CITY OF NEW BUFFALO
CAPITAL IMPROVEMENT PROGRAM
2017 - 2021
CITY OF NEW BUFFALO
2017 – 2021
CAPITAL IMPROVEMENT PROGRAM
PETE WEBER Mayor
LOU O’DONNELL IV Mayor Pro Tem
DONNA MESSINGER City Council Member
JOHN PETERSON City Council Member
ROBERT SPIRITO City Council Member
ALLYSON HOLM City Clerk
DEBBIE LAMBRIX City Treasurer
CITY OF NEW BUFFALO
2017 – 2021
CAPITAL IMPROVEMENT PROGRAM
TABLE OF CONTENTS
Executive Summary. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Description of Projects. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 2017-2021 Project Map – Street Projects. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 2017-2021 Revenue and Expenditure Chart. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 2017 Capital Improvements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 2017 Revenue and Expenditure Chart. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 2018 Capital Improvements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 2018 Revenue and Expenditure Chart. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 2019 Capital Improvements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 2019 Revenue and Expenditure Chart. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 2020 Capital Improvements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 2020 Revenue and Expenditure Chart. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 2021 Capital Improvements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 2021 Revenue and Expenditure Chart. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 Appendix A: Asset Management Plan Appendix B: Water System General Plan Map 5-Year and 20-Year Capital Plan Appendix C: Sanitary Sewer System Map Appendix D: Sanitary Sewer Lift Station Map Appendix E: Stormwater System Map
CITY OF NEW BUFFALO
2017 – 2021
CAPITAL IMPROVEMENT PROGRAM
EXECUTIVE SUMMARY
INTRODUCTION We are pleased to present the City of New Buffalo Capital Improvement Plan (CIP) for the years 2017 through 2021. This document represents staff’s recommendation of City’s street, water, sewer, and drainage infrastructure project needs for the next five years given current financial resources and outlooks. Proposed projects are listed by year, with anticipated cost and source of revenue to fund those improvements. In preparing the CIP, priority is given to projects based on need and condition of the infrastructure item to be improved or replaced. Decisions on street improvements are based on the condition surveys and the analysis completed as part of the City’s Asset Management Plan. The water system improvements are based on the City’s Water System General Plan recommendations. The sanitary sewer and lift station improvements are based on known problem areas identified by the Galien River Sanitary District (GRSD). Drainage improvements are also based on known problems identified either by the GRSD or the Streets Department. The sewer and drainage improvements will be updated as results from the inventory and inspections from the State’s SAW Grant become available. REVENUES Revenue to the CIP comes from the following sources:
Streets Fund and Act 51 Fund – The City of New Buffalo receives approximately $200,000 per year from the Michigan Transportation Fund (MTF) and the Local Roads Program (LRP). The amount of distribution is based on how many miles of Major and Local streets the City owns. Note that the current LRP expires in 2016.
Water Fund – The City of New Buffalo collects a typical ready to serve charge of $12.02 per month and a usage rate of $3.16 per 1000 gallons of water consumed. Note that the ready to serve charge is based on service pipe size. Revenue of the water fund is approximately $440,000 annually.
Sewer Fund – The City of New Buffalo collects a typical ready to serve charge of $20.28 per month and a usage rate of $4.38 per 1000 gallons of water consumed. Revenue of the water fund is approximately $685,000 annually.
Grants / Bonds – Grants will be available for several items of scope with the Whittaker Street Downtown Redevelopment Project. Grants for pedestrian and bicycle facilities and other alternative transportation enhancements are available from state and federal sources. Several grants are currently being pursued along with the design of the project. Where grants are not applicable, the City plans to issue bonds for the remaining costs of the project.
1
EXPENDITURES
The recommended 2017 through 2021 Capital Improvement Program proposes the expenditure of approximately $4.9 million on capital improvements within the project categories of street improvements, water system improvements, sewer improvements, drainage improvements, and other miscellaneous projects.
CONCLUSION
While the CIP plan does not completely provide the level of investment the City of New Buffalo needs, it does offer substantial investment of $4.9 million for infrastructure improvements over the next five years. The CIP is intended to be updated every one to two years to reflect more precise information on available resources and the City’s changing needs in infrastructure improvements. Each update will include projects extending into the new fifth year of the five year plan.
Prepared by:
Becka Shipp, PE Staff Engineer
Robert Anderson City Manager
2
April 4, 2016
CITY OF NEW BUFFALO
2017 – 2021
CAPITAL IMPROVEMENT PROGRAM
DESCRIPTION OF PROJECTS
NORTH WHITTAKER STREET DOWNTOWN REDEVELOPMENT PROJECT The North Whittaker Street project is the highlight of New Buffalo’s projects. It encompasses the main downtown area, from Buffalo Street (US-12) to Mechanic Street. The project scope includes a full reconstruction of the two-block segment with utility upgrades, new pavement, widened sidewalks and streetscaping items. Minor improvements may also be completed on adjacent streets, including parking reconfiguration and repairs of sidewalk, curb and pavements. It is anticipated the project will begin preliminary utility work in the Fall of 2016, with the majority of work completed in 2017. VARIOUS STREET IMPROVEMENTS From an analysis of the overall street network, many streets are in need of repair. Utilizing the City’s Asset Management Plan, several areas have been identified as high priority. Over the next five years, a variety of streets will be rehabilitated or resurfaced, with repairs to the water, sewer and drainage systems. Rehabilitation projects are fairly robust in scope, including significant utility work, such as water main replacements, with pavement replacement. Resurfacing projects are limited to minor utility repairs with a simple mill and overlay of the street’s surface course of pavement. The priority projects include:
East Clay Street (Kinzie to Bell) – Rehabilitation, 2018 North Eagle Street (Merchant to Water) – Resurfacing, 2019 East Indiana Street (Whittaker to Bronson) – Resurfacing, 2020 South Mayhew Street (Detroit to Michigan) – Resurfacing, 2017 West Merchant Street (Berrien to Willard) – Rehabilitation, 2017 West Water Street (Berrien to Willard) – Resurfacing, 2021 North Willard Street (Railroad to Water) – Resurfacing, 2021
WATER MAIN IMPROVEMENTS
For the last several years, the City’s Water Department has been committed to replacing one block of old and deteriorated water mains each year. This policy is important to maintaining the overall good condition of the water system. Some projects have also been identified in the City’s Water System General Plan. Included in typical water main improvement projects include new mains with new service lines, shut-off valves and meters. The CIP will continue this trend, with the following projects:
3
North Chicago Street (Merchant to Mechanic), 2021 West Clay Street (Willard to Whittaker), 2020 West Merchant Street (Berrien to Willard), 2017 (Included as part of street rehabilitation) North Drive (Chicago to Berrien), 2017 North Drive (Eagle to Chicago), 2018 North Drive (Shore to Eagle), 2019 North Whittaker Street (Buffalo to Mechanic), 2017 (Included as part of street reconstruction)
LIFT STATION IMPROVEMENTS The City of New Buffalo owns and maintains eight Sanitary Sewer Lift Stations that are necessary components in the sewerage system. Lift stations allow for raw sewerage to be pumped away from low elevation areas and into the main lines that extend to the GRSD treatment plant. The GRSD provides routine maintenance of the stations, but regular maintenance and repairs are continually necessary. At some point, lift stations, their pumps and other components need to be replaced or upgraded to serve greater capacity as the City grows. Over the next five years, the City will replace, repair and maintain all of the lift stations in the system to ensure optimal operations. SEWER AND DRAINAGE IMPROVEMENTS The City of New Buffalo owns and maintains many sewer and drainage pipes and structures. In 2015, the State of Michigan initiated a substantial grant program for local communities to begin an asset management program for stormwater and wastewater facilities (SAW Grant Program). The City of New Buffalo was awarded almost $1 million to perform an inventory and condition assessment of sewer and drainage pipes and structures and set up a GIS database for the asset management program. It is anticipated that City will receive the results from the program within the next year to begin evaluating these systems and plan for repairing deficiencies. Until that information is available, estimated expenditures are included for typical projects. During the design phase, sewer and drainage improvements will be determined by current field conditions.
4
5
CITY OF NEW BUFFALO
Capital Improvement Plan 2017 - 2021
GRAND TOTAL FOR 2017 - 2021 PROJECTS 4,913,000.00$
Bonds, Grants, $3,000,000 , 61%
Water Fund, $725,000 , 15%
Sewer Fund, $735,000 , 15%
General Fund, $100,000 , 2%
Streets Fund (Major), $222,000 , 5%
Streets Fund (Local), $101,000 , 2%
2017 - 2021 CAPITAL IMPROVEMENT PROGRAMREVENUE SOURCES
Street Improvements, $3,323,000 , 67%
Water Main Improvements, $725,000 , 15%
Lift Station Improvements, $180,000 , 4%
Sewer System Improvements, $425,000 , 9%
Drainage Improvements, $160,000 , 3%
Miscellaneous Improvements, $100,000 , 2%
2017 - 2021 CAPITAL IMPROVEMENT PROGRAMEXPENDITURES
6
CIT
Y O
F N
EW B
UFF
ALO
2017
TH
RO
UG
H 2
021
CA
PIT
AL
IMP
RO
VEM
ENT
PR
OG
RA
M
SUM
MA
RY
FO
R Y
EAR
201
7
CA
TEG
OR
YLO
CA
TIO
NLI
MIT
SA
CTI
VIT
YTO
TAL
CO
STFU
ND
ING
SO
UR
CE(
S)JU
STIF
ICA
TIO
N
Stre
et
Imp
rove
men
tsN
ort
h W
hit
take
r St
ree
tB
uff
alo
St
- M
ech
anic
St
Stre
et
Rec
on
stru
ctio
n3,
000,
000.
00$
B
on
ds,
Gra
nts
Do
wn
tow
n R
edev
elo
pm
ent
Wat
er M
ain
Rep
lace
men
t40
0,00
0.00
$
W
ater
Fu
nd
San
itar
y Se
wer
Rep
airs
350,
000.
00$
Sew
er F
un
d
Sto
rm S
ewer
Rep
airs
50,0
00.0
0$
Se
wer
Fu
nd
Mis
cella
neo
us
100,
000.
00$
Gen
eral
Fu
nd
Sub
tota
l3,
900,
000.
00$
Stre
et
Imp
rove
men
tsW
est
Mer
chan
t St
ree
tB
err
ien
St
- W
illar
d S
tSt
ree
t R
ehab
ilita
tio
n70
,000
.00
$
Stre
ets
Fu
nd
(M
ajo
r)St
ree
t Ev
alu
atio
n
Wat
er M
ain
Rep
lace
men
t50
,000
.00
$
Wat
er F
un
d
San
itar
y Se
wer
Rep
airs
10,0
00.0
0$
Se
wer
Fu
nd
Sto
rm S
ewer
Rep
airs
10,0
00.0
0$
Se
wer
Fu
nd
Sub
tota
l14
0,00
0.00
$
Stre
et
Imp
rove
men
tsSo
uth
May
hew
Str
eet
Det
roit
St
- M
ich
igan
St
Stre
et
Res
urf
acin
g41
,000
.00
$
Stre
ets
Fu
nd
(Lo
cal)
Stre
et
Eval
uat
ion
San
itar
y Se
wer
Rep
airs
10,0
00.0
0$
Se
wer
Fu
nd
Sto
rm S
ewer
Rep
airs
10,0
00.0
0$
Se
wer
Fu
nd
Sub
tota
l61
,000
.00
$
Wat
er M
ain
Imp
rove
men
tsN
ort
h D
rive
Ch
icag
o S
t -
Be
rrie
n S
tW
ater
Mai
n R
epla
cem
ent
50,0
00.0
0$
W
ater
Fu
nd
Wat
er S
yste
m E
valu
atio
n
Sub
tota
l50
,000
.00
$
Lift
Sta
tio
n Im
pro
vem
ents
72 -
Du
new
oo
dA
dja
cen
t to
400
Lak
e D
rive
Lift
Sta
tio
n R
epla
cem
ent
100,
000.
00$
Sew
er F
un
dG
RSD
Eva
luat
ion
Sub
tota
l10
0,00
0.00
$
GR
AN
D T
OTA
L FO
R 2
017
PR
OJE
CTS
4,25
1,00
0.00
$
7
CITY OF NEW BUFFALO
Capital Improvement Plan 2017 - 2021
GRAND TOTAL FOR 2017 PROJECTS 4,251,000.00$
Bonds, Grants, $3,000,000.00 , 70%
Water Fund, $500,000.00 , 12%
Sewer Fund, $540,000.00 , 13%
General Fund, $100,000.00 , 2%
Streets Fund (Major), $70,000.00 , 2%
Streets Fund (Local), $41,000.00 , 1%
2017 CAPITAL IMPROVEMENT PROGRAMREVENUE SOURCES
Street Improvements, $3,111,000.00 , 73%
Water Main Improvements, $500,000.00 , 12%
Lift Station Improvements, $100,000.00 , 2%
Sewer System Improvements, $370,000.00 , 9%
Drainage Improvements, $70,000.00 , 2%
Miscellaneous Improvements, $100,000.00 , 2%
2017 CAPITAL IMPROVEMENT PROGRAMEXPENDITURES
8
CIT
Y O
F N
EW B
UFF
ALO
2017
TH
RO
UG
H 2
021
CA
PIT
AL
IMP
RO
VEM
ENT
PR
OG
RA
M
SUM
MA
RY
FO
R Y
EAR
201
8
CA
TEG
OR
YLO
CA
TIO
NLI
MIT
SA
CTI
VIT
YTO
TAL
CO
STFU
ND
ING
SO
UR
CE(
S)JU
STIF
ICA
TIO
N
Stre
et
Imp
rove
men
tsEa
st C
lay
Stre
et
Kin
zie
St -
Be
ll A
vSt
ree
t R
ehab
ilita
tio
n91
,000
.00
$
Stre
ets
Fu
nd
(M
ajo
r)St
ree
t Ev
alu
atio
n
San
itar
y Se
wer
Rep
airs
20,0
00.0
0$
Se
wer
Fu
nd
Sto
rm S
ewer
Rep
airs
50,0
00.0
0$
Se
wer
Fu
nd
Sub
tota
l16
1,00
0.00
$
Wat
er M
ain
Rep
lace
men
tN
ort
h D
rive
Eagl
e S
t -
Ch
icag
o S
tW
ater
Mai
n R
epla
cem
ent
50,0
00.0
0$
W
ater
Fu
nd
Wat
er S
yste
m E
valu
atio
n
Sub
tota
l50
,000
.00
$
Lift
Sta
tio
n R
epai
rs73
- L
igh
tho
use
Po
int
(No
rth
)A
t en
d o
f La
nd
ings
Lift
Sta
tio
n R
epai
rs15
,000
.00
$
Sew
er F
un
dG
RSD
Eva
luat
ion
74 -
Lig
hth
ou
se P
oin
t (S
ou
th)
Nea
r 21
Lan
din
gsLi
ft S
tati
on
Rep
airs
15,0
00.0
0$
Sub
tota
l30
,000
.00
$
GR
AN
D T
OTA
L FO
R 2
018
PR
OJE
CTS
241,
000.
