City of Greater Bendigo Council Meeting Minutes - 13 June 2012

127
MINUTES Ordinary Meeting of Council 6.00pm Wednesday June 13, 2012 VENUE: Reception Room, Bendigo Town Hall, Hargreaves Street, Bendigo NEXT MEETING: Wednesday July 4, 2012 Bendigo Town Hall Copies of the City of Greater Bendigo Council’s Agendas & Minutes can be obtained online at www.bendigo.vic.gov.au

description

City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Transcript of City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Page 1: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

MINUTES

Ordinary Meeting of

Council

6.00pm Wednesday June 13, 2012

VENUE:Reception Room,Bendigo Town Hall, Hargreaves Street, Bendigo

NEXT MEETING:Wednesday July 4, 2012Bendigo Town Hall

Copies of the City of Greater Bendigo Council’s Agendas & Minutescan be obtained online at www.bendigo.vic.gov.au

Page 2: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Council will realise its vision by setting strategic objectives, strategies and committing to annual actions within four Goal Areas:

Built and Natural Environment

Economic Development

Community and Culture

Our People, Our Processes

VisionGREATER BENDIGO will be the best place to live work and visit, where: growth and living standards are managed to

sustain and enhance quality of life a regional culture of learning, creativity and

innovation allows people to flourish its rich natural and cultural heritage is

conserved for today and tomorrow resilience, local spirit and identity are

proudly celebrated.

ValuesCouncil will achieve its vision by working with the community and business, displaying leadership in its decision-making, operating in an open manner and basing decisions on sound information.

Goal Areas

Page 3: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

ORDINARY MEETING

WEDNESDAY 13 JUNE 2012

ORDER OF BUSINESS:

ITEM PRECIS PAGE

ACKNOWLEDGEMENT OF COUNTRY 3

PRAYER 3

PRESENT 3

APOLOGIES 3

SUSPENSION OF STANDING ORDERS 3

PUBLIC QUESTION TIME 4

RESUMPTION OF STANDING ORDERS 4

DECLARATIONS OF CONFLICT OF INTEREST 4

CONFIRMATION OF MINUTES 5

1. PETITIONS AND JOINT LETTERS 6

2. BUILT AND NATURAL ENVIRONMENT 7

2.1 Use And Develop Land For A Dwelling - 62 Harley Street, Strathdale

7

2.2 Use And Development Of Land For Animal Keeping And Animal Training - 269 Booth Road, Woodvale

21

2.3 Construction Of Telecommunications Facility - 47 & 67 Houlahan Street, Kennington

30

2.4 Draft Eaglehawk Structure Plan 42

2.5 Proposed Kangaroo Flat Indoor Aquatic Facility -Provision Of Design, Engineering And Allied Services Tender

49

2.6 Response To Petition: Tree Hazard Along Mcglashans Road, Lockwood South

56

3. ECONOMIC DEVELOPMENT 69

4. COMMUNITY AND CULTURE 70

4.1 Draft Violence Prevention Plan 2012-2015 70

4.2 2012 Council Plan Review - Final Version for Adoption 99

Page 4: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Following Public Exhibition

5. OUR PEOPLE, OUR PROCESSES 109

5.1 Accounts Payable and Contracts Awarded Under Delegation

109

5.2 Record of Assemblies of Councillors 111

6. URGENT BUSINESS 117

7. NOTICES OF MOTION 117

7.1 Notice of Motion - Major Projects Policy 117

7.2 Notice of Motion - Potential Sale of Multi-Storey Car Parks 119

7.3 Notice of Motion - Productivity and Efficiency 120

8. COUNCILLORS' REPORTS 122

9. MAYOR'S REPORT 123

10. CHIEF EXECUTIVE OFFICER'S REPORT 124

11. CONFIDENTIAL (SECTION 89) REPORTS 124

11.1 Personnel Matter and Contractual Matter 124

____________________________

CRAIG NIEMANNCHIEF EXECUTIVE OFFICER

Page 5: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Ordinary Meeting - 13 June 2012

PAGE 3

ACKNOWLEDGEMENT OF COUNTRY

PRAYER

PRESENT

Cr Alec Sandner (Mayor)Cr Rod CampbellCr Peter CoxCr Rod FyffeCr Barry LyonsCr Bruce PhillipsCr James ReadeCr Keith ReynardCr Lisa RuffellMr Craig Niemann (Chief Executive Officer)Ms Rachel Lee (A/Director, City Futures) Ms Marg Allan (Director, Organisation Support)Mr Darren Fuzzard (Director, Presentation & Assets)Mr Ross Douglas (A/Director, Planning & Development)Ms Pauline Gordon (Director, Community Wellbeing)Mr Peter Davies (Manager, Governance)

APOLOGIES

Ms Prue Mansfield (Director, Planning & Development)Mr Stan Liacos (Director, City Futures)

SUSPENSION OF STANDING ORDERS

That Standing Orders be suspended to allow the conduct of Public Question Time.

