City of Marquette Traffic StudyFinal Draft | September 12, 2014

Update | December 9, 2016March 3, 2017

Page 2: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

City of Marquette Traffic Study

3/3/17 1

City of Marquette Traffic Study

CONTENTS

Introduction..................................................................................................................................................4

Community Overview...........................................................................................................................4

Purpose and Objective .........................................................................................................................4

Study Area ............................................................................................................................................4

Methodology and Approach.........................................................................................................................5

Field Reconnaissance and Data Collection ...........................................................................................5

Capacity Analysis and Mitigation Measures Analysis ...........................................................................5

Warrant Analysis ..................................................................................................................................7

Pedestrian and Bicycle Safety Improvements ......................................................................................7

Stakeholder Input .................................................................................................................................7

Other Studies........................................................................................................................................7

Existing Conditions .......................................................................................................................................9

Existing Traffic Data..............................................................................................................................9

Intersection Turning Movement Counts ......................................................................................9

Corridor Traffic Counts .................................................................................................................9

Existing Capacity Analyses ....................................................................................................................9

Signalized Intersections................................................................................................................9

Unsignalized Intersections ...........................................................................................................9

Corridor Analyses .......................................................................................................................10

Speed Limits ...............................................................................................................................10

Warrant Analyses .......................................................................................................................................13

All-Way Stop Warrant Analyses..........................................................................................................13

Signal Warrant Analyses .....................................................................................................................13

Intersection/Corridor Mitigation Measures (Year 2013)............................................................................15

Traffic Growth and Committed Roadway Improvements ..........................................................................18

Traffic Growth ....................................................................................................................................18

Other Future Developments...............................................................................................................19

Marquette Hospital ....................................................................................................................19

Fire Station .................................................................................................................................20

Page 3: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

City of Marquette Traffic Study

3/3/17 2

Cliff Dow Site ..............................................................................................................................20

Traffic Signal at Grove Street/McClellan Avenue Intersection...................................................20

Future No-Build Conditions (Year 2030).....................................................................................................21

Traffic Projections...............................................................................................................................21

Intersection Turning Movement Volumes .................................................................................21

Corridor Traffic Volumes ............................................................................................................21

Future Capacity Analyses....................................................................................................................21

Signalized Intersections..............................................................................................................21

Unsignalized Intersections .........................................................................................................22

Corridor Analyses .......................................................................................................................22

Intersection/Corridor Mitigation Measures (Year 2030)............................................................................23

Pedestrian/Bicycle Accommodation Analysis & Recommendations ..........................................................24

Pedestrian Facilities............................................................................................................................24

Bicycle Facilities ..................................................................................................................................26

Truck Routes ...............................................................................................................................................28

Conclusions and Recommendations...........................................................................................................29

Intersection/Roadway Improvements................................................................................................29

Pedestrian and Bicycle Facility Improvements ...................................................................................30

Construction Costs and Prioritization.................................................................................................30

Page 4: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

City of Marquette Traffic Study

3/3/17 3

FIGURESFigure 1 Study AreaFigures 2A – 2J Existing Peak Hour Turning Movement Counts (2013)Figure 3 Existing Annual Average Daily Traffic Volumes (2013)Figures 4A & 4B Existing Level of Service Summary (2013)Figures 5A–5G Mitigation Locations (2013) Figures 6A – 6J Future Peak Hour Turning Movement Counts (2030)Figure 7 Future Annual Average Daily Traffic Volumes (2030)Figures 8A–8C Future Level of Service Summary (2030 No-Build) Figures 9A & 9B Mitigation Locations (2030) Figure 10 Recommended Sidewalk System AdditionsFigure 11 Recommended Bikeway System Additions

TABLESTable 1 Study Area Intersections and SegmentsTable 2 Previous and Current StudiesTable 3 Existing Level of Service Summary – Signalized Intersections (2013)Table 4 Existing Level of Service Summary – Unsignalized Intersections (2013)Table 5A Warrant Analyses Summary – All Way Stop WarrantTable 5B Warrant Analyses Summary – Traffic Signal WarrantsTable 6 Locations for Mitigation Analysis Table 7 Future Level of Service Summary – Signalized Intersections (2030 No-Build)Table 8 Future Level of Service Summary – Unsignalized Intersections (2030 No-Build)Table 9 Prioritized List of Mitigation Projects and Costs

APPENDICESAppendix A 12-hour Turning Movement Count SummariesAppendix B 2-Day/24-hour Corridor Count SummariesAppendix C Stakeholder Input/Previous and Current StudiesAppendix D Signalized Intersection Capacity Analyses (2013)Appendix E Unsignalized Intersection Capacity Analyses (2013)Appendix F Warrant Analyses

All-Way Stop Warrant AnalysesSignal Warrant Analyses

Appendix G Signalized/Unsignalized Intersection Capacity Analyses – Mitigation Measures (2013)Appendix H Signalized Intersection Capacity Analyses (2030)Appendix I Unsignalized Intersection Capacity Analyses (2030)Appendix J Signalized/Unsignalized Intersection Capacity Analyses – Mitigation Measures (2030)Appendix K Truck Route Feasibility Study Appendix L Marquette Hospital Transportation Improvements Project Traffic Impact Study

Page 5: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

City of Marquette Traffic Study

3/3/17 4

INTRODUCTION

Community OverviewThe City of Marquette is located in the central region of Michigan's Upper Peninsula. With a population of 21,355, it is the largest community in Michigan’s Upper Peninsula. In addition to being a population center, it serves as the regional center for education, health care, recreation, and retail. This regional draw is particularly evident due to Northern Michigan University (NMU) and Marquette General Hospital, both of which are located in the City of Marquette.

Marquette has a total land area of 19.4 square miles and is home to a variety of valuable natural resources. Historically, the area's mineral and lumber resources attracted settlers to the region and supported a primarily resource-based economy. Other critical resources include the area's hydrology, particularly due to its location along the shoreline of Lake Superior. It also has heavily wooded areas and a hilly topography that add to its scenic charm.

Today, Marquette's economy is less dependent on natural resource industries, such as mining, and is primarily focused on service industries. This is in large part due to the University and Hospital's large staffing needs. In the future, Marquette plans to broaden its economic base, creating a greater diversity of sustainable employment opportunities for residents.

Purpose and ObjectiveThe City of Marquette Traffic Study was commissioned for the express purpose of evaluating the City’s existing traffic volumes, patterns and providing recommendations and options to address identified deficiencies. The study included a City-wide data collection effort to obtain intersection turning movement volumes, bicycle and pedestrian volumes, and segment traffic volumes. Using these volumes, an analysis of key intersections and segments within the City was completed. Any identified deficiencies in intersection or segment operations were further evaluated to develop mitigation measures to improve the operation such as the installation of stop control or the retiming of an existing traffic signal. Bicycle and pedestrian volumes were also considered as part of these evaluations.

Study AreaThe study area for this project encompasses key intersections and roadway segments located within the City of Marquette’s corporate limits. There were 81 intersections and 34 roadway segments included for this study as shown on Figure 1 and as summarized in Table 1.

Page 6: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

City of Marquette Traffic Study

3/3/17 5

METHODOLOGY AND APPROACH

Field Reconnaissance and Data CollectionExisting data and information was obtained from the City in addition to historical data and studies from other agencies including the Board of Light and Power, the Michigan Department of Transportation (MDOT), NMU, MarqTran, and the City of Marquette Police Department. This data included previous traffic count information, traffic signal phasing and timings, indications of existing operational concerns, plans and inventories relating to the study area, and crash data at each intersection.

Traffic data was collected at the intersections and segments shown on Figure 1 and listed in Table 1. Miovision cameras were used for the turning movement intersection counts. The count period was from 6 a.m. to 6 p.m. on either a Tuesday or Wednesday. This twelve-hour period captures the peak traffic volumes that are used for operational analysis and also provides the data needed to conduct stop sign and traffic signal warrant analyses. The intersection counts included classification counts (cars, single unit vehicles, and multi-unit vehicles) in addition to pedestrians and bicyclists. These are included in Appendix A with the peak hour volumes summarized on Figures 2A through 2J.

Nu-Metrics HI-STAR counters were used to obtain traffic volumes for the roadway segments. This data was collected for a 48-hour time period beginning at 12 a.m. on a Tuesday and ending at 12 a.m. the following Wednesday. This interval was identified as the time period when traffic volumes are most representative of typical conditions during a normal week, and this time period is also a standard practice in the traffic engineering industry. These are included in Appendix B. The Average Daily Traffic volumes derived from these counts are shown on Figure 3.

Capacity Analysis and Mitigation Measures AnalysisThe Synchro 8 software program, which is the most recent version of the software, was used for the analysis of operations at each of the study intersections. Synchro is a macroscopic traffic analysis and optimization software tool that supports the Highway Capacity Manual’s methodology for intersection analysis (discussed below). This software tool was chosen for this study as it is widely used in the traffic engineering industry, and is also utilized by the City’s Engineering Department. The City’s existing Synchro 6 model was used as the base model and was imported into Synchro 8. The model was then updated using the new traffic counts. Changes to the model were also made to reflect existing roadway geometry, intersection traffic control and signal timings.

Analyses were completed for six different scenarios: Existing traffic for the AM Peak, Mid-Day Peak, and PM Peak hours, and year 2030 No-Build traffic for the AM Peak, Mid-Day Peak, and PM Peak hours. The “No-Build” scenarios assume that normal traffic growth occurs between now and the year 2030, with no capacity modifications to the existing roadway network except for projects that are already identified/planned and likely to be built (note: it was assumed that for the “No-Build” scenarios, normal ongoing capital maintenance and road resurfacing/reconstruction projects would still occur consistent with the City’s capital improvement plan. “Capacity improvements” which are also assumed to be part of the No-Build scenarios would typically include planned improvements such as added lanes at intersections, construction of new road segments, construction of roundabouts, road widening, etc.). The realignment of Lakeshore Boulevard between Hawley Street and Wright Street with a roundabout at the Lakeshore Boulevard/Wright Street intersection is currently being studied by the City. While this project will need to go through the public review process before it is finalized, it was decided that this project could be constructed by the year 2030, so it was included in the future “No-Build” roadway

Page 7: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

City of Marquette Traffic Study

3/3/17 6

network for this study. A future traffic volume forecast for the year 2030 No-Build scenario was developed through applying a compound annual growth factor (based primarily on historical growth rates) to existing traffic volumes. This is an industry standard method for estimating future traffic growth. The roadway segment counts were used to develop a City-wide Average Daily Traffic map for both existing traffic and 2030 No-Build traffic.

The determination of acceptable traffic operation at an intersection is based on the Highway Capacity Manual Level of Service (LOS) calculated using the methods of the Transportation Research Board Highway Capacity Manual, 2010 Edition. The Highway Capacity Manual (HCM) details methodologies for assessing the operational characteristics of various aspects of public roads and non-motorized facilities. These methodologies have been developed over 60 years based on empirical analyses and studies. HCM methodologies were utilized for this project and are based on travel delay experienced by users, which is then converted to LOS. While other potential methodologies have been developed in recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning and designing public roadways. The Federal Highway Administration (FHWA) also requires the use of HCM for projects that could involve Federal funding. The LOS is a quantitative measure that describes the quality of operating conditions within the traffic stream and the perception of motorists. The LOS of an intersection is based on the total delay experienced by vehicles waiting to travel through an intersection. The LOS is defined in terms of this total delay, as measured by the average number of seconds of delay per vehicle. Vehicle delay is a means of measuring factors such as driver comfort and convenience, safety, maneuverability, fuel consumption, and lost travel time. The LOS is based on a scale of “A” to “F”, with “A” being the best situation. LOS “A” describes traffic operations with very low delay (i.e., most vehicles stop only the minimum amount necessary before entering the intersection). A LOS “F” results in very high delays with long queues of vehicles. In this case, the volume often exceeds the capacity of the intersection. Traffic is interrupted and impeded to the point that it can become “gridlocked” and the capacity of the road system is greatly diminished. The following exhibit summarizes the specific LOS criteria for signalized and unsignalized intersections.

Control Delay per Vehicle (sec)Level of Service Signalized

IntersectionsUnsignalizedIntersections

A 10.0 10.0B > 10.0 and 20.0 > 10.0 and 15.0C > 20.0 and 35.0 > 15.0 and 25.0D > 35.0 and 55.0 > 25.0 and 35.0E > 55.0 and 80.0 > 35.0 and 50.0F > 80.0 > 50.0

Source: Transportation Research Board, Highway Capacity Manual, 2010.

The Synchro 8 model was used to calculate LOS for this study according to the methods of the Highway Capacity Manual. These were calculated for the AM, Mid-Day and PM Peak hours in both the existing and year 2030 No-Build traffic scenarios. An intersection operating at LOS D is typically considered to have an acceptable operation. Based on discussions with the City staff, it was agreed that LOS E or worse was the threshold for when mitigation should be evaluated at an intersection. For this study, the LOS criteria applied to individual movements at the intersection, not just overall level of service. If an

Page 8: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

City of Marquette Traffic Study

3/3/17 7

intersection had no movements at LOS E or F, mitigation was considered optional. For all intersections operating at an unacceptable level of service based on existing or year 2030 No-Build traffic volumes, potential mitigation measures were identified which would reduce travel delays and congestion. A range of mitigation measures was considered for both the near term and long term. These options ranged from low cost improvements, such as traffic signal retiming or the installation of all-way stop control, to higher cost improvements, such as the installation of new traffic signals or the construction of a turn lane or roundabout.

Warrant AnalysisThe existing turning movement traffic counts, pedestrian counts, and crash data were used to conduct all-way stop and signal warrant analyses at unsignalized and signalized intersections. These analyses followed procedures in the Michigan Manual on Uniform Traffic Control Devices (MMUTCD). The four (4) distinct all-way stop warrants consider vehicular volumes, crash history, visibility, speed and other conflict criteria. There are eleven (11) warrants that are reviewed for the potential need for the installation of traffic signals. These warrants consider traffic volumes, pedestrian volumes, crash experience and other criteria that are applicable in specific scenarios such as nearby railroad crossings.

Pedestrian and Bicycle Safety ImprovementsAn analysis of pedestrian and bicycle facilities was also completed. Existing pedestrian and bicycle count information along with input from various stakeholders (discussed below and detailed in Appendix C) was utilized to evaluate the existing pedestrian and bicycle facility networks and to identify gaps in the existing systems. Based on the identified needs and gaps, recommendations were then developed on potential additions to each of these networks.

Stakeholder InputStakeholder input was a valuable factor considered as the team conducted mitigation analyses and developed recommendations. A kick-off meeting was held with City staff to obtain their input on existing operational concerns. Early in the process, various non-City agencies and special interest groups were contacted to obtain input on the project regarding specific problems or deficiencies, data or reports that would benefit the study, transportation improvements that are either already planned/funded or that should be considered, in addition to any other input they wanted to provide. All responses received from non-City agencies and groups are included in Appendix C. In addition, a table in Appendix C summarizes the input received from each of these agencies/groups. The comments and input received were considered as the study was conducted, including in the selection of recommended mitigation measures (assuming a location met the applicable criteria that would warrant mitigation, taking into account the results of the study process).

Other StudiesPrevious and current studies completed by the City and other agencies or groups were reviewed as this traffic study was conducted. A list of these studies is included in Table 2, which includes a brief summary of each study’s relevant content and how this information was used in the study.

Recommendations from the Northern Michigan University Master Plan were considered at those intersections or road segments which are under the City’s jurisdiction and were identified by the City as being within the scope of this study (i.e., the intersections and segments identified in Figure 1 and Table 1). Only one location from the Master Plan (the Presque Isle Avenue/Fair Avenue intersection) met the criteria set for requiring mitigation. That location is discussed further in the “Intersection/Corridor Mitigation Measures (2013)” section below. In addition, based on comments received from NMU staff,

Page 9: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

City of Marquette Traffic Study

3/3/17 8

it was determined that pedestrian improvements would be beneficial along Wright Street, particularly at the Sugarloaf Avenue intersection.

MarqTran is the Marquette County Transit Authority which provides bus service throughout Marquette County. MarqTran provided information on their bus routes, both within Marquette and between the communities in the County. It should also be noted that NMU runs a private shuttle service for students and staff.

Page 10: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

City of Marquette Traffic Study

3/3/17 9

EXISTING CONDITIONS

Existing Traffic DataIntersection Turning Movement CountsIntersection turning movement counts were collected at 81 intersections within the City between 6 a.m. and 6 p.m. The counts were collected on one of the following weekday dates in 2013: October 1, 2, 8 or 9; and December 3 or 4. These dates were identified as optimal because NMU was in session (the University generates substantial traffic volumes), and they would therefore be representative of the peak traffic conditions that occur on regular basis. Copies of the count summaries are included in Appendix A. The peak hours were identified as 7:15-8:15 a.m., 12:00-1:00 p.m., and 4:30-5:30 p.m. These have been shown graphically on Figures 2A through 2J – Existing Peak Hour Turning Movement Counts (2013).

Corridor Traffic CountsForty-eight hour directional counts were taken on 34 corridors throughout the City as shown on Figure 1. Twenty eight out of the 34 corridor location counts were taken on October 8 and 9, 2013. The remaining 6 locations were in the vicinity of the Veridea Development that was then under construction in 2013. Therefore, they were counted on September 30 and October 1, 2014. Summaries of these counts are included in Appendix B. These counts were converted to Average Daily Traffic (ADT) volumes. Average Daily Traffic, sometimes referred to as mean daily traffic, is the average number of total vehicles traveling both ways passing a specific point in a set period of time. Time periods vary with the minimum time required being 24 hours. This study used a 48 hour time period. These ADT volumes are shown on Figure 3 – Existing Annual Average Daily Traffic Volumes (2013/2014).

Existing Capacity AnalysesSignalized IntersectionsAs described in the Methodology section above, the existing peak hour turning movement counts, intersection geometry and signal timings were input into the Synchro 8 model. Using the 2010 Highway Capacity Manual (HCM) methodology (described in the “Methodology and Approach” section above and available through the Synchro software), the existing Levels of Service (LOS) were determined for each of the signalized intersections. These are summarized in Table 3. Copies of the analyses are included in Appendix D. Figure 4A graphically summarizes the overall intersection LOS, and Figure 4B shows the individual movement LOS for the intersections with movements at LOS D, E or F. Two of the intersections, as follows, currently have movements at LOS E or F and will be evaluated for mitigation to improve their operation.

McClellan Avenue/Fair Avenue (Intersection ID #7) U.S. 41/Grove Street (Intersection ID #49)

Unsignalized IntersectionsThe Synchro 8 model for the three existing peak hours was also used to calculate the existing Levels of Service for each of the unsignalized intersections. These are summarized in Table 4 and shown graphically on Figures 4A and 4B. Copies of the analyses are included in Appendix E. Five intersections currently have movements at LOS E or F and will be evaluated for improvements in their operations:

Presque Isle Avenue/Fair Avenue (Intersection ID #16) Front Street/Baraga Avenue (Intersection ID #37)

Page 11: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

City of Marquette Traffic Study

3/3/17 10

McClellan Avenue/Ridge Street (Intersection ID #62) O’Dovero Drive/McClellan Avenue (Intersection ID #66) Lincoln Avenue/Wright Street (Intersection ID #69)

Corridor AnalysesThe corridor analyses are not based on capacity calculations since the 2010 HCM does not have a procedure which is applicable to the corridors included in this study. This is due to the characteristics of the corridors, which are mainly 2-lane, lower speed roadways. The HCM methodology for 2-lane roadways is only applicable to higher speed (greater than 45 mph) roadways.

In addition, the use of the multi-modal analysis method included in the 2010 HCM was evaluated to see if it could provide meaningful results for the study corridors. This type of analysis is used to calculate a LOS for each of the modes of travel: car, bike, pedestrian, and transit. Each user type LOS is calculated independent of the others, and the analysis does not combine these separate LOS’s into an overall LOS. Per the Highway Capacity Manual, this tool is “used to evaluate trade-offs in how the urban street right-of-way is allocated among the modes using the street”. While this tool would be helpful for completing a very detailed alternative analysis for a corridor planning study, that is not the intent of this particular traffic study. More importantly, none of the study corridors have a high enough volume for the different modes to provide meaningful results upon which to make cross section recommendations (i.e. volumes are low enough that the LOS will be very good for all modes of travel). For this study, the corridors were evaluated based on the traffic operational criteria of ADT volumes, roadway cross section, spacing and number of traffic signals, intersection LOS, and input received from the City and the stakeholders. Non-motorized traffic along the corridors is addressed in Section IX - Pedestrian and Bicycle Accommodation Analysis and Recommendations.

The commonly accepted threshold volume for a 2-lane roadway operating at LOS D or better is in the range of 12,000 to 14,000 vehicles per day (vpd). However, the limiting factor for a roadway’s capacity is typically the level of service and operation of the intersections in that corridor. With one exception, none of the existing ADT volumes on the corridor segments in the study are greater than 10,000 vpd, and therefore none of the segments warrant a 4-lane cross section. Wright Street east of Lincoln Avenue carries approximately 15,000 vehicles per day. While this volume of traffic may indicate a need to widen this section of roadway to a 4-lane cross section, the results of the intersection analyses along this corridor, including the three existing and one recommended signalized intersections along Wright Street, found that all can operate at an acceptable level of service (LOS D or better for all movements) through proper timing of the signals. Therefore, traffic signal timing improvements, rather than roadway widening, is the recommended improvement along this corridor.

Speed LimitsDuring the course of the study, speed limits were discussed in general terms. Although speed limit recommendations are not part of this study, the following information describes how speed limits are set within the boundaries of Michigan municipalities.

The Michigan Vehicle Code (Act 300 of 1949) provides guidance regarding how speed limits are established. More specifically MCL 257.627 (which is a section of the Michigan Vehicle Code) states in part:

“257.627 Speed limitations.

Page 12: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

City of Marquette Traffic Study

3/3/17 11

Sec. 627.

(1) A person operating a vehicle on a highway shall operate that vehicle at a careful and prudent speed not greater than nor less than is reasonable and proper, having due regard to the traffic, surface, and width of the highway and of any other condition then existing. A person shall not operate a vehicle upon a highway at a speed greater than that which will permit a stop within the assured, clear distance ahead.

(2) Except in those instances where a lower speed is specified in this chapter or the speed is unsafe under subsection (1), it is prima facie lawful for the operator of a vehicle to operate that vehicle at a speed not exceeding the following, except when this speed would be unsafe:

(a) 25 miles per hour on all highways in a business district. (b) 25 miles per hour in public parks unless a different speed is fixed and duly posted.(c) 25 miles per hour on all highways or parts of highways within the boundaries of land platted under the land division act, 1967 PA 288, MCL 560.101 to 560.293, or the condominium act, 1978 PA 59, MCL 559.101 to 559.276, unless a different speed is fixed and posted.(d) 25 miles per hour on a highway segment with 60 or more vehicular access points within 1/2 mile.(e) 35 miles per hour on a highway segment with not less than 45 vehicular access points but no more than 59 vehicular access points within 1/2 mile.(f) 45 miles per hour on a highway segment with not less than 30 vehicular access points but no more than 44 vehicular access points within 1/2 mile.

(3) It is prima facie unlawful for a person to exceed the speed limits prescribed in subsection (2), except as provided in section 629.”

Based on subsections (2)(a), (2)(b), and (2)(c) above, speed limits within a municipality are set at 25 miles per hour (mph) if they are in a business district, public park, or within an area that is platted (this typically encompasses most residential areas). Speed limits are set at 25 mph in these situations unless a speed survey indicates that they should be set otherwise (see below for further explanation regarding what constitutes a “speed study” in Michigan). In unplatted areas that do not fall into the above categories, subsections (2)(d), (2)(e), and (2)(f) establish speed limits based on the number of “vehicular access points” per half mile of road (typically an access point is an intersecting side street or driveway). However, speed limits can be established differently than these directives if a speed survey is undertaken which justifies a different speed limit, or if the prima facie limit of 55 mph is applicable.

Speed surveys are at times conducted to assist in establishing speed limits. The Michigan State Police website (http://www.michigan.gov/msp/0,4643,7-123-1593_30536_25802-16169--,00.html) provides the following description of speed surveys:

“Speed Surveys

Driver behavior is an extension of societal attitudes. Most drivers respond to traffic regulations in a safe and reasonable manner as demonstrated by their consistently favorable driving records. Traffic laws which reflect the behavior of the majority of motorists are usually respected and

Page 13: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

City of Marquette Traffic Study

3/3/17 12

obeyed. In order for any traffic law to be enforceable, voluntary compliance must be practiced by the vast majority of drivers so violators can be easily identified. Realistic speed limits reflect this fact and recognize that unreasonable restrictions encourage widespread violations and disrespect for the entire traffic control system. Arbitrary laws unnecessarily restrict drivers, encourage violations, and lack public support. Studies show that the driving environment, not the posted speed limit, is the main influence on motorist speeds.