00$
9
CITY OF NEW BUFFALO
Capital Improvement Plan 2017 - 2021
GRAND TOTAL FOR 2018 PROJECTS 241,000.00$
Water Fund, $50,000.00 , 22%
Sewer Fund, $85,000.00 , 38%
Streets Fund (Major), $91,000.00 , 40%
2018 CAPITAL IMPROVEMENT PROGRAMREVENUE SOURCES
Street Improvements, $91,000.00 , 38%
Water Main Improvements, $50,000.00 , 21%
Lift Station Improvements, $30,000.00 , 12%
Sewer System Improvements, $20,000.00 , 8%
Drainage Improvements, $50,000.00 , 21%
2018 CAPITAL IMPROVEMENT PROGRAMEXPENDITURES
10
CIT
Y O
F N
EW B
UFF
ALO
2017
TH
RO
UG
H 2
021
CA
PIT
AL
IMP
RO
VEM
ENT
PR
OG
RA
M
SUM
MA
RY
FO
R Y
EAR
201
9
CA
TEG
OR
YLO
CA
TIO
NLI
MIT
SA
CTI
VIT
YTO
TAL
CO
STFU
ND
ING
SO
UR
CE(
S)JU
STIF
ICA
TIO
N
Stre
et
Imp
rove
men
tsN
ort
h E
agle
Str
eet
Mer
chan
t St
- W
ater
St
Stre
et
Res
urf
acin
g28
,000
.00
$
Stre
ets
Fu
nd
(M
ajo
r)St
ree
t Ev
alu
atio
n
San
itar
y Se
wer
Rep
airs
10,0
00.0
0$
Se
wer
Fu
nd
Sto
rm S
ewer
Rep
airs
10,0
00.0
0$
Se
wer
Fu
nd
Sub
tota
l48
,000
.00
$
Wat
er M
ain
Rep
lace
men
tN
ort
h D
rive
Sho
re D
r -
Eagl
e S
tW
ater
Mai
n R
epla
cem
ent
50,0
00.0
0$
W
ater
Fu
nd
Wat
er S
yste
m E
valu
atio
n
Sub
tota
l50
,000
.00
$
Lift
Sta
tio
n R
epai
rs71
- S
ou
th C
ove
-Har
bo
r Is
leH
arb
or
Isle
just
no
rth
of
gate
Lift
Sta
tio
n R
epai
rs15
,000
.00
$
Sew
er F
un
dG
RSD
Eva
luat
ion
75 -
Har
bo
r P
oin
teO
ff W
hit
take
r at
en
tran
ce b
y ga
rage
Lift
Sta
tio
n R
epai
rs15
,000
.00
$
Sub
tota
l30
,000
.00
$
GR
AN
D T
OTA
L FO
R 2
019
PR
OJE
CTS
128,
000.
00$
11
CITY OF NEW BUFFALO
Capital Improvement Plan 2017 - 2021
GRAND TOTAL FOR 2019 PROJECTS 128,000.00$
Water Fund, $50,000.00 , 44%
Sewer Fund, $35,000.00 , 31%
Streets Fund (Major), $28,000.00 , 25%
2019 CAPITAL IMPROVEMENT PROGRAMREVENUE SOURCES
Street Improvements, $28,000.00 , 22%
Water Main Improvements, $50,000.00 , 39%
Lift Station Improvements, $30,000.00 , 23%
Sewer System Improvements, $10,000.00 , 8%
Drainage Improvements, $10,000.00 , 8%
2019 CAPITAL IMPROVEMENT PROGRAMEXPENDITURES
12
CIT
Y O
F N
EW B
UFF
ALO
2017
TH
RO
UG
H 2
021
CA
PIT
AL
IMP
RO
VEM
ENT
PR
OG
RA
M
SUM
MA
RY
FO
R Y
EAR
202
0
CA
TEG
OR
YLO
CA
TIO
NLI
MIT
SA
CTI
VIT
YTO
TAL
CO
STFU
ND
ING
SO
UR
CE(
S)JU
STIF
ICA
TIO
N
Stre
et
Imp
rove
men
tsEa
st In
dia
na
Stre
et
Wh
itta
ker
St -
Bro
nso
n S
tSt
ree
t R
esu
rfac
ing
60,0
00.0
0$
St
ree
ts F
un
d (
Loca
l)St
ree
t Ev
alu
atio
n
San
itar
y Se
wer
Rep
airs
10,0
00.0
0$
Se
wer
Fu
nd
Sto
rm S
ewer
Rep
airs
15,0
00.0
0$
Se
wer
Fu
nd
Sub
tota
l85
,000
.00
$
Wat
er M
ain
Rep
lace
men
tW
est
Cla
y St
ree
tW
illar
d S
t -
Wh
itta
ker
StW
ater
Mai
n R
epla
cem
ent
75,0
00.0
0$
W
ater
Fu
nd
Wat
er S
yste
m E
valu
atio
n
Sub
tota
l75
,000
.00
$
Lift
Sta
tio
n M
ain
ten
ance
77 -
Su
nse
t Sh
ore
sSo
uth
wes
t C
orn
er o
f B
err
ien
an
d W
ater
Lift
Sta
tio
n M
ain
ten
ance
10,0
00.0
0$
Se
wer
Fu
nd
GR
SD E
valu
atio
n
Sub
tota
l10
,000
.00
$
GR
AN
D T
OTA
L FO
R 2
020
PR
OJE
CTS
170,
000.
00$
13
CITY OF NEW BUFFALO
Capital Improvement Plan 2017 - 2021
GRAND TOTAL FOR 2020 PROJECTS 170,000.00$
Water Fund, $75,000.00 , 44%
Sewer Fund, $35,000.00 , 21%
Streets Fund (Local), $60,000.00 , 35%
2020 CAPITAL IMPROVEMENT PROGRAMREVENUE SOURCES
Street Improvements, $60,000.00 , 35%
Water Main Improvements, $75,000.00 , 44%
Lift Station Improvements, $10,000.00 , 6%
Sewer System Improvements, $10,000.00 , 6%
Drainage Improvements, $15,000.00 , 9%
2020 CAPITAL IMPROVEMENT PROGRAMEXPENDITURES
14
CIT
Y O
F N
EW B
UFF
ALO
2017
TH
RO
UG
H 2
021
CA
PIT
AL
IMP
RO
VEM
ENT
PR
OG
RA
M
SUM
MA
RY
FO
R Y
EAR
202
1
CA
TEG
OR
YLO
CA
TIO
NLI
MIT
SA
CTI
VIT
YTO
TAL
CO
STFU
ND
ING
SO
UR
CE(
S)JU
STIF
ICA
TIO
N
Stre
et
Imp
rove
men
tsW
est
Wat
er S
tree
tB
err
ien
St
- W
illar
d S
tSt
ree
t R
esu
rfac
ing
24,0
00.0
0$
St
ree
ts F
un
d (
Maj
or)
Stre
et
Eval
uat
ion
San
itar
y Se
wer
Rep
airs
10,0
00.0
0$
Se
wer
Fu
nd
Sto
rm S
ewer
Rep
airs
10,0
00.0
0$
Se
wer
Fu
nd
Sub
tota
l44
,000
.00
$
Stre
et
Imp
rove
men
tsN
ort
h W
illar
d S
tree
tR
ail R
oad
to
Wat
er S
tSt
ree
t R
esu
rfac
ing
9,00
0.00
$
St
ree
ts F
un
d (
Maj
or)
Stre
et
Eval
uat
ion
San
itar
y Se
wer
Rep
airs
5,00
0.00
$
Se
wer
Fu
nd
Sto
rm S
ewer
Rep
airs
5,00
0.00
$
Se
wer
Fu
nd
Sub
tota
l19
,000
.00
$
Wat
er M
ain
Rep
lace
men
tN
ort
h C
hic
ago
St
Mer
chan
t -
Mec
han
icW
ater
Mai
n R
epla
cem
ent
50,0
00.0
0$
W
ater
Fu
nd
Wat
er S
yste
m E
valu
atio
n
Sub
tota
l50
,000
.00
$
Lift
Sta
tio
n M
ain
ten
ance
70 -
Wal
den
Way
No
rth
of
Jeff
erso
nLi
ft S
tati
on
Mai
nte
nan
ce10
,000
.00
$
Sew
er F
un
dG
RSD
Eva
luat
ion
Sub
tota
l10
,000
.00
$
GR
AN
D T
OTA
L FO
R 2
021
PR
OJE
CTS
123,
000.
00$
15
CITY OF NEW BUFFALO
Capital Improvement Plan 2017 - 2021
GRAND TOTAL FOR 2021 PROJECTS 123,000.00$
Water Fund, $50,000.00 , 41%
Sewer Fund, $40,000.00 , 32%
Streets Fund (Major), $33,000.00 , 27%
2021 CAPITAL IMPROVEMENT PROGRAMREVENUE SOURCES
Street Improvements, $33,000.00 , 27%
Water Main Improvements, $50,000.00 , 41%
Sewer System Improvements, $15,000.00 , 12%
Drainage Improvements, $15,000.00 , 12%
2021 CAPITAL IMPROVEMENT PROGRAMEXPENDITURES
16
CITY OF NEW BUFFALO
2017 – 2021
CAPITAL IMPROVEMENT PROGRAM
APPENDIX A
Asset Management Plan
CITY OF NEW BUFFALO
ASSET MANAGEMENT PROGRAM
Street System
2016 - 2018
City of New Buffalo
Asset Management Program
Street System
2016-2018
i
TABLE OF CONTENTS INTRODUCTION ............................................................................................................................... 1
ASSET MANAGEMENT IN MICHIGAN .......................................................................................... 1
ASSET MANAGEMENT STEPS TO SUCCESS .................................................................................. 2
ASSESSMENT OF CURRENT CONDITIONS ....................................................................................... 3
CITY OF NEW BUFFALO STREET NETWORK BACKGROUND ........................................................ 3
PAVEMENT EVALUATIONS .......................................................................................................... 4
CURRENT CONDITIONS ................................................................................................................ 4
TREATMENT AND REPAIR CATEGORIES ...................................................................................... 4
PROGRAM TARGETS AND FUNDING LEVELS ................................................................................... 5
TARGET OBJECTIVES .................................................................................................................... 5
ESTIMATED UNIT COSTS .............................................................................................................. 5
ESTIMATED FUTURE FUNDING LEVELS ....................................................................................... 6
PREDICT FUTURE CONDITIONS AND EVALUATE ALTERNATIVES .................................................... 7
PREDICTING FUTURE CONDITIONS WITH ROADSOFT ................................................................. 7
SELECTING RESOURCE ALLOCATIONS ......................................................................................... 8
IDENTIFY CANDIDATE PROJECTS ................................................................................................... 10
SET PRIORITIES AND DEVELOP MULTI-YEAR PROGRAM .............................................................. 10
REPORTING RESULTS ..................................................................................................................... 10
CONCLUSION ................................................................................................................................. 11
APPENDIX A – Street Map with Condition Survey (2015)
APPENDIX B – Street Inventory with Anticipated Improvement Costs
APPENDIX C – Asset Management Funding Resources
City of New Buffalo Asset Management Program
Street System 2016-2018
1
INTRODUCTION
The City of New Buffalo has developed an asset management program for publicly owned street inspection, evaluation and maintenance. This document is intended to serve as a guide for all street work improvements. The plan has been developed using the Michigan Department of Transportation (MDOT) recommended best practices. This guide acts as a starting point for developing the City’s 5-Year Capital Improvement Program, and serves as a tool to determine the best use of funds for repairs and maintenance. Although this plan reflects the best practices currently in use by road agencies across the State, it is tailored to the unique characteristics and circumstances of New Buffalo’s street network and other infrastructure. The plan will evolve as new construction materials and preventative techniques become industry standard.
ASSET MANAGEMENT IN MICHIGAN
Act 499 of the State of Michigan Public Acts of 2002 encourages local municipalities to maintain an asset management plan which is an important strategy for operating, maintaining and improving the infrastructure system of the community.
The act defines asset management as “an ongoing process of maintaining, upgrading and operating physical assets cost-effectively, based on a continuous physical inventory and condition assessment.” Asset management consists of business principles and practices for improving resource allocation decisions. It requires a shift from a traditional tactical project management approach (worst streets first) to a strategic, structured sequence of maintenance, preservation, repair, rehabilitation, and replacement actions that will achieve and sustain a desired state of good repair over the lifecycle of the assets at minimum practicable cost.
Information about asset management in this document is taken from the Asset Management Guide for Local Agencies in Michigan, sponsored by the Michigan Transportation Asset Management Council (TAMC) prepared by Cambridge Systematics, Inc, available on the TAMC website.
