Pending final design and City Council approvalLakeshore Ave Lake Park Ave Mandana Blvd 0 3A X X Included as proposed, plus bike lanes under I‐580Skyline Blvd Parkridge Dr Joaquin Miller Rd 3 3 No proposed bikeway striping

2 of 4

Page 4: CITY OF OAKLAND - Amazon Web ServicesCITY OF OAKLAND DALZIEL BUILDING . 250 FRANK H. OGAWA PLAZA . SUITE 4344 . OAKLAND . CALIFORNIA . 94612 Public Works Agency TEL: (510) 238-3466

Project C369620 (Proposition 1B funding) Status: Priority streets to be completed in 2011; other streets completed in 2012

Street Name Begin Location End LocationExisting Bikeway

Proposed Bikeway

Bike Plan Priority

Included Bikeway

Notes

12th St Broadway Franklin St 0 0 No proposed bikeway; priority street12th St Webster Harrison 0 0 No proposed bikeway; priority street14th St Mandela Pkwy Brush St 0 2 X X Bikeway included as proposed26th St Mandela Pkwy Campbell St 0 0 No proposed bikeway33rd St Market St M. L. King Way 0 0 No proposed bikeway42nd Ave Foothill Blvd International Blvd (600' w 0 0 No proposed bikewayBrookdale Ave High St Monticello Ave 0 0 No proposed bikewayE.33rd Street Elliot St 13th Ave 0 0 No proposed bikewayGreenwood Rd Norwood Ave Park Blvd 0 0 No proposed bikewayJackson Street 7th Street 9th Street 0 0 No proposed bikewayJoaquin Miller Rd HWY 13 Overcrossing Monterey Blvd 0 2 122' paving projectLakeshore  Ave MacArthur Blvd Lake Park Ave 0 3A X X Bike lanes instead of sharrows; priority streetLincoln Ave Palmetto St Monterey Blvd 0 0 No proposed bikewayMoraga Ave Mountain Blvd Thornhill Dr 0 0 No proposed bikewayMountain Blvd Moraga Ave Snake Rd 3 3A X Bikeway corridor pending development; priority streetMountain Blvd Snake Rd Off Ramp 3 3A X Bikeway corridor pending development; priority streetMountain Blvd Off Ramp Ascot Dr 0 0 No proposed bikeway; priority streetPark Blvd Monterey Blvd Mountain Blvd 0 1 Pending Park Blvd path development; priority streetSchool St Fruitvale Ave North End 0 0 No proposed bikewayTelegraph Ave 51st St Aileen St 0 2 X X Sharrows included for 55th to Aileen; priority streetTiffin Rd Lincoln Ave Whittle 0 3B One block paving projectVernon St Bay Place Vernon Terrace 0 0 No proposed bikeway

3 of 4

Page 5: CITY OF OAKLAND - Amazon Web ServicesCITY OF OAKLAND DALZIEL BUILDING . 250 FRANK H. OGAWA PLAZA . SUITE 4344 . OAKLAND . CALIFORNIA . 94612 Public Works Agency TEL: (510) 238-3466

Project C369630 (Proposition 1B funding) Status: Design completed; pending advertising for contract; construction planned for 2012

Street Name Begin Location End LocationExisting Bikeway

Proposed Bikeway

Bike Plan Priority

Included Bikeway

Notes

66th Ave Oakport Ave San Leandro St 0 1/2 Requires study for road diet; path developmentCampus Dr 580' N of Skypoint Ct 13419 Campus Dr 0 0 No proposed bikewayE 12th St 40th Ave 46th Ave 0 3A X Requires study of one‐way to two‐way conversionElmwood Ave Derby St Lancaster St 0 0 No proposed bikewayFoothill Blvd Havenscourt Blvd MacArthur Blvd 0 0 No proposed bikewayGrizzly Peak Blvd Skyline Blvd Marlborough Terrace 3 3 No proposed bikeway stripingGrizzly Peak Blvd Marlborough Terrace Fish Ranch Rd 3 3 No proposed bikeway stripingGrizzly Peak Blvd Fish Ranch Rd Centennial Dr 3 3 WILL BE ADDED PENDING UTILITY CLEARANCESHelen St 32nd St Peralta St 0 0 No proposed bikewayHillmont Dr 73rd Ave Parker 0 0 No proposed bikewayMacArthur Blvd Millsview Ave Camden St 0 2 X Pending final design and City Council approvalMacArthur Blvd Seminary Ave 73rd Ave 0 3A Low priority sharrow projectPiedmont Ave West Mac Arthur Pleasant Valley 0 2 X Bikeway included as proposedShattuck Ave 59th St Woolsey St 0 2 X X WILL BE ADDED PENDING UTILITY CLEARANCESSt Cloud Ct Viewcrest Dr West End 0 0 No proposed bikewayTwin Oaks Way Fairway Ave I‐580 Crossing 0 0 No proposed bikewayViewcrest Ct Viewcrest Dr East End 0 0 No proposed bikeway108th Ave Foothill Blvd MacArthur Blvd 0 0 No proposed bikeway