Speed studies are taken during times that represent normal free-flow traffic. Since modified speed limits are the maximum allowable speeds, roadway conditions must be close to ideal. The primary basis for establishing a proper, realistic speed limit is the nationally recognized method of using the 85th percentile speed. This is the speed at or below which 85% of the traffic moves. Studies have shown that changing the posted speed limit does not significantly change the 85th percentile speed. The driving environment, including other traffic on the roadway, roadway conditions, pedestrian traffic, etc., is a significant factor which influences the prevailing speed.

Use of the 85th percentile speed acknowledges that 15% of the drivers are traveling above a speed that is reasonable and proper. It is to this 15% that enforcement action is directed. Studies have shown that these are the drivers who cause many of the crashes and have the worst driving records.”

Speed surveys typically involve measuring the speeds being traveled by a representative sample of motorists to determine the 85th percentile speeds.

Page 14: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

City of Marquette Traffic Study

3/3/17 13

WARRANT ANALYSES

The All-Way Stop and Traffic Signal Warrant analyses were completed based on existing conditions. These included existing traffic volumes, roadway geometry, speed limits and crash experience. The traffic volumes were hourly totals based on the counts included in Appendix A. The roadway geometry and speed limits were based on field observations. The crash experience was based on six years of crash data provided by the City. A crash data summary was prepared which shows the number of crashes per year for each intersection. It also details the right turn/left turn crashes for use in the all-way stop warrant analyses and the right angle crashes for use in the signal warrant analyses. These data were required to complete the All-Way Stop and Traffic Signal Warrant analyses. Pedestrian and bicycle crashes were also noted during preparation of this summary, and this information was considered as part of the pedestrian and bicycle accommodation analysis. While crash data was used to complete the warrant analyses, an in-depth review of crash data was beyond the scope of this current study and would require additional funding that was not available. An in-depth study of crash data and potential safety improvements/countermeasures would be the focus of a “Safety Study”. This is typically considered to be a separate study from an operational traffic study such as this one. Copies of the All-Way Stop and Signal Warrant Analyses and the Crash Data Summary are included in Appendix F.

Warrant analyses followed the requirements published in the Michigan Manual on Uniform Traffic Control Devices (MMUTCD). The MMUTCD is Michigan’s version of the Federal Highway Administration’s Manual on Uniform Traffic Control Devices (MUTCD). The Federal MUTCD is developed and distributed as a set of national guidelines. Many States, including Michigan, develop clarifications and modifications to these guidelines that tailor them to specific needs and characteristics of their State, while maintaining the integrity of the national guidelines. Such is the case with the MMUTCD.

All-Way Stop Warrant AnalysesEach of the unsignalized intersections was analyzed to see if they met the minimum requirements for installation of an all-way stop. The analysis followed the requirements listed in the MMUTCD, Section 2B.07. Table 5A summarizes the results of these analyses. Three intersections that are currently side-street stop control met these minimum all-way stop control requirements:

Third Street and Fair Avenue (Intersection ID #17) McClellan Avenue and Ridge Street (Intersection ID #62) McClellan Avenue and Baraga Avenue (Intersection ID #64)

Signal Warrant AnalysesThe unsignalized intersections were also analyzed to see if they met the minimum requirements for installation of a traffic signal. The analysis followed the requirements listed in the MMUTCD, Section 4C and used the MDOT Traffic Signal Warrant Spreadsheet1. The MMUTCD and MDOT Traffic and Safety Note 210A states that “The study should consider the effects of the right-turn vehicles from the minor-street approaches. Engineering judgment should be used to determine what, if any, portion of the right-

1 The 2005 MMUTCD Signal Warrant Spreadsheet was used for the initial signal warrant analyses. Subsequent to the initial analyses being completed, MDOT issued the 2014 MMUTCD Signal Warrant Spreadsheet. A comparison of the results from the 2005 spreadsheet to results from the 2014 spreadsheet showed no difference in which warrants were met. The decision was made to only revise the warrant analyses to the new spreadsheet for the intersections which had met at least one of the signal warrants with the 2005 spreadsheet. In addition, the reduction for right turns on red as described above was included in the revised analyses.

Page 15: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

City of Marquette Traffic Study

3/3/17 14

turn traffic is subtracted from the minor-street traffic count when evaluating the count against the signal warrants listed in Paragraph 2.” Based on this and in agreement with City staff, these analyses were completed considering the effects of the right-turn vehicles from the minor street approaches. The following general guidance provided by MDOT was used in the analyses:

If observations of the number of vehicles making right turns on red are available, they should be used to adjust the approach volume.

If the right turn volume from the minor street is less than 50% of the approach volume, the approach volume should not be adjusted.

If the right turn volume from the minor street is greater than 50%, 50% of the right turn volume should be subtracted from the approach volume.

The intersection turning movement counts completed for this study did not observe the ease of right turning traffic to make their turns, therefore the procedure described in the second and third bullets above was utilized.

In addition to performing a signal warrant analysis on the unsignalized intersections, seven of the existing signalized intersections were evaluated for warrants at the request of the City.

Table 5B summarizes results of these analyses. Two of the unsignalized intersections met a traffic signal warrant based on these minimum requirements:

O’Dovero Drive and McClellan Avenue (Intersection ID #66) Lincoln Avenue and Wright Street (Intersection ID #69)

Two of the seven existing signalized intersections which were analyzed also met signal warrants:

Seventh Street and College Avenue (Intersection ID #9) Washington Street and McClellan Avenue (Intersection ID #63)

The five existing signalized intersections which did not meet warrants were:

Hewitt Avenue and Front Street (Intersection ID #30) Front Street and Spring Street (Intersection ID #38) Seventh Street and Magnetic Street (Intersection ID #74) Washington Street and Fifth Street (Intersection ID #75) Washington Street and Front Street (Intersection ID #79)

Traffic signal warrant analyses do not consider possible site distance concerns/issues. Additional study would be needed to determine if substandard sight distances exist at any of these locations and if other engineering solutions besides a traffic signal might address such concerns. Of these five intersections, one intersection meets the all-way stop control requirements. That intersection is:

Washington Street and Front Street (Intersection ID #79)

Page 16: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

City of Marquette Traffic Study

3/3/17 15

INTERSECTION/CORRIDOR MITIGATION MEASURES (YEAR 2013)

The intersection capacity analyses completed for the 81 intersections indicate that seven of the intersections do not meet LOS E or better for all movements at the intersection. Each of these locations was further analyzed to develop recommended mitigation to address the poor Level of Service. Table 6 summarizes the reasons for potential mitigation (if required), the recommended mitigation, and possible additional studies which may be required. These recommendations are considered short-term improvements and are summarized on Figures 5A through 5G, which include mitigation recommendations, peak hour turning movement volumes, existing and 2030 No-Build peak hour levels of service and existing and year 2030 peak hour levels of service after mitigation is implemented. Copies of the intersection capacity analyses are included in Appendix G. Following is a summary of the analysis and recommended mitigation for each location:

Figure 5A: McClellan Avenue and Fair Avenue (Intersection ID #7)To improve the operation of this intersection, it is recommended that the traffic signal timings be adjusted to accommodate the heavy northbound right turn volume. This movement is heaviest during the AM Peak Hour and could be related to any of the significant traffic generators along Fair Avenue to the east, including medical center buildings associated with Marquette General Hospital, the High School and/or NMU. As activities move from the existing hospital to the new site on Baraga Ave., operations at this intersection should be reviewed for further modifications to the traffic signal timings The volumes at this intersection do not indicate a corresponding peak in westbound left turn traffic during the PM Peak Hour which we would expect if all of this traffic was associated with one generator. Therefore, it is likely that the peak northbound right turn traffic in the AM is associated with a combination of these generators, and that the return traffic is distributed throughout the afternoon hours (this is because employees at the medical center buildings are most likely departing work at different times than the dismissal and class schedules of the High School and NMU).

Figure 5B: Presque Isle Avenue and Fair Avenue (Intersection ID #16)This intersection has a heavy westbound to southbound left turn volume which is the stop-controlled movement. Installation of a traffic signal would be the most cost-effective way to address this, however a traffic signal is not warranted since the volume of right turning vehicles from the side street was reduced based on the guidance described above. The other alternative for this location would be the installation of a mini-roundabout.

Figure 5C: U.S. 41 and Grove Street (Intersection ID #49)The operation of this intersection had been noted as a potential problem by the City and MDOT. It was originally recommended as a short-term improvement that the traffic signal timing be adjusted to bring the LOS to within an acceptable range. This intersection is planned for reconstruction as a roundabout during 2017 which will significantly change operations.

Figure 5D: McClellan Avenue and Ridge Street (Intersection ID #62)As with Presque Isle Avenue/Fair Avenue, a traffic signal would be warranted at this intersection if a reduction in the volume of right turning vehicles was not considered in the warrant analysis. However, the right turn reduction was considered, since such an approach is consistent with MDOT’s standard procedures for warrant analyses. Three options could be considered at this location. An all-way stop was warranted. However, this option provides only minimal improvement to the intersection level of service. The other options would be to install a traffic

Page 17: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

City of Marquette Traffic Study

3/3/17 16

signal or a roundabout. The traffic signal would cost less than the roundabout, although a southbound to westbound right-turn lane would also need to be constructed in order to improve all movements to LOS D or better.

Figure 5E: O’Dovero Drive and McClellan Avenue (Intersection ID #66)It is recommended that a traffic signal be installed at this intersection to improve the level of service. McClellan Avenue would need to be widened to construct center left-turn lanes at the intersection. The existing motel driveway east of McClellan would need to be incorporated into the operations of the signal, and the driveway realigned and widened to better line up with O’Dovero Drive on the west side of McClellan. Also, because this intersection is only 350 feet south of the U.S. 41 intersection, it should be interconnected with the U. S. 41 traffic signal.

Figure 5F: Lincoln Avenue and Wright Street (Intersection ID #69)Two mitigation options could be considered at this location. This intersection meets signal warrants, and installation of a traffic signal is the most cost-effective option to improve the intersection level of service. To signalize the intersection, left-turn lanes should be provided on all four approaches to the intersection. This may require some pavement restriping, but should not require pavement widening. The Lincoln Avenue southbound approach, which is an entrance into a parking lot, should either be closed or realigned to line up with the northbound approach. The traffic signal should include countdown pedestrian signals and should be interconnected with the traffic signals along Wright Street. High visibility crosswalks should also be installed. The other option to be considered is a roundabout. This option is more costly than a traffic signal and would require right-of-way acquisition.

Front Street and Baraga Avenue (Intersection ID #37)This intersection does not meet all-way stop or signal warrants. Additional geometric improvements beyond the pavement markings that were added in 2013 do not improve the LOS to within acceptable levels. No additional improvements to this intersection are recommended at this time, however, it is recommended that this intersection be evaluated more closely as part of the Baraga Avenue Corridor Study (a separate study currently being undertaken by the City) in which the alignment of Baraga Avenue across the intersection could be improved.

O’Dovero Drive west of McClellan Avenue

Baraga Avenue west of Front Street(looking eastbound)

Page 18: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

City of Marquette Traffic Study

3/3/17 17

It is also recommended to provide mitigation along two corridors in the study. Interconnecting the traffic signals along Wright Street between McClellan Avenue and Presque Isle Avenue is recommended to improve progression through this roadway segment. An interconnected system is also recommended on Washington Street between McClellan Avenue and Front Street. This segment of Washington Street has a total of seven existing traffic signals which are spaced between 600 and 2,000 feet apart. These intersections all operate at an acceptable level of service, however interconnecting them would improve traffic flow between the lakefront and U.S. 41.

Page 19: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

City of Marquette Traffic Study

3/3/17 18

TRAFFIC GROWTH AND COMMITTED ROADWAY IMPROVEMENTS

Traffic GrowthIn order to evaluate the operation of the study intersections for the future conditions (year 2030 No-Build), the Synchro model was updated to reflect conditions anticipated to exist in the year 2030. The current population growth rate for the City of Marquette was provided by City staff at the project kickoff meeting and is about 0.3 percent per year based on the most recent census information. A traffic growth rate of 0.5 percent per year was chosen in order to be conservative in the volumes developed for 2030. To develop “base” 2030 No-Build traffic volumes, the existing traffic volumes were increased by this 0.5 percent per year growth rate for 17 years (2013 to 2030).

In addition to the traffic increase based on population growth, traffic from two approved developments was included in the year 2030 traffic projections – the Founders Landing development located along the lakefront between Baraga Avenue and Genesee Street, and the Veridea Group development located along Washington Street near Lincoln Avenue. The traffic from the two approved developments was added to the “base” 2030 No-Build traffic. For the Founders Landing development, trips were estimated based on the remaining buildings to be constructed and the anticipated land use within each building. The ITE Trip Generation Manual, 9th Edition was used for the trip generation rates to develop the traffic volumes. The Veridea Group development was under construction at the time traffic counts were taken, and traffic was not yet being generated by the development. The trip generation volumes included in the August 18, 2012 Traffic Impact Study for this development (prepared by Midwest Traffic Consulting, LLC) were used. The estimated trips from each of these developments were distributed to the adjacent street network and then added to the “base” traffic to develop the 2030 No-Build traffic volumes to be included in the Synchro model. Traffic impacts from other potential developments, including the relocation of Marquette General Hospital and the development of the Cliff Dow site, were not included in the year 2030 forecasted traffic volumes since many particulars that would be needed to develop accurate traffic forecasts for these sites were not known at the time of this study. These particulars include specific traffic generating land uses and locations, site plans with drive locations, exact building square footages, number of employees, etc. Once the current study is complete, all Synchro model files will be provided to City staff, and the will be able to model future traffic additions to the network.

The roadway network for the year 2030 No-Build Synchro model was modified for one capacity improvement that is currently being studied. That improvement is the realignment of Lakeshore Boulevard between Hawley Street and Wright Street and the construction of a roundabout at the Lakeshore Boulevard/ Wright Street intersection. This realignment is part of the Lakeshore Boulevard Coastal Restoration project. The project is currently being studied per grant funding and will need to be

Washington Street/Lincoln Avenue intersection with Veridea Development

Page 20: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

City of Marquette Traffic Study

3/3/17 19

vetted through the public process before it is finalized. Through discussions with the City, it was decided to include this capacity improvement as part of the 2030 scenarios’ roadway network.

Other Future Developments Marquette HospitalAnother private action that will change traffic patterns is the relocation of Marquette General Hospital from its existing location on College Avenue between Seventh Street and Presque Isle Avenue. The new site of hospital is on West Baraga Avenue. A separate Traffic Impact Study (TIS) was prepared for the new hospital (see Appendix L). The study area of the TIS includes the following existing intersections plus the proposed hospital accesses:

US-41 and M-553/McClellan Avenue US-41 and Seventh Street/Grove Street US-41 and Front Street Grove Street and M-553 Grove Street and Homestead/Anderson Street Seventh Street and Fisher Street Seventh Street and Baraga Avenue Seventh Street and Washington Street Seventh Street and Spring Street Baraga Avenue and McClellan Avenue Washington Street and McClellan Avenue

The scenarios analyzed include:

Existing Conditions Opening Year 2018 Background Conditions Opening Year 2018 No Build Conditions Opening Year 2018 Build Conditions Design Year 2038 Background Conditions Design Year 2038 No Build Conditions Design Year 2038 Build Conditions

The analysis from the TIS determined the recommended roadway improvements, included in the Preferred Alternative, that are proposed for the study area to accommodate the proposed relocation of Marquette General Hospital. These Preferred Alternative roadway improvements are illustrated in Error! Reference source not found. of the TIS and summarized as follows:

Main Hospital Entrance Connection to US-41 with a Roundabout Intersection; The existing intersection of US - 41 with Grove/Seventh Streets is converted to a roundabout

intersection; The proposed intersection of Baraga Avenue with the Main Hospital Entrance is proposed as a

compact urban roundabout with two northbound lanes for traffic entering the site from US-41; The westbound approach of Baraga Avenue at McClellan Avenue is restricted to prohibit left

turns and through traffic and allow right turns only. All other movements at this intersection will continue to be permitted, and the intersection will continue to operate as stop controlled on Baraga Avenue approaches and free flow on McClellan Avenue;

Page 21: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

City of Marquette Traffic Study

3/3/17 20

McClellan Avenue is widened to provide northbound and southbound left turn lanes at Baraga Avenue and to lengthen the northbound left turn lane at Washington Street;

The existing traffic signal at the intersection of McClellan Avenue and Washington Street is modified to provide permitted/protected left turn phasing;

Seventh Street is widened to provide a center left turn lane from north of Spring Street to Fisher Street and left turn lanes are provided on the Baraga Avenue and Spring Street minor leg approaches to Seventh Street.

Non-motorized facilities will be constructed alongside and as part of the above roadway improvements to accommodate pedestrians and bicycles consistent with City and MDOT plans and requirements.

These improvements are slated for construction during 2017 and 2018.

The Final Traffic Impact Study for the Marquette Hospital Transportation Improvement Project is included in Appendix L.

Fire StationA consolidated fire station is being considered at the northwest corner of Spring Street and Seventh Avenue. As with the hospital relocation, it is recommended that a traffic impact study be completed for this which would evaluate the operation of the immediately adjacent intersections: Seventh Street with Washington Street, Spring Street and Baraga Avenue. The study should also review other intersections which are difficult for emergency vehicles to cross. Two specifically mentioned by the Fire Chief are Lincoln Avenue/Washington Street and Front Street/Washington Street. The timings at these locations should also be reviewed as the recommended Washington Street traffic signal interconnect is installed and timings are implemented. It is also possible that emergency vehicle signal pre-emption could be implemented as part of signal upgrades. These considerations were factored into the evaluation of mitigation on this corridor.

Cliff Dow SiteThe Cliff Dow site, a 46-acre parcel of land in the northeast portion of the City, was also not included in this study. The type and size of the development that may eventually be located on this land is not yet known. Similarly, site access conditions and locations are not known at this time. Once development plans are finalized, it is recommended that a traffic impact study be conducted to determine what, if any, roadway improvements will be needed in the vicinity of the site to accommodate traffic expected to be generated by the planned development. City staff will have access to the Synchro 8 software and the specific Synchro models developed through this study for use in evaluating development scenarios at the Cliff Dow site or any other potential traffic additions to the system.

Traffic Signal at Grove Street/McClellan Avenue IntersectionFinally, discussions with both City and MDOT staff indicated that a traffic signal installation is proposed at the Grove Street/McClellan Avenue intersection. This location did not warrant mitigation based on this study, and because the signal is proposed as an MDOT project, it has not been included as part of mitigation recommendations.

Page 22: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

City of Marquette Traffic Study

3/3/17 21

FUTURE NO-BUILD CONDITIONS (YEAR 2030)

As discussed previously, future No-Build scenarios were analyzed for the AM, Mid-Day and PM peak hours. The “No-Build” scenarios assume that normal traffic growth occurs between now and the year 2030, with no capacity modifications to the existing roadway network except for projects that are already identified/planned and likely to be constructed (note: it was assumed that for the “No-Build” scenarios, normal ongoing capital maintenance and road resurfacing/reconstruction projects would still occur consistent with the City’s capital improvement plan. “Capacity improvements” which are also assumed to be part of the No-Build scenarios would typically include identified/planned improvements such as added lanes at intersections, construction of new road segments, construction of roundabouts, road widening, etc.). Reviewing expected traffic operations of the existing network in the year 2030 based on anticipated traffic growth allows identification of potential future infrastructure needs that would not be apparent when only looking at existing traffic volumes. This is why the No-Build scenario is evaluated.

Traffic ProjectionsIntersection Turning Movement VolumesBased on the description given in the previous section, year 2030 No-Build peak hour turning movement counts were developed for the AM, Mid-day and PM peak hours. These are shown on Figures 6A through 6J.

Corridor Traffic VolumesIn order to develop the year 2030 No-Build corridor traffic volumes, the growth rate of 0.5 percent per year was applied to the 2013/2014 corridor traffic counts. These volumes are summarized on Figure 7 – Future Annual Average Daily Traffic Volumes.

Future Capacity AnalysesSignalized IntersectionsAs noted in the previous section, the 2030 No-Build peak hour turning movement volumes were input into the Synchro 8 model, which had also been updated to include the realignment of Lakeshore Boulevard. The Levels of Service were determined for each of the signalized intersections and are summarized in Table 7. Copies of the capacity analyses are included in Appendix H. Figure 8A graphically summarizes the overall intersection LOS, and Figures 8B and 8C show the individual movement LOS for the five signalized intersections with movements at LOS D, E or F. Out of the 25 signalized intersections that were studied, three (3) of these have movements at LOS E or F. The McClellan Avenue/Fair Avenue and U.S. 41/Grove Street intersections were discussed in the Intersection/Corridor Mitigation Measures (2013) section above regarding improvements to address existing operational deficiencies. Each of these intersections will require further mitigation as a result of the additional traffic present by the year 2030. These mitigation measures are discussed in the Intersection/Corridor Mitigation Measures (2030) section below.

McClellan Avenue/Wright Avenue (Intersection ID #6) McClellan Avenue/Fair Avenue (Intersection ID #7) U.S. 41/Grove Street (Intersection ID #49)

Page 23: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

City of Marquette Traffic Study

3/3/17 22

Unsignalized IntersectionsThe Synchro 8 model was also used to determine the Levels of Service for the unsignalized intersections with the 2030 No-Build traffic volumes and geometry. Table 8 summarizes these Levels of Service, Figure 8A shows the LOS graphically, and Figures 8B and 8C show the individual movement LOS for the ten unsignalized intersections with movements at LOS D, E or F. Copies of these analyses are included in Appendix I. Of the 56 unsignalized intersections studied, seven (7) locations have movements at LOS E or F. Five of these intersections were identified with poor LOS in existing conditions and were discussed in the Intersection/Corridor Mitigation Measures (2013) section above. At these five locations, the mitigation recommendations in that section (for year 2013) are also expected to address the deficiencies identified in the year 2030 No-Build scenario as well. Two additional intersections (U.S. 41/Hampton Street and McClellan Avenue/Baraga Avenue) were forecasted to have poor LOS as a result of the additional traffic by the year 2030. These two intersections are discussed below.

Presque Isle Avenue/Fair Avenue (Intersection ID #16) Front Street/Baraga Avenue (Intersection ID #37) U.S. 41/Hampton Street (Intersection ID #55) McClellan Avenue/Ridge Street (Intersection ID #62) McClellan Avenue and Baraga Avenue (Intersection ID #64) O’Dovero Drive/McClellan Avenue (Intersection ID #66) Lincoln Avenue/Wright Street (Intersection ID #69)

Corridor AnalysesFollowing the methodology described in the Existing Conditions Corridor Analyses section (in which the corridors were evaluated based on the operational criteria of ADT volumes, intersection operations, roadway cross section, spacing and number of traffic signals), no further corridors warrant mitigation based on 2030 No-Build traffic volumes.

Page 24: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

City of Marquette Traffic Study

3/3/17 23

INTERSECTION/CORRIDOR MITIGATION MEASURES (YEAR 2030)

The intersection capacity analyses completed for the 81 intersections using the 2030 No-Build traffic volumes and geometry indicate that a total of ten intersections do not meet the “LOS E or better” criteria for all movements at the intersection. Seven of these were the same ones as discussed in the “Intersection/Corridor Mitigation Measures (2013)” section above. Each of these seven locations was further analyzed to develop recommended mitigation to address the substandard Level of Service. Two of the seven intersections (McClellan Avenue/Fair Avenue and U.S. 41/Grove Street) will require additional mitigation beyond what was described previously for the year 2013. Intersection capacity analysis Synchro output sheets are included in Appendices G and J. The following mitigation recommendations are considered long term improvements and are also summarized on Figures 5A, 5D, 9A and 9B:

Figure 5A: McClellan Avenue and Fair Avenue (Intersection ID #7)To address the heavy northbound right turn volume it is recommended that a northbound to eastbound right-turn lane be constructed. This will require modification to the existing traffic signal installation and adjustment to the signal timings.

Figure 5D: U.S. 41 and Grove Street (Intersection ID #49)Traffic signal timing was originally recommended to be revised to bring the LOS to within an acceptable range. With the Marquette Hospital relocation to Baraga Avenue, this intersection is being reconstructed as a roundabout intersection in 2017.

Figure 9A: McClellan Avenue and Wright Street (Intersection ID #6)It is recommended that the traffic signal be retimed to account for the heavy northbound right-turn movement. If the signal is not already interconnected with the adjacent signals, that should be installed.