With the adoption of this Asset Management Plan, the City of New Buffalo can look at the street network as a complete system, shifting away from emphasis on separate street projects and a worse case first approach. The implementation of asset management strategies enables good stewardship, transparent decision processes, and measureable performance. It allows for decisions to be made with regard to the long-range condition of the entire system. This requires various investment strategies which maintain the entire system in the best condition possible within the constraints of the budget.
City of New Buffalo Asset Management Program
Street System 2016-2018
2
ASSET MANAGEMENT STEPS TO SUCCESS
The City of New Buffalo Asset Management Plan follows the model from the TAMC Asset Management Guide for Local Agencies in Michigan. It is outlined in these six steps.
1. Assess Current ConditionThe first step in the process is to assess current condition. Understanding what featuresNew Buffalo owns and the condition they are in is essential for good asset management.
2. Establish Program Targets and Funding LevelsNew Buffalo must determine the types of improvements, maintenance and repairs that areneeded to that will best preserve the system. Additionally, the City needs to estimate costsfor the treatments under consideration, and evaluate what funding will be available orsought after in future years.
3. Predict Future Condition and Develop Performance Measures and TargetsStrategic management of physical assets (roads, buildings, vehicles, etc.) is dependent onpredicting condition in future years, using appropriate software and prediction models. TheCity of New Buffalo must define the direction it is going and what it is trying to accomplish—its mission and goals. Performance Measures and Targets help the City communicate theseideas with elected officials and the public and indicate whether or not they are successful.
4. Identify Candidate ProjectsCandidate projects can be identified through a combination of applying rules of thumb tocurrent condition data, input from management systems, public input or throughengineering judgment and field inspection. Projects identified represent the work thatshould be done, to improve the overall condition and life-cycle of the street network.
5. Set Priorities and Develop Multi-Year ProgramThe next step in the process is to prioritize the projects and incorporate them into a multi-year program that is updated annually. The prioritization process should be public,transparent, and centered on the results of the previous steps. The high priority projects arethen placed in the New Buffalo’s Capital Improvement Program.
6. Report results from the multi-year program listing the planned street projects.The final step is to report the results of the asset management process. Michigan’s assetmanagement legislation requires three reports – a summary of current condition, a three-year program, and a summary of actual spending over the past year that must besubmitted.
City of New Buffalo Asset Management Program
Street System 2016-2018
3
ASSESSMENT OF CURRENT CONDITIONS
CITY OF NEW BUFFALO STREET NETWORK BACKGROUND
The City of New Buffalo has 28.3 miles of streets, within the approximately 2.5 square miles of our jurisdiction. Of that number, approximately two miles are U.S. Route 12, also called Buffalo Street within City limits. U.S. Route 12 is managed by the Michigan Department of Transportation.
The remaining 26.36 miles of streets are divided into 7.56 miles of major streets and 18.80 miles of local streets, all of which are maintained by the Street Department.
Jefferson Street (which has 0.4 miles) also counts as part of the I.R.R. (Indian Reservation Route) system of the Pokagon Band, due to it being a route to their tribal land. The City of New Buffalo still maintains control of this street, but the City works in partnership with the Pokagon Band to keep it well maintained.
The City does not maintain private drives (e.g., Harbor Isle Drive, Peninsula Drive, Landings Boulevard, Preserve Way, Pond Path, Walden Way, Diamond Point Lane, Ramona Court, Merchant Street Cottages drives off Taylor Street, and Marquette Drive northeasterly of the City Beach/ City Boat Launch property.)
All streets are asphalt pavement. Most local streets have a typical width of 20 feet. Many streets within the downtown area have curb and gutter and vary from 20 to 30 feet wide. Some of the major streets have 26 foot wide pavement with 4 to 6 feet of gravel shoulders. Pavement base is unknown at most locations, but it is assumed there is only a few inches of gravel beneath 2 to 4 inches of asphalt pavement.
Currently, many streets are in poor condition, with significant alligator type cracking. Many streets have developed potholes and structural deficiencies. Factors such as deteriorating storm sewers and poor drainage have impacted the roadway condition.
The City has not been following a structured preventative maintenance program for its streets for several years. It has simply been performing routine maintenance such as pothole patching or small pavement patching over utility repairs. Only a handful of streets have been resurfaced, rehabilitated or reconstructed in recent years.
The shift to an asset management program is pivotal to maintaining a high quality road network. Having appropriate plans, tools, and techniques are important keys to maintaining the service life of the infrastructure and more efficient spending of budgeted resources.
City of New Buffalo Asset Management Program
Street System 2016-2018
4
PAVEMENT EVALUATIONS
The City of New Buffalo has adopted using the Pavement Surface Evaluation and Rating (PASER) system for measuring pavement conditions. The PASER system is a visual survey method of street conditions developed by the University of Wisconsin Transportation Information Center. It provides a simple, efficient and consistent method for evaluating street condition. PASER uses a scale of 1 to 10 to rate the streets. A rating of 10 is excellent and is assigned to new pavement. A rating of 1 is assigned to failed pavement with restricted speed, extensive potholes and an almost total loss of pavement integrity.
An evaluation was completed over the winter 2015-2016 of each street segment using the PASER rating system, and recorded in our Roadsoft database, which is a roadway management system for collecting, storing, and analyzing data associated with transportation assets.
CURRENT CONDITIONS
Below is a summary of the PASER ratings from the 2015-2016 study:
NEW BUFFALO STREET NETWORK CONDITION
Percentage of NB Street Network
PASER Ratings Condition
4.7% 9, 10 Excellent
8.7% 8 Very Good
54.2% 6, 7 Good
27.1% 4, 5 Fair
4.7% 3 Poor
0.6% 2 Very Poor
0.0% 1 Failed
From this condition assessment, the majority of streets are in good condition, however, at the lowest range of that category. A third of the street network is in fair or poor condition. It is crucial that New Buffalo begins a structured maintenance program to extend the life of the existing pavement and reduce further deterioration of the system.
TREATMENT AND REPAIR CATEGORIES
The City of New Buffalo reviewed the current PASER ratings of the streets and determined several types of improvements that can be considered. The ratings were grouped into five main categories based upon the type of work that may be required for each rating; routine maintenance, capital preventative maintenance, and structural improvements:
City of New Buffalo Asset Management Program
Street System 2016-2018
5
NEW BUFFALO PASER RATINGS AND IMPROVEMENT PROJECT TYPES
PASER Ratings Improvement Type Improvement Description
8, 9 or 10 Routine Maintenance (RM)
Street Sweeping, Catch Basin and Sewer Cleaning
6, 7 or 8 Capital Preventative Maintenance (CPM)
Crack Sealing
4, 5 or 6 Capital Preventative Maintenance (CPM)
Resurfacing, 2” mill and resurface
3, 4 or 5 Structural Improvements (SI)
Rehabilitation of pavement (4” mill and resurface) with base pavement repairs, various curb and sidewalk repairs.
1, 2 or 3 Structural Improvements (SI)
Reconstruction of entire street, including removal and replacement of all pavement, pavement base and curb, with various repairs of sidewalk and other appurtenances.
Note that there is some overlap in the ratings and recommended treatments, and is modified from the PASER manual to fit with New Buffalo’s infrastructure needs and budget. This also allows for locations to be evaluated along with other planned work, for example, utility improvements within the roadway.
PROGRAM TARGETS AND FUNDING LEVELS
TARGET OBJECTIVES
As previously discussed, many of New Buffalo’s streets are in poor condition and no structured preventative maintenance program has been in place. The goal of this asset management program is to analyze available budgets and street conditions to generate cost effective repair strategies to include a mix of routine maintenance, capital preventive maintenance and structural improvements.
The target objective is to have 90% of our streets at a PASER rating of 6 or better within the next 10 years.
ESTIMATED UNIT COSTS
To relate an annual budget to street system condition improvements for the City of New Buffalo, we reviewed unit costs in recent Michigan Department of Transportation (MDOT)
City of New Buffalo Asset Management Program
Street System 2016-2018
6
projects, and developed estimated unit costs for the different types of repair strategies. The following table lists the type of activity and the estimated cost per lane mile of typical projects. Note that as the need for more extensive repairs increase, the cost significantly increases.
ESTIMATED COSTS OF IMPROVEMENT PROJECT TYPES
Cost Per Lane Mile
Improvement Type Improvement Description
$11,200 Routine Maintenance (RM)
Street Sweeping, Catch Basin and Sewer Cleaning
$50,700 Capital Preventative Maintenance (CPM)
Crack Sealing
$78,300 Capital Preventative Maintenance (CPM)
Resurfacing, 2” mill and resurface
$281,800 Structural Improvements (SI)
Rehabilitation of pavement (4” mill and resurface) with base pavement repairs, various curb and sidewalk repairs.
$489,000 Structural Improvements (SI)
Reconstruction of entire street, including removal and replacement of all pavement, pavement base and curb, with various repairs of sidewalk and other appurtenances.
As the City begins to complete projects, local cost data will be used to update maintenance and construction costs accordingly.
ESTIMATED FUTURE FUNDING LEVELS
The City of New Buffalo funds its streets primarily through motor fuel tax distributed to municipalities under the Public Act of 1951 (Act 51). New Buffalo receives approximately $200,000 annually from the Michigan Transportation Fund (MTF) and the Local Roads Program (LRP). Approximately $129,000 is designated as major street funding, $65,000 as local street funding, and $6,000 is from the LRP. The current LRP is set to expire in 2016.
Other potential sources of revenue for road projects can include State and Federal Grants, or transfers from various funds such as Water and Sewer. These other funding sources would only be applicable depending on the scope of work, and are not considered a component of the available resources for this plan.
City of New Buffalo Asset Management Program
Street System 2016-2018
7
Analyzing expenditures from recent years, the City of New Buffalo uses approximately $117,000 per year for regular street maintenance and repairs from the Act 51 funding sources. Typical work includes pothole patching, patching over utility repairs and snow removal operations.
After typical repair and maintenance costs, the City of New Buffalo has approximately $85,000 per year available for street maintenance, rehabilitation, and reconstruction projects as part of this Asset Management Plan. Additionally, there is a positive balance in both the Major and Local Street Funds, totaling approximately $431,000 (projected to fiscal year end June 30, 2016). The City has chosen to shift approximately 30% of this surplus over the next 5 years for this Asset Management plan to maximize resources.
In summary, a total of $103,000 per year can be allocated to the Asset Management Plan.
PREDICT FUTURE CONDITIONS AND EVALUATE ALTERNATIVES
The challenge for most agencies is to determine when in the life of a pavement is the best time to apply a preventive maintenance treatment for the maximum benefit. Preventive maintenance is perhaps the single most influential component in the network strategy that allows an agency to manage pavement conditions. It creates the ability to postpone costly reconstruction or rehabilitation activities, by extending the remaining service life of the original pavement. A significant benefit of a comprehensive preventive maintenance program is that it gives managers control over future network conditions and funding requirements. By controlling or predicting future network conditions, decision makers can anticipate routine maintenance work loads, safety deficiencies, and ride quality needs.
A Pavement Management System (PMS) is a method of tracking and analyzing street conditions. A PMS supports the entire resource allocation process, including the analysis of future pavement conditions. Specifically, it is a tool to help maintain an inventory of streets and conditions, estimate the current condition of the overall network, predict the future condition of the network based on standard deterioration curves and funding strategies and optimize alternative repair and funding strategies.
The City of New Buffalo has begun using Roadsoft which is a roadway management system for collecting, storing, and analyzing data associated with transportation assets. The database program software was developed by Michigan Technological University, and is used by the Transportation Asset Management Council and many other agencies in Michigan.
PREDICTING FUTURE CONDITIONS WITH ROADSOFT
Roadsoft uses the PASER ratings, asphalt deterioration curves, and sophisticated algorithms to predict how a street will hold up in the future. The program also allows the City to compare
City of New Buffalo Asset Management Program
Street System 2016-2018
8
different combinations of repairs and funding levels through strategy optimization and evaluation programming.
DO NOTHING VS. PREVENTATIVE MAINTENANCE
If no improvements are done, the road system will continue to deteriorate over time. If even a modest budget is applied to preventative maintenance activities such as crack sealing and resurfacing, the remaining service life (RSL) of the system is extended as shown in the graphic below.
SELECTING RESOURCE ALLOCATIONS
With an investment in preventative maintenance, the amount of roads that require little or no maintenance can be increased over time. Applying the right mix of maintenance operations at the right time and at the appropriate funding levels is central to the asset management plan.
The next graph represents the optimal use of resources over the next five years, given a budget of $103,000.
City of New Buffalo Asset Management Program
Street System 2016-2018
9
The program recommends utilizing the budget in the following manner:
BREAKDOWN OF MAINTENANCE TYPES PER YEAR
Year Crack Sealing Mill & Resurface 2” Rehab - 4” Mill & Replace Reconstruction
1 46.5% ($47,931) 51.5% ($53,049) 0% 0%
2 19.8% ($20,399) 76.2% ($78,603) 0% 0%
3 0% 100% ($97,058) 0% 0%
4 0% 100% ($95,154) 0% 0%
5 8.5% ($8,774) 82.5% ($84,517) 0% 0%
Note that a limited budget of $103,000 is less than a typical rehabilitation or reconstruction project. Therefore, no structural improvements can be included in the mix of treatments at this funding level. At some point, New Buffalo will need to increase funding to repair streets that are in poor or failing condition.
Also, the functional class of the roadway (major and local) dictates some of the funding availability. For evaluation purposes, the class is ignored to understand the overall best use of funding and types of treatment. The City operates within tight budget constraints and so it is important to optimize the performance of the existing system. Utilizing the analysis from the Roadsoft program, New Buffalo can effectively budget and implement most efficient treatments to improve the condition of the roadway system.