4 of 4

Page 6: CITY OF OAKLAND - Amazon Web ServicesCITY OF OAKLAND DALZIEL BUILDING . 250 FRANK H. OGAWA PLAZA . SUITE 4344 . OAKLAND . CALIFORNIA . 94612 Public Works Agency TEL: (510) 238-3466

E 12TH ST

CLAR

EMON

T AV

PLEASANT VALLEY AV

W MACARTHUR BLVD

27TH ST

HARRISON ST

EXCELSIOR AV

MACARTHUR BLVD

ARDLEY AV

E12TH ST

ALAMEDA AV

COLISEUM WY

105T

H AV

GOLF

LINK

S RD

LINK ST

FOOTHILL BLVD

MACARTHUR BLVD

HAVE

NSCO

URT B

LVD

HILLMONT DR

FRUITVALE

AVLINCOLN AV

LEIMERT PL

MORAGA AV

SKYLINE DR

CARSON ST

66TH

AV

98TH

AV

106T

H AV

66TH

AV

PIEDM

ONT A

V

MARKET

ST

51ST ST

CAMPBELL ST

14TH ST12TH ST JACKSON ST

W GRAND AV

LAKE-SHOREAV

29TH ST

HIGH

ST

MACARTHUR BLVD

FOOTHILL BLVD

FOOTHILL BLVD INTERNATIONAL BLVD SAN LEANDRO ST

OAKPORT ST

MACARTHUR BLVD

GOLF LINKS RD

OAKPORT STEDGEWATER DR

42ND

AVE

HIGH

ST

BANC

ROFT

W

Y

SAN LEANDRO ST

PARK

BLVD

5TH A

VE

BROADWAY

CLAREMONT AVALCATR

AZ AV

STAN

FORD

AV ADELINE AV

SAN PABLO AVEADELINE ST

MARI

TIME S

T

MANDELA PKWY

40TH ST

BROADWAY

GRAND AVESANTA CLARA AVE

MACARTHUR BLVDOA

KLAN

DAV

E8TH ST

EMBARCADERO

MADISON ST

HARRISON ST

WEBSTER ST

2ND ST

BROADWAY

CASTRO ST

TELEGRAPH AVE

GOLF LINKS RDKELLER AVE

FRUIT

VALE

AVE

PARK

BLVD

LINCO

LN AV

SEQUOYAH RD

SEMINAR

Y AVE OVERDALE

AV

73RD

AV

8TH ST

W GRAND

AV W GRAND AVEBROADWAY

RETTIG PL

GRIZZLY PEAK BLVD

GRIZZLY PEAK BLVD

HIGH

ST

E12TH ST

16TH AVE

23RD AVE

DENNISON

ST

BRUSH ST

MIDDLE HARBOR RD

MACARTHUR

BLVD

PIEDM

ONT

AV

MORA

GA

A

V

PARK

BLV

D

TOMPKINS

AV

SEMINARY AV

ASCOT LNAIRPORT ACCESS RD

ORCH

ID ST

LAKE

SHOR

E AV

E8TH ST

14TH ST

10TH ST

EXCELSIOR AV

PERALTA ST

NORTHGATE AV

MLK JR WY

VAN MOURIK

AV

MARKET ST BRUSH ST

11TH ST

12TH ST

13

2413

§̈¦80

§̈¦880

§̈¦580

§̈¦880

§̈¦880

§̈¦80

§̈¦580

§̈¦580 §̈¦980 L0 2,000 4,000

Feet

CITY OF OAKLAND PAVEMENT MANAGEMENT PROGRAM5 YEAR PAVING PLAN STATUS 2011

Map: J. Mach

June 2011

Legend5 Yr Paving Plan Paved Or Planned5 Yr Paving Plan Remaining LocationsOakland City Limit