Department of Public Works Bureau of Contract Administration
CITY OF LOS ANGELES PROJECT LABOR AGREEMENT
QUARTERLY REPORT December 11, 2017
2
Total Awarded and to be Awarded (2010-2015 PLA)
# of Projects 62
Total $ Amount $733,750,161
Summary of Departmental PLA Projects (2010-2015 PLA)
Departmental PLA Projects Closed Active To Be Awarded
# of Projects 44 18 0
Total $ Amount $271,285,159 $462,465,002 $0
Departmental PLA Achievements Closed Active Total All Projects
(2010-present)
Local Hire % 42% 36% 39%
Local Apprentice Hire % 68% 55% 61%
Disadvantaged/Transitional Hire % 25% 18% 21%
DEPARTMENT OF PUBLIC WORKS SUMMARY OF PROJECTS UNDER DEPARTMENTAL 2010-2015 PROJECT LABOR AGREEMENT (PLA)
* PLA Local Hiring Target Percentages : Local Hire - 30% Local Apprentice - 50% Disadvantaged/Transitional - 10%
3
Total Awarded and to be Awarded (2015-2020 PLA)
# of Projects 21
Total $ Amount $334,883,337
Summary of Departmental PLA Projects (2015-2020 PLA)
Departmental PLA Projects Closed Active To Be Awarded
# of Projects 0 17 4
Total $ Amount $0 $277,348,246 $57,535,091
Departmental PLA Achievements Closed Active Total All Projects
(2015-Present)
Local Hire % None 36% 39%
Local Apprentice Hire % None 57% 61%
Disadvantaged/Transitional Hire % None 12% 21%
DEPARTMENT OF PUBLIC WORKS SUMMARY OF PROJECTS UNDER DEPARTMENTAL 2015-2020 “ N E W” PROJECT LABOR AGREEMENT (PLA)
* PLA Local Hiring Target Percentages : Local Hire - 30% Local Apprentice - 50% Disadvantaged/Transitional - 10%
4
ACTIVE DEPARTMENTAL PLA PROJECTS
Award Date Project Contract AmountProject Status as
of 11/28/17
02/16/2011 Los Angeles Wastewater Control System Replacement Program (LAWCSRP) $88,600,000 72%
01/29/2014 Machado Lake Ecosystem Rehabilitation Project $74,800,000 99%
01/21/2014 HTP - Digester Gas Utilization Project (BOS) $127,302,000 92%
03/14/2014 HTP - Secondary Clarifiers Upgrade $5,590,000 99%
01/28/2015 Slauson Compton Sewer Rehab $19,345,500 60%
04/08/2015Terminal Island Water Reclamation Plant (TIWRP) Advanced Water Purifcation
Facility$41,560,000 98%
05/06/2015Terminal Island Water Reclamation Plant (TIWRP) Tertiary Filter Rehabilitation (CIP
5229)$5,943,685 100%
06/12/2015Hyperion Treatment Plant (HTP) Truck Loading Facitilty Odor Control Modernization
(CIP 2402)$5,757,000 100%
05/20/2015 Hawaiian and B, Wilmington, Fries, & San Pedro Pumping Plant Rehabilitation $6,236,358 100%
07/20/2015Donald C Tillman Water Reclamation Plant (DCTWRT) Screw Pumps Installation &
Upgrades$5,859,000 99%
09/09/2015Terminal Island Water Reclamation Plant (TIWRP) Aeration System Replacement
(CIP 5159)$11,975,000 84%
11/09/2015Central Los Angeles Recycling and Transfer Station (CLARTS) Stormwater and
Safety Improvements$7,956,000 64%
11/13/2015 NOS Rehab Unit 3 - Vermont to Trinity $10,827,780 98%
05/23/2016 Normandie Avenue Sewer Replacement/Rehabilitation $9,530,079 71%
03/30/2016 Penmar Water Quality Improvement Phase II $3,037,000 90%
06/01/2016 Asphalt Plant #1 Replacement & Modernization Project (CIP G999) $31,073,000 40%Papich Construction
Kiewit Infrastructure West Co.
J.F. Shea Construction
OHL USA, Inc.
Prime Contractor
Honeywell
Myers & Sons Construction
Ford, E.C.
J.F. Shea Construction
Green Building Corp.
J.R. Pipeline Co., Inc.
Spinello
Walsh Construction Co.
Ford, E.C.