City of New Buffalo Asset Management Program
Street System 2016-2018
10
IDENTIFY CANDIDATE PROJECTS
Selection of potential projects are based on current conditions and engineering judgement, with attention to community concerns and complaints, as well as other planned infrastructure work like water main, sewer or drainage improvements. It is also important to focus on multi-block segments of streets to more effectively compile projects for local contractors, reducing mobilization costs.
SET PRIORITIES AND DEVELOP MULTI-YEAR PROGRAM
After projects have been identified, a multi-year program can be developed. The City of New Buffalo has chosen to outline a five year Capital Improvement Plan. It is important to maintain some level of consistency with the pavement management system recommendations during the programming process because it is used to set performance targets and funding levels.
At the estimated funding level of $103,000 per year, the Roadsoft optimization tool recommends the City should initially focus on a roughly 50%-50% mix between Crack Sealing and Resurfacing. Then the priority becomes Resurfacing, ranging from $82% to 100% of the budget.
As other funding resources become available, there may be opportunities to Rehabilitate or Reconstruct streets. Many of these projects will be based on community need.
The Capital Improvement Plan will be updated every one to two years, which involves reviewing and updating the projects each year of the program and then selecting projects for the new year.
It is important to note that this Asset Management Plan will also be updated every one to two years. As treatments are applied, the roadway network condition will improve, and therefore strategies for maintaining the network will evolve. The cycle of asset management to capital investment to system re-evaluation is a key process to actively maintain the City of New Buffalo’s infrastructure.
REPORTING RESULTS
The final step is to report the results of the asset management process. Michigan’s asset management legislation requires all agencies submit three annual reports:
Condition Report – The Council reports total mileage of the road network and asummary of pavement and bridge conditions.
City of New Buffalo Asset Management Program
Street System 2016-2018
11
Record of Work – The Council reports on transportation maintenance and operational orimprovement activities with locations and associated costs as reported by agencies thatwere performed in the previous year.
Multi-Year Program – Per Act 51, agencies report a list of work planned for each budgetcategory for the next three years, with locations (where possible) and associated costs.
With the adoption of this Asset Management Plan, The City of New Buffalo is committed to the reporting requirements according to the rules and guidelines set forth by MDOT and TAMC.
CONCLUSION
Asset management is an ongoing process of maintaining, upgrading, and operating physical assets in a cost-effective manner. This is achieved by a continuous inventory condition assessment, combined with analysis of maintenance or repair options compared with budget levels to optimize both spending and implementation of maintenance.
Because the City of New Buffalo has not prioritized regular preventative maintenance for a number of years, it will take a large capital investment to significantly improve conditions of the street network. This goal cannot be achieved immediately due to funding constraints. However, this asset management plan is a tool that provides a baseline of current conditions, analyzes future conditions and offers a strategic guideline for effective project selection and budgeting of resources.
Prepared By:
Becka Shipp, PE Staff Engineer City of New Buffalo
April 4, 2016
City of New Buffalo Asset Management Program
Street System 2016-2018
APPENDIX A
Street Map with Condition Survey (2015)
City of New Buffalo Asset Management Program
Street System 2016-2018
APPENDIX B
Street Inventory with Anticipated Improvement Costs
CIT
Y O
F N
EW B
UFF
ALO
Stre
et
Inve
nto
ry w
ith
An
tici
pat
ed Im
pro
vem
ent
Co
sts
Ro
ad N
ame
Fro
mTo
Len
gth
(ft
)A
ct 5
1 C
ate
gory
PA
SER
Rat
ing
Imp
rove
men
t Ty
pe
Esti
mat
ed
Co
stB
ell A
veB
uff
alo
St
E In
dia
na
12
67
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
3
7,4
40
.00
B
ell A
veE
Ind
ian
aD
iam
on
d P
oin
t LN
35
4C
tyM
inSt
7: G
oo
dC
PM
(C
rack
Sea
l) $
6,7
93
.80
B
ell A
veD
iam
on
d P
oin
t LN
E C
lay
St1
09
8C
tyM
inSt
7: G
oo
dC
PM
(C
rack
Sea
l) $
2
1,0
91
.20
B
ell A
veE
Cla
y St
CSX
Tra
nsp
ort
atio
n1
21
Cty
Maj
St7
: Go
od
CP
M (
Cra
ck S
eal)
$
2
,33
2.2
0
Bel
l Ave
CSX
Tra
nsp
ort
atio
nB
idd
le S
t4
8C
tyM
ajSt
7: G
oo
dC
PM
(C
rack
Sea
l) $
9
12
.60
B
ell A
veB
idd
le S
tC
ity/
Twp
Lin
e3
80
Cty
Maj
St6
: Go
od
CP
M (
Res
urf
) $
1
1,2
32
.00
B
idd
le S
tB
ell A
veE
Was
hin
gto
n S
t4
38
Cty
Min
St5
: Fai
rSI
(R
ehab
) $
4
6,7
78
.80
B
idd
le S
tE
Was
hin
gto
n S
tD
ead
En
d o
r St
art
30
1C
tyM
inSt
5: F
air
SI (
Reh
ab)
$
32
,12
5.2
0
Bid
dle
St
E C
lay
StD
ead
En
d o
r St
art
63
9C
tyM
inSt
6: G
oo
dC
PM
(R
esu
rf)
$
18
,87
6.0
0
E C
lay
StW
Cla
y St
& S
Wh
itta
ker
StS
Tho
mp
son
St
35
4C
tyM
ajSt
6: G
oo
dC
PM
(R
esu
rf)
$
10
,45
2.0
0
E C
lay
StS
Tho
mp
son
St
S To
wn
sen
d S
t3
33
Cty
Maj
St5
: Fai
rSI
(R
ehab
) $
3
5,5
06
.80
E
Cla
y St
S To
wn
sen
d S
tS
Tayl
or
St3
17
Cty
Maj
St6
: Go
od
CP
M (
Res
urf
) $
9,3
60
.00
E
Cla
y St
S Ta
ylo
r St
S N
ort
on
St
34
8C
tyM
ajSt
6: G
oo
dC
PM
(R
esu
rf)
$
10
,29
6.0
0
E C
lay
StS
No
rto
n S
tS
Jam
eso
n S
t3
54
Cty
Maj
St6
: Go
od
CP
M (
Res
urf
) $
1
0,4
52
.00
E
Cla
y St
S Ja
mes
on
St
S B
ron
son
St
33
3C
tyM
ajSt
7: G
oo
dC
PM
(C
rack
Sea
l) $
6,3
88
.20
E
Cla
y St
S B
ron
son
St
S K
inzi
e St
16
4C
tyM
ajSt
7: G
oo
dC
PM
(C
rack
Sea
l) $
3,1
43
.40
E
Cla
y St
S K
inzi
e St
Bel
l Ave
30
78
Cty
Maj
St6
: Go
od
CP
M (
Res
urf
) $
9
0,9
48
.00
E
Cla
y St
Bel
l Ave
Bid
dle
St
11
1C
tyM
ajSt
6: G
oo
dC
PM
(R
esu
rf)
$
3
,27
6.0
0
E C
lay
StB
idd
le S
tC
ity/
Twp
Lin
e8
13
Cty
Maj
St7
: Go
od
CP
M (
Cra
ck S
eal)
$
15
,61
5.6
0
E D
etro
it S
tS
Wh
itta
ker
StS
Tho
mp
son
St
34
3C
tyM
inSt
8: V
ery
Go
od
RM
(C
lean
) $
1,4
56
.00
E
Det
roit
St
S Th
om
pso
n S
tS
Tow
nse
nd
St
32
7C
tyM
inSt
7: G
oo
dC
PM
(C
rack
Sea
l) $
6,2
86
.80
E
Det
roit
St
S To
wn
sen
d S
tS
Tayl
or
St3
38
Cty
Min
St7
: Go
od
CP
M (
Cra
ck S
eal)
$
6
,48
9.6
0
E D
etro
it S
tS
Tayl
or
StS
No
rto
n S
t3
54
Cty
Min
St7
: Go
od
CP
M (
Cra
ck S
eal)
$
6
,79
3.8
0
E D
etro
it S
tS
No
rto
n S
tS
Jam
eso
n S
t3
38
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
9,9
84
.00
E
Det
roit
St
S Ja
mes
on
St
S B
ron
son
St
32
7C
tyM
inSt
6: G
oo
dC
PM
(R
esu
rf)
$
9
,67
2.0
0
E D
etro
it S
tS
Bro
nso
n S
tS
Kin
zie
St1
69
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
4,9
92
.00
E
Det
roit
St
S K
inzi
e St
Dea
d E
nd
or
Star
t6
18
Cty
Min
St8
: Ve
ry G
oo
dR
M (
Cle
an)
$
2
,62
0.8
0
E In
dia
na
Bel
l Ave
Dea
d E
nd
or
Star
t1
95
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
5,7
72
.00
E
Ind
ian
a St
S W
hit
take
r St
S Th
om
pso
n S
t3
33
Cty
Min
St5
: Fai
rSI
(R
ehab
) $
3
5,5
06
.80
E
Ind
ian
a St
S Th
om
pso
n S
tS
Tow
nse
nd
St
33
3C
tyM
inSt
5: F
air
SI (
Reh
ab)
$
35
,50
6.8
0
E In
dia
na
StS
Tow
nse
nd
St
S Ta
ylo
r St
24
8C
tyM
inSt
4: F
air
SI (
Reh
ab)
$
26
,48
9.2
0
E In
dia
na
StS
Tayl
or
StS
Tayl
or
St8
4C
tyM
inSt
7: G
oo
dC
PM
(C
rack
Sea
l) $
1,6
22
.40
E
Ind
ian
a St
S Ta
ylo
r St
S N
ort
on
St
36
4C
tyM
inSt
3: P
oo
rSI
(R
eco
n)
$
67
,48
2.0
0
E In
dia
na
StS
No
rto
n S
tS
Jam
eso
n S
t3
33
Cty
Min
St5
: Fai
rSI
(R
ehab
) $
3
5,5
06
.80
E
Ind
ian
a St
S Ja
mes
on
St
S B
ron
son
St
33
8C
tyM
inSt
5: F
air
SI (
Reh
ab)
$
36
,07
0.4
0
E In
dia
na
StS
Bro
nso
n S
tS
Kin
zie
St3
33
Cty
Min
St9
: Exc
elle
nt
RM
(C
lean
) $
1,4
11
.20
E
Ind
ian
a St
S K
inzi
e St
S G
riff
ith
St
33
3C
tyM
inSt
9: E
xcel
len
tR
M (
Cle
an)
$
1
,41
1.2
0
E In