RESOLUTION

Moved Cr Fyffe, seconded Cr Cox.

That Standing Orders be suspended to allow the conduct of Public Question Time.

CARRIED

Page 6: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Ordinary Meeting - 13 June 2012

PAGE 4

PUBLIC QUESTION TIME

RESUMPTION OF STANDING ORDERS

That Standing Orders be resumed.

RESOLUTION

Moved Cr Reade, seconded Cr Fyffe.

That Standing Orders be resumed.

CARRIED

DECLARATIONS OF CONFLICT OF INTEREST

Pursuant to Sections 77, 78 and 79 of the Local Government Act 1989 (as amended) direct and indirect conflict of interest must be declared prior to debate on specific items within the minutes; or in writing to the Chief Executive Officer before the meeting. Declaration of indirect interests must also include the classification of the interest (in circumstances where a Councillor has made a Declaration in writing, the classification of the interest must still be declared at the meeting), i.e.

(a) direct financial interest(b) indirect interest by close association(c) indirect interest that is an indirect financial interest(d) indirect interest because of conflicting duties(e) indirect interest because of receipt of an applicable gift (f) indirect interest as a consequence of becoming an interested party(g) indirect interest as a result of impact on residential amenity(h) conflicting personal interest

A Councillor who has declared a conflict of interest, must leave the meeting and remain outside the room while the matter is being considered, or any vote is taken.

Councillors are also encouraged to declare circumstances where there may be a perceived conflict of interest.

Nil.

Page 7: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Ordinary Meeting - 13 June 2012

PAGE 5

CONFIRMATION OF MINUTES

Minutes of the Ordinary Meeting of Wednesday May 23, 2012 and the Special Meeting of Wednesday May 30, 2012.

The following items were considered at the Ordinary Council meeting held on Wednesday May 23, 2012 at 6:00pm.

Petition: Lester Street, Eaglehawk Demolition of Buildings, Construction of Building, Reduction in Car Parking

Requirements, Use of Land for Retail Premises and Offices - 108-114 High Street and Adjoining Road Zone, Bendigo

Staged Subdivision of Land into 36-Lots - 117-119 Station Street, Epsom Subdivision of Land into 3 Lots and Variation of Covenants - 6 Harveys Lane,

Jackass Flat Report Withdrawn - Subdivide Land into 2 Lots - 1088 McIvor Highway, Junortoun -

Report Withdrawn Partial Demolition and Extension to Dwelling, Demolition of Outbuilding - 109 Wattle

Street, Bendigo Response to Joint Letter: Traffic Management Infrastructure in the Long Gully Area Response to Petition: Upgrading of Watson Street, White Hills Bendigo Art Gallery Major Extension Construction Tender Draft Municipal Fire Management Plan 2012 Accounts Payable and Contracts Awarded Under Delegation Record of Assemblies of Councillors City of Greater Bendigo Audit Committee Provision of Loan Borrowings Revenue and Debt Collection Policy Procurement Policy Review Bendigo Stadium Report - March 2012 Notice of Motion No. 2 - Removal of Vegetation from Nature Strips and Road

Reserves Section 89 Reports: Contractual Matter and Confidential Attachment

The following items were considered at the Special Council meeting held on Wednesday May 30, 2012 at 6:00pm.

Declarations of Conflicts of Interest for Budget Items Proposed Budget for the Municipal Year Ending 30 June 2013

The unconfirmed minutes have also been posted on the City of Greater Bendigo website pending confirmation at this meeting.

Page 8: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Ordinary Meeting - 13 June 2012

PAGE 6

RECOMMENDATION

That the Minutes of the Ordinary Meeting of Council held on Wednesday May 23, 2012 and the Special Meeting of Council held on Wednesday May 30, 2012, as circulated, be taken as read and confirmed.