Figure 9B: U.S. 41 and Hampton Street (Intersection ID #55)This intersection did not meet all-way stop or signal warrants. An analysis using the existing 2-way stop control and adding left turn lanes to Hampton Street was completed, but the level of service did not improve to an acceptable level. Hampton Street has a relatively low volume compared with adjacent streets; therefore the cost of construction of a roundabout would not be justified. It is recommended that a detailed crash analysis and an evaluation of the impacts of restricting Hampton Street to right-in/right-out only be completed.

McClellan Avenue/Baraga Avenue (Intersection ID #64)This intersection met the all-way stop warrant, however installation of an all-way stop mid-way between the two adjacent signalized intersections (Washington Street and U.S. 41) is not reasonable and would not provide an acceptable level of service. With the Marquette Hospital relocation, the westbound approach of Baraga Avenue at McClellan Avenue will be restricted to prohibit left turns and through traffic, and will allow right turns only. All other movements at this intersection will continue to be permitted, and the intersection will continue to operate as stop controlled on Baraga Avenue approaches and free flow on McClellan Avenue.

Page 25: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

City of Marquette Traffic Study

3/3/17 24

PEDESTRIAN/BICYCLE ACCOMMODATION ANALYSIS & RECOMMENDATIONS

The existing pedestrian and bicycle facilities have been evaluated to identify deficiencies in the existing system. This analysis complements the previous studies and recommendations described earlier in this report and provides some general recommendations to be applied throughout the City. Data and information from a variety of sources were used in the analysis as discussed below.

Pedestrian and bicycle count data was collected at each of the 81 study locations. These volumes were used to assist in identifying corridors and intersections which warrant additional facilities. The counts for this study were taken in fall and winter when pedestrian and bicycle activity at some locations could theoretically be at lower levels than during warmer weather months. However, it was indicated by stakeholders that student activity while NMU is in session drives a significant amount of the pedestrian and bicycle activity in the City, with the result being that some locations experience highest volumes while NMU is in session. These counts were only one input to the analysis since there is not a universally accepted standard regarding what level of pedestrian or bicycle activity justifies provision of additional facilities. The analysis and recommendations also relied on input from City staff and stakeholders as well as the professional judgment of the consultant team.

Other resources evaluated included the Draft City of Marquette Community Master Plan, Chapter 6 - Transportation, the Third Street Corridor Sustainable Development Plan (version 5.0) and input from various stakeholders including City staff, Northern Michigan University, Marquette Bikeability Committee and Marquette Access Group. Finally, evaluation of the corridors and intersections was accomplished using field visits, aerial photography and video recordings taken during field visits.

Pedestrian FacilitiesAn assessment of the existing sidewalk network within the City was completed in order to identify gaps in the system which would warrant the construction of additional sidewalk links. Figure 10 depicts this existing sidewalk network and identifies the recommended additions to the existing network.

The following list includes the sidewalk links being recommended for addition to the system and are shown graphically on Figure 10. As these links are added to the system, crossing improvements such as crosswalks and ADA ramps should be added at related intersections.

Wright Street – McClellan Avenue to Lakeshore Boulevard (north side – McClellan Avenue to a point easterly of Sugar Loaf Avenue at the existing sidewalk and Vanevera Avenue to Wilkinson Avenue; south side – Sugar Loaf Avenue to Presque Isle Avenue and NMU Dome entrance to Lakeshore Boulevard)

Center Street – Vanevera Avenue to Tracy Avenue (both sides) Fair Avenue – McClellan Avenue to 7th Street (north side – McClellan Avenue to Lincoln Avenue

and Northrup Street to 8th Street; south side – 8th Street to 7th Street) Presque Isle Avenue – Norwood Street to Wright Street (west side) Magnetic Street – Fourth Street to Third Street (north side) Hewitt Avenue – Seventh Street to Oak Street (south side) Ridge Street – Sixth Street to Fifth Street (north side) Ridge Street – McClellan Avenue to Lincoln Avenue (south side) McClellan Avenue – US 41 to Washington Street (west side) including improved pedestrian

crossing of US 41 McClellan Avenue – Washington Street to Fair Avenue (both sides)

Page 26: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

City of Marquette Traffic Study

3/3/17 25

Washington Street – McClellan Avenue easterly to Garfield Avenue (south side) US 41 – Hampton Street to Genesee Street (east side) Altamont Street – Mesnard Street to Fisher Street (west side – Jackson Street to U.S. 41

overpass; east side – Mesnard street to Fisher Street) Altamont Street – Jackson Street to U.S. 41 (east side) Hampton Street – Adams Street to Altamont Street (both sides) Mesnard Street – Bothwell Middle School to Altamont Street (north side)

In addition to these specific segments, sidewalk should be filled in to connect all areas where the sidewalk is intermittent along the block. There are two areas within the City where this is most prevalent, but this guidance should be followed throughout the City in order to complete the sidewalk system. The most prevalent areas include the areas both north and south of Wright Street between Sugarloaf Avenue and Presque Isle Avenue and the areas south of U.S. 41, north of Pioneer Road and west of Adams Street.

On Presque Isle Avenue at Summit Street and Waldo Street, there are two existing overhead flashing signals (yellow for Presque Isle Avenue, red for Summit Street or Waldo Street). These overhead signals were installed when both intersections were cross streets that extended east into the area that is now part of the Northern Michigan University campus. Although these locations both are used by students to cross Presque Isle, it is recommended that the overhead signals be removed and that crosswalks be upgraded to high visibility crosswalks. Warning signs for the crossings should also be reviewed for retro-reflectivity and proper placement.

Several other locations have been identified as having a higher concentration of pedestrian activity, and improved pedestrian crossings are recommended as follows:

Wright Street between Sugarloaf Avenue and Lincoln Avenue – There is a high concentration of pedestrian crossings to and from the NMU parking lot north of Wright Street. A high visibility crosswalk has been installed, but it is recommended that advanced warning signs with flashers also be installed to alert drivers to this mid-block crossing. Installation of a grade separated crossing (overpass or tunnel) could also be considered, although costs would be considerably higher, and there would be design challenges in order to meet ADA requirements.

U.S. 41/McClellan Avenue – As noted above, an improved crossing of the west leg of U.S. 41 is recommended, including high visibility crosswalks, pedestrian countdown signals and advanced warning signs. Installation of a grade-separated facility for non-motorized traffic (tunnel or overpass) could be investigated.

Washington Street/McClellan Avenue - Improvements should include high visibility crosswalks, pedestrian countdown signals and advanced warning signs.

U.S. 41/Genesee Street – Improvements should include high visibility crosswalks, pedestrian countdown signals and advanced warning signs.

The following list includes general recommendations which should be reviewed when maintenance or infrastructure improvements are programmed at intersections within the City. Evaluation of the applicability of these should be included in the normal design/review process for each location.

Provision of high visibility crosswalks consisting of white 12-inch bars perpendicular to the crossing direction (ladder style). This design provides better visibility of the crosswalk to the driver.

Page 27: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

City of Marquette Traffic Study

3/3/17 26

Provision of curb extensions (bulb outs) to shorten crossing distance and provide traffic calming (see photograph). These should be constructed after more detailed studies are completed on whether this measure is appropriate for the location.

Upgrades to signalized intersections to meet current Michigan Manual on Uniform Traffic Control Devices and Proposed Right-of-Way Accessibility Guidelines (PROWAG). PROWAG serves to improve accessibility to all users, including the physically disabled. These documents may include facilities such as countdown pedestrian signals, audible pedestrian signals, properly located pedestrian pushbuttons and other related improvements to accessibility.

Bicycle FacilitiesThe existing bicycle network in the City was assessed to identify gaps in the system which would warrant the construction of additional links. The existing network is sparse when compared to the demand that was identified during the bicycle counts and when compared to input received from the City and stakeholders. While the intersections along Lakeshore Boulevard (Lakeshore Multi-Use Path) generally had the highest bicycle volumes, relatively high volumes were also encountered elsewhere, particularly in the vicinity of Northern Michigan University. Figure 11 depicts the existing bicycle network along with the recommendations for additional bikeway segments.

The additional bikeway segments being recommended are primarily the same as those recommended in the Draft Community Master Plan and the Third Street Corridor Sustainable Development Plan , with the exception of a link on Fair Avenue between McClellan Avenue and Lincoln Avenue and several additional links south of US 41. Further study of each of the recommended corridors shown on Figure 11 will be

Lakeshore Multi-Use Path near NMU Campus

Example of curb extension or bulb-out.Innovative Intersection Safety Improvement Strategies and ManagementPractices: A Domestic Scan. FHWA, September 2006.

Page 28: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

City of Marquette Traffic Study

3/3/17 27

required to identify whether the bikeway should be an on-street bike lane, a shared bike lane (sharrows), or a separate bike path.

Following are the recommended additional locations which were included in the Third Street Corridor Sustainable Development Plan:

Sugarloaf Avenue – Hawley Street to Wright Street Wright Street – Sugarloaf Avenue to Presque Isle Avenue Lincoln Avenue – Washington Street to Wright Street Kaye Avenue – Lincoln Avenue to Presque Isle Avenue Seventh Street/Tracy Avenue – Baraga Avenue to Wright Street Presque Isle Avenue – Kaye Avenue to Hawley Street Fair Avenue – Presque Isle Avenue to Lakeshore Boulevard Third Street – Fisher Street to Fair Avenue Pine Street – Ridge Street to Fair Avenue Hewitt Avenue – Seventh Street to Lakeshore Boulevard Ridge Street – Seventh Street to Lakeshore Boulevard Baraga Avenue – McClellan Avenue to Lakeshore Boulevard McClellan Avenue – US 41 to Washington Street

The following ten segments are recommended but had not been included in the Third Street Plan:

Hawley Street – Wilkinson Avenue to Dead River (north side) Fair Avenue – McClellan Avenue to Lincoln Avenue Altamont Street – Pioneer Road to Baraga Avenue Pioneer Road – Altamont Street to Division Street Division Street – Pioneer Road to Genesee Street Division Street – McClellan Avenue to Pioneer Road Genesee Street – Altamont Street to US 41 Wilson Street – existing path easterly of McClellan Avenue to the existing Iron Ore Heritage Trail

(north side) McClellan Avenue – Washington Street to Fair Avenue Washington Street – McClellan Avenue to Lakeshore Boulevard (see discussion in following

paragraph)

A recommendation to provide bicycle facilities along Washington Street was made by the Marquette Bikeability Committee. Washington Street would need to be widened to provide adequate width for bike lanes in addition to the single through lane in each direction and center median. However, Washington Street could be marked with sharrows for cyclists traveling this corridor for “non-recreational” purposes (i.e. commuting). This traffic study does recommend that the recreational bicyclists along Washington Street should be encouraged to use the multi-use path which runs parallel to Washington Street about 200 feet to the south.

Also, as noted in the Sidewalk Facilities section, in addition to an improved at-grade crossing of the west leg of U.S. 41 at McClellan Avenue, installation of a grade-separated facility for non-motorized traffic (tunnel or overpass) could be investigated.

Page 29: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

City of Marquette Traffic Study

3/3/17 28

TRUCK ROUTES

During the course of the traffic study, the consultant team was requested to assess potential truck routes to assist the City in their ongoing evaluation of this issue. While not part of the original study, applicable information related to this topic has been included in Appendix K.

Page 30: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

City of Marquette Traffic Study

3/3/17 29

CONCLUSIONS AND RECOMMENDATIONS

This study analyzed intersections, road segments, and non-motorized facilities within the City of Marquette. These locations were evaluated for traffic operations and system connectivity for both existing (year 2013) traffic volumes and year 2030 traffic volumes. All-way stop and traffic signal warrants were also evaluated. For intersections and road segments, mitigation recommendations were developed for any locations which had movements at LOS E or F. For non-motorized facilities, mitigation recommendations were developed to: connect “gaps” in the current non-motorized system; provide a basic bicycle facility network consistent with other ongoing City planning efforts, and; improve pedestrian crossing facilities.

Based on these analyses, the following recommendations for mitigation are made:

Intersection/Roadway Improvements McClellan Avenue/Wright Street (Intersection ID #6)

Near term - Retime existing traffic signal. Upgrade to interconnect with signals along Wright Street.

McClellan Avenue/Fair Avenue (Intersection ID #7)Near term – Retime existing traffic signal.Long term – Install northbound right turn lane.

Presque Isle Avenue/Fair Avenue (Intersection ID #16)Near term – Option 1: Install a traffic signal; Option 2: Install a mini-roundabout.

Front Street/Baraga Avenue (Intersection ID #37)No mitigation recommended. Geometric improvements do not improve level of service. Include intersection in the ongoing Baraga Avenue Corridor Study currently underway.

U.S. 41/Grove Street (Intersection ID #49)This intersection is being reconstructed as a roundabout in 2017.

U.S. 41/Hampton Street (Intersection ID #55)No mitigation recommended. Geometric improvements do not improve level of service. Impacts of converting to Hampton Street movements to right-in/right-out should be studied.

McClellan Avenue/Ridge Street (Intersection ID #62)Near term - Option 1: Install a traffic signal. Option 2: Install a roundabout.

McClellan Avenue/Baraga Avenue (Intersection ID #64)With the Marquette Hospital relocation, the east leg of this intersection has been restricted to right in right out operation.

McClellan Avenue/O’Dovero Drive (Intersection ID #66)Near term – Install traffic signal. Widen McClellan Avenue to add left turn lanes. Realign and widen westbound approach. Interconnect with U.S. 41/McClellan Avenue signal.

Lincoln Avenue/Wright Street (Intersection ID #69)Near term – Option 1: Install traffic signal with left turn lanes on all four intersection approaches. Realign or close southbound approach (driveway into private property). Install pedestrian countdown signals with high visibility crosswalks. Interconnect with signals along Wright Street. Option 2: Install a roundabout.

Washington Street Interconnect

Page 31: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

City of Marquette Traffic Study

3/3/17 30

Upgrade traffic signals to include interconnect system. Implement system timings to provide progression through system. Do not extend system to U.S. 41 since that system is on different cycle length and maintained by MDOT.

Wright Street InterconnectUpgrade traffic signals to include interconnect system. Implement system timings to provide progression through system.

Pedestrian and Bicycle Facility Improvements Sidewalks

Recommended sidewalk connections are shown on Figure 10. Pedestrian Crossing Improvements

Upgrades recommended across Wright Street between Sugarloaf Avenue and Lincoln Avenue, across west leg of U.S. 41 at McClellan Avenue (possible grade separation), U.S. 41 at Genesee Street, McClellan Avenue at Washington Street, and Presque Isle Avenue at Summit Street and Waldo Street.

Bicycle Facilities Recommended multi-use paths and/or on-street bike lanes are shown on Figure 11.

Non-motorized crossingsWhen maintenance or infrastructure improvements are programmed at intersections, evaluate/implement the following items where feasible and appropriate:

Provide high visibility crosswalks consisting of white 12-inch bars perpendicular to the crossing direction (ladder style).

Provide curb extensions (bulb outs) to shorten crossing distance and provide traffic calming.

When signals infrastructure is upgraded, meet current Michigan Manual on Uniform Traffic Control Devices and Proposed Right-of-Way Accessibility Guidelines (PROWAG). PROWAG serves to improve accessibility to all users, including the physically disabled. This may include elements such as countdown pedestrian signals, audible pedestrian signals, and properly located pedestrian pushbuttons.

Construction Costs and PrioritizationEstimated construction costs were developed for mitigation recommendations that could be specifically defined. These are summarized in Table 9. Table 9 also designates a priority level for implementing each improvement with “high” priority indicating an improvement which should be funded and constructed in the near future (0-5 years), “medium” priority indicating improvements funded and constructed in 5-10 years, and “low” priority funded and constructed long term (10-20 years). These priority levels were set based on an evaluation of existing versus longer term issues, construction cost, safety issues and level of service.

Because traffic growth is dependent on many variables (some of which could not be foreseen at the time of this study), all locations should be monitored for degradation in operation even though the location may not have been identified for mitigation. Further study of each of the recommended improvements will be required to refine the design concepts and estimated construction costs. As individual projects are advanced, the City’s “Complete Streets Guiding Principles” should be incorporated to develop improvements which provide for multiple transportation modes. It is also

Page 32: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

City of Marquette Traffic Study

3/3/17 31

recommended that to the extent practical, the “7 Principles of Universal Design” be incorporated into future projects. These include the following: equitable use, flexibility in use, simple and intuitive, perceptible information, tolerance for error, low physical effort, and size and space for approach and use.

Page 33: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

TABLE 1

Study Area Intersections and Segments

Int. 

#Intersection Location

Int. 

#Intersection Location

1 Lakeshore Boulevard and Peter White Drive 41 Seventh Street and Spring Street

2 Lakeshore Boulevard and Hawley Street 42 Seventh Street and Baraga Avenue

3 Presque Isle Avenue and Hawley Street 43 Front Street and Fisher Street

4 Sugarloaf Avenue and Hawley Street 44 Third Street and Fisher Street

5 Sugarloaf Avenue and Wright Street 45 Fourth Street and Fisher Street

6 McClellan Avenue and Wright Street 46 Fifth Street and Fisher Street

7 McClellan Avenue and Fair Avenue 47 Altamont Street and Fisher Street

8 McClellan Avenue and Cleveland Street 48 Seventh Street and Fisher Street

9 Seventh Street and College Avenue 49 U.S. 41 and Grove Street

10 Presque Isle Avenue and Center Street 50 U.S. 41 and Genesee Street

11 Presque Isle Avenue and Wright Street 51 Division Street and Genesee Street

12 Lakeshore Boulevard and Wright Street 52 Altamont Street Genesee Street

13 Pine Street and Lakeshore Boulevard 53 Altamont Street and Hampton Street

14 Pine Street and Fair Avenue 54 Division Street and Hampton Street

15 Lakeshore Boulevard and Fair Avenue 55 U.S. 41 and Hampton Street

16 Presque Isle Avenue and Fair Avenue 56 Division Street and Joliet Road

17 Third Street and Fair Avenue 57 Division Street and Pioneer Road

18 Front Street and Fair Avenue 58 Altamont Street and Pioneer Road

19 Presque Isle Avenue and Kaye Avenue 59 Division Street and McClellan Avenue

20 Fourth Street and College Avenue 60 Third Street and Spring Street

21 Third Street and College Avenue 61 U.S. 41 and Washington Street

22 Pine Street and Magnetic Street 62 McClellan Avenue and Ridge Street

23 Front Street and Magnetic Street 63 McClellan Avenue and Washington Street

24 Third Street and Magnetic Street 64 McClellan Avenue and Baraga Avenue

25 Fourth Street and Magnetic Street 65 U.S. 41 and McClellan Avenue

26 Lakeshore Boulevard and Crescent Street 66 O'Dovero Drive and McClellan Avenue

27 Lakeshore Boulevard and Hewitt Avenue 67 Grove Street and McClellan Avenue

28 Spruce Street and Hewitt Avenue 68 Pioneer Road and McClellan Avenue

29 Pine Street and Hewitt Avenue 69 Lincoln Avenue and Wright Street

30 Front Street and Hewitt Avenue 70 Lincoln Avenue and Fair Avenue

31 Third Street and Hewitt Avenue 71 Lincoln Avenue and College Avenue

32 Fourth Street and Hewitt Avenue 72 Lincoln Avenue and Cleveland Street

33 Front Street and Arch Street 73 Lincoln Avenue and Washington Street

34 Pine Street and Ridge Street 74 Seventh Street and Magnetic Street

35 Lakeshore Boulevard and Spring Street 75 Seventh Street and Washington Street

36 Lakeshore Boulevard and Baraga Avenue 76 Fifth Street and Washington Street

37 Front Street and Baraga Avenue 77 Fourth Street and Washington Street

38 Front Street and Spring Street 78 Third Street and Washington Street

39 Third Street and Baraga Avenue 79 Front Street and Washington Street

40 Fourth Street and Baraga Avenue 80 Front Street and Main Street

81 Lakeshore Blvd and Washington Street

Page 34: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

TABLE 1 (cont.)

Study Area Intersections and Segments

#

C1

C2

C3

C4

C5

C6

C7

C8

C9

C10

C11

C12

C13

C14

C15

C16

C17

C18

C19

C20

C21

C22

C23

C24

C25

C26

C27

C28

C29

C30

C31

C32

C33

C34

Fair Avenue from City limits to Seventh Street (Loc. 2)

Washington Street from U.S. 41 to Lakeshore Boulevard (Loc. 2)

Corridor Analysis Locations

Hawley Street from City limits to Lakeshore Boulevard

Sugarloaf Avenue from Wright Street to Hawley Street

Wright Street from City limits to Lakeshore Boulevard

Wright Street from City limits to Lakeshore Boulevard (Loc. 2)

Presque Isle Avenue from College Avenue to Hawley Street

Presque Isle Avenue from College Avenue to Hawley Street (Loc. 2)

Center Street from Presque Isle Avenue to Tracy Avenue

Fair Avenue from Presque Isle Avenue to Lakeshore Boulevard

College Avenue from Lincoln Avenue to Front Street

Magnetic Street from Lincoln Avenue to Front Street

Magnetic Street from Lincoln Avenue to Front Street (Loc. 2)

College Avenue from Lincoln Avenue to Front Street (Loc. 2)

Fair Avenue from City limits to Seventh Street

Grove Street from City Limits to U.S. 41 (Loc. 2)

Lincoln Avenue from Washington Street to Wright Street

Lincoln Avenue from Washington Street to Wright Street (Loc. 2)

Washington Street from U.S. 41 to Lakeshore Boulevard

Hewitt Avenue from Seventh Street to Lakeshore Boulevard ( Loc. 2)

Pine Street from Ridge Street to Fair Avenue (Loc. 2)

Hewitt Avenue from Seventh Street to Lakeshore Boulevard

Front Street from U.S. 41 to Fair Avenue (Loc. 2)

Third Street from Fisher Street to Fair Avenue (Loc. 2)

McClellan Avenue from U.S. 41 to Wright Street (Loc. 2)

McClellan Avenue from U.S. 41 to Wright Street

Grove Street from City Limits to U.S. 41

Seventh Street from U.S. 41 to Fair Avenue (Loc. 2)

Fourth Street from Fisher Street to College Avenue (Loc. 2)

Seventh Street from U.S. 41 to Fair Avenue

Pine Street from Ridge Street to Fair Avenue

Front Street from U.S. 41 to Fair Avenue

Third Street from Fisher Street to Fair Avenue

Fourth Street from Fisher Street to College Avenue

Page 35: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

Table 2

Previous and Current Studies

Name Contents or Date Summary

2013‐02‐13 Marquette Drawing Set Shoreline Restoration Concepts Depicts relocation of Lakeshore Blvd as part of shoreline restoration. Used 

for 2030 No Build Synchro network.

Northern Michigan University Master 

Plan

15‐ to 20‐year planning document for growth and redevelopment of the 

campus. Used for evaluation of mitigation in the vicinity of the NMU 

campus.

Community Master Plan Update ‐ Draft 

Chapter 6 ‐ Transportation

Currently being updated by City Provided good description of existing transportation system and 

recommendations for improvements to the system. Used to develop 

pedestrian and bicycle facility recommendations.

Marquette Place Site Plan Part of Founders Landing 

Development

Used to develop 2030 No Build Traffic

Complete Streets Resolution Complete Streets Guiding Principles Facilities for all modes should be included in planning, funding, designing, 

constructing, operating and maintaining new and modified streets.

Implementation Report ‐ Marquette 

SGA (Smart Growth America)

Marquette Mobility Management and 

Coordination Implementation Plan ‐ 

2013

Mobility management strategies to improve effectiveness of transit 

network; Also improve the 3rd Street corridor and enhance walkability, 

bikeability and transit use. 

Third Street Corridor Sustainable 

Development Plan

2/6/2013 ‐ Version 5.0 Plan created to create a mixed‐use corridor to link downtown with NMU 

and surrounding neighborhoods.  Public input and charrettes to develop 

Vision plan for corridor. Used to develop pedestrian and bicycle facility 

recommendations.

Central UP Planning and Development US‐41/M‐28 Comprehensive Corridor 

& Access Management Plan

Corridor and access management plan for US 41/M28.  Includes 

recommendations at Washsington/US 41 (p 4‐6)/ US 41/McClellan (p. 4‐7), 

US 41/Grove (p. 4‐7)

Multi Use Path CIP Multi Use Path Exhibit Identifies existing and future multi‐use paths within and near Marquette. 