Constellation Newenergy, Inc.
Colich & Sons, LP
Ford, E.C.
5
ACTIVE DEPARTMENTAL PLA PROJECTS (CONTINUED)
* Projects in Blue indicate New 2015 to 2020 PLA Projects
Award Date Project Contract AmountProject Status as
of 11/28/17
04/01/2016 Temescal Canyon Park Stormwater Phase II $2,817,500 75%
10/31/2016 Machado Lake Pipeline Project $4,255,100 39%
06/16/2016 South District Sewer Maintenance Yard $7,550,000 47%
08/15/2016My Fig Project: Figueroa Corridor Streetscape Improvements (11th St & Figueroa
St)$11,806,000 40%
02/01/2017 North Outfall Sewer Rehab Unit 6 & Unit 7 Hooper to LA River $17,245,196 0%
01/18/2017 Venice Dual Force Main & Pumping Plant Generator Replacement $88,893,730 15%
03/03/2017 Albion Riverside Park $16,625,000 17%
03/17/2017 LCIS Rehab Blackwelder to Olympic $21,455,000 0%
04/18/2017 DCTWRP Blower Air Clean-Up System (CIP 6171) $5,393,000 14%
02/01/2017 SSRP P17 Cypress Ave and Division Street $5,446,227 23%
03/15/2017 SSRP DAR 03 Northeast LA: Eagle Rock, Los Feliz and Griffith Park $6,387,418 10%
04/05/2017 South Hall Solar Photovoltaic(PV) Roof System $5,405,560 11%
04/26/2017HTP Headworks Improvements (CIP 2409) & Headworks Odor Control Upgrades
(CIP 2344)$25,879,213 9%
04/26/2017 DCTWRP- Electrical Power System Modifications (CIP 6163) $7,479,460 4%
05/05/2017 LAFD- Van Nuys Fire Station 39 $14,499,000 16%
Prime Contractor
KDC, Inc. dba Dynalectric
Ford E.C., Inc.
MNR Construction, Inc.
Ramona, Inc.
Ford E.C., Inc.
Ford E.C., Inc.
J.R. Pipeline Co., Inc.
Vadnais Trenchless Services, Inc.
Sully-Miller Contracting Company
Permacity Construction Corp
Murray Company
Green Building Corp.
All American Asphalt
Kiewit Infrastructure West Co.
Mike Bubalo Construction Co., Inc.
6
ACTIVE DEPARTMENTAL PLA PROJECTS (CONTINUED)
* Projects in Blue indicate New 2015 to 2020 PLA Projects
Award Date Project Contract AmountProject Status as
of 11/28/17
07/19/2017 SSRP P06 El Sereno Ave and Edison $6,216,102 0%
06/21/2017 North Central Animal Services Center Phase II $18,875,000 0%
09/11/2017 North Outfall Sewer Rehab Unit 1 Van Ness Ave to Western Ave $7,407,340 0%
09/14/2017 Robertson Recreation Center (PRJ20021) $10,785,000 0%
Prime Contractor
Colich & Sons L.P.
Ford E.C., Inc.
Mladen Buntich Construction Co., Inc.
Ford E.C., Inc.
7
PLA PROJECTS TO BE AWARDED
* "PIPS List" means it w as on the originally negotiated list of projects identified for the Department-w ide PLA
"Potential PLA" means a project that may potentially have a PLA added to the bid
PIPS List* Potential PLA*
Channel 35 TV Studio Relocation & Pico
House Seismic SeparationMunicipal Facilities $ 21,120,000
Alpine Recreation Center Expansion (a.k.a
Ord and Yale Street Park)
Recreational and
Cultural $ 5,117,000
NOS Rehabilitation Unit 18 - Colorado
Boulevard to Doran StreetSewers $ 7,862,158
Argo Drain Sub-Basin Facility Prop O $ 23,435,933
Project Title Type of Project Estimated Value PLA Status
PROJECTS ANTICIPATED TO BID WITH PLA
8
"PIPS PLA" means it was on the Public Infrastructure Project Series (PIPS) list of projects identified for the Department-wide 2015 - 2020 PLA .
"Potential PLA" means a project that may potentially have a PLA added to the bid document.