RESOLUTION

Moved Cr Phillips, seconded Cr Fyffe.

That the recommendation be adopted.

CARRIED

1. PETITIONS AND JOINT LETTERS

Nil.

Page 9: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 7

2. BUILT AND NATURAL ENVIRONMENT

2.1 USE AND DEVELOP LAND FOR A DWELLING - 62 HARLEY STREET, STRATHDALE

Document Information

Author Shannon Rosewarne, Senior Planner

Responsible Ross Douglas, Acting Director Planning & DevelopmentDirector

Summary/Purpose

This application seeks approval for the use and development of the land at 62 Harley Street, Strathdale for a dwelling.

One objection was received as a result of public notice. The objection is concerned with the loss of native trees from the site. A meeting was held with the objector to discuss their concerns, however the objection was not resolved.

There are no Planning Scheme controls on the vegetation on the site, however a restriction on title requires that no trees are removed from the site without planning approval from the City of Greater Bendigo.

Prior to making this application, the applicant obtained consent to remove 7 Ironbark trees from the site. The consent was granted under a previous permit for the subdivision of the land. These trees have now been removed. As such, consideration of the tree removal is not required under this application.

Overall, the proposal is considered satisfactory. The proposal complies with Rescode (Clause 54) and is consistent with State and local planning policies. This report recommends that Council resolves to grant a Notice of Decision to Grant a Permit subject to appropriate conditions.

Policy Context

City of Greater Bendigo Council Plan 2009 – 2013 (updated 2011)

1. Built and Natural EnvironmentStrategic Objectives: Value, conserve and enhance the rich built and natural environment. Achieve high quality outcomes in planning and policy activities. Encourage and foster high quality urban design to create environments that

support public wellbeing and economic success.

Page 10: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 8

Background Information

The subject site (Lot 6 on Plan SP037793A) was created under Planning Permit DS/14/2009 as part of a two lot subdivision.

At that time, a restriction on title was created which states: "The registered proprietor or proprietors for the time being of Lot 6 on this plan shall not: Remove, destroy or lop any native tree, in particular, Eucalyptus Sideroxlon and Eucalyptus Citriodora except where separate planning approval has been obtained from the City of Greater Bendigo."

Removal of seven trees was approved via secondary consent under Planning Permit DS/14/2009 on 9 December 2011. The removal of the trees did not trigger the requirement for a planning permit under the Greater Bendigo Planning Scheme, which is why the request was not advertised to abutting neighbours.

Report

Application No: DR/205/2012

Application Date: 3 April 2012

Applicant: T M Stephens

Land: 62 Harley Street, STRATHDALE

Zoning: Business 1 Zone

Overlays: Nil

Subject Site and Surrounds

The subject site is located on the eastern side of Harley Street, approximately 25 metres north of the intersection with Butcher Street. The site is a rectangular shaped vacant parcel with an area of 908 square metres and a frontage of 25.29 metres to Harley Street. The site is affected by a 2 metre wide drainage easement along the eastern boundary of the site. A small drainage easement is also located in the north eastern corner of the site, and a 3 metre wide easement for water and sewerage running east to west in the northern part of the site.

A footpath exists adjacent to the western boundary of the site, with indented angle parking within the road reserve. A bus stop and Australia Post mailbox are also adjacent to the site. The site is accessed via an existing crossover in the north western corner of the site.

Six Ironbark trees were located along the northern boundary and one Ironbark in the south western part of the site. Three Lemon-scented Gum trees are located in the south western corner of the site.

The adjoining land to the south at 56-60 Harley Street is zoned Business 1 and contains a complex of five shops, including a milk bar, hairdresser, business broker, massage therapy and a fitness business, with associated car parking.

Page 11: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 9

The two adjoining lots to the north of the site each contain a single storey brick dwelling and are also zoned Business 1. The adjoining lot to the east contains a single storey brick dwelling and is zoned Residential 1. The surrounding area is zoned Residential 1 and is an established residential area.

Figure 1: Location map showing subject site. Objector’s property marked with a star.

Proposal

The proposal is to construct a single storey dwelling which will comprise four bedrooms, home office, kitchen, meals, living, rumpus, bathroom, two ensuites, laundry, toilet, storage, double garage, alfresco area and a swimming pool.