Information is reflected on Figure 11 ‐ Recommended Bikeway System 

Additions

Capital Improvement Plan 2013/2014 

Budget

Supplemental information

City of Marquette Downtown 

Development Authority ‐ Development 

Plan and Tax Increment Financing Plan 

#3

Development Plan and Tax Increment 

Financing Plan #3 ‐ 2011

Description of Development Plan and proposed projects through 2036.

Downtown Parking  Downtown Marquette Parking Map Shows On‐Street and Parking lots

MarqTran Combined Schedules Transit Route Maps Information was considered as mitigation locations were reviewed.

Multi Use Map Identifies groomed multi‐use path along lakefront.  Reflected on Figure 11 ‐ 

Recommended Bikeway System Additions

Past Traffic Counts 1990 and 2000 ADTs Counts taken at 72 locations throughout City.  

Proposed 3rd Street Bus Route Prop. Bus route from Mobility 

Management Strategies ‐ Fig. 5.5

Community Master Plan 2004 Previous version of Master Plan. This plan is currently being updated.

Gravel Street Ex11 Gravel Street Paving Capital 

Improvement Plan

Presentation Meeting 

2_MM_Marquette

Strategies and Alternatives for 

Marquette: Mobility Management ‐ 

PowerPoint presentation 

Focused on providing transit service within City to improve mobility.

Sidewalks  CIP Sidewalks Exhibit Identifies types of sidewalks

City Traffic Counts Map 2007 Historic Counts Presents roadway classifications, truck routes and traffic counts 

(Marquette ‐ 2000; MDOT ‐ 1999)

Downtown Development Plan and 

Parking Demand Analysis

1996 Parking study for downtown Marquette to address parking shortage

Page 36: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

AM Peak Hour Mid-Day Peak Hour PM Peak Hour Notes

Overall

LOS

Delay

(sec/veh)

Overall

LOS

Delay

(sec/veh)

Overall

LOS

Delay

(sec/veh)

5 Sugarloaf Ave & Wright St B 14.5 B 15.5 B 18.7

6 McClellan Ave & Wright St B 14.0 B 14.5 C 23.9

7 McClellan Ave & Fair Ave F 88.4 C 21.8 B 17.2 AM: NB TH/RT = F;

Mid-Day: NB TH/RT = D

9 Seventh St & College Ave B 10.3 B 17.7 B 14.7

11 Presque Isle Ave & Wright St A 7.5 B 10.2 B 11.9

19 Presque Isle Ave & Kaye Ave B 11.0 B 11.9 B 12.2

20 Fourth St & College Ave A 8.7 A 9.9 B 10.6

30 Front St & Hewitt Ave B 11.3 B 11.5 B 12.0

31 Third St & Hewitt Ave B 11.7 B 12.6 B 13.0

38 Front St & Spring St A 4.6 A 5.1 A 5.3

49 U.S. 41 & Grove St D 40.4 C 32.2 C 32.5 AM: SB Th/RT = F; SEB LT = E; SB LT, NB LT = D

Mid-Day: SEB LT = E; SB TH/RT = F; NB LT, NWB LT = D

PM: NWB LT, SEB LT = D; SB TH/RT = E, NB LT = D

50 U.S. 41 & Genesee St B 13.6 B 12.8 B 14.8

61 U.S. 41 & Washington St (NW)* A 7.0 B 12.3 A 9.9

Intersection

TABLE 3

Existing Level of Service Summary

Signalized Intersections (2013)

61 U.S. 41 & Washington St (NW)* A 7.0 B 12.3 A 9.9

U.S. 41 & Washington St (SE)* C 28.9 C 22.2 C 31.1 PM: NW TH = D

63 McClellan Ave & Washington St B 14.4 B 15.9 B 16.4

65 U.S. 41 & McClellan Ave (North)* B 11.9 B 13.6 B 15.6

U.S. 41 & McClellan Ave (South)* B 14.4 B 13.4 B 13.9

70 Lincoln Ave & Fair Ave B 12.2 B 13.2 B 12.6

71 Lincoln Ave & College Ave B 11.4 B 10.7 B 10.8

73 Lincoln Ave & Washington St B 11.8 B 11.9 B 14.1

74 Seventh St & Magnetic St B 11.9 B 14.4 B 9.2

75 Seventh St & Washington St B 12.1 B 14.6 B 14.8

76 Fifth St & Washington St B 11.2 B 12.7 B 12.7

77 Fourth St & Washington St A 9.4 B 10.9 B 10.4

78 Third St & Washington St B 13.3 B 15.2 B 14.8

79 Front St & Washington St A 3.3 A 6.3 A 5.3

Indicates Intersection with Movements at Level of Service of E or F

Indicates Intersection with Movements at Level of Service of D

* Level of Service cannot be calculated using HCM 2010. HCM 2000 was used for these intersections.

Page 37: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

AM Peak Hour Mid-Day Peak Hour PM Peak Hour Notes

Overall

LOS

Delay

(sec/veh)

Overall

LOS

Delay

(sec/veh)

Overall

LOS

Delay

(sec/veh)

1 Lakeshore Blvd & Peter White Dr A 3.1 A 1.4 A 1.2

2 Lakeshore Blvd & Hawley St A 4.5 A 3.0 A 4.6

3 Presque Isle Ave & Hawley St A 5.3 A 5.9 A 5.6

4 Sugarloaf Ave & Hawley St A 4.7 A 5.3 A 6.0

8 McClellan Ave & Clevel& St B 12.7 B 13.4 B 17.1

10 Presque Isle Ave & Center St A 1.1 A 1.7 A 1.7

12 Lakeshore Blvd & Wright St A 2.9 A 3.3 A 3.8

13 Pine St & Lakeshore Blvd A 1.0 A 1.2 A 1.6

14 Pine St & Fair Ave A 7.5 A 8.0 A 8.5

15 Lakeshore Blvd & Fair Ave A 2.3 A 3.5 A 2.5

16 Presque Isle Ave & Fair Ave A 4.8 A 6.3 A 7.3 Mid-Day: WB LT = D

PM: WB LT = E

17 Third St & Fair Ave A 4.9 A 6.7 A 6.8

18 Front St & Fair Ave A 3.1 A 2.5 A 2.6

21 Third St & College Ave A 4.2 A 3.9 A 4.5

22 Pine St & Magnetic St A 1.8 A 2.0 A 2.2

Intersection

TABLE 4

Existing Level of Service Summary

Unsignalized Intersections (2013)

22 Pine St & Magnetic St A 1.8 A 2.0 A 2.2

23 Front St & Magnetic St A 2.1 A 1.7 A 2.4

24 Third St & Magnetic St A 1.4 A 1.4 A 2.1

25 Fourth St & Magnetic St A 3.4 A 3.4 A 3.6

26 Lakeshore Blvd & Crescent St A 1.7 A 0.8 A 1.3

27 Lakeshore Blvd & Hewitt Ave A 1.3 A 1.0 A 0.7

28 Spruce St & Hewitt Ave A 4.7 A 5.4 A 4.4

29 Pine St & Hewitt Ave A 7.2 A 7.3 A 7.4

32 Fourth St & Hewitt Ave A 1.4 A 1.9 A 2.3

33 Front St & Arch St A 7.9 A 8.4 A 9.2

34 Pine St & Ridge St A 3.2 A 3.2 A 3.6

35 Lakeshore Blvd & Spring St A 0.6 A 0.3 A 0.6

36 Lakeshore Blvd & Baraga Ave A 0.0 A 9.4 B 10.6

37 Front St & Baraga Ave A 2.4 A 3.3 A 4.4 PM: WB TH/LT = E

39 Third St & Baraga Ave A 4.2 A 4.5 A 5.0

40 Fourth St & Baraga Ave A 3.6 A 4.8 A 4.4

41 Seventh St & Spring St A 1.0 A 1.8 A 2.0

42 Seventh St & Baraga Ave A 2.6 A 3.4 A 3.4

43 Front St & Fisher St A 1.3 A 1.1 A 1.4

Page 38: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

AM Peak Hour Mid‐Day Peak Hour PM Peak Hour NotesOverall 

LOS

Delay 

(sec/veh)

Overall 

LOS

Delay 

(sec/veh)

Overall 

LOS

Delay 

(sec/veh)

44 Third St & Fisher St A 9.8 A 8.0 B 11.5

45 Fourth St & Fisher St A 8.7 A 8.5 A 9.3

46 Fifth St & Fisher St A 2.9 A 2.5 A 2.3

47 Altamont St & Fisher St A 6.6 A 3.7 A 4.9

48 Seventh St & Fisher St A 0.0 A 0.0 A 0.0

51 Division St & Genesee St A 3.8 A 5.1 A 5.7

52 Altamont St & Genesee St A 0.5 A 1.9 A 1.5

53 Altamont St & Hampton St A 3.4 A 6.4 A 6.1

54 Division St & Hampton St A 6.0 A 3.4 A 3.4

55 U.S. 41 & Hampton St A 1.5 A 1.3 A 1.7 PM: EB and WB = D

56 Division St & Joliet Rd A 2.7 A 2.3 A 1.7

57 Division St & Pioneer Rd A 1.7 A 3.4 A 3.0

58 Altamont St & Pioneer Rd A 3.1 A 1.4 A 2.0

59 Division St & McClellan Ave A 1.1 A 1.8 A 3.0

60 Third St & Spring St A 1.9 A 2.8 A 2.8

62 McClellan Ave & Ridge St A 2.8 A 6.4 A 8.4 Mid‐Day: WB LT = D, EB LT = E

PM:WB TH/RT = D, EB TH/RT = E, EB LT and WB LT = F64 McClellan Ave & Baraga Ave A 2.1 A 6.1 A 4.9

66 O'Dovero Dr & McClellan Ave A 1.6 A 4.7 A 6.7 PM: EB LT = E67 Grove St & McClellan Ave B 11.5 B 10.3 C 15.4

68 Pioneer Rd & McClellan Ave A 3.3 A 2.9 A 2.4

69 Lincoln Ave & Wright St A 2.3 A 6.3 C 20.7 Mid‐Day: NB TH = D

PM: NB LT = F72 Lincoln Ave & Cleveland St A 2.3 A 2.2 A 2.0

80 Front St & Main St A 1.1 A 1.8 A 1.6

81 Lakeshore Blvd & Washington St A 1.4 A 1.9 A 1.4

Indicates Intersection with Movements at Level of Service of E or F

Indicates Intersection with Movements at Level of Service of D +

* Level of Service cannot be calculated using HCM 2010.  HCM 2000 was used for these intersections.

Existing Level of Service Summary

Unsignalized Intersections  (2013)

Intersection

TABLE 4 (cont.)

Page 39: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

TABLE 5A

Warrant Analyses Summary

All-Way Stop Warrant

Met Met

All Way

Stop

All Way

Stop

1 Lakeshore Blvd & Peter White Dr Yield No 43 Front St & Fisher St 1-way Stop No

2 Lakeshore Blvd & Hawley St 1-way Stop No 44 Third St & Fisher St 3-way Stop Ex.-No

3 Presque Isle Ave & Hawley St 2-way Stop No 45 Fourth St & Fisher St 3-way Stop No

4 Sugarloaf Ave & Hawley St 1-way Stop No 46 Fifth St & Fisher St 1-way Stop No

8 McClellan Ave & Cleveland St All-way Stop Ex.-No 47 Altamont St & Fisher St 2-way Stop No

10 Presque Isle Ave & Center St 1-way Stop No 48 Seventh St & Fisher St 2-way Stop No

12 Lakeshore Blvd & Wright St 1-way Stop No 51 Division St & Genesee St 2-way Stop No

13 Pine St & Lakeshore Blvd 1-way Stop No 52 Altamont St Genesee St 2-way Stop No

14 Pine St & Fair Ave All-way Stop Ex.-No 53 Altamont St & Hampton St 2-way Stop No

15 Lakeshore Blvd & Fair Ave 1-way Stop No 54 Division St & Hampton St 2-way Stop No

16 Presque Isle Ave & Fair Ave 1-way Stop No 55 U.S. 41 & Hampton St* 2-way Stop No

17 Third St & Fair Ave 2-way Stop Yes 56 Division St & Joliet Road 1-way Stop No

18 Front St & Fair Ave 1-way Stop No 57 Division St & Pioneer Road 1-way Stop No

21 Third St & College Ave 2-way Stop No 58 Altamont St & Pioneer Road 1-way Stop No

22 Pine St & Magnetic St 2-way Stop No 59 Division St & McClellan Ave* 1-way Stop No

23 Front St & Magnetic St 2-way Stop No 60 Third St & Spring St 2-way Stop No

24 Third St & Magnetic St 2-way Stop No 62 McClellan Ave & Ridge St 2-way Stop Yes

25 Fourth St & Magnetic St 2-way Stop No 64 McClellan Ave & Baraga Ave 2-way Stop Yes

26 Lakeshore Blvd & Crescent St 1-way Stop No 66 O'Dovero Dr & McClellan Ave* 1-way Stop No

27 Lakeshore Blvd & Hewitt Ave 1-way Stop No 67 Grove St & McClellan Ave* All-way Stop Ex.-No

28 Spruce St & Hewitt Ave 2-way Stop No 68 Pioneer Rd & McClellan Ave* 2-way Stop No

29 Pine St & Hewitt Ave All-way Stop Ex.-No 69 Lincoln Ave & Wright St 1-way Stop No

Intersection Intersection

Existing

Intersection

Control Type

Existing

Intersection

Control Type

30 Hewitt Ave & Front St Signal No 72 Lincoln Ave & Cleveland St 1-way Stop No

32 Fourth St & Hewitt Ave 2-way Stop No 74 Seventh St & Magnetic St Signal No

33 Front St & Arch St All-way Stop Ex.-No 75 Washington St & Fifth St Signal No

34 Pine St & Ridge St 1-way Stop No 79 Washington St & Front St Signal Yes

35 Lakeshore Blvd & Spring St 1-way Stop No 80 Front St & Main St 2-way Stop No

36 Lakeshore Blvd & Baraga Ave 2-way Stop No 81 Lakeshore Blvd & Washington St 1-way Stop No

37 Front St & Baraga Ave 2-way Stop No * Indicates Intersection on MDOT Trunk Line

38 Front St & Spring St Signal No

39 Third St & Baraga Ave All-way Stop Ex.-No

40 Fourth St & Baraga Ave 2-way Stop No

41 Seventh St & Spring St 2-way Stop No

42 Seventh St & Baraga Ave 2-way Stop No

Page 40: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

TABLE 5B

Warrant Analyses Summary

Traffic Signal Warrants

Warrant 1 

(8‐Hour 

Volume)

Warrant 2 

(4‐Hour 

Volume)

Warrant 3 

(Peak Hour)

Warrant 4 

(Min. Ped. 

Volume)

Warrant 5 

(School 

Crossing)

Warrant 7 

(Crash 

Experience)1 Lakeshore Blvd & Peter White Dr None/Yield No No No No No No

2 Lakeshore Blvd & Hawley St 1‐way Stop No No No No No No

3 Presque Isle Ave & Hawley St 2‐way Stop No No No No No No

4 Sugarloaf Ave & Hawley St 1‐way Stop No No No No No No

8 McClellan Ave & Cleveland St All‐way Stop No No No No No No

9 Seventh St & College Ave Signalized  No Yes No No No No

10 Presque Isle Ave & Center St 1‐way Stop No No No No No No

12 Lakeshore Blvd & Wright St 1‐way Stop No No No No No No

13 Pine St & Lakeshore Blvd 1‐way Stop No No No No No No

14 Pine St & Fair Ave All‐way Stop No No No No No No

15 Lakeshore Blvd & Fair Ave 1‐way Stop No No No No No No

16 Presque Isle Ave & Fair Ave 1‐way Stop No No No No No No

17 Third St & Fair Ave 2‐way Stop No No No No No No

18 Front St & Fair Ave 1‐way Stop No No No No No No

21 Third St & College Ave 2‐way Stop No No No No No No

22 Pine St & Magnetic St 2‐way Stop No No No No No No

23 Front St & Magnetic St 2‐way Stop No No No No No No

24 Third St & Magnetic St 2‐way Stop No No No No No No

25 Fourth St & Magnetic St 2‐way Stop No No No No No No

26 Lakeshore Blvd & Crescent St 1‐way Stop No No No No No No

27 Lakeshore Blvd & Hewitt Ave 1‐way Stop No No No No No No

28 Spruce St & Hewitt Ave 2‐way Stop No No No No No No

29 Pine St & Hewitt Ave All‐way Stop No No No No No No

30 Hewitt Ave & Front St Signalized  No No No No No No

32 Fourth St & Hewitt Ave 2‐way Stop No No No No No No

33 Front St & Arch St All‐way Stop No No No No No No

34 Pine St & Ridge St 1‐way Stop No No No No No No

35 Lakeshore Blvd & Spring St 1‐way Stop No No No No No No

36 Lakeshore Blvd & Baraga Ave 2‐way Stop No No No No No No

37 Front St & Baraga Ave 2‐way Stop No No No No No No

38 Front St & Spring St Signalized  No No No No No No

39 Third St & Baraga Ave All‐way Stop No No No No No No

40 Fourth St & Baraga Ave 2‐way Stop No No No No No No

41 Seventh St & Spring St 2‐way Stop No No No No No No

42 Seventh St & Baraga Ave 2‐way Stop No No No No No No

IntersectionExisting 

Intersection 

Control Type

Traffic Signal Warrants

Page 41: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

TABLE 5B (cont.)

Warrant Analyses Summary

Traffic Signal Warrants

Warrant 1 

(8‐Hour 

Volume)

Warrant 2 

(4‐Hour 

Volume)

Warrant 3 

(Peak Hour)

Warrant 4 

(Min. Ped. 

Volume)

Warrant 5 

(School 

Crossing)

Warrant 7 

(Crash 

Experience)43 Front St & Fisher St 1‐way Stop No No No No No No

44 Third St & Fisher St 3‐way Stop No No No No No No

45 Fourth St & Fisher St 3‐way Stop No No No No No No

46 Fifth St & Fisher St 1‐way Stop No No No No No No

47 Altamont St & Fisher St 2‐way Stop No No No No No No

48 Seventh St & Fisher St 2‐way Stop No No No No No No

51 Division St & Genesee St 2‐way Stop No No No No No No

52 Altamont St Genesee St 2‐way Stop No No No No No No

53 Altamont St & Hampton St 2‐way Stop No No No No No No

54 Division St & Hampton St 2‐way Stop No No No No No No

55 U.S. 41 & Hampton St* 2‐way Stop No No No No No No

56 Division St & Joliet Rd 1‐way Stop No No No No No No

57 Division St & Pioneer Rd 1‐way Stop No No No No No No

58 Altamont St & Pioneer Rd 1‐way Stop No No No No No No

59 Division St & McClellan Ave* 1‐way Stop No No No No No No

60 Third St & Spring St 2‐way Stop No No No No No No

62 McClellan Ave & Ridge St 2‐way Stop No No No No No No

63 Washington St & McClellan Ave Signalized  Yes Yes Yes No No No

64 McClellan Ave & Baraga Ave 2‐way Stop No No No No No No

66 O'Dovero Dr & McClellan Ave* 1‐way Stop Yes Yes No No No Yes

67 Grove St & McClellan Ave* All‐way Stop No No No No No No

68 Pioneer Rd & McClellan Ave* 2‐way Stop No No No No No No

69 Lincoln Ave & Wright St 1‐way Stop Yes Yes Yes No No No

72 Lincoln Ave & Cleveland St 1‐way Stop No No No No No No

74 Seventh St & Magnetic St Signalized  No No No No No No

76 Washington St & Fifth St Signalized  No No No No No No

79 Washington St & Front St Signalized  No No No No No No

80 Front St & Main St 2‐way Stop No No No No No No

81 Lakeshore Blvd & Washington St 1‐way Stop No No No No No No

* Indicates Intersection on MDOT Trunk Line

IntersectionExisting 

Intersection 

Control Type

Traffic Signal Warrants

Page 42: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

ID # NS EW Existing Traffic Control

1 Lakeshore Blvd Peter White Drive NO CONTROL No movements at LOS D, E or F None

2 Lakeshore Blvd Hawley Street 1WS EB No movements at LOS D, E or F None

3 Presque Isle Avenue Hawley Street 2WS NS No movements at LOS D, E or F None

4 Sugarloaf Avenue Hawley Street 1WS NB No movements at LOS D, E or F None

5 Sugarloaf Avenue Wright Street Signal LOS D is worst LOS ‐ mitigation is optional, 

pedestrian crossing issues, high traffic 

volumes

Signal Retiming. Add Countdown Pedestrian Signal Heads, High 

Visibility Crosswalks and Pedestrian Crossing Warning Signs. Upgrade 

signal to include interconnect system along Wright Street. Implement 

system timings.

Evaluate No Right Turn on Red 

restriction for SB to WB right turns.

6 McClellan Avenue Wright Street Signal 2030 movements at E/F Signal Retiming. Upgrade signal to include interconnect system along 

Wright Street. Implement system timings.

7 McClellan Avenue Fair Avenue Signal Existing and 2030 movements at E/F Signal Retiming; Install NB right turn lane to address 2030 traffic 

needs.

8 McClellan Avenue Cleveland Street AWS No movements at LOS D, E or F None

9 Seventh Street College Avenue Signal No movements at LOS D, E or F None

10 Presque Isle Avenue Center Street 1WS EB No movements at LOS D, E or F None

11 Presque Isle Avenue Wright Street Signal No movements at LOS D, E or F Upgrade signal to include interconnect system along Wright Street. 

Implement system timings.

12 Lakeshore Blvd Wright Street 1WS EB No movements at LOS D, E or F None

13 Pine Street Lakeshore Boulevard 1WS NB No movements at LOS D, E or F None

14 Pine Street Fair Avenue AWS No movements at LOS D, E or F None

15 Lakeshore Blvd Fair Avenue 1WS EB No movements at LOS D, E or F None

16 Presque Isle Avenue Fair Avenue 1WS WB Existing and 2030 movements at E/F Install Traffic Signal or Mini‐roundabout

17 Third Street Fair Avenue 2WS NS LOS D is worst LOS ‐ Mitigation is optional  None, All‐way stop warranted but not recommended 

18 Front Street Fair Avenue 1WS NB No movements at LOS D, E or F None

19 Presque Isle Avenue Kaye Avenue Signal No movements at LOS D, E or F None

20 Fourth Street College Avenue Signal No movements at LOS D, E or F None

21 Third Street College Avenue 2WS EW No movements at LOS D, E or F None

22 Pine Street Magnetic Street 2WS EW No movements at LOS D, E or F None

23 Front Street Magnetic Street 2WS EW No movements at LOS D, E or F None

24 Third Street Magnetic Street 2WS EW No movements at LOS D, E or F None

25 Fourth Street Magnetic Street 2WS EW No movements at LOS D, E or F None

26 Lakeshore Blvd Crescent Street 1WS EB No movements at LOS D, E or F None

27 Lakeshore Blvd Hewitt Avenue 1WS EB No movements at LOS D, E or F None

28 Spruce Street Hewitt Avenue 2WS EW No movements at LOS D, E or F None

29 Pine Street Hewitt Avenue AWS No movements at LOS D, E or F None

30 Front Street Hewitt Avenue Signal No movements at LOS D, E or F None

31 Third Street Hewitt Avenue Signal No movements at LOS D, E or F None

32 Fourth Street Hewitt Avenue 2WS EW No movements at LOS D, E or F None

33 Front Street Arch Street AWS No movements at LOS D, E or F None

34 Pine Street Ridge Street 1WS SB No movements at LOS D, E or F None

35 Lakeshore Blvd Spring Street 1WS EB No movements at LOS D, E or F None

TABLE 6

Locations for Mitigation for Vehicular Operations*

IntersectionsIntersection Details

Reasons for Potential Mitigation Recommended Mitigation Possible Additional Study

Page 43: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

DLZ # NS EW Existing Traffic Control

36 Lakeshore Blvd Baraga Avenue 2WS NS LOS C is worst LOS ‐ Mitigation is optional; 

Atypical intersection control, future 

access for Founders Landing

Convert to 2‐way stop as Founders Landing is developed.   Evaluate in conjunction with Baraga 

Avenue Corridor Study (ongoing 

study by City).

37 Front Street Baraga Avenue 2WS EW Existing and 2030 movements at E/F Geometric improvements do not improve LOS. Evaluate in conjunction with Baraga 

Avenue Corridor Study (ongoing 

study by City).