dia
na
StS
Gri
ffit
h S
tD
ead
En
d o
r St
art
61
2C
tyM
inSt
9: E
xcel
len
tR
M (
Cle
an)
$
2
,59
8.4
0
E M
adis
on
Ave
S Ja
mes
on
St
Dea
d E
nd
or
Star
t1
37
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
4,0
56
.00
E
Mec
han
ic S
tN
Wh
itta
ker
St &
W M
ech
anic
St
N T
ho
mp
son
St
32
2C
tyM
inSt
5: F
air
SI (
Reh
ab)
$
34
,37
9.6
0
E M
ech
anic
St
N T
ho
mp
son
St
N T
ow
nse
nd
St
35
4C
tyM
inSt
6: G
oo
dC
PM
(R
esu
rf)
$
10
,45
2.0
0
E M
ech
anic
St
N T
ow
nse
nd
St
N T
aylo
r St
31
7C
tyM
inSt
10
: Exc
elle
nt
RM
(C
lean
) $
1,3
44
.00
E
Mer
chan
t St
N W
hit
take
r St
& W
Mer
chan
t St
N T
ho
mp
son
St
34
8C
tyM
ajSt
6: G
oo
dC
PM
(R
esu
rf)
$
10
,29
6.0
0
E M
erch
ant
StN
Th
om
pso
n S
tN
To
wn
sen
d S
t3
27
Cty
Maj
St7
: Go
od
CP
M (
Cra
ck S
eal)
$
6
,28
6.8
0
E M
erch
ant
StN
To
wn
sen
d S
tN
Tay
lor
St3
48
Cty
Maj
St7
: Go
od
CP
M (
Cra
ck S
eal)
$
6
,69
2.4
0
E M
erch
ant
StN
Tay
lor
StR
amo
na
Ct
66
5C
tyM
ajSt
7: G
oo
dC
PM
(C
rack
Sea
l) $
1
2,7
76
.40
E
Mer
chan
t St
Ram
on
a C
tW
ilso
n S
t1
90
Cty
Maj
St8
: Ve
ry G
oo
dR
M (
Cle
an)
$
80
6.4
0
E M
ich
igan
St
S N
ort
on
St
S Ja
mes
on
St
32
7C
tyM
inSt
7: G
oo
dC
PM
(C
rack
Sea
l) $
6,2
86
.80
Pag
e 1
of
7
CIT
Y O
F N
EW B
UFF
ALO
Stre
et
Inve
nto
ry w
ith
An
tici
pat
ed Im
pro
vem
ent
Co
sts
Ro
ad N
ame
Fro
mTo
Len
gth
(ft
)A
ct 5
1 C
ate
gory
PA
SER
Rat
ing
Imp
rove
men
t Ty
pe
Esti
mat
ed
Co
stE
Mic
hig
an S
tS
Jam
eso
n S
tS
Bro
nso
n S
t3
33
Cty
Min
St7
: Go
od
CP
M (
Cra
ck S
eal)
$
6
,38
8.2
0
E M
ich
igan
St
S To
wn
sen
d S
tS
Tayl
or
St2
48
Cty
Min
St7
: Go
od
CP
M (
Cra
ck S
eal)
$
4
,76
5.8
0
E M
ich
igan
St
S G
riff
ith
St
S Fr
ankl
in S
t3
27
Cty
Min
St5
: Fai
rSI
(R
ehab
) $
3
4,9
43
.20
E
Was
hin
gto
n S
tS
11
th S
tB
idd
le S
t3
27
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
9,6
72
.00
E
Was
hin
gto
n S
tG
reen
St
S 1
1th
St
38
0C
tyM
inSt
6: G
oo
dC
PM
(R
esu
rf)
$
11
,23
2.0
0
E W
ater
St
Att
rib
ute
Ch
ange
E W
ater
St
26
4C
tyM
inSt
8: V
ery
Go
od
RM
(C
lean
) $
1,1
20
.00
E
Wat
er S
tE
Wat
er S
tN
Wh
itta
ker
St &
W W
ater
St
68
6C
tyM
inSt
8: V
ery
Go
od
RM
(C
lean
) $
2,9
12
.00
E
Wat
er S
tE
Wat
er S
t &
N W
hit
take
r St
Lan
din
gs B
lvd
33
3C
tyM
inSt
5: F
air
SI (
Reh
ab)
$
35
,50
6.8
0
E W
ater
St
E W
ater
St
Dea
d E
nd
or
Star
t2
06
Cty
Min
St8
: Ve
ry G
oo
dR
M (
Cle
an)
$
87
3.6
0
Gre
en S
tE
Was
hin
gto
n S
tD
ead
En
d o
r St
art
90
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
2,6
52
.00
Je
ffer
son
St
S 1
1th
St
Dea
d E
nd
or
Star
t1
00
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
2,9
64
.00
La
Po
rte
Rd
Cit
y/Tw
p L
ine
W M
adis
on
Ave
73
4C
tyM
ajSt
9: E
xcel
len
tR
M (
Cle
an)
$
3
,11
3.6
0
La P
ort
e R
dW
Mad
iso
n A
veE
Jeff
erso
n S
t4
59
Cty
Maj
St9
: Exc
elle
nt
RM
(C
lean
) $
1,9
48
.80
La
Po
rte
Rd
E Je
ffer
son
St
CSX
Tra
nsp
ort
atio
n3
43
Cty
Maj
St9
: Exc
elle
nt
RM
(C
lean
) $
1,4
56
.00
La
ke D
rN
Ber
rien
St
Dea
d E
nd
or
Star
t7
39
Cty
Min
St5
: Fai
rSI
(R
ehab
) $
7
8,9
04
.00
La
ke D
rB
each
Ct
Dea
d E
nd
or
Star
t5
23
Cty
Min
St7
: Go
od
CP
M (
Cra
ck S
eal)
$
10
,03
8.6
0
Lake
Dr
Bea
ch C
tD
ead
En
d o
r St
art
24
3C
tyM
inSt
7: G
oo
dC
PM
(C
rack
Sea
l) $
4,6
64
.40
Lu
bke
Rd
Cit
y/Tw
p L
ine
S C
linto
n S
t6
02
Cty
Maj
St7
: Go
od
CP
M (
Cra
ck S
eal)
$
11
,55
9.6
0
Lub
ke R
dS
Clin
ton
St
S M
arsh
all S
t &
Mar
shal
l St
32
7C
tyM
ajSt
7: G
oo
dC
PM
(C
rack
Sea
l) $
6,2
86
.80
Lu
bke
Rd
S M
arsh
all S
t &
Mar
shal
l St
S M
on
roe
St3
33
Cty
Maj
St7
: Go
od
CP
M (
Cra
ck S
eal)
$
6
,38
8.2
0
Lub
ke R
dS
Mo
nro
e St
S Ea
gle
St3
27
Cty
Maj
St7
: Go
od
CP
M (
Cra
ck S
eal)
$
6
,28
6.8
0
Lub
ke R
dS
Eagl
e St
S C
hic
ago
St
33
8C
tyM
ajSt
7: G
oo
dC
PM
(C
rack
Sea
l) $
6,4
89
.60
Lu
bke
Rd
S C
hic
ago
St
S B
erri
en S
t3
33
Cty
Maj
St7
: Go
od
CP
M (
Cra
ck S
eal)
$
6
,38
8.2
0
Lub
ke R
dS
Ber
rien
St
S H
arri
son
St
32
7C
tyM
ajSt
7: G
oo
dC
PM
(C
rack
Sea
l) $
6,2
86
.80
Lu
bke
Rd
S H
arri
son
St
S W
illar
d S
t3
33
Cty
Maj
St7
: Go
od
CP
M (
Cra
ck S
eal)
$
6
,38
8.2
0
Lub
ke R
dS
Will
ard
St
S M
ayh
ew
St
33
3C
tyM
inSt
5: F
air
SI (
Reh
ab)
$
35
,50
6.8
0
Lub
ke R
dS
May
he
w S
tS
Smit
h S
t3
22
Cty
Min
St5
: Fai
rSI
(R
ehab
) $
3
4,3
79
.60
Lu
bke
Rd
S Sm
ith
St
S B
arke
r St
32
7C
tyM
inSt
5: F
air
SI (
Reh
ab)
$
34
,94
3.2
0
Mar
qu
ette
Dr
N W
hit
take
r St
Att
rib
ute
Ch
ange
10
98
Cty
Min
St5
: Fai
rSI
(R
ehab
) $
11
7,2
28
.80
M
arsh
all S
tS
Mar
shal
l St
& W
Det
roit
St
Dea
d E
nd
or
Star
t2
96
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
8,7
36
.00
M
arx
Dr
W W
ater
St
& S
ho
re D
rD
ead
En
d o
r St
art
63
9C
tyM
inSt
6: G
oo
dC
PM
(R
esu
rf)
$
18
,87
6.0
0
Mau
dlin
Rd
S W
hit
take
r St
Tho
mp
son
St
35
4C
tyM
ajSt
8: V
ery
Go
od
RM
(C
lean
) $
1,5
00
.80
M
aud
lin R
dTh
om
pso
n S
tS
Tayl
or
St6
60
Cty
Maj
St8
: Ve
ry G
oo
dR
M (
Cle
an)
$
2
,80
0.0
0
Mau
dlin
Rd
S Ta
ylo
r St
S N
ort
on
St
32
7C
tyM
ajSt
8: V
ery
Go
od
RM
(C
lean
) $
1,3
88
.80
M
aud
lin R
dS
No
rto
n S
tS
Jam
eso
n S
t3
75
Cty
Maj
St8
: Ve
ry G
oo
dR
M (
Cle
an)
$
1
,59
0.4
0
Mau
dlin
Rd
S Ja
mes
on
St
S B
ron
son
St
33
8C
tyM
ajSt
8: V
ery
Go
od
RM
(C
lean
) $
1,4
33
.60
M
aud
lin R
dS
Bro
nso
n S
tW
ald
on
Way
16
9C
tyM
ajSt
8: V
ery
Go
od
RM
(C
lean
) $
7
16
.80
M
aud
lin R
dW
ald
on
Way
Cit
y/Tw
p L
ine
11
6C
tyM
ajSt
8: V
ery
Go
od
RM
(C
lean
) $
4
92
.80
N
Bar
ker
StB
uff
alo
St
& S
Bar
ker
StW
Mer
chan
t St
46
5C
tyM
inSt
6: G
oo
dC
PM
(R
esu
rf)
$
13
,72
8.0
0
N B
arke
r St
W M
erch
ant
StW
Mec
han
ic S
t4
65
Cty
Min
St7
: Go
od
CP
M (
Cra
ck S
eal)
$
8
,92
3.2
0
N B
arto
n S
tS
Bar
ton
St
& B
uff
alo
St
W M
erch
ant
St4
59
Cty
Maj
St6
: Go
od
CP
M (
Res
urf
) $
1
3,5
72
.00
N
Bar
ton
St
W M
erch
ant
StW
Mec
han
ic S
t4
70
Cty
Maj
St7
: Go
od
CP
M (
Cra
ck S
eal)
$
9
,02
4.6
0
N B
arto
n S
tW
Mec
han
ic S
tD
ead
En
d o
r St
art
12
1C
tyM
inSt
8: V
ery
Go
od
RM
(C
lean
) $
5
15
.20
N
Ber
rien
St
W M
ech
anic
St
W M
erch
ant
St4
70
Cty
Min
St4
: Fai
rSI
(R
ehab
) $
5
0,1
60
.40
N
Ber
rien
St
W M
erch
ant
StS
Ber
rien
St
& B
uff
alo
St
46
5C
tyM
inSt
6: G
oo
dC
PM
(R
esu
rf)
$
13
,72
8.0
0
N B
erri
en S
tA
mtr
akW
Wat
er S
t3
06
Cty
Min
St8
: Ve
ry G
oo
dR
M (
Cle
an)
$
1
,29
9.2
0
N B
erri
en S
tW
Wat
er S
tN
ort
h D
r5
97
Cty
Min
St8
: Ve
ry G
oo
dR
M (
Cle
an)
$
2
,53
1.2
0
N B
erri
en S
tN
ort
h D
rLa
ke D
r1
74
Cty
Min
St5
: Fai
rSI
(R
ehab
) $
1
8,5
98
.80
Pag
e 2
of
7
CIT
Y O
F N
EW B
UFF
ALO
Stre
et
Inve
nto
ry w
ith
An
tici
pat
ed Im
pro
vem
ent
Co
sts
Ro
ad N
ame
Fro
mTo
Len
gth
(ft
)A
ct 5
1 C
ate
gory
PA
SER
Rat
ing
Imp
rove
men
t Ty
pe
Esti
mat
ed
Co
stN
Ch
icag
o S
tS
Ch
icag
o S
t &
Bu
ffal
o S
tW
Mer
chan
t St
45
9C
tyM
inSt
4: F
air
SI (
Reh
ab)
$
49
,03
3.2
0
N C
hic
ago
St
W M
erch
ant
StW
Mec
han
ic S
t4
65
Cty
Min
St4
: Fai
rSI
(R
ehab
) $
4
9,5
96
.80
N
Ch
icag
o S
tW
Wat
er S
tN
ort
h D
r6
76
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
1
9,9
68
.00
N
Eag
le S
tS
Eagl
e St
& B
uff
alo
St
W M
erch
ant
St4
65
Cty
Maj
St6
: Go
od
CP
M (
Res
urf
) $
1
3,7
28
.00
N
Eag
le S
tW
Mer
chan
t St
W M
ech
anic
St
46
5C
tyM
ajSt
5: F
air
SI (
Reh
ab)
$
49
,59
6.8
0
N E
agle
St
W M
ech
anic
St
Am
trak
15
3C
tyM
ajSt
5: F
air
SI (
Reh
ab)
$
16
,34
4.4
0
N E
agle
St
Am
trak
W W
ater
St
30
6C
tyM
ajSt
4: F
air
SI (
Reh
ab)
$
32
,68
8.8
0
N E
agle
St
W W
ater
St
Bea
ch C
t &
No
rth
Dr
58
1C
tyM
inSt
7: G
oo
dC
PM
(C
rack
Sea
l) $
1
1,1
54
.00
N
Har
riso
n S
tS
Har
riso
n S
t &
Bu
ffal
o S
tW
Mer
chan
t St
46
5C
tyM
inSt
7: G
oo
dC
PM
(C
rack
Sea
l) $
8,9
23
.20
N
Har
riso
n S
tW
Mer
chan
t St
W M
ech
anic
St
45
9C
tyM
inSt
8: V
ery
Go
od
RM
(C
lean
) $
1,9
48
.80
N
Mo
nro
e St
Bu
ffal
o S
tW
Mer
chan
t St
48
6C
tyM
inSt
6: G
oo
dC
PM
(R
esu
rf)
$
14
,35
2.0
0
N S
mit
h S
tS
Smit
h S
t &
Bu
ffal
o S
tW
Mer
chan
t St
45
9C
tyM
ajSt
5: F
air
SI (
Reh
ab)
$
49
,03
3.2
0
N S
mit
h S
tW
Mer
chan
t St
W M
ech
anic
St
46
5C
tyM
inSt
4: F
air
SI (
Reh
ab)
$
49
,59
6.8
0
N T
aylo
r St
E M
erch
ant
StE
Mec
han
ic S
t4
54