Note: Project and Advertised Information based on "Construction Projects Anticipated to Bid November 2017 through November 2018" (Source: BOE Website)
PIPS List* Potential
PLA*
Cesar Chavez Ave/Lorena St/Indiana St - Roundabout Bridges and Streets $ 3,900,000 0-3 months
Demolition of Parker Center Municipal Facilities $ 9,000,000 0-3 months
Potrero Canyon Park (Final Grading and Landscaping)Recreational & Cultural
Facilities $ 18,000,000 0-3 months
HWRP- Digester Corrosion Rehabilitation Wastewater Treatment Plants $ 8,100,000 0-3 months
HWRP- IPS Odor Control Improvements Wastewater Treatment Plants $ 6,200,000 0-3 months
HWRP-Secondary Clarifiers Upgrade- Modules 1-5 Wastewater Treatment Plants $ 17,000,000 0-3 months
Burbank Blvd - Lankershim Blvd to Cleon Ave Bridges and Streets $ 7,500,000 3-6 months
San Fernando Bike Bridge/Tujunga Wash-1309 | Phase 3 Bridges and Streets $ 3,200,000 3-6 months
Soto St Bridge/Valley-0011 Bridges and Streets $ 8,800,000 3-6 months
LAPD CATS Storage Building Municipal Facilities $ 23,000,000 3-6 months
Taylor Yard Bikeway/Pedestrian Bridge over LA River Municipal Facilities $ 14,000,000 3-6 months
Van Ness RC - Swimming Pool Imp.Recreational & Cultural
Facilities $ 4,500,000 3-6 months
74th Street Sewer Rehab Unit 1 - Van Ness to Western Sewers $ 8,300,000 3-6 months
Arlington Ave Sewer Rehab Jefferson Blvd to Rodeo Rd Sewers $ 8,600,000 3-6 months
Project Title Type of Project Estimated
Value
PLA StatusAnticipated to
Bid
PROJECTS ANTICIPATED TO BID WITH PLA (CONTINUED)
9
"PIPS PLA" means it was on the Public Infrastructure Project Series (PIPS) list of projects identified for the Department-wide 2015 - 2020 PLA .
"Potential PLA" means a project that may potentially have a PLA added to the bid document.
Note: Project and Advertised Information based on "Construction Projects Anticipated to Bid November 2017 through November 2018" (Source: BOE Website)
PIPS List* Potential
PLA*
NOS Rehab Unit 13 - Forney to Duvall Sewers $ 14,000,000 3-6 months
NOS Rehab Unit 8 - 6th to 8th St R/W (C728 - Enterprise
St. Siphon)Sewers $ 10,000,000 3-6 months
NOS Rehab Unit 9 - Aliso to 6th Sewers $ 11,000,000 3-6 months
SSRP H31 Beachwood Dr & Scenic Ave (C689) Sewers $ 5,200,000 3-6 months
Venice Auxiliary Pumping Plant Sewers $ 15,000,000 3-6 months
Aliso Creek - Limekiln Creek Restoration Project Stormwater and Water Quality $ 6,800,000 3-6 months
Machado Lake Pipeline Project- Eastern Reach Stormwater and Water Quality $ 18,000,000 3-6 months
DCTWRP- Berm Improvements Wastewater Treatment Plants $ 5,100,000 3-6 months
HWRP- Primary Tanks Skimmer Improvements Wastewater Treatment Plants $ 7,100,000 3-6 months
LAGWRP- Personnel Building Wastewater Treatment Plants $ 13,000,000 3-6 months
North Hollywood Sewer Maintenance Yard Facility Municipal Facilities $ 6,800,000 6-9 months
Engine Company 23 Arts Center Phase IIRecreational & Cultural
Facilities $ 3,100,000 6-9 months
Granada Hills Pool & Bathhouse ReplacementRecreational & Cultural
Facilities $ 5,400,000 6-9 months
Studio City Recreation Center - GymnasiumRecreational & Cultural
Facilities $ 7,000,000 6-9 months
Project Title Type of Project Estimated
Value
PLA StatusAnticipated to
Bid
PROJECTS ANTICIPATED TO BID WITH PLA (CONTINUED)
10
"PIPS PLA" means it was on the Public Infrastructure Project Series (PIPS) list of projects identified for the Department-wide 2015 - 2020 PLA .
"Potential PLA" means a project that may potentially have a PLA added to the bid document.