38 Front Street Spring Street Signal No movements at LOS D, E or F None

39 Third Street Baraga Avenue AWS No movements at LOS D, E or F None

40 Fourth Street Baraga Avenue 2WS EW No movements at LOS D, E or F None

41 Seventh Street Spring Street 2WS EW No movements at LOS D, E or F None

42 Seventh Street Baraga Avenue 2WS EW No movements at LOS D, E or F None

43 Front Street Fisher Street 1WS EB No movements at LOS D, E or F None

44 Third Street Fisher Street 3WS No movements at LOS D, E or F None

45 Fourth Street Fisher Street 2WS EW No movements at LOS D, E or F None

46 Fifth Street Fisher Street 1WS SB No movements at LOS D, E or F None

47 Altamont Street Fisher Street 2WS NS No movements at LOS D, E or F None

48 Seventh Street Fisher Street 2WS NS, Y EB No movements at LOS D, E or F None

49 US 41 Grove Street Signal Existing and 2030 movements at E/F Reconstruction as a roundabout intersection

50 US 41 Genesee Street Signal No movements at LOS D, E or F None

51 Division Street Genesee Street 2WS EW No movements at LOS D, E or F None

52 Altamont Street Genesee Street 2WS EW No movements at LOS D, E or F None

53 Altamont Street Hampton Street 2WS NS No movements at LOS D, E or F None

54 Division Street Hampton Street 2WS EW No movements at LOS D, E or F None

55 US 41 Hampton Street 2WS EW 2030 movements at E/F Geometric improvements do not improve LOS. Evaluate impacts of restricting 

Hampton Street movements to right‐

in/right‐out only.

56 Division Street Joliet Road 1WS WB No movements at LOS D, E or F None

57 Division Street Pioneer Road 1WS EB No movements at LOS D, E or F None

58 Altamont Street Pioneer Road 1WS SB No movements at LOS D, E or F None

59 Division Street McClellan Avenue 1WS No movements at LOS D, E or F None

60 Third Street Spring Street 2WS  No movements at LOS D, E or F None

61 US 41 Washington Street Signal LOS D is worst LOS ‐ Mitigation is optional  Signal Retiming

62 McClellan Avenue Ridge Street 2WS EW Existing and 2030 movements at E/F All‐Way Stop does not improve LOS.  Install Traffic Signal or 

Roundabout.

63 McClellan Avenue Washington Street Signal No movements at LOS D, E or F Upgrade signal to include interconnect system along Washington 

Street. Implement system timings.

64 McClellan Avenue Baraga Avenue 2WS EW 2030 movements at E/F Right in right out on east approach

65 McClellan Avenue US 41 Signal No movements at LOS D, E or F None

66 McClellan Avenue O'Dovero Drive 1WS EB Existing and 2030 movements at E/F Traffic Signal Installation; Widen McClellan to provide LT lanes in both 

directions; Realign and widen east leg; Interconnect with US 

41/McClellan.

IntersectionsIntersection Details

Reasons for Potential Mitigation Recommended Mitigation Possible Additional Study

TABLE 6 (cont.)

Locations for Mitigation for Vehicular Operations*

Page 44: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

DLZ # NS EW Existing Traffic Control

67 McClellan Avenue Grove Street AWS No movements at LOS D, E or F None

68 McClellan Avenue Pioneer Road 2WS  No movements at LOS D, E or F None

69 Lincoln Avenue Wright Street 1WS NB Existing and 2030 movements at E/F Install traffic signal or roundabout.  For traffic signal, install left turn 

lanes on all legs. Realign or close north leg into parking lot. Install 

countdown pedestrian signals with high visibility crosswalks. Include 

signal in interconnect system along Wright Street. Implement system 

timings.  Roundabout may require closing north leg into parking lot. 

70 Lincoln Avenue Fair Avenue Signal No movements at LOS D, E or F None

71 Lincoln Avenue College Avenue Signal No movements at LOS D, E or F None

72 Lincoln Avenue Cleveland Street 1WS EB No movements at LOS D, E or F None

73 Lincoln Avenue Washington Street Signal No movements at LOS D, E or F Upgrade signal to include interconnect system along Washington 

Street. Implement system timings.

74 Seventh Street Magnetic Street Signal No movements at LOS D, E or F None

75 Seventh Street Washington Street Signal No movements at LOS D, E or F Upgrade signal to include interconnect system along Washington 

Street. Implement system timings.

76 Fifth Street Washington Street Signal No movements at LOS D, E or F Upgrade signal to include interconnect system along Washington 

Street. Implement system timings.

77 Fourth Street Washington Street Signal No movements at LOS D, E or F Upgrade signal to include interconnect system along Washington 

Street. Implement system timings.

78 Third Street Washington Street Signal No movements at LOS D, E or F Upgrade signal to include interconnect system along Washington 

Street. Implement system timings.

79 Front Street Washington Street Signal No movements at LOS D, E or F Upgrade signal to include interconnect system along Washington 

Street. Implement system timings.

80 Front Street Main Street 2WS EW No movements at LOS D, E or F None

81 Lakeshore Blvd Washington Street 1WS EB No movements at LOS D, E or F None

Corridors for Traffic Signal Progression ImprovementCorridor From To Reasons for Potential Mitigation Recommended Mitigation Possible Additional Study

Washington Street US 41 Front Street Candidate for Traffic Progression 

Improvement

Upgrade traffic signals to include interconnect system.  Implement 

system timings to provide progression through system. Do not extend 

to US 41 since that system is on different cycle length and maintained 

by MDOT.

Adaptive Signal Control

Wright Street McClellan Avenue Presque Isle Avenue Candidate for Traffic Progression 

Improvement

Upgrade traffic signals to include interconnect system.  Implement 

system timings to provide progression through system.

* Non‐Motorized improvement recommendations are included in the Pedestrian and Bicycle Accommodation Analysis and Recommendations section of the Traffic Study.

Indicates intersections where mitigation is recommended to address movements at LOS E or F.

Indicates intersections where mitigation is optional to address movements at LOS D.

TABLE 6 (cont.)

Locations for Mitigation for Vehicular Operations*

IntersectionsIntersection Details

Reasons for Potential Mitigation Recommended Mitigation Possible Additional Study

Page 45: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

AM Peak Hour Mid-Day Peak Hour PM Peak Hour Notes

Overall

LOS

Delay

(sec/veh)

Overall

LOS

Delay

(sec/veh)

Overall

LOS

Delay

(sec/veh)

5 Sugarloaf Ave & Wright St B 14.9 B 16.3 C 21.5 PM: NB LT = D

6 McClellan Ave & Wright St B 15.1 B 15.4 C 34.2 PM: WB TH/RT = F

7 McClellan Ave & Fair Ave F 113.8 C 27.0 B 19.2 AM: NB TH/RT = F

Mid-Day: NB TH/RT = D

9 Seventh St & College Ave B 10.7 B 18.3 B 15.7

11 Presque Isle Ave & Wright St A 7.8 B 11.1 B 13.5

19 Presque Isle Ave & Kaye Ave B 11.2 B 12.3 B 12.7

20 Fourth St & College Ave A 9.0 B 10.3 B 11.1

30 Front St & Hewitt Ave B 11.6 B 11.8 B 12.3

31 Third St & Hewitt Ave A 12.0 B 13.1 B 14.3

38 Front St & Spring St A 4.8 A 5.4 A 5.6

49 U.S. 41 & Grove St D 49.7 D 39.6 D 39.2 AM: NW LT, SB LT = D; SB TH/RT, NB TH/RT, SEB LT = F

Mid-Day: NB LT, NWB LT = D; SEB LT, SB TH/RT = F

PM: NB TH/LT, NWB LT, SEB LT, SB LT = D; SB TH/RT = F

50 U.S. 41 & Genesee St B 14.3 B 13.4 B 15.8

61 U.S. 41 & Washington St (NW)* A 7.1 B 12.5 B 10.4

Intersection

TABLE 7

Future Level of Service Summary

Signalized Intersections (2030 No-Build)

61 U.S. 41 & Washington St (NW)* A 7.1 B 12.5 B 10.4

U.S. 41 & Washington St (SE)* C 29.3 C 23.3 C 31.0 AM: NW TH = D; PM: NW TH = D

63 McClellan Ave & Washington St B 15.1 B 17.0 B 17.7

65 U.S. 41 & McClellan Ave (North)* B 12.3 B 14.0 B 16.3

U.S. 41 & McClellan Ave (South)* B 14.7 B 13.8 B 14.5

70 Lincoln Ave & Fair Ave B 12.6 B 13.7 B 13.2

71 Lincoln Ave & College Ave B 11.7 B 11.4 B 11.5

73 Lincoln Ave & Washington St B 12.4 B 15.4 B 16.8

74 Seventh St & Magnetic St B 12.4 B 14.7 A 9.6

75 Seventh St & Washington St B 13.2 B 15.9 B 16.3

76 Fifth St & Washington St B 11.5 B 13.4 B 13.3

77 Fourth St & Washington St A 9.5 B 11.2 B 10.7

78 Third St & Washington St B 13.6 B 14.0 B 15.3

79 Front St & Washington St A 3.6 A 6.6 A 5.5

Indicates Intersection with Movements at Level of Service of E or F

Indicates Intersection with Movements at Level of Service of D

* Level of Service cannot be calculated using HCM 2010. HCM 2000 was used for these intersections.

Page 46: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

AM Peak Hour Mid-Day Peak Hour PM Peak Hour Notes

Overall

LOS

Delay

(sec/veh)

Overall

LOS

Delay

(sec/veh)

Overall

LOS

Delay

(sec/veh)

1 Lakeshore Blvd & Peter White Dr A 3.0 A 1.9 A 1.8

2 Lakeshore Blvd & Hawley St A 4.4 A 3.2 A 4.7

3 Presque Isle Ave & Hawley St A 5.5 A 6.2 A 5.7

4 Sugarloaf Ave & Hawley St A 4.8 A 5.4 A 6.6

8 McClellan Ave & Cleveland St B 15.0 B 11.3 C 24.3 PM: SB = D

10 Presque Isle Ave & Center St A 1.4 A 2.1 A 2.2

12 Lakeshore Blvd & Wright St A 4.1 A 4.8 A 5.7

13 Pine St & Lakeshore Blvd A 1.5 A 1.5 A 1.8

14 Pine St & Fair Ave A 7.6 A 8.2 A 8.8

15 Lakeshore Blvd & Fair Ave A 3.0 A 3.7 A 3.7

16 Presque Isle Ave & Fair Ave A 4.9 A 7.0 A 8.6 Mid-Day: WB LT = D

PM: WB LT = F

17 Third St & Fair Ave A 5.2 A 7.7 A 7.9 PM: NB LT = D

18 Front St & Fair Ave A 3.2 A 2.7 A 2.8

21 Third St & College Ave A 4.6 A 4.7 A 5.5

22 Pine St & Magnetic St A 2.7 A 2.8 A 2.8

23 Front St & Magnetic St A 3.0 A 2.2 A 2.9

Intersection

TABLE 8

Future Level of Service Summary

Unsignalized Intersections (2030 No-Build)

23 Front St & Magnetic St A 3.0 A 2.2 A 2.9

24 Third St & Magnetic St A 1.7 A 1.8 A 2.9

25 Fourth St & Magnetic St A 3.8 A 4.1 A 4.2

26 Lakeshore Blvd & Crescent St A 1.9 A 0.9 A 1.4

27 Lakeshore Blvd & Hewitt Ave A 1.4 A 1.1 A 1.0

28 Spruce St & Hewitt Ave A 5.6 A 5.7 A 4.8

29 Pine St & Hewitt Ave A 7.3 A 7.4 A 7.6

32 Fourth St & Hewitt Ave A 1.9 A 2.1 A 3.0

33 Front St & Arch St A 8.1 A 8.8 A 9.9

34 Pine St & Ridge St A 3.1 A 3.5 A 3.6

35 Lakeshore Blvd & Spring St A 0.9 A 0.6 A 0.8

36 Lakeshore Blvd & Baraga Ave A 8.0 A 8.6 B 11.3

37 Front St & Baraga Ave A 3.8 A 5.7 B 15.0 AM: WB TH/LT = D; Mid-Day: WB TH/LT, EB TH/LT = D

PM: EB TH/LT = E; WB TH/LT = F

39 Third St & Baraga Ave A 4.7 A 5.4 A 6.3

40 Fourth St & Baraga Ave A 4.0 A 5.2 A 4.9

41 Seventh St & Spring St A 1.2 A 2.2 A 2.7

42 Seventh St & Baraga Ave A 3.1 A 3.8 A 4.3

Page 47: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

AM Peak Hour Mid‐Day Peak Hour PM Peak Hour NotesOverall 

LOS

Delay 

(sec/veh)

Overall 

LOS

Delay 

(sec/veh)

Overall 

LOS

Delay 

(sec/veh)

43 Front St & Fisher St A 1.5 A 1.2 A 1.644 Third St & Fisher St B 10.1 A 8.1 B 13.345 Fourth St & Fisher St A 8.9 A 8.8 B 10.046 Fifth St & Fisher St A 3.1 A 2.8 A 2.847 Altamont St & Fisher St A 7.4 A 4.2 A 5.748 Seventh St & Fisher St A 0.0 A 0.0 A 0.051 Division St & Genesee St A 4.2 A 5.5 A 6.152 Altamont St & Genesee St A 1.0 A 2.4 A 1.953 Altamont St & Hampton St A 3.7 A 6.4 A 6.254 Division St & Hampton St A 6.7 A 3.9 A 3.755 U.S. 41 & Hampton St A 2.4 A 1.9 A 3.3 AM:WB = D; Mid‐Day: EB = D

PM: EB & WB = F

56 Division St & Joliet Rd A 3.0 A 2.6 A 1.957 Division St & Pioneer Rd A 2.0 A 3.6 A 3.258 Altamont St & Pioneer Rd A 3.2 A 1.5 A 2.159 Division St & McClellan Ave A 1.4 A 2.0 A 3.660 Third St & Spring St A 2.2 A 3.1 A 3.4

62 McClellan Ave & Ridge St A 3.5 A 9.2 B 16.1 AM: EB LT & WB LT = DMid‐Day: EB TH & WB TH = D, WB LT = E, EB LT = FPM: EB LT =F, EB TH = F; WB LT = F, WB TH  = E

64 McClellan Ave & Baraga Ave A 2.6 A 8.9 A 7.2 Mid‐Day: EB = EPM: EB & WB = D

66 O'Dovero Dr & McClellan Ave A 1.9 A 6.1 B 10.9 Mid‐Day: EB LT = DPM: EB LT = F

67 Grove St & McClellan Ave B 12.6 B 11.0 B 18.4 PM: SB = C/D

68 Pioneer Rd & McClellan Ave A 3.4 A 3.2 A 2.769 Lincoln Ave & Wright St A 2.7 B 11.4 D 47.0 Mid‐Day: NB TH = F; PM: NB TH = F

72 Lincoln Ave & Cleveland St A 2.3 A 2.3 A 2.080 Front St & Main St A 1.4 A 1.9 A 2.081 Lakeshore Blvd & Washington St A 1.5 A 2.0 A 1.6

Indicates Intersection with Movements at Level of Service of E or FIndicates Intersection with Movements at Level of Service of D

* Level of Service cannot be calculated using HCM 2010.  HCM 2000 was used for these intersections.

Intersection

TABLE 8 (cont.)Future Level of Service Summary

Unsignalized Intersections  (2030 No‐Build)

Page 48: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

ID Number NS EW

6 McClellan Avenue Wright Street Signal Retiming. Upgrade signal to include interconnect system along 

Wright Street. Implement system timings.Near Term = $35,000 High

7 McClellan Avenue Fair Avenue Signal Retiming; Install NB right turn lane to address 2030 traffic 

needs.Long Term = $80,000 Low

16 Presque Isle Avenue Fair Avenue Install Traffic Signal or Mini‐roundabout Near Term ‐ Traffic Signal = $160,000

Near Term ‐ Mini Roundabout = $300,000Medium

37 Front Street Baraga Avenue Geometric improvements do not improve LOS. NA NA

55 US 41 Hampton Street Geometric improvements do not improve LOS. NA NA

62 McClellan Avenue Ridge Street All‐Way Stop does not improve LOS.  Install Traffic Signal or 

Roundabout.

Near Term ‐ Traffic Signal = $210,000

Near Term ‐ Roundabout = $900,000Medium

66 McClellan Avenue O'Dovero Drive Traffic Signal Installation; Widen McClellan to provide LT lanes in 

both directions; Realign and widen east leg; Interconnect with US 

41/McClellan.

Near Term = $210,000 Medium

69 Lincoln Avenue Wright Street Install traffic signal or roundabout.  Traffic signal will require left turn 

lanes on all legs. Realign or close north leg into parking lot. Install 

countdown pedestrian signals with high visibility crosswalks. Include 

signal in interconnect system along Wright Street. Implement system 

timings.

Near Term ‐ Traffic Signal = $170,000

Near Term ‐ Roundabout = $750,000High

Corridor Recommended Mitigation Estimated Construction Cost Recommended Priority

Washington Street

Upgrade traffic signals to include interconnect system.  Implement 

system timings to provide progression through system. Do not extend 

to US 41 since that system is on different cycle length.$280,000  High

Wright Street

Upgrade traffic signals to include interconnect system.  Implement 

system timings to provide progression through system. $105,000  High

Element Recommended Mitigation Estimated Construction Cost Recommended Priority

SidewalksSidewalk Connections as shown on Figure 10

Varies based on linear feet of sidewalk constructed Varies

Pedestrian Crossing UpgradesImprove pedestrian crossings with high visibility crosswalks, 

advanced signing/flashers, potential grade separationsVaries based on improvements Medium/High

Bicycle FacilitiesMulti‐use paths and/or on‐street bike lanes as shown on Figure 11 Varies based on linear feet of facilities/type 

constructedVaries

Prioritized List of Mitigation Projects and Costs

TABLE 9

These preliminary construction costs have been estimated based on limited investigations.  It is possible that these costs may change once more detailed engineering design is undertaken.  Therefore, these 

estimates should only be used for general planning purposes (i.e., they are not recommended for use in programming capital funding). Costs are for construction only and do not include engineering fees or right‐

of‐way acquisition costs.    

Intersection DetailsRecommended Mitigation Estimated Construction Cost Recommended Priority

Intersections

Corridors for Traffic Signal Progression Improvement

Non‐Motorized Improvements

Page 49: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning
Page 50: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

Pine St

Presque Isle

Ave

Lakeshore Blvd

Dr

White

Peter

2

2

2

2

2

2

1

23

11

12

1310

Center St

Wright St

Hawley St

(2013)

TURNING MOVEMENT COUNTS

EXISTING PEAK HOUR

FIGURE 2A

TRAFFIC STUDY

CITY OF MARQUETTE

DrWhitePeter

Lakeshore Blvd

Lake Superior

N

2-10-10

24-48-51

2-8-6

17-32-39

0-0-1

205-364-437

0-1-0

3-6-13

0-3-0

4-5-4

141-

326-431

0-1-

0

14-49-44

71-158-211

61-118-147

111-

177-217

8-32-40

72-13

4-16

8

4-12-11

70-81-144

7-14-24

27-51-

37

66-12

4-14

4

5-14-15

28-12-7

22-41-37

23-27-37

31-

39-34

21-

35-36

29-20-4

18-8-3

32-29-51

9-36-35

7-11-30

8-25-29

0-5-15

2-15-1

9

2-1-319-

108-12

2

2-5-5

0-0-1

0-0-0

0-2-3

10-78-

122

0-0-1

14-15-9

0-0-1

0-2-2

39-50-66

67-13

1-13

4

6-9-17

41-

82-17

3

20-53-98

6-25-33

1-5-7

92-14

8-14

0

7-2

3-4

2

55-113

-227

2-1-2

16-33-58

LEGEND

EXISTING SIGNAL

EXISTING ALL-WAY STOP CONTROL

STUDY INTERSECTION

EXISTING 1-WAY OR 2-WAY STOP CONTROL

XX-XX-XX A.M.-MIDDAY-P.M. PEAK HOUR VOLUME

2

A

#

41-

44-64

29-10

4-10

424-29-90

12-34-57

14-57-52

17-53-97

Page 51: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

73

72

71

70

69

5

4

9

74Magnetic St

College Ave

Fair Ave

Lincoln

Ave

N

Washington St

AveCleveland

Hawley St

Wright St

Center St

Tracy Ave

(2013)

TURNING MOVEMENT COUNTS

EXISTING PEAK HOUR

FIGURE 2B

TRAFFIC STUDY

CITY OF MARQUETTE

22-57-94

7-21-

38

59-41-

66

33-27-28

41-32-26

209-314-37999-17

7-284

47-61-

69

8-34-52

90-79-73

139-298-390

210-177-195

29-72-110

41-60-88

77-91-

138

56-67-8677-83-135

42-42-87

20-65-95

60-13

5-14

6

0-1-

279-107-99

2-3-3

211-341-4990-0-5

2-1-

1

1-2-3

94-70-78

289-349-396

1-2-0

88-13

1-12

4

16-12-11

72-93-77

2-20-11

5-2-6

46-68-10223-18-18

55-12

0-13

1

4-5-9

103-137-136

74-90-60

18-19-29

66-21-

5

98-67-44

110-14

7-12

2

36-69-89

64-92-97

73-18-92-1-

0

102-16

9-18

3

54-10

2-92

27-34-17

54-28-23

3-0-1

2-3-4

217-12

9-89

32-66-92

116-19

1-200

11-6-4

78-80-73

2-3-3

1-0-0

0-2-0

0-0-0

76-33-54

197-532-59993-12

0-14

9

0-0-0

65-71-

111

5-5-4

270-557-440

115-106-75

LEGEND

EXISTING SIGNAL

EXISTING ALL-WAY STOP CONTROL

STUDY INTERSECTION

EXISTING 1-WAY OR 2-WAY STOP CONTROL

XX-XX-XX A.M.-MIDDAY-P.M. PEAK HOUR VOLUME

2

A

#

14-20-18

57-19-21

307-17

5-19

8

12-18-48

20-18-18

50-90-830-5-3

131-

177-285

2-12-16

28-28-25

77-75-67

1-0-2

63-61-

85

95-38-26

170-94-10

7

20-36-63

36-28-46

113-183-2000-6-18

47-10

3-18

8

21-

58-64

53-55-66

160-234-224

13-11-5

7th St

Washington St

Lincoln

Ave

Magnetic St

College Ave

Kaye Ave

Center St

Wright St

Tracy

Ave

Sugar

Loaf

Ave

Hawley St

2

2

2

Page 52: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

61

66

65

64

63

62

8

7

6

Washington St

Ridge St

Wright St

Ave

Cleveland

Fair Ave

N

(2013)

TURNING MOVEMENT COUNTS

EXISTING PEAK HOUR

FIGURE 2C

TRAFFIC STUDY

CITY OF MARQUETTE

Odovero Dr

Baraga Ave

2D

FIGURE

SEE

115-115-113

207-170-121

515-510-727

101-190-321

443-525-786

0-0-0

53-12

2-214

125-231-

360

0-0-0

0-0-0

340-271-

261

141-

165-19

1

12-16-24

28-69-53

4-18-10

8-91-105

5-15-14

12-49-31

16-79-76

160-270-443

54-60-58

24-67-30

498-377-386

21-

16-7

40-59-78

7-12-10

1-1-6

4-1-3

4-3-5

4-1-2

2-2-3

218-348-478

8-14-19

1-3-4

437-363-351

43-87-68

45-126-185

6-12-41

46-113-178

63-62-83

151-105-105

30-15-8

3-12-23

90-15

6-206

15-18-18

19-43-72

215-16

5-14

8

235-14

6-10

0

86-88-125

0-0-3

179-395-562

56-52-31

389-358-447

2-2-0

2-1-

3

0-0-2

0-0-0

14-36-10

3

1-1-

4

81-

98-12

3

1-9-11

6-21-28

8-26-26

36-97-115

15-19-28

42-65-61

38-53-112

236-344-467

12-29-18

48-81-

80

425-352-246

13-24-29

55-111-141

38-79-100

226-470-580

26-69-56

316-485-400

87-137-108

56-14

8-15

5

152-231-

388

56-10

5-10

5

44-87-81

379-278-283

110-12

3-99

1-0-0

3-7-2

0-1-0

19-53-101

0-0-0

49-155-142

61-

155-212

160-260-462

3-6-2

25-29-41

429-276-309

0-1-

0

LEGEND

EXISTING SIGNAL

EXISTING ALL-WAY STOP CONTROL

STUDY INTERSECTION

EXISTING 1-WAY OR 2-WAY STOP CONTROL

XX-XX-XX A.M.-MIDDAY-P.M. PEAK HOUR VOLUME

2

A

#

McClellan

Ave

Odovero Dr

Baraga Ave

Cleveland Ave

Fair Ave

McClellan

Ave

2

2

2

A

41

28

Page 53: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

N

(2013)