Cty
Min
St1
0: E
xcel
len
tR
M (
Cle
an)
$
1
,92
6.4
0
N T
ho
mp
son
St
Bu
ffal
o S
tE
Mer
chan
t St
45
9C
tyM
ajSt
6: G
oo
dC
PM
(R
esu
rf)
$
13
,57
2.0
0
N T
ho
mp
son
St
E M
erch
ant
StE
Mec
han
ic S
t4
65
Cty
Min
St8
: Ve
ry G
oo
dR
M (
Cle
an)
$
1
,97
1.2
0
N T
ow
nse
nd
St
Bu
ffal
o S
t &
S T
ow
nse
nd
St
E M
erch
ant
St4
59
Cty
Maj
St6
: Go
od
CP
M (
Res
urf
) $
1
3,5
72
.00
N
To
wn
sen
d S
tE
Mer
chan
t St
E M
ech
anic
St
46
5C
tyM
inSt
6: G
oo
dC
PM
(R
esu
rf)
$
13
,72
8.0
0
N W
hit
take
r St
S W
hit
take
r St
& B
uff
alo
St
W M
erch
ant
St &
E M
erch
ant
St4
59
Cty
Maj
St5
: Fai
rSI
(R
ehab
) $
4
9,0
33
.20
N
Wh
itta
ker
StW
Mer
chan
t St
& E
Mer
chan
t St
W M
ech
anic
St
& E
Mec
han
ic S
t4
59
Cty
Maj
St5
: Fai
rSI
(R
ehab
) $
7
3,5
49
.80
N
Wh
itta
ker
StW
Mec
han
ic S
t &
E M
ech
anic
St
Am
trak
16
4C
tyM
ajSt
6: G
oo
dC
PM
(R
esu
rf)
$
4
,83
6.0
0
N W
hit
take
r St
Am
trak
Ose
lka
Dr
53
Cty
Maj
St7
: Go
od
CP
M (
Cra
ck S
eal)
$
1
,01
4.0
0
N W
hit
take
r St
Ose
lka
Dr
E W
ater
St
& W
Wat
er S
t2
43
Cty
Maj
St7
: Go
od
CP
M (
Cra
ck S
eal)
$
4
,66
4.4
0
N W
hit
take
r St
E W
ater
St
& W
Wat
er S
tM
arq
uet
te D
r1
03
5C
tyM
ajSt
7: G
oo
dC
PM
(C
rack
Sea
l) $
1
9,8
74
.40
N
Will
ard
St
W M
erch
ant
StW
Mec
han
ic S
t4
65
Cty
Maj
St5
: Fai
rSI
(R
ehab
) $
4
9,5
96
.80
N
Will
ard
St
W M
ech
anic
St
Am
trak
15
3C
tyM
ajSt
6: G
oo
dC
PM
(R
esu
rf)
$
4
,52
4.0
0
N W
illar
d S
tA
mtr
akO
selk
a D
r6
3C
tyM
ajSt
3: P
oo
rSI
(R
eco
n)
$
11
,73
6.0
0
N W
illar
d S
tO
selk
a D
rW
Wat
er S
t2
38
Cty
Maj
St3
: Po
or
SI (
Rec
on
) $
4
4,0
10
.00
N
ort
h D
rLa
ke D
rN
Eag
le S
t &
No
rth
Dr
33
8C
tyM
inSt
7: G
oo
dC
PM
(C
rack
Sea
l) $
6,4
89
.60
N
ort
h D
rB
each
Ct
& N
Eag
le S
tN
Ch
icag
o S
t3
33
Cty
Min
St7
: Go
od
CP
M (
Cra
ck S
eal)
$
6
,38
8.2
0
No
rth
Dr
N C
hic
ago
St
N B
erri
en S
t3
43
Cty
Min
St7
: Go
od
CP
M (
Cra
ck S
eal)
$
6
,59
1.0
0
No
rth
Dr
N B
erri
en S
tD
ead
En
d o
r St
art
55
4C
tyM
inSt
5: F
air
SI (
Reh
ab)
$
59
,17
8.0
0
Ose
lka
Dr
N W
illar
d S
tW
Wat
er S
t5
23
Cty
Min
St7
: Go
od
CP
M (
Cra
ck S
eal)
$
10
,03
8.6
0
Ose
lka
Dr
W W
ater
St
N W
hit
take
r St
11
51
Cty
Min
St7
: Go
od
CP
M (
Cra
ck S
eal)
$
22
,10
5.2
0
S 1
1th
St
Pu
lask
i Hw
yD
ead
En
d o
r St
art
30
1C
tyM
inSt
6: G
oo
dC
PM
(R
esu
rf)
$
8
,89
2.0
0
S 1
1th
St
E W
ash
ingt
on
St
Jeff
erso
n S
t4
38
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
1
2,9
48
.00
S
Bar
ker
StW
Cla
y St
W D
etro
it S
t4
65
Cty
Maj
St6
: Go
od
CP
M (
Res
urf
) $
1
3,7
28
.00
S
Bar
ker
StW
Det
roit
St
W In
dia
na
St4
70
Cty
Maj
St6
: Go
od
CP
M (
Res
urf
) $
1
3,8
84
.00
S
Bar
ker
StW
Ind
ian
a St
W M
ich
igan
St
45
9C
tyM
ajSt
6: G
oo
dC
PM
(R
esu
rf)
$
13
,57
2.0
0
S B
arke
r St
W M
ich
igan
St
Bu
ffal
o S
t &
N B
arke
r St
45
9C
tyM
inSt
7: G
oo
dC
PM
(C
rack
Sea
l) $
8,8
21
.80
S
Bar
ker
StW
Was
hin
gto
n S
tW
Cla
y St
45
9C
tyM
inSt
6: G
oo
dC
PM
(R
esu
rf)
$
13
,57
2.0
0
S B
arto
n S
tD
ead
En
d o
r St
art
W M
ich
igan
St
48
0C
tyM
inSt
7: G
oo
dC
PM
(C
rack
Sea
l) $
9,2
27
.40
S
Bar
ton
St
W M
ich
igan
St
Bu
ffal
o S
t &
N B
arto
n S
t4
59
Cty
Maj
St5
: Fai
rSI
(R
ehab
) $
4
9,0
33
.20
S
Ber
rien
St
N B
erri
en S
t &
Bu
ffal
o S
tW
Mic
hig
an S
t4
59
Cty
Min
St4
: Fai
rSI
(R
ehab
) $
4
9,0
33
.20
S
Ber
rien
St
W M
ich
igan
St
W In
dia
na
St4
59
Cty
Min
St4
: Fai
rSI
(R
ehab
) $
4
9,0
33
.20
S
Ber
rien
St
W In
dia
na
StW
Det
roit
St
47
0C
tyM
inSt
5: F
air
SI (
Reh
ab)
$
50
,16
0.4
0
S B
erri
en S
tW
Det
roit
St
W C
lay
St4
65
Cty
Min
St5
: Fai
rSI
(R
ehab
) $
4
9,5
96
.80
S
Ber
rien
St
W C
lay
StW
Was
hin
gto
n S
t4
54
Cty
Min
St5
: Fai
rSI
(R
ehab
) $
4
8,4
69
.60
Pag
e 3
of
7
CIT
Y O
F N
EW B
UFF
ALO
Stre
et
Inve
nto
ry w
ith
An
tici
pat
ed Im
pro
vem
ent
Co
sts
Ro
ad N
ame
Fro
mTo
Len
gth
(ft
)A
ct 5
1 C
ate
gory
PA
SER
Rat
ing
Imp
rove
men
t Ty
pe
Esti
mat
ed
Co
stS
Ber
rien
St
W W
ash
ingt
on
St
Dea
d E
nd
or
Star
t2
75
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
8,1
12
.00
S
Bro
nso
n S
tE
Cla
y St
E D
etro
it S
t4
75
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
1
4,0
40
.00
S
Bro
nso
n S
tE
Det
roit
St
E In
dia
na
St4
59
Cty
Min
St8
: Ve
ry G
oo
dR
M (
Cle
an)
$
1
,94
8.8
0
S B
ron
son
St
E In
dia
na
StE
Mic
hig
an S
t4
70
Cty
Min
St5
: Fai
rSI
(R
ehab
) $
5
0,1
60
.40
S
Bro
nso
n S
tE
Mic
hig
an S
tB
uff
alo
St
45
4C
tyM
inSt
5: F
air
SI (
Reh
ab)
$
48
,46
9.6
0
S B
ron
son
St
E Je
ffer
son
St
Dea
d E
nd
or
Star
t2
69
Cty
Min
St8
: Ve
ry G
oo
dR
M (
Cle
an)
$
1
,14
2.4
0
S C
hic
ago
St
W W
ash
ingt
on
St
W C
lay
St4
86
Cty
Min
St5
: Fai
rSI
(R
ehab
) $
5
1,8
51
.20
S
Ch
icag
o S
tW
Cla
y St
W D
etro
it S
t4
65
Cty
Min
St5
: Fai
rSI
(R
ehab
) $
4
9,5
96
.80
S
Ch
icag
o S
tW
Det
roit
St
W In
dia
na
St4
65
Cty
Maj
St5
: Fai
rSI
(R
ehab
) $
4
9,5
96
.80
S
Ch
icag
o S
tW
Ind
ian
a St
W M
ich
igan
St
45
9C
tyM
ajSt
7: G
oo
dC
PM
(C
rack
Sea
l) $
8,8
21
.80
S
Ch
icag
o S
tW
Mic
hig
an S
tB
uff
alo
St
& N
Ch
icag
o S
t4
65
Cty
Maj
St7
: Go
od
CP
M (
Cra
ck S
eal)
$
8
,92
3.2
0
S C
linto
n S
tW
Det
roit
St
W In
dia
na
St4
65
Cty
Min
St4
: Fai
rSI
(R
ehab
) $
4
9,5
96
.80
S
Clin
ton
St
W In
dia
na
StW
Mic
hig
an S
t3
48
Cty
Min
St4
: Fai
rSI
(R
ehab
) $
3
7,1
97
.60
S
Eagl
e St
W C
lay
StW
Det
roit
St
50
7C
tyM
inSt
4: F
air
SI (
Reh
ab)
$
54
,10
5.6
0
S Ea
gle
StW
Det
roit
St
W In
dia
na
St4
65
Cty
Min
St5
: Fai
rSI
(R
ehab
) $
4
9,5
96
.80
S
Eagl
e St
W In
dia
na
StW
Mic
hig
an S
t4
54
Cty
Min
St5
: Fai
rSI
(R
ehab
) $
4
8,4
69
.60
S
Eagl
e St
W M
ich
igan
St
N E
agle
St
& B
uff
alo
St
47
0C
tyM
inSt
5: F
air
SI (
Reh
ab)
$
50
,16
0.4
0
S Fr
ankl
in S
tB
uff
alo
St
E M
ich
igan
St
47
5C
tyM
inSt
8: V
ery
Go
od
RM
(C
lean
) $
2,0
16
.00
S
Fran
klin
St
E M
ich
igan
St
Dea
d E
nd
or
Star
t3
48
Cty
Min
St8
: Ve
ry G
oo
dR
M (
Cle
an)
$
1
,47
8.4
0
S G
riff
ith
St
E M
ich
igan
St
Bu
ffal
o S
t4
70
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
1
3,8
84
.00
S
Gri
ffit
h S
tE
Ind
ian
a St
Dea
d E
nd
or
Star
t2
80
Cty
Min
St8
: Ve
ry G
oo
dR
M (
Cle
an)
$
1
,18
7.2
0
S H
arri
son
St
W D
etro
it S
tW
Ind
ian
a St
45
9C
tyM
inSt
6: G
oo
dC
PM
(R
esu
rf)
$
13
,57
2.0
0
S H
arri
son
St
W In
dia
na
StW
Mic
hig
an S
t4
65
Cty
Min
St7
: Go
od
CP
M (
Cra
ck S
eal)
$
8
,92
3.2
0
S H
arri
son
St
W M
ich
igan
St
Bu
ffal
o S
t &
N H
arri
son
St
46
5C
tyM
inSt
2: V
ery
Po
or
SI (
Rec
on
) $
8
6,0
64
.00
S
Har
riso
n S
tW
Was
hin
gto
n S
tW
Cla
y St
45
4C
tyM
inSt
6: G
oo
dC
PM
(R
esu
rf)
$
13
,41
6.0
0
S H
arri
son
St
W C
lay
StW
Det
roit
St
46
5C
tyM
inSt
5: F
air
SI (
Reh
ab)
$
49
,59
6.8
0
S Ja
mes
on
St
E C
lay
StE
Det
roit
St
47
0C
tyM
inSt
7: G
oo
dC
PM
(C
rack
Sea
l) $
9,0
24
.60
S
Jam
eso
n S
tE
Det
roit
St
E In
dia
na
St4
65
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
1
3,7
28
.00
S
Jam
eso
n S
tE
Ind
ian
a St
E M
ich
igan
St
46
5C
tyM
inSt
7: G
oo
dC
PM
(C
rack
Sea
l) $
8,9
23
.20
S
Jam
eso
n S
tE
Mic
hig
an S
tB
uff
alo
St
46
5C
tyM
inSt
6: G
oo
dC
PM
(R
esu
rf)
$
13
,72
8.0
0
S Ja
mes
on
St
E Je
ffer
son
St
E M
adis
on
Ave
45
9C
tyM
inSt
6: G
oo
dC
PM
(R
esu
rf)
$
13
,57
2.0
0
S K
inzi
e St
Bu
ffal
o S
tD
ead
En
d o
r St
art
30
1C
tyM
inSt
2: V
ery
Po
or
SI (
Rec
on
) $
5
5,7
46
.00
S
Kin
zie
StE
Ind
ian
a St
Dea
d E
nd
or
Star
t3
43
Cty
Min
St8
: Ve
ry G
oo
dR
M (
Cle
an)
$
1
,45
6.0
0
S M
arsh
all S
tM
arsh
all S
t &
W D
etro
it S
tW
Ind
ian
a St
46
5C
tyM
inSt
6: G
oo
dC
PM
(R
esu
rf)
$
13
,72
8.0
0
S M
arsh
all S
tW
Ind
ian
a St
W M
ich
igan
St
25
9C
tyM
inSt
6: G
oo
dC
PM
(R
esu
rf)
$
7
,64
4.0
0
S M
ayh
ew
St
W W
ash
ingt
on
St
W C
lay
St4
54
Cty
Min
St7
: Go
od
CP
M (
Cra
ck S
eal)
$
8
,72
0.4
0
S M
ayh
ew
St
W C
lay
StW
Det
roit
St
47
0C
tyM
inSt
7: G
oo
dC
PM
(C
rack
Sea
l) $
9,0
24
.60
S
May
he
w S
tW
Det
roit
St
W In
dia
na
St4
54
Cty
Min
St5
: Fai
rSI
(R
ehab
) $
4
8,4
69
.60
S
May
he
w S
tW
Ind
ian
a St
W M
ich
igan
St
45
9C
tyM
inSt
5: F
air
SI (
Reh
ab)
$
49
,03
3.2
0
S M
ayh
ew
St
W M
ich
igan
St
Bu
ffal
o S
t4
65
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