Note: Project and Advertised Information based on "Construction Projects Anticipated to Bid November 2017 through November 2018" (Source: BOE Website)
PIPS List* Potential
PLA*
Whitsett Fields Park Synthetic Turf Improvements Phase IIRecreational & Cultural
Facilities $ 3,700,000 6-9 months
Cochran Adams Relief Sewer Sewers $ 6,800,000 6-9 months
Wilshire Area System Swr Rehab Sewers $ 4,400,000 6-9 months
HWRP- Digester Battery E Improvements Wastewater Treatment Plants $ 13,000,000 6-9 months
Alameda St. Widening from Anaheim to PCH Bridges and Streets $ 5,000,000 9-12 months
Alameda St. Widening from Harry Bridges to Anaheim Bridges and Streets $ 5,000,000 9-12 months
Boyle Heights/Cesar Chavez Great Streets -Warren to
Evergreen (DOTBridges and Streets $ 3,800,000 9-12 months
Magnolia Blvd (North) - Cahuenga Blvd to Vineland Ave Bridges and Streets $ 5,300,000 9-12 months
Crenshaw Bl Prop 1C Grant Municipal Facilities $ 6,600,000 9-12 months
1st & Broadway Civic Center ParkRecreational & Cultural
Facilities $ 20,000,000 9-12 months
Pio Pico Library Pocket Park and Underground Parking
Structure
Recreational & Cultural
Facilities $ 7,700,000 9-12 months
NOS Rehab Unit 12 - Duvall to Humboldt Sewers $ 13,000,000 9-12 months
NOS Rehab Unit 14 - Marsh to Forney Sewers $ 13,000,000 9-12 months
NOS Rehab Unit 4 - Trinity from 41st to Alley s/o 23rd
(C813)Sewers $ 15,000,000 9-12 months
Project Title Type of Project Estimated
Value
PLA StatusAnticipated to
Bid
ACTIVE DEPARTMENTAL PLA Local, Local Apprentice, and Disadvantaged / Transitional Hire Summary (11/17)
11
Note: Active Projects include 2010-2015 and 2015-2020 “New” PLA Projects.
Project NameTotal Project
Hours
Local
(Goal: 30%)Local Tier 1 Local Tier 2
Apprentice
(Goal: 20%)
Local Apprentice
(Goal: 50%)
Disadvantaged
(Goal: 10%)
Los Angeles Wastewater Control System Replacement Program (LAWCSRP) 81,107 54% 21% 33% 25% 54% 44%
Machado Lake Ecosystem Rehabilitation Project 256,622 34% 25% 9% 17% 50% 12%
HTP - Digester Gas Utilization Project (BOS) 517,570 30% 22% 8% 22% 46% 12%
HTP - Secondary Clarifiers Upgrade 51,030 48% 40% 7% 26% 68% 24%
Slauson Compton Sewer Rehab 31,202 41% 25% 17% 21% 80% 39%
Terminal Island Water Reclamation Plant (TIWRP) Advanced Water Purifcation Facility 90,729 31% 26% 5% 31% 49% 13%
Terminal Island Water Reclamation Plant (TIWRP) Tertiary Filter Rehabilitation (CIP 5229) 22,816 30% 22% 9% 31% 85% 17%
Hyperion Treatment Plant (HTP) Truck Loading Facitilty Odor Control Modernization (CIP 2402) 19,483 57% 41% 16% 23% 68% 15%
Hawaiian and B, Wilmington, Fries, & San Pedro Pumping Plant Rehabilitation 15,342 36% 26% 10% 36% 57% 18%
Donald C Tillman Water Reclamation Plant (DCTWRT) Screw Pumps Installation & Upgrades 25,705 39% 20% 19% 29% 66% 22%
Terminal Island Water Reclamation Plant (TIWRP) Aeration System Replacement (CIP 5159) 41,670 47% 37% 10% 24% 71% 32%
Central Los Angeles Recycling and Transfer Station (CLARTS) Stormwater and Safety Improvements 14,376 44% 31% 13% 21% 75% 19%
ACTIVE DEPARTMENTAL PLA (CONTINUED) Local, Local Apprentice, and Disadvantaged / Transitional Hire Summary (11/17)
12
Note: Active Projects include 2010-2015 and 2015-2020 “New” PLA Projects.