TURNING MOVEMENT COUNTS

EXISTING PEAK HOUR

FIGURE 2D

TRAFFIC STUDY

CITY OF MARQUETTE

U.S. 41 Eastbound

U.S. 41 Westbound

Washington Street

Meeske

Avenue

Parkin

g Lot

30-28-60

11-13-4

27-32-25

30-59-92

28-23-36

11-29-28

58-51-

96

5-31-50

33-55-46

3-19-17

16-20-12

11-12-13

0-0-1311-751-844

500-528-735

0-0-0

447-654-542

439-546-795

434-634-509

434-634-509

439-546-795

284-694-

777273-665-749

500-528-735

LEGEND

EXISTING SIGNAL

EXISTING ALL-WAY STOP CONTROL

STUDY INTERSECTION

EXISTING 1-WAY OR 2-WAY STOP CONTROL

XX-XX-XX A.M.-MIDDAY-P.M. PEAK HOUR VOLUME

2

A

#

U.S. 41 Westbound

U.S. 41 Eastbound

Page 54: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

Magnetic St

College Ave

Kaye Ave

Fair Ave

2nd St

Hig

h St

Lakeshore Blvd

Pine St

2222

2

2222 A

4th St

1514

22

23

24

21

25

20

19

1617

18

Presque Isle

Ave

3rd St

Fro

nt St

Lakeshore Blv

d

Pine St

Fair Ave

Hig

h St

N

(2013)

TURNING MOVEMENT COUNTS

EXISTING PEAK HOUR

FIGURE 2E

TRAFFIC STUDY

CITY OF MARQUETTE

2

Kaye Ave

College Ave

Magnetic St

Lake Superior

29-58-41

87-13

9-13

2

6-9-23

45-10

0-206

21-73-53

4-19-23

3-6-4

0-0-1

45-32-63

0-0-0

2-4-5

4-2-82-1-

1

17-36-60

1-2-6

3-4-7

1-1-6

2-2-5

7-12-14

0-6-3

86-114-115

3-1-0

2-2-1

12-7-140-0-3

34-46-10

1

2-0-2

6-10-16

5-4-20

1-2-4

76-74-66

1-10-14

147-231-

241

4-5-8

1-10-7

45-24-269-27-16

113-272-313

3-8-3

36-103-93

12-18-41

5-7-10

16-45-37

6-9-22

220-302-318

3-2-10

4-10-14

18-13-107-16-17

149-370-429

3-5-13

11-18-28

6-4-17

0-3-9

77-49-41

4-17-20

176-209-215

6-9-5

1-22-14

31-46-3411-17-10

135-280-330

8-18-27

17-26-54

13-14-27

7-5-9

58-46-26

1-8-8

125-18

8-203

3-6-4

2-9-18

125-100-7619-34-24

112-214-233

0-7-11

38-96-124

53-126-148

15-46-50

36-36-30

1-5-7

105-19

5-231

4-1-1

26-20-39

56-44-3341-

44-39

105-19

6-221

0-6-7

22-54-57

17-44-64

23-59-53

106-201-

249

47-78-79

42-62-59

118-229-22795-19

9-19

4

90-211-286

46-10

6-10

9

10-59-67

17-28-17

22-48-60

18-16-13

74-119-13931-

44-31

27-44-50

1-7-11

49-145-154

40-85-154

30-57-49

6-9-18

69-124-153

50-60-72

5-20-2816-19-51

36-115-167

25-18-28

3-7-19

12-12-27

2-3-5

2-1-8

45-75-908-29-40

3-10-30

4-3-9

7-21-26

32-108-131

8-23-33

LEGEND

EXISTING SIGNAL

EXISTING ALL-WAY STOP CONTROL

STUDY INTERSECTION

EXISTING 1-WAY OR 2-WAY STOP CONTROL

XX-XX-XX A.M.-MIDDAY-P.M. PEAK HOUR VOLUME

2

A

#

EXISTING YELLOW FLASHER SIGNAL

Page 55: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

Lakeshore Blvd

Ridge StArch St

Fro

nt St

3rd St

Hig

h St

Pine St

Spru

ce St

Lakeshore Blvd

4th St Crescent St

2

222

2

A

A Hewitt Ave

Hig

h St

27

26

28

34

33

32 31

30 29

Pine St

Crescent St

3rd St

Fro

nt St

2

Lakeshore Blvd

N

(2013)

TURNING MOVEMENT COUNTS

EXISTING PEAK HOUR

FIGURE 2F

TRAFFIC STUDY

CITY OF MARQUETTE

Hewitt Ave

Ridge St

Arch St

Lake Superior

15-11-

32

105-16

5-18

8

7-12-23

57-16

7-18

9

16-12-20

11-8-13

3-2-5

4-4-8

8-14-20

1-5-2

2-2-4

10-14-192-4-3

8-10-23

1-3-0

5-4-4

1-15-11

3-3-7

2-6-8

2-9-14

29-32-35

3-2-5

1-3-9

9-24-251-4-5

30-34-52

3-6-9

2-4-5

17-15-26

3-4-5

15-15-22

7-13-14

88-14

0-15

4

7-10-17

6-3-6

21-24-289-8-11

67-88-14

0

1-5-1

8-11-20

7-19-32

8-4-7

4-2-5

6-11-21

217-237-257

5-7-12

11-20-19

14-18-236-9-20

179-253-357

11-22-37

5-8-5

9-17-24

4-4-11

1-15-10

12-17-24

204-279-310

7-11-13

18-18-17

15-17-308-11-15

173-291-

368

7-13-23

9-10-20

15-17-42

3-12-13

11-19-19

5-11-10

102-13

8-217

31-47-53

4-5-1

15-16-181-3-3

104-117-16

5

2-2-7

10-12-14

9-25-28

0-6-5

16-42-69

26-34-44

29-36-38

2-4-39-10-36

0-11-8

11-15-14

111-16

2-210

4-11-

1170-16

9-200

12-13-12

9-13-9

LEGEND

EXISTING SIGNAL

EXISTING ALL-WAY STOP CONTROL

STUDY INTERSECTION

EXISTING 1-WAY OR 2-WAY STOP CONTROL

XX-XX-XX A.M.-MIDDAY-P.M. PEAK HOUR VOLUME

2

A

#

Page 56: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

Grove St

Alta

mont St

Spring StBaraga Ave

49

4847

46

7675

41

42

2

45

40

774th St

Fisher St

7th St

N

(2013)

TURNING MOVEMENT COUNTS

EXISTING PEAK HOUR

FIGURE 2G

TRAFFIC STUDY

CITY OF MARQUETTE

Washington St

22-3-8

9-10-8

128-75-81

8-8-8

27-31-1925-34-38

15-12-14

85-10

8-16

812-27-33

1-2-8

16-38-40

8-11-7

2-2-3

2-1-

0

1-1-

0

0-0-0

44-17-2083-90-79

54-71-

81

5-4-3

33-37-93

3-2-6

63-82-94

76-67-68

3-9-3

4-6-9

0-6-2

11-8-1

9-11-184-144-162

21-

25-46

4-2-2

12-11-14

12-4-4

136-115-151

68-29-26

123-55-75

86-40-29

37-20-29

27-38-63

2-1-265-164-151

1-3-2

3-6-11

0-1-

2

62-52-69

141-142-100

0-4-519-27-23

32-47-86

169-89-108

34-3

8-6

996-3

7-4

2

526-4

91-5

83

113-165-203

63-106-171

19-36-745

4-3

4-4

3

350-5

38-6

94

110-12

1-77

1-2-3

132-13

0-86

259-12

0-14

8

104-169-172

92-53-542-0-0

0-2-1

98-14

8-277

73-69-89

1-3-2

1-0-2

1-0-0

25-18-14

6-7-2

313-15

8-16

3

4-9-15

5-10-1223-26-25

24-25-18

131-

185-339

6-15-16

33-34-47

24-32-37

13-14-12

4-0-1

14-16-7

332-16

8-17

7

12-25-51

23-32-300-1-1

1-1-

114

9-19

7-329

8-20-10

2-3-1

0-0-1

0-1-0

81-

58-41

21-

27-26

255-113-88

14-12-21

20-25-23175-359-388

44-67-93

96-88-16

911-29-33

40-66-80

241-394-369

53-47-75

30-35-34

31-

12-31

7-8-7

11-13-10

1-8-7153-346-368

4-7-7

7-6-9

1-1-

4

21-31-28

231-392-372

2-9-9

19-33-36

11-15-10

93-71-

92

9-11-8

25-28-23112-230-196

42-72-78

103-81-

139

15-26-35

32-43-28

157-292-272

52-66-77

LEGEND

EXISTING SIGNAL

EXISTING ALL-WAY STOP CONTROL

STUDY INTERSECTION

EXISTING 1-WAY OR 2-WAY STOP CONTROL

XX-XX-XX A.M.-MIDDAY-P.M. PEAK HOUR VOLUME

2

A

#

Grove St

Fisher St

Baraga A

ve

Spring St

7th St

5th St

4th St

3rd St

Washington St

22

22

2

2

2

41

28

Page 57: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

3rd St

Fro

nt St

Lakeshore Blvd

Main St

2

2 2

2

2

2

A

2

2

Lakeshore Blv

d

Spring St

Washington St

Baraga Ave

Fisher St

St

Main2

Fro

nt St

44

43

37

78

39

60

36

35

8179

80

38

N

(2013)

TURNING MOVEMENT COUNTS

EXISTING PEAK HOUR

FIGURE 2H

TRAFFIC STUDY

CITY OF MARQUETTE

Superior

Lake

20-14-11

4-4-2

82-87-91

1-4-3

0-3-40-6-5

15-19-35

45-10

5-15

30-5-4

3-16-17

1-7-4

70-64-97

89-47-49

61-

60-83

320-316-386

14-17-22

8-14-138-11-15

11-28-29

187-242-425

2-10-14

31-61-116

11-20-26

4-27-21

6-5-2

2-0-9

1-3-6

0-1-0

123-40-93100-30-42

20-43-56

0-1-

255-68-16

5

1-4-0

61-58-128

34-27-58

10-6-4

8-12-18

142-10

8-15

6

4-6-9

55-35-4038-37-36

9-19-14

76-14

1-210

25-57-88

4-9-13

18-41-52

6-9-17

20-46-47

4-31-

18

114-12

6-17

4

0-9-8

23-36-3274-127-105

52-114-10

889-10

4-16

016-34-27

39-65-58

84-153-177

53-109-121

28-36-30

302-326-399

14-31-48

4-18-1711-15-16

18-46-38

184-256-423

20-20-13

3-9-8

265-240-282

3-4-2

9-22-212-6-4

11-28-30

165-220-310

10-19-10

7-25-45

4-4-2

3-4-10

LEGEND

EXISTING SIGNAL

EXISTING ALL-WAY STOP CONTROL

STUDY INTERSECTION

EXISTING 1-WAY OR 2-WAY STOP CONTROL

XX-XX-XX A.M.-MIDDAY-P.M. PEAK HOUR VOLUME

2

A

#12-16-6

163-16

4-18

9

6-21-28

22-44-6716-25-27

5-9-15

79-209-324

4-12-14

3-11-14

75-10

9-87

4-6-2

194-14

9-216

22-60-53

139-15

4-215

0-0-0

48-121-125

22-37-30

25-58-65

83-89-96

71-

97-13

0

15-15-13

13-30-26

16-5-6

8-4-5

123-14

5-17

5

0-5-4

0-0-61-2-7

24-47-58

57-12

1-18

32-0-3

68-20-32

1-1-

0

490-422-507

13-11-19

215-350-576

2-1-

1

44-59-117

3-0-0

7-11-8

Page 58: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

Divisio

n St

Lakeshore Blv

d

Pioneer Rd

5857

53

56

55

5051

54

52

Alta

mont St

N

(2013)

TURNING MOVEMENT COUNTS

EXISTING PEAK HOUR

FIGURE 2I

TRAFFIC STUDY

CITY OF MARQUETTE

Joliet R

d

Alta

mont St

Hampton St

Genesee St

6-10-12

110-55-81

54-69-87

37-56-142

5-10

-4

33-7

7-10

0

36-91-111

18-13-32

52-67-86

7-3-832-18-26

5-2-5

4-0-1

4-7-10

36-11-28

6-6-9

22-6-11

137-12-2410-6-16

8-12-22

9-15-18

3-1-0

79-4-20

48-6-6

0-1-

0

0-1-

5

220-60-84

4-1-5

5-16-12

0-0-65-5-6

113-81-

108

7-13-14

2-1-0

1-4-0

2-5-3

50-23-17

6-8-1

959-591-

723

1-4-7

43-39-36

2-1-313-37-23

386-670-1114

35-46-36

42-16-48

1-3-2

7-8-4

99-3-13

7-8-9

159-117-13

1

7-13-15

19-39-27

42-14-1920-11-13

50-90-18

3

11-20-32

22-13-12

43-6-16

25-16-18

LEGEND

EXISTING SIGNAL

EXISTING ALL-WAY STOP CONTROL

STUDY INTERSECTION

EXISTING 1-WAY OR 2-WAY STOP CONTROL

XX-XX-XX A.M.-MIDDAY-P.M. PEAK HOUR VOLUME

2

A

#

20-19-33

63-40-59

949-615-726

31-54-102

26-32-4538-59-77

370-654-10

34

0-10-7

48-57-50

45-30-38

62-68-64

5-15-13

3-3-3

205-12

6-17

2

10-13-12

81-105-163

3-4-6

10-12-220-0-0

12-9-23

10-8-4

4-2-6

22-18-16

0-1-1

0-0-0

7-17-28

143-88-12

0

21-13-12

46-23-21

0-1-

166-83-15

913-17-31

2-1-1

3-10-6

Hampton St

Alta

mont St

Joliet Rd

Genesee St

Alta

mont St

2 2

2

222

2 2

41

28

Page 59: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

Division

St

Grove St

59

68

67

Pioneer Rd

N

(2013)

TURNING MOVEMENT COUNTS

EXISTING PEAK HOUR

FIGURE 2J

TRAFFIC STUDY

CITY OF MARQUETTE

McClella

n

Ave

313-17

6-212

88-38-54

28-44-

11315-17-

11

96-15

6-390

5-13-25

27-14-34

58-26-39

375-290-242

23-22-62

23-24-17

24-46-7812-39-62

128-218-459

5-21-

34

34-22-19

79-49-53

47-28-38

0-1-

0

10-11-6

320-16

4-213

4-4-4

137-66-82

0-3-10-5-2

97-16

6-410

73-85-12

7

0-0-0

0-1-3

1-5-1

LEGEND

EXISTING SIGNAL

EXISTING ALL-WAY STOP CONTROL

STUDY INTERSECTION

EXISTING 1-WAY OR 2-WAY STOP CONTROL

XX-XX-XX A.M.-MIDDAY-P.M. PEAK HOUR VOLUME

2

A

#

McClellan

Ave

A

2

2

553

Page 60: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

N

Lakeshore Blvd

Hawley St

4th St Crescent St

Hewitt Ave

CITY OF MARQUETTE TRAFFIC STUDY

Lake Superior

Lake Superior

CIT

Y LIMIT

S

CIT

Y LIMIT

S

CIT

Y LIMIT

S

553

28

28

28

41

41

41

Division St

McClella

n A

ve

Pioneer Rd

Hampton St

Alta

mont S

t

Joliet R

d

Genesee St

Alta

mont

St

Grove St

Fisher St

Baraga Ave

Spring St

7th St

5th St

4th St

3rd St

Fro

nt

St

Lakeshore Blvd

Washington St

Ridge St

McClellan A

ve

Lincoln A

ve

Odovero Dr

Baraga Ave Ridge St

Arch St

Fro

nt

StCleveland Ave

Fair Ave

Magnetic St

College Ave

Kaye Ave

Fair Ave

3rd St

2nd St

High St

Pine St

Spru

ce St

Lakeshore Blvd

Center St

Pine St

Wright St

McClella

n A

ve

Tracy A

ve

Sugar

Loaf

Ave

Presque Isle A

ve

Main St

Dr

Peter White

3,100

3,300

10,4

00

4,0

00

9,700 14,900

5,5

00 3,400

3,4

00

9,3

00

3,600

1,3

00

1,100

600

4,9

00

3,700

5,7

00

6,000 2,800

4,400

6,9

00

1,000

2,8

00

8,8

00

7,6

00

1,100

1,300

FIGURE 3

LEGEND

X,XXX TWO-WAY AVERAGE DAILY TRAFFIC

VOLUMES (2013/2014)AVERAGE DAILY TRAFFIC

EXISTING ANNUAL

3,7

00

2,500

5,5

00

15,600

10,500

11,0

00

Page 61: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

N

Lakeshore Blvd

Hawley St

4th St Crescent St

Hewitt Ave

CITY OF MARQUETTE TRAFFIC STUDY

Lake Superior

Lake Superior

CIT

Y LIMIT

S

CIT

Y LIMIT

S

CIT

Y LIMIT

S

553

28

28

28

41

41

41

Division St

McClella

n A

ve

Pioneer Rd

Hampton St

Alta

mont S

t

Joliet R

d

Genesee St

Alta

mont

St

Grove St

Fisher St

Baraga Ave

Spring St

7th St

5th St

4th St

3rd St

Fro

nt

St

Lakeshore Blvd

Washington St

Ridge St

McClellan A

ve

Lincoln A

ve

Odovero Dr

Baraga Ave Ridge St

Arch St

Fro

nt

StCleveland Ave

Fair Ave

Magnetic St

College Ave

Kaye Ave

Fair Ave

3rd St

2nd St

High St

Pine St

Spru

ce St

Lakeshore Blvd

Center St

Pine St

Wright St

McClella

n A

ve

Tracy A

ve

Sugar

Loaf

Ave

Presque Isle A

ve

Main St

Dr

Peter White

68

59

56

5758

67

53

54 55

505152

61

63

64

65

73

49

4847

4645

40

42

41 75

76

60

7778

44

43

37

38

39

36

35

80

8179

34

33

27

28293031

32

74

72

62

8

7

71

70

9

25

20

19

21

24 22

23

26

18

1417

1615

1310

12

115696

43 2

1

66

LEGEND

*

**

*

*

*

*

*

*

*BY MOVEMENT

LEVEL OF SERVICE

SEE FIGURE 4B FOR

OVERALL LEVEL OF SERVICE A, B OR C

OVERALL LEVEL OF SERVICE D

OVERALL LEVEL OF SERVICE E OR F

SUMMARY (2013)

LEVEL OF SERVICE

EXISTING OVERALL

FIGURE 4A

Page 62: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

N

LEGEND

(2013)

SERVICE BY MOVEMENT

EXISTING LEVEL OF

FIGURE 4B

TRAFFIC STUDY

CITY OF MARQUETTE

LEVEL OF SERVICE CALCULATED USING HCM 2000

A.M.-MIDDAY-P.M. LEVEL OF SERVICEX-X-X

*

49

OVERALL LOS D-C-C

61

D-C-D

B-B-B

U.S. 41 & Washington St (SE)

OVERALL LOS C-C-C

*

7

C-C-B

B-B-B

B-B-B

B-B-BB-B-B

F-

D-C

B-B-BB-B-B

McClellan Ave & Fair Ave

OVERALL LOS F-C-B

16

A-

A-

AN

O D

EL

AY

NO D

EL

AY

A-B-BB-D-E

Presque Isle Ave & Fair Ave

OVERALL LOS A-A-A

37 Front St & Baraga Ave

OVERALL LOS A-A-A

55

C-B-D

B-C-D

A-

A-B

NO D

EL

AY

U.S. 41 & Hampton St

OVERALL LOS A-A-A

B-

A-

A

NO D

EL

AY

62

A-

A-

AN

O D

EL

AY

C-C-DC-D-F

A-

A-

A

NO D

EL

AY

C-E-FC-C-E

McClellan Ave & Ridge St

OVERALL LOS A-A-A

B-B-A

A-

A-

AA-

A-

A

A-

A-

A

A-

A-

A

B-C-EA-B-B

O’Dovero Drive & McClellan Ave

OVERALL LOS A-A-A

66 69

CO

NT

RO

L

YIE

LD

A-A-A

B-

D-F

A-A-A

Lincoln Ave & Wright St

OVERALL LOS A-A-C

U.S. 41 & Grove St

E-E-D

B-B-C

B-B-B

D-D-

D

E-C-

C

C-D-D

B-B-C

B-B-B

F-F-

E

D-C-

C

A-

A-

A

C-C-E

A-

A-

A

A-B-B

A-

A-

A

B-B-B

A-

A-

A

C-C-D

Page 63: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

MOVEMENT VOLUMES

EXISTING PEAK HOUR TURNING

45-126-185

6-12-41

46-113-178

63-62-83

151-105-105

30-15-8

3-12-23

90-15

6-206

15-18-18

19-43-72

215-16

5-14

8

235-14

6-10

0

VOLUMES

TURNING MOVEMENT

2030 NO BUILD PEAK HOUR

25-50-80

260-16

0-11

0

235-18

0-16

5

50-140-205

10-15-45

55-125-1955-15-30

100-17

0-225

20-20-20

70-70-95

165-115-115

35-20-10

LEVEL OF SERVICE

EXISTING PEAK HOUR

OVERALL LEVEL OF SERVICE:

AM: F (88.4 sec. of delay)

Mid-Day: C (21.8 sec. of delay)

PM: B (17.2 sec. of delay)

C-C-B

B-B-B

B-B-B

B-B-BB-B-B

F-D-C

B-B-BB-B-B

WITH MITIGATION

LEVEL OF SERVICE

EXISTING PEAK HOUR

OVERALL LEVEL OF SERVICE:

AM: C (31.6 sec. of delay)

Mid-Day: B (18.6 sec. of delay)

PM: B (17.2 sec. of delay)

C-C-B

A-B-B

A-B-B

B-B-BC-C-B

D-C-C

B-B-BC-B-B

OVERALL LEVEL OF SERVICE:

Mid-Day: C (27.0 sec. of delay)

PM: B (19.2 sec. of delay)

LEVEL OF SERVICE

2030 NO BUILD PEAK HOUR

AM: F (113.8 sec. of delay)

C-C-C

B-B-B

B-B-B

B-B-BB-B-C

F-D-C

B-B-BB-B-B

OVERALL LEVEL OF SERVICE:

AM: B (18.0 sec. of delay)

Mid-Day: B (14.5 sec. of delay)

PM: B (15.7 sec. of delay)

WITH MITIGATION

LEVEL OF SERVICE

2030 PEAK HOURA-B-B

A-B-B

B-B-BC-C-C

B-B-BC-B-B

A-B-B

A-B-B

B-B-B

acquisition cost.engineering fees or right-of-way for construction only and do not include programming capital funding). Costs are they are not recommended for use in used for general planning purposes (i.e., Therefore, these estimates should only be engineering design is undertaken. costs may change once more detailed investigations. It is possible that these been estimated based on limited These preliminary construcion costs have

RECOMMENDATIONS

MITIGATION

EXISTING TRAFFIC (2013)

FIGURE 5A

TRAFFIC STUDY

CITY OF MARQUETTE

EXISTING TRAFFIC CONTROL:

LOCATION:

SIGNAL OR ALL-WAY STOP WARRANT MET:

MITIGATION RECOMMENDED:

ADDITIONAL STUDIES RECOMMENDED:

7 - McClellan Avenue / Fair Avenue

EXISTING OR NEAR TERM:

- Retime Traffic Signal

- Approximate Construction Cost - $0

2030 / LONG TERM:

- Construct Northbound Right Turn Lane

- Reevaluate Traffic Signal Timing

- Approximate Construction Cost - $80,000

- None

Existing Traffic Signal

Traffic Signal

Page 64: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

Signal Warrant Met

MOVEMENT VOLUMES

EXISTING PEAK HOUR TURNING

106-201-

249

47-78-79

42-62-59

118-229-22795-19

9-19

4

90-211-286

VOLUMES

TURNING MOVEMENT

2030 NO BUILD PEAK HOUR

120-220-275

55-85-90

50-70-65

130-250-250105-220-215

100-230-315

LEVEL OF SERVICE

EXISTING PEAK HOUR

OVERALL LEVEL OF SERVICE:

AM: A (4.8 sec. of delay)

Mid-Day: A (6.3 sec. of delay)

PM: A (7.3 sec. of delay)

A-A-A

NO

DEL

AY

NO

DEL

AY

A-B-BB-D-E

OVERALL LEVEL OF SERVICE:

Mid-Day: A (7.0 sec. of delay)

PM: A (8.6 sec. of delay)

LEVEL OF SERVICE

2030 NO BUILD PEAK HOUR

AM: A (4.9 sec. of delay)

A-A-A

NO

DEL

AY

NO

DEL

AY

B-B-BB-D-F

WITH MITIGATION

LEVEL OF SERVICE

EXISTING PEAK HOUR

OVERALL LEVEL OF SERVICE:

AM: B (10.3 sec. of delay)

Mid-Day: C (21.2 sec. of delay)

PM: B (16.7 sec. of delay)

B-C-B

B-B-A

A-B-A

B-C-DB-B-B

OVERALL LEVEL OF SERVICE:

AM: B (10.6 sec. of delay)

Mid-Day: C (24.5 sec. of delay)

PM: C (21.4 sec. of delay)

WITH MITIGATION

LEVEL OF SERVICE

2030 PEAK HOURB-C-B

B-B-A

A-B-A

B-D-EB-B-B

acquisition cost.engineering fees or right-of-way for construction only and do not include programming capital funding). Costs are they are not recommended for use in used for general planning purposes (i.e., Therefore, these estimates should only be engineering design is undertaken. costs may change once more detailed investigations. It is possible that these been estimated based on limited These preliminary construcion costs have

*

*

*Based on Signalized Intersection

RECOMMENDATIONS

MITIGATION

EXISTING TRAFFIC (2013)

FIGURE 5B

TRAFFIC STUDY

CITY OF MARQUETTE

EXISTING TRAFFIC CONTROL:

LOCATION:

SIGNAL OR ALL-WAY STOP WARRANT MET:

MITIGATION RECOMMENDED:

ADDITIONAL STUDIES RECOMMENDED:

EXISTING OR NEAR TERM:

- Approximate Construction Cost - $160,000

2030 / LONG TERM:

16 - Presque Isle Avenue and Fair Avenue

Stop Sign

- No additional improvements recommended

- None

Option 1

- Approximate Construction Cost - $300,000

Option 2

- Install Traffic Signal

- Install Mini-Roundabout

Page 65: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

C-D-D

B-B-C

B-B-B

C-C-

C

C-C-

C

D-D-D

C-B-B

B-B-B

C-C-

C

C-C-

D

WITH MITIGATION

LEVEL OF SERVICE

EXISTING PEAK HOUR

OVERALL LEVEL OF SERVICE:

AM: C (25.7 sec. of delay)

Mid-Day: C (26.5 sec. of delay)

PM: C (30.6 sec. of delay)

D-D-D

B-C-C

B-B-B

C-C-

D

C-C-

C

D-D-D

C-C-C

C-B-B

D-D-

D

C-C-

C

MOVEMENT VOLUMES

EXISTING PEAK HOUR TURNING

19-2

7-23

32-4

7-86

169-

89-1

08

34-38-69

96-37-42

526-491-583

113-

165-

203

63-1

06-1

71

19-3

6-745

4-34-43

350-538-694

110-121-77

VOLUMES

TURNING MOVEMENT

2030 NO BUILD PEAK HOUR

25-3

0-30

35-5

5-95

185-

100-

120

40-45-80

105-45-50

575-535-635

125-

180-

225

70-1

20-1

90

25-4

0-856

0-40-50

385-590-760

120-135-85

LEVEL OF SERVICE

EXISTING PEAK HOUR

OVERALL LEVEL OF SERVICE:

AM: D (40.4 sec. of delay)

Mid-Day: C (32.2 sec. of delay)

PM: C (32.5 sec. of delay)

E-E-D

B-B-C

B-B-B

D-D-

D

E-C-

C

C-D-D

B-B-C

B-B-B

F-F-

E

D-C-

C

EXISTING TRAFFIC CONTROL:

LOCATION:

SIGNAL OR ALL-WAY STOP WARRANT MET:

MITIGATION RECOMMENDED:

ADDITIONAL STUDIES RECOMMENDED:

EXISTING OR NEAR TERM:

2030 / LONG TERM:

49 - U.S. 41 and Grove Street

Traffic Signal

- Retime traffic signal

- Construct SB right turn lane

- Approximate Construction Cost - $65,000

Existing Traffic Signal

C-D-

D

OVERALL LEVEL OF SERVICE:

AM: C (23.6 sec. of delay)

Mid-Day: C (21.8 sec. of delay)

PM: C (27.2 sec. of delay)

WITH MITIGATION

LEVEL OF SERVICE

2030 PEAK HOUR

- Complete detailed crash analysis to identify anyrequired safety improvements

RECOMMENDATIONS

MITIGATION

EXISTING TRAFFIC (2013)

FIGURE 5C

TRAFFIC STUDY

CITY OF MARQUETTE

right-of-way acquisition cost.and do not include engineering fees or funding). Costs are for construction only recommended for use in programming capital general planning purposes (i.e., they are not these estimates should only be used for engineering design is undertaken. Therefore, costs may change once more detailed investigations. It is possible that these been estimated based on limited These preliminary construction costs have

F-F-D

B-B-C

B-B-B

D-D-

D

F-C-

C

D-D-D

B-B-C

B-B-B

F-F-

F

D-C-

C

OVERALL LEVEL OF SERVICE:

Mid-Day: D (39.6 sec. of delay)

PM: D (39.2 sec. of delay)

LEVEL OF SERVICE

2030 NO BUILD PEAK HOUR

AM: D (49.7 sec. of delay)

12/16/2016Reconstruction as a roundabout - updated

Page 66: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

Traffic Signal or All-Way Stop Warrant Met

EXISTING TRAFFIC CONTROL:

LOCATION:

SIGNAL OR ALL-WAY STOP WARRANT MET:

MITIGATION RECOMMENDED:

ADDITIONAL STUDIES RECOMMENDED:

EXISTING OR NEAR TERM:

- Install Traffic Signal

2030 / LONG TERM:

62 - McClellan Avenue and Ridge Street

Stop Control

- No additional improvements recommended

- Approximate Construction Cost - $210,000

- Construct Southbound Right Turn Lane

MOVEMENT VOLUMES

EXISTING PEAK HOUR TURNING

1-9-11

6-21-28

8-26-26

36-97-115

15-19-28

42-65-61

38-53-112

236-344-467

12-29-18

48-81-80

425-352-246

13-24-29

VOLUMES

TURNING MOVEMENT

2030 NO BUILD PEAK HOUR

55-90-90

15-30-35

465-385-380

5-10-15

10-25-35

10-30-3045-60-125

260-375-510

15-35-20

40-110-130

20-25-35

50-75-70

LEVEL OF SERVICE

EXISTING PEAK HOUR

OVERALL LEVEL OF SERVICE:

AM: A (2.8 sec. of delay)

Mid-Day: A (6.4 sec. of delay)

PM: A (8.4 sec. of delay)

A-

A-

AN

O D

EL

AY

C-C-DC-D-F

A-

A-

A

NO D

EL

AY

C-E-FC-C-E

WITH MITIGATION

LEVEL OF SERVICE

EXISTING PEAK HOUR

OVERALL LEVEL OF SERVICE:

AM: B (10.5 sec. of delay)

Mid-Day: B (11.9 sec. of delay)

PM: B (12.6 sec. of delay)

B-B-BB-C-C

A-B-B

C-C-CB-C-C

OVERALL LEVEL OF SERVICE:

Mid-Day: A (9.2 sec. of delay)

PM: B (16.1 sec. of delay)

LEVEL OF SERVICE

2030 NO BUILD PEAK HOUR

AM: A (3.5 sec. of delay)

A-

A-

AN

O D

EL

AY

C-D-ED-E-F

A-

A-

A

NO D

EL

AY

D-F-FC-D-F

OVERALL LEVEL OF SERVICE:

AM: B (11.0 sec. of delay)

Mid-Day: B (12.4 sec. of delay)

PM: B (13.3 sec. of delay)

WITH MITIGATION

LEVEL OF SERVICE

2030 PEAK HOUR

B-B-CC-C-C

A-B-B

C-C-CB-C-C

A-

A-

A

A-

A-B

B-B-B

A-

A-

A

A-

A-

A

A-

A-B

B-B-B

B-

A-

A

Option 1

Option 2

- Construct Roundabout

- Approximate Construction Cost - $900,000

*

*

Based on Signalized Intersection*

RECOMMENDATIONS

MITIGATION

EXISTING TRAFFIC (2013)

FIGURE 5D

TRAFFIC STUDY

CITY OF MARQUETTE

- None

right-of-way acquisition cost.and do not include engineering fees or funding). Costs are for construction only recommended for use in programming capital general planning purposes (i.e., they are not these estimates should only be used for engineering design is undertaken. Therefore, costs may change once more detailed investigations. It is possible that these been estimated based on limited These preliminary construction costs have

Page 67: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

Traffic Signal Warrant Met

EXISTING TRAFFIC CONTROL:

LOCATION:

SIGNAL OR ALL-WAY STOP WARRANT MET:

MITIGATION RECOMMENDED:

ADDITIONAL STUDIES RECOMMENDED:

EXISTING OR NEAR TERM:

- Install Traffic Signal

2030 / LONG TERM:

66 - O’Dovero Drive and McClellan Avenue

Stop Sign

- No additional improvements recommended

- Approximate Construction Cost - $210,000

- Widen McClellan Avenue to provide left turn lanes

- Interconnect with U.S. 41 / McClellan Avenue intersection

- None

MOVEMENT VOLUMES

EXISTING PEAK HOUR TURNING

1-0-0

3-7-2

0-1-0

19-53-101

0-0-0

49-155-142

61-155-212

160-260-462

3-6-2

25-29-41

429-276-309

0-1-0

VOLUMES

TURNING MOVEMENT

2030 NO BUILD PEAK HOUR

30-35-45

0-5-0

470-305-340

5-0-0

5-10-5

0-5-070-170-235

175-285-505

5-10-5

25-60-110

0-0-0

55-170-155

LEVEL OF SERVICE

EXISTING PEAK HOUR

OVERALL LEVEL OF SERVICE:

AM: A (1.6 sec. of delay)

Mid-Day: A (4.7 sec. of delay)

PM: A (6.7 sec. of delay)

B-B-A

A-

A-

A

A-

A-

A

B-C-EA-B-B

B-B-BB-B-B

OVERALL LEVEL OF SERVICE:

Mid-Day: A (6.1 sec. of delay)

PM: A (10.9 sec. of delay)

LEVEL OF SERVICE

2030 NO BUILD PEAK HOUR

AM: A (1.9 sec. of delay)

B-B-A

A-

A-

AA-

A-

A

A-

A-

A

A-

A-

A

C-D-FA-B-B

B-B-BB-B-B

B-B-B

A-

A-

AA-

A-

A

B-B-B

B-B-B

C-B-B

A-B-BA-B-B

A-A-BA-B-B

A-B-B

A-B-B

A-C-B

A-B-B

- Realign and widen east leg

WITH MITIGATION

LEVEL OF SERVICE

EXISTING PEAK HOUR

OVERALL LEVEL OF SERVICE:

AM: B (13.9 sec. of delay)

Mid-Day: B (15.7 sec. of delay)

PM: B (13.9 sec. of delay)

OVERALL LEVEL OF SERVICE:

AM: A (5.6 sec. of delay)

Mid-Day: B (16.5 sec. of delay)

PM: B (15.0 sec. of delay)

WITH MITIGATION

LEVEL OF SERVICE

2030 PEAK HOUR

RECOMMENDATIONS

MITIGATION

EXISTING TRAFFIC (2013)

FIGURE 5E

TRAFFIC STUDY

CITY OF MARQUETTE

right-of-way acquisition cost.and do not include engineering fees or funding). Costs are for construction only recommended for use in programming capital general planning purposes (i.e., they are not these estimates should only be used for engineering design is undertaken. Therefore, costs may change once more detailed investigations. It is possible that these been estimated based on limited These preliminary construction costs have

Page 68: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

1-2-0

289-349-396

94-70-78

20-65-95

0-1-2

60-135-146

79-107-99

211-341-499

2-3-3

0-0-5

2-1-1

1-2-3

B-

D-F

A-A-A

A-A-AA-A-A

B-A-A

C-C-C

C-C-C

A-A-B

A-A-B

C-C-C

C-C-C

0-0-10

5-5-5

5-5-5

5-5-5

230-375-545

90-120-110

70-150-160

0-5-5

25-75-105

105-80-85

315-380-435

5-5-0 A-A-A

C-F-F

A-A-A

B-B-B

A-B-B

C-C-B

C-C-C

A-A-B

A-B-C

C-C-C

C-C-B

AM: A (2.3 sec. of delay)

Mid-Day: A (6.3 sec. of delay)

PM: C (20.7 sec. of delay)

AM: A (8.6 sec. of delay)

Mid-Day: B (7.9 sec. of delay)

PM: B (11.6 sec. of delay)

AM: A (2.7 sec. of delay)

Mid-Day: B (11.4 sec. of delay)

PM: D (47.0 sec. of delay) PM: B (15.4 sec. of delay)

Mid-Day: B (13.8 sec. of delay)

AM: B (10.7 sec. of delay)

MOVEMENT VOLUMES

EXISTING PEAK HOUR TURNING

VOLUMES

TURNING MOVEMENT

2030 NO BUILD PEAK HOUR

LEVEL OF SERVICE

EXISTING PEAK HOUR

OVERALL LEVEL OF SERVICE:

CO

NT

RO

L

YIE

LD

OVERALL LEVEL OF SERVICE:

LEVEL OF SERVICE

2030 NO BUILD PEAK HOUR

CO

NT

RO

L

YIE

LD

Traffic Signal Warrant Met

EXISTING TRAFFIC CONTROL:

LOCATION:

SIGNAL OR ALL-WAY STOP WARRANT MET:

MITIGATION RECOMMENDED:

ADDITIONAL STUDIES RECOMMENDED:

EXISTING OR NEAR TERM:

2030 / LONG TERM:

Stop Sign

- No additional improvements recommended

- Approximate Construction Cost - $170,000

- Realign or close north leg (parking lot entrance)

- None

69 - Lincoln Avenue and Wright Street

- Install countdown pedestrian signals, high visibility crosswalks

- Interconnect with McClellan Avenue andSugarloaf Avenue intersections

- Install Traffic Signal with left turn lanes on all legs

RECOMMENDATIONS

MITIGATION

EXISTING TRAFFIC (2013)

FIGURE 5F

TRAFFIC STUDY

CITY OF MARQUETTE

Option 1

Option 2

- Construct Roundabout

- Approximate Construction Cost - $750,000

WITH MITIGATION

LEVEL OF SERVICE

EXISTING PEAK HOUR

OVERALL LEVEL OF SERVICE:

OVERALL LEVEL OF SERVICE:

WITH MITIGATION

LEVEL OF SERVICE

2030 PEAK HOUR

*

Based on Signalized Intersection*

*

right-of-way acquisition cost.and do not include engineering fees or funding). Costs are for construction only recommended for use in programming capital general planning purposes (i.e., they are not these estimates should only be used for engineering design is undertaken. Therefore, costs may change once more detailed investigations. It is possible that these been estimated based on limited These preliminary construction costs have

Page 69: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

Pine St

Presque Isle

Ave

Lakeshore Blvd

Dr

White

Peter

2

2

2

2

2

2

1

23

11

12

1310

Center St

Wright St

Hawley St

TRAFFIC STUDY

CITY OF MARQUETTE

DrWhitePeter

Lakeshore Blvd

Lake Superior

N

(2030 NO-BUILD)

TURNING MOVEMENT COUNTS

FUTURE PEAK HOUR

FIGURE 6A

5-20-2

5

5-5-525-

120-13

5

5-10-10

0-0-5

0-0-0

0-5-5

15-80-

125

0-0-5

15-20-10

0-0-5

0-5-5

45-50-70

35-115-115

20-65-60

20-65-110

30-35-100

15-40-65

45-55-80

75-14

5-15

0

10-10-20

45-90-19

0

25-60-110

10-30-40

35-15-10

25-45-45

30-30-45

35-45-40

25-40-40

35-25-5

20-10-5

35-35-60

10-40-40

10-15-35

10-30-35

0-10-20

20-55-50

80-175-230

70-130-165

125-19

5-240

10-35-45

80-15

0-18

5

5-15-15

80-90-160

10-20-30

30-60-45

75-13

5-16

0

10-20-20

5-15-15

30-55-60

5-10-10

20-35-45

0-0-5

225-400-480

0-5-0

5-10-15

0-5-0

5-10-5

155-355-470

0-5-0

LEGEND

EXISTING SIGNAL

EXISTING ALL-WAY STOP CONTROL

STUDY INTERSECTION

EXISTING 1-WAY OR 2-WAY STOP CONTROL

XX-XX-XX A.M.-MIDDAY-P.M. PEAK HOUR VOLUME

2

A

#

5-10

-1510

5-16

5-15

5

10-3

0-5

0

60-12

5-2

50

5-5-5

25-40-65

Page 70: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

73

72

71

70

69

5

4

9

74Magnetic St

College Ave

Fair Ave

Lincoln

Ave

N

Washington St

AveCleveland

Hawley St

Wright St

Center St

Tracy Ave

(2030 NO-BUILD)

TURNING MOVEMENT COUNTS

FUTURE PEAK HOUR

FIGURE 6B

TRAFFIC STUDY

CITY OF MARQUETTE

25-65-10

5

10-25-45

65-45-75

40-30-35

45-35-30

230-345-415110-19

5-310

55-70-80

10-40-60

100-90-80

155-325-425

230-195-215

35-80-120

45-70-100

85-10

0-15

5

65-75-9585-95-150

50-50-95

25-75-10

5

70-15

0-16

0

0-5-5

90-120-110

5-5-5

230-375-5450-0-10

5-5-5

5-5-5

105-80-85

315-380-435

5-5-0

105-15

0-14

5

25-25-20

90-110-95

15-30-20

10-5-10

55-75-11530-20-20

70-14

0-15

0

5-10-10

115-150-150

85-100-70

20-25-35

5-5-5

260-16

5-12

0

35-75-10

5

160-230-230

15-10-5

85-90-80

LEGEND

EXISTING SIGNAL

EXISTING ALL-WAY STOP CONTROL

STUDY INTERSECTION

EXISTING 1-WAY OR 2-WAY STOP CONTROL

XX-XX-XX A.M.-MIDDAY-P.M. PEAK HOUR VOLUME

2

A

#

70-70-95

105-45-30

190-10

5-12

0

25-40-70

40-35-55

125-200-2200-10-20

55-115-205

25-65-70

60-60-75

175-255-245

15-15-10

20-25-20

65-25-25

335-19

5-220

15-20-55

25-20-20

55-100-950-10-5

145-19

5-315

5-15-20

35-35-30

85-85-75

5-0-5

50-50-55

35-35-35

15-20-15

40-25-15

90-45-70

250-615-685110-13

5-16

5

15-10-5

85-85-12

5

50-40-25

330-635-495

130-120-85

80-30-15

115-80-55

130-17

0-14

0

50-85-105

70-105-110

80-20-105-5-0

125-19

5-205

60-115-10

5

40-45-25

60-35-30

5-0-5

7th St

Washington St

Lincoln

Ave

Magnetic St

College Ave

Kaye Ave

Center St

Wright St

Tracy

Ave

Sugar

Loaf

Ave

Hawley St

2

2

2

Page 71: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

61

66

65

64

63

62

8

7

6

Washington St

Ridge St

Wright St

Ave

Cleveland

Fair Ave

N

Odovero Dr

Baraga Ave

(2030 NO-BUILD)

TURNING MOVEMENT COUNTS

FUTURE PEAK HOUR

FIGURE 6C

TRAFFIC STUDY

CITY OF MARQUETTE

2D

FIGURE

SEE

30-35-45

0-5-0

470-305-340

5-0-0

5-10-5

0-5-070-17

0-235

175-285-505

5-10-5

25-60-110

0-0-0

55-170-155

0-0-0

155-18

0-210

375-295-285

130-130-125

230-190-135

565-560-79560-13

5-235

140-255-395

0-0-0

110-210-350

485-575-860

65-120-205

30-75-35

25-20-10

545-415-425

15-20-30

35-80-60

5-20-1520-90-85

175-295-485

60-70-65

10-100-115

10-20-20

15-55-355-5-5

50-95-75

480-400-385

45-65-85

10-15-15

5-5-105-5-5

240-380-525

10-20-25

5-5-5

5-5-10

5-5-5

25-50-80

260-16

0-110

235-18

0-16

5

50-140-205

10-15-45

55-125-1955-15-30

100-17

0-225

20-20-20

70-70-95

165-115-115

35-20-10

20-40-115

90-110-13

5

5-5-5

95-100-140

0-0-5

195-430-6155-5-5

0-0-5

0-0-0

65-60-35

425-390-490

5-5-0

55-90-90

15-30-35

465-385-380

5-10-15

10-25-35

10-30-3045-60-12

5

260-375-510

15-35-20

40-110-130

20-25-35

50-75-70

50-95-90

120-13

5-110

415-305-310

60-125-155

45-90-110

250-515-63565-16

5-17

0

170-255-425

65-115-115

30-80-65

345-530-440

95-150-120

LEGEND

EXISTING SIGNAL

EXISTING ALL-WAY STOP CONTROL

STUDY INTERSECTION

EXISTING 1-WAY OR 2-WAY STOP CONTROL

XX-XX-XX A.M.-MIDDAY-P.M. PEAK HOUR VOLUME

2

A

#

McClellan

Ave

Odovero Dr

Baraga Ave

Cleveland Ave

Fair Ave

McClellan

Ave

2

2

2

A

41

28

Page 72: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

N

U.S. 41 Eastbound

U.S. 41 Westbound

Washington Street

Meeske

Avenue

Parkin

g Lot

365-820-890

545-575-735

490-715-590

480-595-870

475-695-555

475-695-555

480-595-870

310-760-

850300-725-820

545-575-805

(2030 NO-BUILD)

TURNING MOVEMENT COUNTS

FUTURE PEAK HOUR

FIGURE 6D

TRAFFIC STUDY

CITY OF MARQUETTE

35-65-70

15-15-50-0-0

30-35-30

35-30-40

20-25-15

15-15-15

15-35-35

65-65-110

40-60-55

10-35-55

5-25-20

0-0-1

LEGEND

EXISTING SIGNAL

EXISTING ALL-WAY STOP CONTROL

STUDY INTERSECTION

EXISTING 1-WAY OR 2-WAY STOP CONTROL

XX-XX-XX A.M.-MIDDAY-P.M. PEAK HOUR VOLUME

2

A

#

U.S. 41 Westbound

U.S. 41 Eastbound

40-65-10

5

Page 73: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

Magnetic St

College Ave

Kaye Ave

Fair Ave

2nd St

Hig

h St

Lakeshore Blvd

Pine St

2222

2

2222 A

4th St

1514

22

23

24

21

25

20

19

1617

18

Presque Isle

Ave

3rd St

Fro

nt St

Lakeshore Blv

d

Pine St

Fair Ave

Hig

h St

N

2

Kaye Ave

College Ave

Magnetic St

Lake Superior

(2030 NO-BUILD)

TURNING MOVEMENT COUNTS

FUTURE PEAK HOUR

FIGURE 6E

TRAFFIC STUDY

CITY OF MARQUETTE

35-65-45

95-15

5-14

5

10-10-30

50-110

-225

25-80-60

5-25-30

5-10-5

0-0-5

50-35-70

0-0-0

5-5-10

5-5-105-5-5

20-40-70

5-5-10

5-5-10

5-5-10

5-5-10

10-15-20

0-10-5

95-12

5-13

0

5-5-0

5-5-5

15-10-200-0-5

40-55-110

5-0-5

10-15-20

10-5-25

5-5-5

85-85-75

5-15-20

165-255-265

5-10-10

5-15-10

50-30-3010-30-20

125-300-345

5-10-5

40-115-105

15-20-45

10-10-15

20-50-45

10-10-25

240-330-350

5-5-15

5-15-20

20-15-1510-20-20

165-405-470

5-10-15

15-20-35

10-5-20

0-5-10

85-55-45

5-20-25

195-230-235

10-10-10

5-25-20

35-55-4015-20-15

150-305-360

10-20-30

20-30-60

15-20-30

10-10-10

65-55-30

5-10-10

140-205-225

5-10-5

5-10-20

140-110-8525-40-30

125-235-255

0-10-15

45-105-135

60-140-165

20-55-55

40-40-35

5-10-10

115-215-255

5-5-5

30-25-45

65-50-4045-50-45

115-215-245

0-10-10

25-60-65

20-50-70

30-65-60

120-220-275

55-85-90

50-70-65

130-250-250105-220-215

100-230-315

55-12

0-12

0

15-65-75

20-35-20

25-55-70

20-20-15

85-130-15535-50-35

30-50-55

5-10-15

55-160-170

45-95-170

35-65-55

10-10-20

80-135-170

55-70-80

10-25-3520-25-60

40-130-185

30-20-35

5-10-25

15-15-30

5-5-10

5-5-10

50-85-10010-35-45

5-15-35

5-5-10

10-25-30

35-120-145

10-30-40

LEGEND

EXISTING SIGNAL

EXISTING ALL-WAY STOP CONTROL

STUDY INTERSECTION

EXISTING 1-WAY OR 2-WAY STOP CONTROL

XX-XX-XX A.M.-MIDDAY-P.M. PEAK HOUR VOLUME

2

A

#

EXISTING YELLOW FLASHER SIGNAL

Page 74: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

Lakeshore Blvd

Ridge StArch St

Fro

nt St

3rd St

Hig

h St

Pine St

Spru

ce St

Lakeshore Blvd

4th St Crescent St

2

222

2

A

A Hewitt Ave

Hig

h St

27

26

28

34

33

32 31

30 29

Pine St

Crescent St

3rd St

Fro

nt St

2

Lakeshore Blvd

N

Hewitt Ave

Ridge St

Arch St

Lake Superior

(2030 NO-BUILD)