1
3,7
28
.00
S
Mo
nro
e St
W D
etro
it S
tW
Ind
ian
a St
47
0C
tyM
inSt
4: F
air
SI (
Reh
ab)
$
50
,16
0.4
0
S M
on
roe
StW
Ind
ian
a St
Dea
d E
nd
or
Star
t2
43
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
7,1
76
.00
S
No
rto
n S
tE
Cla
y St
E D
etro
it S
t4
75
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
1
4,0
40
.00
S
No
rto
n S
tE
Det
roit
St
E In
dia
na
St4
59
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
1
3,5
72
.00
S
No
rto
n S
tE
Ind
ian
a St
E M
ich
igan
St
46
5C
tyM
inSt
6: G
oo
dC
PM
(R
esu
rf)
$
13
,72
8.0
0
S N
ort
on
St
E M
ich
igan
St
Bu
ffal
o S
t4
65
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
1
3,7
28
.00
S
No
rto
n S
tE
Jeff
erso
n S
tD
ead
En
d o
r St
art
26
4C
tyM
inSt
6: G
oo
dC
PM
(R
esu
rf)
$
7
,80
0.0
0
S Sm
ith
St
W W
ash
ingt
on
St
W C
lay
St4
54
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
1
3,4
16
.00
Pag
e 4
of
7
CIT
Y O
F N
EW B
UFF
ALO
Stre
et
Inve
nto
ry w
ith
An
tici
pat
ed Im
pro
vem
ent
Co
sts
Ro
ad N
ame
Fro
mTo
Len
gth
(ft
)A
ct 5
1 C
ate
gory
PA
SER
Rat
ing
Imp
rove
men
t Ty
pe
Esti
mat
ed
Co
stS
Smit
h S
tW
Cla
y St
W D
etro
it S
t4
65
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
1
3,7
28
.00
S
Smit
h S
tW
Mic
hig
an S
tN
Sm
ith
St
& B
uff
alo
St
47
0C
tyM
inSt
5: F
air
SI (
Reh
ab)
$
50
,16
0.4
0
S Ta
ylo
r St
E In
dia
na
StE
Mic
hig
an S
t4
65
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
1
3,7
28
.00
S
Tayl
or
StE
Mic
hig
an S
tB
uff
alo
St
45
9C
tyM
inSt
6: G
oo
dC
PM
(R
esu
rf)
$
13
,57
2.0
0
S Ta
ylo
r St
E C
lay
StE
Det
roit
St
47
0C
tyM
inSt
6: G
oo
dC
PM
(R
esu
rf)
$
13
,88
4.0
0
S Ta
ylo
r St
E D
etro
it S
tE
Ind
ian
a St
46
5C
tyM
inSt
6: G
oo
dC
PM
(R
esu
rf)
$
13
,72
8.0
0
S Ta
ylo
r St
E Je
ffer
son
St
Dea
d E
nd
or
Star
t2
16
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
6,3
96
.00
S
Tho
mp
son
St
E C
lay
StE
Det
roit
St
47
0C
tyM
inSt
8: V
ery
Go
od
RM
(C
lean
) $
1,9
93
.60
S
Tho
mp
son
St
E In
dia
na
StE
Mic
hig
an S
t4
91
Cty
Min
St5
: Fai
rSI
(R
ehab
) $
5
2,4
14
.80
S
Tow
nse
nd
St
E C
lay
StE
Det
roit
St
47
0C
tyM
inSt
7: G
oo
dC
PM
(C
rack
Sea
l) $
9,0
24
.60
S
Tow
nse
nd
St
E D
etro
it S
tE
Ind
ian
a St
46
5C
tyM
inSt
7: G
oo
dC
PM
(C
rack
Sea
l) $
8,9
23
.20
S
Tow
nse
nd
St
E In
dia
na
StE
Mic
hig
an S
t4
59
Cty
Min
St8
: Ve
ry G
oo
dR
M (
Cle
an)
$
1
,94
8.8
0
S To
wn
sen
d S
tE
Mic
hig
an S
tB
uff
alo
St
& N
To
wn
sen
d S
t4
59
Cty
Min
St8
: Ve
ry G
oo
dR
M (
Cle
an)
$
1
,94
8.8
0
S To
wn
sen
d S
tE
Cla
y St
Dea
d E
nd
or
Star
t4
01
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
1
1,8
56
.00
S
Web
ster
St
W In
dia
na
StD
ead
En
d o
r St
art
26
9C
tyM
inSt
5: F
air
SI (
Reh
ab)
$
28
,74
3.6
0
S W
hit
take
r St
CSX
Tra
nsp
ort
atio
nW
Was
hin
gto
n S
t1
27
Cty
Maj
St9
: Exc
elle
nt
RM
(C
lean
) $
5
37
.60
S
Wh
itta
ker
StW
Was
hin
gto
n S
tE
Cla
y St
& W
Cla
y St
45
9C
tyM
ajSt
9: E
xcel
len
tR
M (
Cle
an)
$
1
,94
8.8
0
S W
hit
take
r St
E C
lay
St &
W C
lay
StE
Det
roit
St
46
5C
tyM
ajSt
9: E
xcel
len
tR
M (
Cle
an)
$
1
,97
1.2
0
S W
hit
take
r St
E D
etro
it S
tE
Ind
ian
a St
45
9C
tyM
ajSt
9: E
xcel
len
tR
M (
Cle
an)
$
1
,94
8.8
0
S W
hit
take
r St
E In
dia
na
StE
Mic
hig
an S
t &
W M
ich
igan
St
46
5C
tyM
ajSt
9: E
xcel
len
tR
M (
Cle
an)
$
1
,97
1.2
0
S W
hit
take
r St
E M
ich
igan
St
& W
Mic
hig
an S
tN
Wh
itta
ker
St &
Bu
ffal
o S
t4
70
Cty
Maj
St9
: Exc
elle
nt
RM
(C
lean
) $
1,9
93
.60
S
Will
ard
St
W W
ash
ingt
on
St
W C
lay
St4
59
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
1
3,5
72
.00
S
Will
ard
St
W C
lay
StW
Det
roit
St
46
5C
tyM
ajSt
6: G
oo
dC
PM
(R
esu
rf)
$
13
,72
8.0
0
S W
illar
d S
tW
Det
roit
St
W In
dia
na
St4
59
Cty
Maj
St7
: Go
od
CP
M (
Cra
ck S
eal)
$
8
,82
1.8
0
S W
illar
d S
tW
Ind
ian
a St
W M
ich
igan
St
45
9C
tyM
ajSt
6: G
oo
dC
PM
(R
esu
rf)
$
13
,57
2.0
0
S W
illar
d S
tW
Mic
hig
an S
tB
uff
alo
St
& N
Will
ard
St
46
5C
tyM
ajSt
6: G
oo
dC
PM
(R
esu
rf)
$
13
,72
8.0
0
S W
illar
d S
tS
Will
ard
St
& B
uff
alo
St
W M
erch
ant
St4
59
Cty
Maj
St5
: Fai
rSI
(R
ehab
) $
4
9,0
33
.20
Sa
nd
Rd
Stro
mer
Rd
CSX
Tra
nsp
ort
atio
n1
01
9C
tyM
inSt
4: F
air
SI (
Reh
ab)
$
1
08
,77
4.8
0
Sho
re D
rM
arx
Dr
& W
Wat
er S
tW
Sh
ore
Dr
23
8C
tyM
inSt
5: F
air
SI (
Reh
ab)
$
25
,36
2.0
0
Sho
re D
rW
Sh
ore
Dr
W W
ater
St
18
80
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
5
5,5
36
.00
St
rom
er R
dSa
nd
Rd
W M
adis
on
Ave
& R
ose
Cit
y R
d4
66
8C
tyM
inSt
3: P
oo
rSI
(R
eco
n)
$
8
64
,55
2.0
0
Stro
mer
Rd
Ro
se C
ity
Rd
& S
tro
mer
Rd
S B
arto
n S
t2
41
3C
tyM
inSt
6: G
oo
dC
PM
(R
esu
rf)
$
71
,29
2.0
0
Stro
mer
Rd
S B
arto
n S
tS
Wh
itta
ker
St3
17
Cty
Min
St5
: Fai
rSI
(R
ehab
) $
3
3,8
16
.00
U
S 1
2O
akla
nd
Dr
Rid
ge R
d2
75
St-T
rnkl
ne
7: G
oo
dSt
ate
Juri
sdic
tio
nU
S 1
2R
idge
Rd
Cit
y/Tw
p L
ine
41
7St
-Trn
kln
e7
: Go
od
Stat
e Ju
risd
icti
on
US
12
Cit
y/Tw
p L
ine
N M
on
roe
St4
59
St-T
rnkl
ne
7: G
oo
dSt
ate
Juri
sdic
tio
nU
S 1
2N
Mo
nro
e St
S Ea
gle
St &
N E
agle
St
34
3St
-Trn
kln
e7
: Go
od
Stat
e Ju
risd
icti
on
US
12
S Ea
gle
St &
N E
agle
St
S C
hic
ago
St
& N
Ch
icag
o S
t3
27
St-T
rnkl
ne
7: G
oo
dSt
ate
Juri
sdic
tio
nU
S 1
2S
Ch
icag
o S
t &
N C
hic
ago
St
S B
erri
en S
t &
N B
erri
en S
t3
33
St-T
rnkl
ne
7: G
oo
dSt
ate
Juri
sdic
tio
nU
S 1
2S
Ber
rien
St
& N
Ber
rien
St
S H
arri
son
St
& N
Har
riso
n S
t3
33
St-T
rnkl
ne
7: G
oo
dSt
ate
Juri
sdic
tio
nU
S 1
2S
Har
riso
n S
t &
N H
arri
son
St
S W
illar
d S
t &
N W
illar
d S
t3
22
St-T
rnkl
ne
7: G
oo
dSt
ate
Juri
sdic
tio
nU
S 1
2S
Will
ard
St
& N
Will
ard
St
S M
ayh
ew
St
33
8St
-Trn
kln
e7
: Go
od
Stat
e Ju
risd
icti
on
US
12
S M
ayh
ew
St
S Sm
ith
St
& N
Sm
ith
St
33
3St
-Trn
kln
e7
: Go
od
Stat
e Ju
risd
icti
on
US
12
S Sm
ith
St
& N
Sm
ith
St
S B
arke
r St
& N
Bar
ker
St3
33
St-T
rnkl
ne
7: G
oo
dSt
ate
Juri
sdic
tio
nU
S 1
2S
Bar
ker
St &
N B
arke
r St
S B
arto
n S
t &
N B
arto
n S
t3
27
St-T
rnkl
ne
7: G
oo
dSt
ate
Juri
sdic
tio
nU
S 1
2S
Bar
ton
St
& N
Bar
ton
St
N W
hit
take
r St
& S
Wh
itta
ker
St3
43
St-T
rnkl
ne
7: G
oo
dSt
ate
Juri
sdic
tio
nU
S 1
2N
Wh
itta
ker
St &
S W
hit
take
r St
N T
ho
mp
son
St
35
4St
-Trn
kln
e7
: Go
od
Stat
e Ju
risd
icti
on
US
12
N T
ho
mp
son
St
S To
wn
sen
d S
t &
N T
ow
nse
nd
St
33
8St
-Trn
kln
e7
: Go
od
Stat
e Ju
risd
icti
on
Pag
e 5
of
7
CIT
Y O
F N
EW B
UFF
ALO
Stre
et
Inve
nto
ry w
ith
An
tici
pat
ed Im
pro
vem
ent
Co
sts
Ro
ad N
ame
Fro
mTo
Len
gth
(ft
)A
ct 5
1 C
ate
gory
PA
SER
Rat
ing
Imp
rove
men
t Ty
pe
Esti
mat
ed
Co
stU
S 1
2S
Tow
nse
nd
St
& N
To
wn
sen
d S
tS
Tayl
or
St2
22
St-T
rnkl
ne
7: G
oo
dSt
ate
Juri
sdic
tio
nU
S 1
2S
Tayl
or
StS
No
rto
n S
t4
59
St-T
rnkl
ne
8: V
ery
Go
od
Stat
e Ju
risd
icti
on
US
12
S N
ort
on
St
S Ja
mes
on
St
32
7St
-Trn
kln
e7
: Go
od
Stat
e Ju
risd
icti
on
US
12
S Ja
mes
on
St
Wils
on
St
16
9St
-Trn
kln
e7
: Go
od
Stat
e Ju
risd
icti
on
US
12
Wils
on
St
S B
ron
son
St
15
3St
-Trn
kln
e7
: Go
od
Stat
e Ju
risd
icti
on
US
12
S B
ron
son
St
S K
inzi
e St
33
8St
-Trn
kln
e7
: Go
od
Stat
e Ju
risd
icti
on
US
12
S K
inzi
e St
S G
riff
ith
St
33
3St
-Trn
kln
e7
: Go
od
Stat
e Ju
risd
icti
on
US
12
S G
riff
ith
St
S Fr
ankl
in S
t3
43
St-T
rnkl
ne
7: G
oo
dSt
ate
Juri
sdic
tio
nU
S 1
2S
Fran
klin
St
Bel
l Ave
22
7St
-Trn
kln
e7
: Go
od
Stat
e Ju
risd
icti
on
US
12
Bel
l Ave
Pu
lask
i Hw
y &
Dia
mo
nd
Po
int
LN1
84
3St
-Trn
kln
e7
: Go
od
Stat
e Ju
risd
icti
on
US
12
Dia
mo
nd
Po
int
LNS
11
th S
t1
64
St-T
rnkl
ne
7: G
oo
dSt
ate
Juri
sdic
tio
nU
S 1
2S
11
th S
tC
ity/
Twp
Lin
e7
55
St-T
rnkl
ne
7: G
oo
dSt
ate
Juri
sdic
tio
nW
Cla
y St
S Ea
gle
StS
Ch
icag
o S
t2
75
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
8,1
12
.00
W
Cla
y St
S C
hic
ago
St
S B
erri
en S
t3
22
Cty
Min
St5
: Fai
rSI
(R
ehab
) $
3
4,3
79
.60
W
Cla
y St
S B
erri
en S
tS
Har
riso
n S
t3
38
Cty
Min
St5
: Fai
rSI
(R
ehab
) $
3
6,0
70
.40
W
Cla
y St
S H
arri
son
St
S W
illar
d S
t3
27
Cty
Min
St5
: Fai
rSI
(R
ehab
) $
3
4,9
43
.20
W
Cla
y St
S W
illar