Project NameTotal Project
Hours
Local
(Goal: 30%)Local Tier 1 Local Tier 2
Apprentice
(Goal: 20%)
Local Apprentice
(Goal: 50%)
Disadvantaged
(Goal: 10%)
NOS Rehab Unit 3 - Vermont to Trinity 28,441 36% 28% 8% 20% 91% 41%
Normandie Avenue Sewer Replacement/Rehabilitation 18,793 33% 28% 5% 20% 57% 31%
Penmar Water Quality Improvement Phase II 11,521 53% 18% 35% 32% 76% 31%
Asphalt Plant #1 Replacement & Modernization Project (CIP G999) 10,125 57% 38% 19% 37% 73% 27%
Temescal Canyon Park Stormwater Phase II 9,891 67% 34% 33% 26% 89% 43%
Machado Lake Pipeline Project 3,498 41% 29% 12% 33% 54% 12%
South District Sewer Maintenance Yard 15,533 40% 34% 7% 18% 55% 9%
My Fig Project: Figueroa Corridor Streetscape Improvements (11th St & Figueroa St) 23,327 22% 18% 4% 30% 41% 11%
North Outfall Sewer Rehab Unit 6 & Unit 7 Hooper to LA River 0 0% 0% 0% 0% 0% 0%
Venice Dual Force Main & Pumping Plant Generator Replacement 17,463 36% 27% 9% 12% 74% 17%
Albion Riverside Park 4,426 32% 30% 2% 24% 94% 20%
LCIS Rehab Blackwelder to Olympic 3,349 41% 27% 15% 19% 78% 7%
DCTWRP Blower Air Clean-Up System (CIP 6171) 2,417 59% 58% 1% 22% 71% 24%
SSRP P17 Cypress Ave and Division Street 3,107 37% 26% 12% 20% 69% 14%
SSRP DAR 03 Northeast LA: Eagle Rock, Los Feliz and Griffith Park 1,351 43% 42% 1% 24% 51% 0%
South Hall Solar Photovoltaic(PV) Roof System 1,259 20% 20% 0% 56% 6% 0%
HTP Headworks Improvements (CIP 2409) & Headworks Odor Control Upgrades (CIP 2344) 2,099 52% 52% 0% 22% 89% 15%
DCTWRP- Electrical Power System Modifications (CIP 6163) 3,621 57% 27% 30% 20% 82% 13%
LAFD- Van Nuys Fire Station 39 8,931 50% 40% 9% 22% 64% 9%
SSRP P06 El Sereno Ave and Edison 0 0% 0% 0% 0% 0% 0%
North Central Animal Services Center Phase II 0 0% 0% 0% 0% 0% 0%
North Outfall Sewer Rehab Unit 1 Van Ness Ave to Western Ave 0 0% 0% 0% 0% 0% 0%
Robertson Recreation Center (PRJ20021) 0 0% 0% 0% 0% 0% 0%
CUMULATIVE for Active Projects 1,336,801 36% 25% 11% 23% 55% 17%
LOCAL HIRE WORKER SUMMARY (Active Projects with Head Counts as of November 2017)
* For Departmental PLA Projects, "Local Resident" is defined as "an individual whose primary residence is within Tier 1 or 2 zip code areas."
13
Journeyman Apprentice Journeyman Apprentice Journeyman Apprentice Journeyman Apprentice
Los Angeles Wastewater Control System Replacement Program (LAWCSRP) 31 16 79 27 33,119 10,937 27,547 9,504
Machado Lake Ecosystem Rehabilitation Project 190 62 620 124 65,542 22,617 146,221 22,244
HTP - Digester Gas Utilization Project (BOS) 168 96 598 138 104,637 52,564 299,063 61,307
HTP - Secondary Clarifiers Upgrade 15 32 55 19 15,391 8,862 22,621 4,157
Slauson Compton Sewer Rehab 13 12 100 21 7,750 5,176 16,989 1,288
Terminal Island Water Reclamation Plant (TIWRP) Advanced Water Purifcation Facility 52 37 224 47 14,643 13,677 48,017 14,393
Terminal Island Water Reclamation Plant (TIWRP) Tertiary Filter Rehabilitation (CIP 5229) 6 14 45 11 904 6,005 14,865 1,042
Hyperion Treatment Plant (HTP) Truck Loading Facitilty Odor Control Modernization (CIP 2402) 35 40 65 33 8,014 3,067 6,971 1,431
Hawaiian and B, Wilmington, Fries, & San Pedro Pumping Plant Rehabilitation 5 8 42 8 2,332 3,147 7,525 2,339