The dwelling is a contemporary design which will be constructed of Hebel powerpanel cladding with an acrylic render and painted finish. It will have a low pitched skillion roofline with parapet walls. The front façade will also feature timber battens and slate stone finishes.

The dwelling will have a footprint of 425 square metres, and will have a maximum height of 4.18 metres.

Planning Controls - Greater Bendigo Planning Scheme

The following clauses are relevant in the consideration of this proposal:

State Planning Policy Framework

Settlement (Clause 11) Regional planning strategies and principles (Clause 11.05-4) Business (Clause 17.01-1) Residential development (Clause 16.01-1) Urban design (Clause 15.01-1) Energy efficiency (Clause 15.02-1)

Page 12: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 10

Municipal Strategic Statement

Settlement (Clause 21.05) Housing (Clause 21.06) Economic development (Clause 21.07)

Local Planning Policies

Residential Character Policy Strathdale/Kennington Precinct 8 (Clause 22.24)

Other Provisions

Construction of one dwelling on a lot (Clause 54) General decision guidelines (Clause 65.01)

Consultation/Communication

Referrals

The following internal departments have been consulted on the proposal:

Referral Comment

Traffic & Design No objection subject to conditions

Drainage No objection subject to conditions

Parks & Natural Environment No objection. The trees were inspected prior to them being removed. The Unit advised that the six Ironbark trees that existed along the northern boundary either had suspect health or structure to varying degrees and were not worthy of retention. The three Lemon-scented Gum trees at the south west corner should be retained.

Public Notification

The application was advertised by way of notice on the site and letters to adjoining and nearby owners and occupiers.

As a result of advertising one objection was received, with the grounds of objection summarised as being:

The decision by the Planning Department to approve the destruction of the trees was ill-considered, not in accord with due process and based on specious grounds.

There is insufficient evidence to support the reasons sought to remove the trees.

These trees are indigenous to the area, are very healthy, have existed without problems for many years and show no signs of becoming problematic in the future.

Page 13: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 11

Trees add amenity value to residential areas. Their removal will not only change the character of the area but will also lower the attractiveness of the region for prospective purchasers and thereby diminish property values.

I have no objection to the development of the residence, but do object to the removal of the trees and the consequent impact. Their loss would counter any claim that the Bendigo City Council can make of its concern to preserve environmental amenity in the city.

The objection is discussed below.

Planning Assessment

The site is located within a Business 1 Zone and a permit is required to use and develop land for a dwelling in this zone under clauses 34.01-1 and 34.01-4 of the Planning Scheme.

State and local planning policiesThe proposal accords with State and Local policies at Clause 16.01 (Residential development) and Clause 21.06 (Housing) which encourage infill development in residential areas with access to existing infrastructure and transport. The site forms part of an established residential area in Strathdale which is within the Urban Growth Boundary. The site is located adjacent to a bus stop (route Bendigo –Route 2), is 310 metres from Kennington Reservoir and within 300 metres of three local parks, is within close proximity to Kennington Primary School, a kindergarten, maternal and child health centre and local shops, including Strath Village and Strath Hill.

The proposal is a quality architectural design which offers a high level of articulation and will make a positive contribution to the streetscape, consistent with Clause 15.01-2 (Urban design principles). The proposal is consistent with State policy on energy and resource efficiency (Clause 15.02-1) which seeks to improves efficiency in energy use,promotes consolidation of urban development and integration of land use and transport, improve efficiency in energy use through greater use of renewable energy and support low energy forms of transport such as walking and cycling.

The dwelling has been designed to maximise solar access opportunities and is well located to take advantage of existing services and facilities in the Strathdale and Kennington areas.

State and local policies within the Planning Scheme at Clause 17.01 (Business) and Clause 21.07 (Economic Development) encourage the development of retail, entertainment, office and other commercial services within business areas. The subject site does not form part of an identified business area within the hierarchy of activity centres in the City of Greater Bendigo’s Commercial Land Strategy (2005), nor is it identified as one of the City’s isolated stores and facilities, although undoubtedly it could be categorized as such. While there is potential for the site to be used for business purposes, the site has remained vacant for many years and presents a number of constraints for a commercial development including the need to provide for parking and potential amenity impacts to the adjoining dwellings to the north and east. As such, the proposed dwelling is an acceptable planning outcome in this instance.