TURNING MOVEMENT COUNTS

FUTURE PEAK HOUR

FIGURE 6F

TRAFFIC STUDY

CITY OF MARQUETTE

15-20-20

125-18

0-230

5-15-15

80-18

5-220

15-15-15

10-15-10

20-50-80

30-40-50

35-40-45

5-5-510-15-40

0-15-10

15-25-25

10-15-15

115-15

5-240

35-55-60

5-10-5

20-20-205-5-5

115-13

0-18

0

5-5-10

15-15-20

10-30-35

0-10-10

5-20-15

15-20-30

225-305-340

10-15-15

20-20-20

20-20-3510-15-20

190-320-405

10-15-30

10-15-25

20-20-50

5-15-15

5-5-10

10-15-25

240-260-280

10-10-15

15-25-25

20-20-3010-10-25

195-280-390

15-25-45

10-10-10

10-20-30

5-5-15

20-20-25

10-15-20

100-15

5-17

0

10-15-20

10-5-10

25-30-3510-10-15

75-10

0-15

5

5-10-5

10-15-25

10-25-35

10-5-10 5-10-10

5-10-20

35-35-40

5-5-10

5-5-10

10-30-305-5-10

35-40-60

5-10-10

5-5-10

20-20-30

5-5-10

5-5-10

5-5-10

10-20-25

5-10-5

5-5-5

15-20-255-5-5

10-15-30

5-5-0

10-5-5

5-20-15

5-5-10

20-15-35

115-18

0-205

10-15-30

65-18

5-210

20-15-25

15-10-15

LEGEND

EXISTING SIGNAL

EXISTING ALL-WAY STOP CONTROL

STUDY INTERSECTION

EXISTING 1-WAY OR 2-WAY STOP CONTROL

XX-XX-XX A.M.-MIDDAY-P.M. PEAK HOUR VOLUME

2

A

#

Page 75: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

Grove St

Alta

mont St

Spring StBaraga Ave

49

4847

46

7675

41

42

2

45

40

774th St

Fisher St

7th St

N

Washington St

(2030 NO-BUILD)

TURNING MOVEMENT COUNTS

FUTURE PEAK HOUR

FIGURE 6G

TRAFFIC STUDY

CITY OF MARQUETTE

25-30-30

35-55-95

185-100-120

40-4

5-8

010

5-4

5-5

0

575-5

35-6

35

125-180-22

5

70-120-190

25-40-856

0-4

0-5

0

385-5

90-7

60

120-13

5-8

5

5-5-5

145-14

5-95

285-13

5-16

5

115-185-190

105-60-605-0-0

0-5-5

110-16

5-305

80-80-10

0

5-5-5

5-0-5

5-0-0

30-20-20

10-10-5

345-17

5-18

0

5-10-20

10-15-1530-30-30

30-30-20

145-205-370

10-20-20

40-40-55

30-35-45

15-20-15

5-0-5

20-20-10

365-18

5-19

5

15-30-60

30-35-350-5-5

5-5-5

165-215-360

10-25-15

5-5-5

0-0-5

0-5-0

35-40-40

35-15-35

10-10-10

15-15-15

5-10-10170-380-405

5-10-10

10-10-10

5-5-5

25-35-35

255-430-405

5-10-10

25-40-40

15-20-15

105-80-10

5

10-15-10

30-35-30125-255-215

50-80-85

115-90-15

520-30-40

35-50-35

175-320-300

60-75-85

25-5-10

10-15-10

140-85-90

10-10-10

30-35-2530-40-45

20-15-20

95-12

0-18

515-30-40

5-5-10

20-45-45

10-15-10

5-5-5

5-5-0

5-5-0

0-0-0

50-20-2595-100-90

60-80-90

10-5-5

40-45-10

5

5-5-10

70-90-105

85-75-75

5-10-5

5-10-10

0-10-5

15-10-5

10-15-595-160-180

25-30-55

5-5-5

15-15-20

15-5-5

150-130-165

75-35-30

135-60-85

95-45-35

45-25-35

30-45-70

5-5-575-180-165

5-5-5

5-10-15

0-5-5

70-60-80

155-155-110

0-5-10

LEGEND

EXISTING SIGNAL

EXISTING ALL-WAY STOP CONTROL

STUDY INTERSECTION

EXISTING 1-WAY OR 2-WAY STOP CONTROL

XX-XX-XX A.M.-MIDDAY-P.M. PEAK HOUR VOLUME

2

A

#

110-80-55

25-30-30

280-12

5-10

0

20-15-25

25-30-30230-420-440

60-80-110

105-10

0-18

515-35-40

60-90-105

290-460-435

60-60-70

Grove St

Fisher St

Baraga A

ve

Spring St

7th St

5th St

4th St

3rd St

Washington St

22

22

2

2

2

41

28

Page 76: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

3rd St

Fro

nt St

Lakeshore Blvd

Main St

2

2 2

2

2

2

A

2

2

Lakeshore Blv

d

Spring St

Fisher St

St

Main2

Fro

nt St

44

43

37

78

39

60

36

35

8179

80

38

N

Superior

Lake

(2030 NO-BUILD)

TURNING MOVEMENT COUNTS

FUTURE PEAK HOUR

FIGURE 6H

TRAFFIC STUDY

CITY OF MARQUETTE

Baraga Ave

Washington St

10-10-5

5-0-10

5-5-10

0-5-0

135-45-105110-35-50

25-50-65

0-5-5

60-75-18

0

5-5-0

70-65-140

40-30-65

25-55-65

5-35-20

130-14

0-19

5

0-10-10

30-40-3585-145-125

60-12

5-12

010

0-115-17

520-40-30

50-75-65

95-170-195

60-120-135

LEGEND

EXISTING SIGNAL

EXISTING ALL-WAY STOP CONTROL

STUDY INTERSECTION

EXISTING 1-WAY OR 2-WAY STOP CONTROL

XX-XX-XX A.M.-MIDDAY-P.M. PEAK HOUR VOLUME

2

A

#

75-25-35

5-5-0

580-460-560

15-15-25

245-395-660

5-5-5

50-65-130

5-0-0

10-15-10

15-10-5

10-15-20

155-12

0-17

0

5-10-10

65-40-4545-50-55

10-25-20

85-15

5-230

35-20-110

5-10-15

30-55-60

10-10-20

15-20-10

185-18

0-210

10-25-35

25-50-7520-30-30

10-10-20

95-230-355

5-15-20

5-15-20

35-55-50

330-355-435

20-35-55

5-20-2015-20-20

20-55-45

225-280-465

85-12

5-10

5

5-10-5

215-17

0-245

25-70-60

165-17

5-240

0-0-0

65-140-140

25-45-35

30-65-75

95-10

5-110

80-110-14

5

20-20-20

15-35-30

25-25-15

5-10-10

295-275-325

5-5-5

10-25-255-10-5

15-25-15

200-250-345

15-35-35

10-30-50

5-5-5

5-5-15

20-10-10

10-5-10

135-16

5-200

0-10-5

0-0-105-5-10

30-55-65

65-13

5-200

5-0-5

25-20-15

15-15-10

90-95-10

0

5-10-15

5-10-1015-50-75

20-25-40

50-115-17

05-10-10

5-20-20

80-55-20

80-70-110

100-55-55

110-90-10

0

350-345-425

25-35-55

15-30-3015-30-40

15-35-35

205-265-465

25-25-20

35-70-130

30-40-35

5-30-25

Page 77: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

Divisio

n St

Lakeshore Blv

d

Pioneer Rd

5857

53

56

55

5051

54

52

Alta

mont St

N

Joliet R

d

Alta

mont St

Hampton St

Genesee St

(2030 NO-BUILD)

TURNING MOVEMENT COUNTS

FUTURE PEAK HOUR

FIGURE 6I

TRAFFIC STUDY

CITY OF MARQUETTE

40-100-125

20-15-35

60-75-95

10-5-1035-20-30

10-5-10

10-15-15

120-60-90

60-80-95

45-65-155

10-15-5

40-85-110

110-5-15

10-10-10

175-13

0-14

5

10-15-20

25-45-30

50-20-2525-15-15

60-10

0-205

15-25-35

25-15-15

50-10-20

30-20-20

55-30-20

10-10-5

1045-645-790

5-5-10

50-45-40

5-5-515-45-30

425-735-12

15

40-55-40

50-20-55

5-5-5

10-10-5

25-25-40

70-45-70

1035-670-795

40-65-115

10-20-15

35-40-5045-65-85

405-715-1130

5-15-15

55-65-55

50-35-45

70-75-70

5-5-5

225-14

0-19

0

15-15-15

95-120-180

5-5-10

15-15-250-0-0

15-10-30

15-10-5

5-5-10

25-20-20

0-5-5

0-5-0

0-5-10

240-70-95

5-5-10

10-20-15

0-0-1010-10-10

125-90-12

0

10-15-20

5-5-0

5-5-0

5-10-5

5-0-5

5-10-15

40-15-35

10-10-10

25-10-15

150-15-3015-10-20

10-15-25

10-20-20

5-5-0

90-5-25

55-10-10

LEGEND

EXISTING SIGNAL

EXISTING ALL-WAY STOP CONTROL

STUDY INTERSECTION

EXISTING 1-WAY OR 2-WAY STOP CONTROL

XX-XX-XX A.M.-MIDDAY-P.M. PEAK HOUR VOLUME

2

A

#

0-0-0

10-20-35

160-10

0-13

5

25-15-15

55-30-25

0-5-5

75-95-17

515-30-35

5-5-5

5-15-10

Hampton St

Alta

mont St

Joliet Rd

Genesee St

Alta

mont St

2 2

2

222

2 2

41

28

Page 78: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

Division

St

Grove St

59

68

67

Pioneer Rd

N

McClella

n

Ave

(2030 NO-BUILD)

TURNING MOVEMENT COUNTS

FUTURE PEAK HOUR

FIGURE 6J

TRAFFIC STUDY

CITY OF MARQUETTE

30-20-40

65-30-45

10-230-265

30-25-70

30-30-20

30-55-8515-45-70

140-240-500

10-25-40

40-25-25

90-55-60

55-35-45

0-5-0

15-15-10

350-18

0-235

5-5-5

150-75-90

0-5-50-10-5

110-18

5-450

80-95-14

0

0-0-0

0-5-5

5-10-5

345-19

5-235

100-45-60

35-50-

12520-20-

15

105-17

0-425

10-15-30

LEGEND

EXISTING SIGNAL

EXISTING ALL-WAY STOP CONTROL

STUDY INTERSECTION

EXISTING 1-WAY OR 2-WAY STOP CONTROL

XX-XX-XX A.M.-MIDDAY-P.M. PEAK HOUR VOLUME

2

A

#

McClellan

Ave

A

2

2

553

Page 79: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

N

Lakeshore Blvd

Hawley St

4th St Crescent St

Hewitt Ave

CITY OF MARQUETTE TRAFFIC STUDY

Lake Superior

Lake Superior

CIT

Y LIMIT

S

CIT

Y LIMIT

S

CIT

Y LIMIT

S

553

28

28

28

41

41

41

Division St

McClella

n A

ve

Pioneer Rd

Hampton St

Alta

mont S

t

Joliet R

d

Genesee St

Alta

mont

St

Grove St

Fisher St

Baraga Ave

Spring St

7th St

5th St

4th St

3rd St

Fro

nt

St

Lakeshore Blvd

Washington St

Ridge St

McClellan A

ve

Lincoln A

ve

Odovero Dr

Baraga Ave Ridge St

Arch St

Fro

nt

StCleveland Ave

Fair Ave

Magnetic St

College Ave

Kaye Ave

Fair Ave

3rd St

2nd St

High St

Pine St

Spru

ce St

Lakeshore Blvd

Center St

Pine St

Wright St

McClella

n A

ve

Tracy A

ve

Sugar

Loaf

Ave

Presque Isle A

ve

Main St

Dr

Peter White

3,300

3,600

11,4

00

4,3

00

10,300 16,300

6,0

00 3,700

3,7

00

10,1

00

4,000

1,3

00

1,200

700

5,3

00

4,000

6,2

00

6,500 3,100

4,800

7,5

00

1,100

3,0

00

9,6

00

8,3

00

1,200

1,400

FIGURE 7

LEGEND

X,XXX TWO-WAY AVERAGE DAILY TRAFFIC

(2030)DAILY TRAFFIC VOLUMES

FUTURE ANNUAL AVERAGE

4,0

00

2,700

5,9

00

16,900

11,400

11,9

00

Page 80: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

N

Lakeshore Blvd

Hawley St

4th St Crescent St

Hewitt Ave

CITY OF MARQUETTE TRAFFIC STUDY

Lake Superior

Lake Superior

CIT

Y LIMIT

S

CIT

Y LIMIT

S

CIT

Y LIMIT

S

553

28

28

28

41

41

41

Division St

McClella

n A

ve

Pioneer Rd

Hampton St

Alta

mont S

t

Joliet R

d

Genesee St

Alta

mont

St

Grove St

Fisher St

Baraga Ave

Spring St

7th St

5th St

4th St

3rd St

Fro

nt

St

Lakeshore Blvd

Washington St

Ridge St

McClellan A

ve

Lincoln A

ve

Odovero Dr

Baraga Ave Ridge St

Arch St

Fro

nt

StCleveland Ave

Fair Ave

Magnetic St

College Ave

Kaye Ave

Fair Ave

3rd St

2nd St

High St

Pine St

Spru

ce St

Lakeshore Blvd

Center St

Pine St

Wright St

McClella

n A

ve

Tracy A

ve

Sugar

Loaf

Ave

Presque Isle A

ve

Main St

Dr

Peter White

68

59

56

5758

67

53

54 55

505152

61

63

64

65

73

49

4847

4645

40

42

41 75

76

60

7778

44

43

37

38

39

36

35

80

8179

34

33

27

28293031

32

74

72

62

8

7

71

70

9

25

20

19

21

24 22

23

26

18

1417

1615

1310

12

115696

43 2

1

66

* * *

* * *

*

*

*

*

*

*

*

*

*

*BY MOVEMENT

FOR LEVEL OF SERVICE

SEE FIGURE 8B & 8C

LEGEND

OVERALL LEVEL OF SERVICE A, B OR C

OVERALL LEVEL OF SERVICE D

OVERALL LEVEL OF SERVICE E OR F

FIGURE 8A

(2030 NO-BUILD)

OF SERVICE SUMMARY

FUTURE OVERALL LEVEL

Page 81: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

N

LEGEND

LEVEL OF SERVICE CALCULATED USING HCM 2000

A.M.-MIDDAY-P.M. LEVEL OF SERVICEX-X-X

*

(2030 NO-BUILD)

SERVICE BY MOVEMENT

FUTURE LEVEL OF

FIGURE 8B

TRAFFIC STUDY

CITY OF MARQUETTE

49

OVERALL LOS D-D-D

7

C-C-C

B-B-B

B-B-B

B-B-BB-B-C

F-

D-C

B-B-BB-B-B

McClellan Ave & Fair Ave

OVERALL LOS F-C-B

A-

A-

AN

O D

EL

AY

NO D

EL

AY

B-B-BB-D-F

Presque Isle Ave & Fair Ave

OVERALL LOS A-A-A

16 37 Front St & Baraga Ave

OVERALL LOS A-A-B

55

B-

A-

A

D-C-F

C-D-F

A-

A-B

NO D

EL

AY

U.S. 41 & Hampton St

OVERALL LOS A-A-A

NO D

EL

AY

61

D-C-D

B-B-B

U.S. 41 & Washington St (SE)

OVERALL LOS C-C-C

*

62

A-

A-

AN

O D

EL

AY

C-D-ED-E-F

A-

A-

A

NO D

EL

AY

D-F-FC-D-F

McClellan Ave & Ridge St

OVERALL LOS A-A-B

66

B-B-A

A-

A-

AA-

A-

A

A-

A-

A

A-

A-

A

C-D-FA-B-B

O’Dovero Drive & McClellan Ave

OVERALL LOS A-A-A

69

CO

NT

RO

L

YIE

LD

A-A-A

C-F-F

A-A-A

Lincoln Ave & Wright St

OVERALL LOS A-B-D

U.S. 41 & Grove St

A-

A-

A

D-D-F

A-

A-

A

A-B-B

A-

A-

A

B-B-B

A-

A-

A

C-D-E

F-F-D

B-B-C

B-B-B

D-D-

D

F-C-

C

D-D-D

B-B-C

B-B-B

F-F-

F

D-C-

C

Page 82: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

N

LEGEND

A.M.-MIDDAY-P.M. LEVEL OF SERVICE

(2030 NO-BUILD)

SERVICE BY MOVEMENT

FUTURE LEVEL OF

FIGURE 8C

TRAFFIC STUDY

CITY OF MARQUETTE

X-X-X

* LEVEL OF SERVICE CALCULATED USING HCM 2000

5

OVERALL LOS B-B-C

B-B-B

B-C-D

C-C-CB-B-B

B-B-C

B-B-BB-B-C

B-B-B

Sugarloaf Ave & Wright St 6

OVERALL LOS B-B-C

McClellan Ave & Wright St

A-A-A

B-B-FC-C-C

B-B-B

A-A-B

B-B-C A-A-B

C-A-C

A-A-B

B-B-D

8

OVERALL LOS B-B-C

McClellan Ave & Cleveland St

64

C-E-D

C-C-D

OVERALL LOS A-A-B

McClellan Ave & Baraga Ave

A-A-A

A-A-A

A-A-A

A-A-A

17

B-C-D

B-C-C

OVERALL LOS A-A-A

Third St & Fair Ave

A-A-AA-A-A

A-A-AA-A-A

B-C-C

67

B-A-B

B-B-C

A-A-B

B-B-BB-B-B

B-B-B

B-B-BB-B-B

Grove St & McClellan Ave

OVERALL LOS B-B-BB-B-D

C-B-C

Page 83: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

MOVEMENT VOLUMES

EXISTING PEAK HOUR TURNING

86-88-125

0-0-3

179-395-562

56-52-31

389-358-447

2-2-0

2-1-

3

0-0-2

0-0-0

14-36-10

3

1-1-

4

81-

98-12

3

VOLUMES

TURNING MOVEMENT

2030 NO BUILD PEAK HOUR

20-40-11

5

90-11

0-13

5

5-5-5

95-100-140

0-0-5

195-430-6155-5-5

0-0-5

0-0-0

65-60-35

425-390-490

5-5-0

OVERALL LEVEL OF SERVICE:

Mid-Day: B (16.3 sec. of delay)

PM: C (24.2 sec. of delay)

LEVEL OF SERVICE

2030 NO BUILD PEAK HOUR

AM: B (14.9 sec. of delay)

A-A-A

B-B-FC-C-C

B-B-B

A-A-B

B-B-C

LEVEL OF SERVICE

EXISTING PEAK HOUR

OVERALL LEVEL OF SERVICE:

AM: B (14.0 sec. of delay)

Mid-Day: B (15.5 sec. of delay)

PM: C (23.9 sec. of delay)

OR BETTER

LOS C

MOVEMENTS

ALL

WITH MITIGATION

LEVEL OF SERVICE

EXISTING PEAK HOUR

OVERALL LEVEL OF SERVICE:

AM: A (9.4 sec. of delay)

Mid-Day: A (7.8 sec. of delay)

PM: A (9.0 sec. of delay)

OR BETTER

LOS C

MOVEMENTS

ALL

OVERALL LEVEL OF SERVICE:

AM: A (9.5 sec. of delay)

Mid-Day: A (8.3 sec. of delay)

PM: A (9.9 sec. of delay)

WITH MITIGATION

LEVEL OF SERVICE

2030 PEAK HOURB-B-B

A-A-AA-A-A

C-C-C

B-B-C

B-B-B

acquisition cost.engineering fees or right-of-way for construction only and do not include programming capital funding). Costs are they are not recommended for use in used for general planning purposes (i.e., Therefore, these estimates should only be engineering design is undertaken. costs may change once more detailed investigations. It is possible that these been estimated based on limited These preliminary construcion costs have

Traffic Signal

Existing Traffic Signal

EXISTING TRAFFIC CONTROL:

LOCATION:

SIGNAL OR ALL-WAY STOP WARRANT MET:

MITIGATION RECOMMENDED:

ADDITIONAL STUDIES RECOMMENDED:

EXISTING OR NEAR TERM:

2030 / LONG TERM:

- No additional improvements recommended

- Approximate Construction Cost - $35,000

- None

6 - McClellan Avenue and Wright Street

- Retime Traffic Signal

- Interconnect with adjacent signals to provide traffic progression

RECOMMENDATIONS

MITIGATION

FUTURE TRAFFIC (2030)

FIGURE 9A

TRAFFIC STUDY

CITY OF MARQUETTE

Page 84: City of Marquette Traffic Study · recent years (such as the Intersection Capacity Utilization (ICU) method), the HCM methodology remains the industry standard for evaluating, planning

MOVEMENT VOLUMES

EXISTING PEAK HOUR TURNING

VOLUMES

TURNING MOVEMENT

2030 NO BUILD PEAK HOUR

WITH MITIGATION

LEVEL OF SERVICE

EXISTING PEAK HOUR

C-B-D

B-C-D

A-A-B

NO

DEL

AY

B-A-A

NO

DEL

AY

OVERALL LEVEL OF SERVICE:

AM: A (1.5 sec. of delay)

Mid-Day: A (1.3 sec. of delay)

PM: A (1.7 sec. of delay)

LEVEL OF SERVICE

EXISTING PEAK HOUR

OVERALL LEVEL OF SERVICE:

AM: A (1.5 sec. of delay)

Mid-Day: A (1.3 sec. of delay)

PM: A (1.7 sec. of delay)

C-B-D

B-C-D

A-A-B

NO

DEL

AY

B-A-A

NO

DEL

AY

OVERALL LEVEL OF SERVICE:

Mid-Day: A (1.9 sec. of delay)

PM: A (3.3 sec. of delay)

LEVEL OF SERVICE

2030 NO BUILD PEAK HOUR

AM: A (2.4 sec. of delay)

B-A-A

D-C-F

C-D-F

A-A-B

NO

DEL

AY

NO

DEL

AY

WITH MITIGATION

LEVEL OF SERVICE

2030 PEAK HOURB-A-A

D-C-F

C-D-F

A-A-B

NO

DEL

AY

NO

DEL

AY

OVERALL LEVEL OF SERVICE:

Mid-Day: A (1.9 sec. of delay)

PM: A (3.3 sec. of delay)

AM: A (2.4 sec. of delay)

42-16-48

7-8-4

50-20-55

13-39-23

386-670-11

14

35-46-36

43-39-36

2-1-3

1-4-7

50-23-17

959-591-

123

6-8-11-3-2

15-45-30

425-735-12

15

40-55-40

50-45-40

5-5-5

5-5-10

55-30-20

1045-645-790

10-10-5

10-10-5

5-5-5

acquisition cost.engineering fees or right-of-way for construction only and do not include programming capital funding). Costs are they are not recommended for use in used for general planning purposes (i.e., Therefore, these estimates should only be engineering design is undertaken. costs may change once more detailed investigations. It is possible that these been estimated based on limited These preliminary construcion costs have

EXISTING TRAFFIC CONTROL:

LOCATION:

SIGNAL OR ALL-WAY STOP WARRANT MET:

MITIGATION RECOMMENDED:

ADDITIONAL STUDIES RECOMMENDED:

EXISTING OR NEAR TERM:

2030 / LONG TERM:

55 - U.S. 41 and Hampton Street

Stop Sign

None Met

- None required

- Geometric improvements do not improve Level of Service

- Evaluate impacts of restricting Hampton Street movements to right-in / right-out only

RECOMMENDATIONS

MITIGATION

FUTURE TRAFFIC (2030)

FIGURE 9B

TRAFFIC STUDY

CITY OF MARQUETTE