Donald C Tillman Water Reclamation Plant (DCTWRT) Screw Pumps Installation & Upgrades 16 10 85 14 5,148 4,990 13,053 2,515
Terminal Island Water Reclamation Plant (TIWRP) Aeration System Replacement (CIP 5159) 34 26 138 32 12,547 7,029 19,271 2,823
Central Los Angeles Recycling and Transfer Station (CLARTS) Stormwater and Safety Improvements 33 34 74 28 4,060 2,266 7,288 764
NOS Rehab Unit 3 - Vermont to Trinity 12 12 101 16 5,015 5,253 17,640 535
Normandie Avenue Sewer Replacement/Rehabilitation 7 4 19 3 4,022 2,168 10,975 1,628
Penmar Water Quality Improvement Phase II 21 12 36 14 3,357 2,772 4,523 869
Asphalt Plant #1 Replacement & Modernization Project (CIP G999) 15 8 13 1 3,071 2,715 3,334 1,005
Temescal Canyon Park Stormwater Phase II 20 8 24 6 4,291 2,317 3,000 285
Machado Lake Pipeline Project 3 2 9 2 814 620 1,541 524
South District Sewer Maintenance Yard 44 32 131 23 4,741 1,534 8,027 1,230
My Fig Project: Figueroa Corridor Streetscape Improvements (11th St & Figueroa St) 25 14 206 41 2,185 2,915 14,060 4,168
North Outfall Sewer Rehab Unit 6 & Unit 7 Hooper to LA River 0 0 0 0 0 0 0 0
Venice Dual Force Main & Pumping Plant Generator Replacement 40 9 133 15 4,689 1,580 10,652 542
Albion Riverside Park 6 5 63 4 417 990 2,953 67
LCIS Rehab Blackwelder to Olympic 8 5 32 3 884 502 1,821 142
DCTWRP Blower Air Clean-Up System (CIP 6171) 6 3 12 5 1,067 370 829 151
Non-Local
Hours
Local*Project Name
Count
Local* Non-Local
LOCAL HIRE WORKER SUMMARY (CONTINUED) (Active Projects with Head Counts as of November 2017)
* For Departmental PLA Projects, "Local Resident" is defined as "an individual whose primary residence is within Tier 1 or 2 zip code areas."
14
Journeyman Apprentice Journeyman Apprentice Journeyman Apprentice Journeyman Apprentice
SSRP P17 Cypress Ave and Division Street 8 2 24 5 738 424 1,759 186
SSRP DAR 03 Northeast LA: Eagle Rock, Los Feliz and Griffith Park 8 4 11 5 414 165 614 158
South Hall Solar Photovoltaic(PV) Roof System 3 2 4 6 212 44 348 655
HTP Headworks Improvements (CIP 2409) & Headworks Odor Control Upgrades (CIP 2344) 3 3 9 2 686 408 953 52
DCTWRP- Electrical Power System Modifications (CIP 6163) 7 3 18 5 1,468 590 1,431 133
LAFD- Van Nuys Fire Station 39 26 16 52 14 3,170 1,274 3,768 720
SSRP P06 El Sereno Ave and Edison 0 0 0 0 0 0 0 0
North Central Animal Services Center Phase II 0 0 0 0 0 0 0 0
North Outfall Sewer Rehab Unit 1 Van Ness Ave to Western Ave 0 0 0 0 0 0 0 0
Robertson Recreation Center (PRJ20021) 0 0 0 0 0 0 0 0
Active PLA Projects Subtotal 860 531 3,022 672 315,323 166,972 717,654 136,852
Completed PLA Projects Subtotal 1,548 847 4,516 877 347,637 193,236 652,522 89,338
Subtotal 2,408 1,378 7,538 1,549 662,959 360,208 1,370,177 226,190
Total
Non-Local
Hours
Local*
12,873 2,619,534
Project Name
Count
Local* Non-Local
Data: Records available as of November 2017
ESTIMATED WAGES AND BENEFITS REINVESTED INTO
LOS ANGELES
15
Total Estimated Wages Reinvested
$33,744,633.70
Local Journeyman Local Apprentice
Total Local
Journeyman
Hours
Total Estimated Wages Earned
by Local Journeymen
Total Local
Apprentice
Hours
Total Estimated Wages Earned
by Local Apprentices
662,959 $28,341,509.65 360,208 $5,403,124.05
$28,341,509.65 $5,403,124.05