Page 14: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 12

Although the site falls within the area covered by Strathdale/Kennington Residential Character Policy (Precinct 8), it is not required to be assessed against the policy as the site is not zoned Residential 1. However, this policy, contained at Clause 22.24 of the Local Planning Policy Framework, can be used as a guide to assess the development. The character description for the precinct is as follows:

"This precinct, developed mostly from the 1960s to the 1980s, is one in which the horizontal emphasis of dwelling form is important, resulting from the long, low elevations of the buildings in relation to their height. Brick and tile is the predominant building material. Most have similar modest front and side setbacks, creating a more intimate street feel, combined with the absence of front fencing in most instances.”

The statement of desired future character is to maintain the horizontality of the dwellings, the consistent use of materials and the flow of landscape up to the face of the dwellings.Assessment of the proposal against the design objectives of the policy is as follows:

Objectives Recommended Design Response

To strengthen the garden settings of the dwellings.

Prepare a landscape plan to accompany all applications for new dwellings.

Retain large, established trees and provide for the planting of new indigenous and native trees whenever possible.

Comment: Consent was granted to remove the Ironbark trees along the northern boundary of the site and one Ironbark near the western boundary. Three large Lemon-scented Gum trees in the south western corner of the site, which form part of the Harley Street streetscape will be retained. A satisfactory landscape plan has been prepared as part of the application which shows a range of native grasses, shrubs and trees to be planted.

To minimise site disturbance and impact of the building on the landscape.

Buildings should be designed to follow the contours of the site or step down the site.

Comment: The proposed dwelling has generally been designed to follow the contours of the site, with a small site cut proposed on the southern side of the site.

To maintain the consistency, where present, of building front setbacks.

The front setback should be not less than the average setback of the adjoining two dwellings.

Comment: The proposed front setback is 3.4 metres to the front wall of the dwelling, with the garage setback 4 metres. The adjoining dwelling to the north has a setback of 2 metres to Harley Street and the commercial building to the south has a setback of 9.6 metres. The proposed setback is satisfactory given the site context and streetscape.

To maintain the rhythm of dwelling spacing.

Buildings should be setback between 1 and 3 metres from both side boundaries, based on the predominant pattern in the streetscape.

Page 15: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 13

Objectives Recommended Design Response

Comment: The dwelling will have a setback of 1.4 metres to the southern boundary and 3.08 metres to the northern boundary. The proposal complies with this objective.

To ensure that buildings and extensions do not dominate the streetscape.

Respect the predominant building height in the street and nearby properties. Use low pitched roof forms.

Comment: The dwelling will be single storey with a maximum height of 4.18 metres from natural ground level. The dwelling will have a flat roofline, which is consistent with the design objective.

To maintain the openness of the streetscape.

Provide no front fencing.

Comment: No front fence is proposed, however the landscape plan incorporates a timber post feature screen setback 2 metres from the front boundary to screen the entrance to the dwelling from the on street car parks.

Zoning

The site is zoned Business 1 under the Greater Bendigo Planning Scheme. Dwelling is a Section 2 use which requires a planning permit, as the frontage exceeds 2 metres in this instance.

The primary purpose of the zone is to encourage the intensive development of business centres for retailing and other complementary commercial, entertainment and community uses. While the proposal is for a residential use, the subject site has remained undeveloped since the land was originally subdivided in 1990. Dwellings have been constructed on the two adjoining lots to the north, which are also zoned Business 1. The site is located within a predominantly residential area and the proposal is consistent with this pattern of development.

The proposed dwelling will not result in adverse amenity impacts on the neighbourhoodand the design of the dwelling is appropriate to the locality. No adverse impacts on the adjoining shops are envisaged and the design has taken into account the site’s context, with the private open space and living areas of the dwelling oriented to the north of the site. The dwelling has been designed to incorporate passive design principles for solar access and energy efficiency.

The dwelling is able to connect to the existing drainage system and all utilities are available to the site. The dwelling will generate minimal traffic and there will be no loss ofon street car spaces, with the existing access point to be used. On site car parking will be provided via a double garage.

Compliance with Rescode

The proposal has been assessed against Clause 54 (Construction of one dwelling on a lot). The proposal complies with the objectives and standards and is satisfactory.

Page 16: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 14

Native Vegetation

The objector is concerned about the loss of native vegetation from the site and believes the trees should have been retained as part of the development. The plans submitted show six Ironbark trees and other shrubs located adjacent to the northern boundary of the site to be removed. Three Lemon-scented Gum trees in the south western corner of the site will be retained.