d S
tS
May
he
w S
t3
33
Cty
Maj
St7
: Go
od
CP
M (
Cra
ck S
eal)
$
6
,38
8.2
0
W C
lay
StS
May
he
w S
tS
Smit
h S
t3
27
Cty
Maj
St6
: Go
od
CP
M (
Res
urf
) $
9,6
72
.00
W
Cla
y St
S Sm
ith
St
S B
arke
r St
33
3C
tyM
ajSt
6: G
oo
dC
PM
(R
esu
rf)
$
9
,82
8.0
0
W C
lay
StS
Bar
ker
StS
Bar
ton
St
32
7C
tyM
ajSt
8: V
ery
Go
od
RM
(C
lean
) $
1,3
88
.80
W
Cla
y St
S B
arto
n S
tE
Cla
y St
& S
Wh
itta
ker
St3
38
Cty
Maj
St5
: Fai
rSI
(R
ehab
) $
3
6,0
70
.40
W
Ind
ian
a St
S W
ebst
er S
tS
Clin
ton
St
33
8C
tyM
inSt
6: G
oo
dC
PM
(R
esu
rf)
$
9
,98
4.0
0
W In
dia
na
StS
Clin
ton
St
S M
arsh
all S
t3
27
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
9,6
72
.00
W
Ind
ian
a St
S M
arsh
all S
tS
Mo
nro
e St
33
8C
tyM
inSt
6: G
oo
dC
PM
(R
esu
rf)
$
9
,98
4.0
0
W In
dia
na
StS
Mo
nro
e St
S Ea
gle
St3
17
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
9,3
60
.00
W
Ind
ian
a St
S Ea
gle
StS
Ch
icag
o S
t3
38
Cty
Min
St5
: Fai
rSI
(R
ehab
) $
3
6,0
70
.40
W
Ind
ian
a St
S C
hic
ago
St
S B
erri
en S
t3
27
Cty
Min
St5
: Fai
rSI
(R
ehab
) $
3
4,9
43
.20
W
Ind
ian
a St
S B
erri
en S
tS
Har
riso
n S
t3
27
Cty
Min
St5
: Fai
rSI
(R
ehab
) $
3
4,9
43
.20
W
Ind
ian
a St
S H
arri
son
St
S W
illar
d S
t3
33
Cty
Min
St5
: Fai
rSI
(R
ehab
) $
3
5,5
06
.80
W
Ind
ian
a St
S W
illar
d S
tS
May
he
w S
t3
33
Cty
Min
St5
: Fai
rSI
(R
ehab
) $
3
5,5
06
.80
W
Ind
ian
a St
S B
arke
r St
Dea
d E
nd
or
Star
t1
95
Cty
Min
St7
: Go
od
CP
M (
Cra
ck S
eal)
$
3
,75
1.8
0
W M
ech
anic
St
N E
agle
St
N C
hic
ago
St
32
2C
tyM
inSt
6: G
oo
dC
PM
(R
esu
rf)
$
9
,51
6.0
0
W M
ech
anic
St
N C
hic
ago
St
N B
erri
en S
t3
43
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
1
0,1
40
.00
W
Mec
han
ic S
tN
Ber
rien
St
N H
arri
son
St
32
7C
tyM
inSt
5: F
air
SI (
Reh
ab)
$
34
,94
3.2
0
W M
ech
anic
St
N H
arri
son
St
N W
illar
d S
t3
22
Cty
Min
St5
: Fai
rSI
(R
ehab
) $
3
4,3
79
.60
W
Mec
han
ic S
tN
Will
ard
St
N S
mit
h S
t6
55
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
1
9,3
44
.00
W
Mec
han
ic S
tN
Sm
ith
St
N B
arke
r St
34
3C
tyM
inSt
6: G
oo
dC
PM
(R
esu
rf)
$
10
,14
0.0
0
W M
ech
anic
St
N B
arke
r St
N B
arto
n S
t3
22
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
9,5
16
.00
W
Mec
han
ic S
tN
Bar
ton
St
N W
hit
take
r St
& E
Mec
han
ic S
t3
48
Cty
Maj
St6
: Go
od
CP
M (
Res
urf
) $
1
0,2
96
.00
W
Mer
chan
t St
N M
on
roe
StN
Eag
le S
t3
01
Cty
Min
St7
: Go
od
CP
M (
Cra
ck S
eal)
$
5
,77
9.8
0
W M
erch
ant
StN
Eag
le S
tN
Ch
icag
o S
t3
27
Cty
Maj
St6
: Go
od
CP
M (
Res
urf
) $
9,6
72
.00
W
Mer
chan
t St
N B
erri
en S
tN
Har
riso
n S
t3
33
Cty
Maj
St3
: Po
or
SI (
Rec
on
) $
6
1,6
14
.00
W
Mer
chan
t St
N H
arri
son
St
N W
illar
d S
t3
12
Cty
Maj
St3
: Po
or
SI (
Rec
on
) $
5
7,7
02
.00
W
Mer
chan
t St
N W
illar
d S
tN
Sm
ith
St
68
1C
tyM
ajSt
7: G
oo
dC
PM
(C
rack
Sea
l) $
1
3,0
80
.60
W
Mer
chan
t St
N S
mit
h S
tN
Bar
ker
St3
33
Cty
Maj
St7
: Go
od
CP
M (
Cra
ck S
eal)
$
6
,38
8.2
0
W M
erch
ant
StN
Bar
ker
StN
Bar
ton
St
32
7C
tyM
ajSt
7: G
oo
dC
PM
(C
rack
Sea
l) $
6,2
86
.80
W
Mer
chan
t St
N B
arto
n S
tN
Wh
itta
ker
St &
E M
erch
ant
St3
48
Cty
Maj
St7
: Go
od
CP
M (
Cra
ck S
eal)
$
6
,69
2.4
0
W M
ich
igan
St
Cit
y/Tw
p L
ine
S C
linto
n S
t1
48
Cty
Min
St5
: Fai
rSI
(R
ehab
) $
1
5,7
80
.80
Pag
e 6
of
7
CIT
Y O
F N
EW B
UFF
ALO
Stre
et
Inve
nto
ry w
ith
An
tici
pat
ed Im
pro
vem
ent
Co
sts
Ro
ad N
ame
Fro
mTo
Len
gth
(ft
)A
ct 5
1 C
ate
gory
PA
SER
Rat
ing
Imp
rove
men
t Ty
pe
Esti
mat
ed
Co
stW
Mic
hig
an S
tS
Clin
ton
St
S M
arsh
all S
t3
64
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
1
0,7
64
.00
W
Mic
hig
an S
tS
Tho
mp
son
St
S W
hit
take
r St
& W
Mic
hig
an S
t2
85
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
8,4
24
.00
W
Mic
hig
an S
tE
Mic
hig
an S
t &
S W
hit
take
r St
S B
arto
n S
t3
43
Cty
Maj
St6
: Go
od
CP
M (
Res
urf
) $
1
0,1
40
.00
W
Mic
hig
an S
tS
Bar
ton
St
S B
arke
r St
33
8C
tyM
ajSt
5: F
air
SI (
Reh
ab)
$
36
,07
0.4
0
W M
ich
igan
St
S B
arke
r St
S Sm
ith
St
32
7C
tyM
ajSt
4: F
air
SI (
Reh
ab)
$
34
,94
3.2
0
W M
ich
igan
St
S Sm
ith
St
S M
ayh
ew
St
32
2C
tyM
ajSt
5: F
air
SI (
Reh
ab)
$
34
,37
9.6
0
W M
ich
igan
St
S M
ayh
ew
St
S W
illar
d S
t3
38
Cty
Maj
St6
: Go
od
CP
M (
Res
urf
) $
9,9
84
.00
W
Mic
hig
an S
tS
Will
ard
St
S H
arri
son
St
33
8C
tyM
ajSt
6: G
oo
dC
PM
(R
esu
rf)
$
9
,98
4.0
0
W M
ich
igan
St
S H
arri
son
St
S B
erri
en S
t3
33
Cty
Maj
St7
: Go
od
CP
M (
Cra
ck S
eal)
$
6
,38
8.2
0
W M
ich
igan
St
S B
erri
en S
tS
Ch
icag
o S
t3
27
Cty
Maj
St7
: Go
od
CP
M (
Cra
ck S
eal)
$
6
,28
6.8
0
W M
ich
igan
St
S C
hic
ago
St
S Ea
gle
St3
33
Cty
Min
St5
: Fai
rSI
(R
ehab
) $
3
5,5
06
.80
W
Mic
hig
an S
tS
Eagl
e St
Dea
d E
nd
or
Star
t2
27
Cty
Min
St7
: Go
od
CP
M (
Cra
ck S
eal)
$
4
,36
0.2
0
W S
ho
re D
rSh
ore
Dr
Dea
d E
nd
or
Star
t2
27
Cty
Min
St5
: Fai
rSI
(R
ehab
) $
2
4,2
34
.80
W
Was
hin
gto
n S
tS
Ch
icag
o S
tS
Ber
rien
St
30
6C
tyM
inSt
6: G
oo
dC
PM
(R
esu
rf)
$
9
,04
8.0
0
W W
ash
ingt
on
St
S B
erri
en S
tS
Har
riso
n S
t3
38
Cty
Min
St6
: Go
od
CP
M (
Res
urf
) $
9,9
84
.00
W
Was
hin
gto
n S
tS
Har
riso
n S
tS
Will
ard
St
32
7C
tyM
inSt
4: F
air
SI (
Reh
ab)
$
34
,94
3.2
0
W W
ash
ingt
on
St
S W
illar
d S
tS
May
he
w S
t3
27
Cty
Min
St5
: Fai
rSI
(R
ehab
) $
3
4,9
43
.20
W
Was
hin
gto
n S
tS
May
he
w S
tS
Smit
h S
t3
27
Cty
Min
St5
: Fai
rSI
(R
ehab
) $
3
4,9
43
.20
W
Was
hin
gto
n S
tS
Smit
h S
tS
Bar
ker
St3
33
Cty
Min
St5
: Fai
rSI
(R
ehab
) $
3
5,5
06
.80
W
Was
hin
gto
n S
tS
Bar
ker
StS
Bar
ton
St
32
7C
tyM
inSt
5: F
air
SI (
Reh
ab)
$
34
,94
3.2
0
W W
ash
ingt
on
St
S B
arto
n S
tS
Wh
itta
ker
St3
38
Cty
Min
St5
: Fai
rSI
(R
ehab
) $
3
6,0
70
.40
W
Wat
er S
tM
arx
Dr
& S
ho
re D
rW
ater
Ct
19
0C
tyM
inSt
5: F
air
SI (
Reh
ab)
$
20
,28
9.6
0
W W
ater
St
Wat
er C
tSh
ore
Dr
11
72
Cty
Min
St5
: Fai
rSI
(R
ehab
) $
12
5,1
19
.20
W
Wat
er S
tSh
ore
Dr
N E
agle
St
63
9C
tyM
inSt
6: G
oo
dC
PM
(R
esu
rf)
$
18
,87
6.0
0
W W
ater
St
N E
agle
St
N C
hic
ago
St
32
2C
tyM
ajSt
6: G
oo
dC
PM
(R
esu
rf)
$
9
,51
6.0
0
W W
ater
St
N C
hic
ago
St
N B
erri
en S
t3
38
Cty
Maj
St6
: Go
od
CP
M (
Res
urf
) $
4,9
92
.00
W
Wat
er S
tN
Ber
rien
St
N W
illar
d S
t6
44
Cty
Maj
St5
: Fai
rSI
(R
ehab
) $
6
8,7
59
.20
W
ater
Ct
W W
ater
St
Dea
d E
nd
or
Star
t2
16
Cty
Min
St4
: Fai
rSI
(R
ehab
) $
2
3,1
07
.60
W
ilso
n S
tB
uff
alo
St
E M
erch
ant
St4
22
Cty
Maj
St7
: Go
od
CP
M (
Cra
ck S
eal)
$
8
,11
2.0
0
Pag
e 7
of
7
City of New Buffalo Asset Management Program
Street System 2016-2018
APPENDIX C
Asset Management Funding Resources
Asset Management Funding Resources 2016-2018
Revenue From Act 51
Year Major Local Total Pct Incr
2012 118,127$ 53,853$ 171,980$
2013 120,638$ 57,945$ 178,583$ 3.7%
2014 123,055$ 62,202$ 185,257$ 3.6%
2015 128,967$ 65,200$ 194,167$ 4.6%
Average Percentage Increase = 4.0%
2016 134,126$ 67,808$ 201,934$
projected at 4.0%
Average Expenditures - Regular Maintenance
Fiscal Year Major Local Total
2011-2012 36,482$ 41,095$ 77,577$
2012-2013 61,410$ 39,979$ 101,389$
2013-2014 87,920$ 63,651$ 151,571$
2014-2015 81,025$ 55,063$ 136,088$
Average 66,709$ 49,947$ 116,656$
2016 Projected Revenues 201,934$
2016 Projected Regular Maintenance Expenses 116,656$
2016 Projected funds available for Asset Management = 85,277$
Projected Major Fund Balance as of 6/30/16 = 292,002$
Projected Local Fund Balance as of 6/30/16 = 139,709$
Projected Total Available Balance as of 6/30/16 = 431,711$
Portion to apply to Asset Management 30% 86,342$
Over 5 Years Per Year = 17,268$
Grand Total available for Asset Management Per Year = 102,546$
CITY OF NEW BUFFALO
2017 – 2021
CAPITAL IMPROVEMENT PROGRAM
APPENDIX B
Water System General Plan 5-Year and 20-Year Capital Plan
CITY OF NEW BUFFALO
2017 – 2021
CAPITAL IMPROVEMENT PROGRAM
APPENDIX C
Sanitary Sewer System Map
CITY OF NEW BUFFALO
2017 – 2021
CAPITAL IMPROVEMENT PROGRAM
APPENDIX D
Sanitary Sewer Lift Station Map
CITY OF NEW BUFFALO
2017 – 2021
CAPITAL IMPROVEMENT PROGRAM
APPENDIX E