The site is not subject to any environmental overlays which require a planning permit for the removal of native vegetation. The applicant obtained consent to remove the Ironbark trees prior to making this planning application for the dwelling. These trees have now been removed.

In response to the objection received, advice was sought from the City’s Parks and Natural Environment Unit about the health of the trees and what impact they would have on the development if they were required to be retained. The City’s Parks and Natural Environment Unit advised that the Ironbark trees along the northern boundary were not worthy of retention due to structural and health concerns, to varying degrees.

While it is agreed that trees do add to the amenity of residential areas, in this instance the retention of the trees along the northern boundary presented a risk due to structural and health problems, and there were concerns relating to their proximity to the easements affecting the site, and the need to maintain services within this part of the site.

The three Lemon-scented Gums on the site will be retained. These trees make a significant contribution to the streetscape, and there are other trees of this species in front of the adjoining shops. It is recommended that a condition of permit require an arborist plan be submitted detailing how these trees will be protected during the construction period.

Conclusion

The proposal will add to the available housing stock in the Strathdale area and will makes efficient use of an underutilized parcel and existing social and physical infrastructure.

Options

Council, acting as the responsible authority, may resolve to approve or refuse to grant a permit.

Attachments

Objection

Page 17: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 15

RECOMMENDATION

Pursuant to section 61 of the Planning and Environment Act (1987), Greater Bendigo City Council resolve to issue a Notice of Decision to Grant a Permit for the use and development of land for a dwelling at 62 Harley Street, Strathdale subject to the following conditions:

1. NO LAYOUT ALTERATIONThe use and development permitted by this permit as shown on the endorsed plans and/or described in the endorsed documents must not be altered or modified (for any reason) except with the prior written consent of the Responsible Authority.

2. ARBORIST PLAN REQUIREDBefore the development start(s), an arborist plan prepared by a suitably qualified arborist detailing how the Lemon-Scented Gum trees identified for retention will be protected during the construction period, is to be submitted for approval from the Responsible Authority.

3. GENERAL EXTERIOR TREATMENTThe exterior treatment of the buildings permitted by this permit including all exterior decoration, materials, finishes and colours must be to the satisfaction of the responsible authority. The exterior treatment of the building(s) must be maintained to the satisfaction of the responsible authority.

4. REFRIGERATION & AIR-CONDITIONING EQUIPMENT Any equipment required for refrigeration, air-conditioning, heating and the like must be suitably insulated for the purpose of reducing noise emissions and must be located so as to not be highly visible from the street to the satisfaction of the responsible authority.

5. CONSTRUCTION PHASEAll activities associated with the construction of the development permitted by this permit must be carried out to the satisfaction of the responsible authority and all care must be taken to minimise the effect of such activities on the amenity of the locality and ensure the protection of the trees to be retained.

6. GENERAL DRAINAGEThe proposed building(s) and works must be drained to the satisfaction of the City of Greater Bendigo as the responsible drainage authority.

7. VEHICLE CROSSINGSVehicular access to the subject land from any roadway or service lane (and vice versa) must be by way of a vehicle crossing(s) constructed at right angles to the road, to suit the proposed driveway(s) and vehicles that will use the crossing. A Works within Road Reserves permit must be obtained from the City of Greater Bendigo Asset Planning & Design Unit prior to any work commencing in the road reserve.

Page 18: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 16

8. SEALED CAR PARKAreas set aside for the parking of vehicles together with the aisles and drives must be properly formed to such levels that they can be utilised in accordance with the endorsed plan and must be drained and provided with an impervious all weather seal coat. The areas must be constructed, drained and maintained in a continuously useable condition to the satisfaction of the responsible authority.

9. USE OF CAR PARKING AREASAreas set aside for the parking and movement of vehicles as shown on the endorsed plan must be made available for such use and must not be used for any other purpose.

10. FENCING OF SITEThe fence(s) as shown on the endorsed plans(s) must be erected and maintained to the satisfaction of the responsible authority.

11. COMPLETION OF LANDSCAPINGBefore the occupation of the development starts or by such later date as is approved by the responsible authority in writing, the landscaping works shown on the endorsed plans must be carried out and completed to the satisfaction of the responsible authority.

12. LANDSCAPING MAINTENANCEThe landscaping shown on the endorsed plans must be maintained to the satisfaction of the responsible authority, including that any dead, diseased or damaged plants are to be replaced.

RESOLUTION

Moved Cr Reynard, Seconded Cr Reade.

That the recommendation be adopted.

CARRIED

Page 19: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 17

PROPOSED SITE LAYOUT PLAN

Page 20: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 18

PROPOSED FLOOR PLAN

Page 21: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 19

PROPOSED ELEVATIONS

Page 22: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 20

Page 23: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 21

2.2 USE AND DEVELOPMENT OF LAND FOR ANIMAL KEEPING AND ANIMAL TRAINING - 269 BOOTH ROAD, WOODVALE

Document Information

Author Bryce Kilian, Statutory Planner

Responsible Ross Douglas, Acting Director Planning & DevelopmentDirector

Summary/Purpose

The applicant seeks approval for the use of land for animal keeping and animal training at 269 Booth Road, Woodvale. Three objections were received after notice of the application was given. The primary grounds of objection relate to noise, odour, animal living conditions and animal waste impacting on the environment.

No consultation meeting was held as it was considered no resolution could be reached based on the objections.

The applicant has provided little detail addressing the relevant Planning Scheme requirements and the detail that has been provided is not satisfactory.

This report recommends that the Council resolve to refuse the development as the proposal fails to comply with the City’s Animal Keeping and Animal Training Policy and the requirements of the Farming Zone.

Policy Context

City of Greater Bendigo Council Plan 2009 – 2013 (updated 2011)

1. Built and Natural EnvironmentStrategic Objectives: Value, conserve and enhance the rich built and natural environment. Achieve high quality outcomes in planning and policy activities. Encourage and foster high quality urban design to create environments that

support public wellbeing and economic success.

Background Information

The land owners and applicants for the permit have had Greyhounds on the property in the past 6 months, however after a number of complaints were received relating primarily to noise the matter was investigated by the Animal Control Department, Environmental Health Department and the City’s Planning Compliance Officer. Subsequent to this a letter was sent to the land owners advising them that there was no planning permit in place for keeping any Greyhounds on the property and that they should be removed within a set timeframe.

Page 24: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 22

It is believed the animals were removed initially, however, some have returned to the site. Letters were sent to the land owner from the City’s Compliance Officer on two separate occasions requiring removal of all Greyhounds.

Report

Application No: DU/897/2011

Application Date: 10 November 2011

Applicant: J L Dunn

Land: 269 Booth Road, WOODVALE

Zoning: Farming Zone

Overlays: Vegetation Protection Overlay 2Bushfire Management Overlay

Subject Site and Surrounds

The subject site is irregular in shape, zoned Farming, contains an existing dwelling and is approximately 8.4 hectares in size. Properties surrounding the site are the same land zoning and affected by the same overlays.

The southern half of the block is heavily vegetated, while the northern half contains patchy vegetation. Fencing of all properties is post and wire rural type fencing of various heights. The subject site shares a boundary with eight separate properties.

The predominant land use within the surrounding area is rural/residential dwellings owing to the heavily vegetated nature of the area, small lot sizes and soil conditions making the sites unsuited to most forms of agriculture.

In terms of the connection to services, the property has a potable water supply in the form of tanks, effluent disposal via a septic system and power from a generator.

Page 25: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 23

Figure 1: Location map showing subject site. Objectors properties marked with a star.

Proposal

Use

The application is for the use of land for animal keeping and animal training. The applicant is proposing to house and train up to 25 Greyhounds on the site.

Development

The construction of dog enclosures and runs will be required in association with this use. The proposal includes six groups of three joined kennels measuring approximately 4 metres by 2.7 metres by 1.5 metres, constructed of steel as well as enclosed runs measuring 50 metres by 70 metres. The six kennels will be positioned to the west of the existing dwelling and the larger enclosed runs to the north of the existing dwelling.

Planning Controls - Greater Bendigo Planning Scheme

The following clauses are relevant in the consideration of this proposal:

Local Planning Policies

22.07 Animal Keeping and Animal Training Policy

Other Provisions

35.07 Farming Zone 65 Decision Guidelines

Page 26: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 24

Consultation/Communication

Referrals

The following internal department has been consulted on the proposal:

Referral Comment

Environmental Health Department Objected subject to non compliance with EPA Noise Control Guidelines.

Public Notification

The application was advertised by way of notice on the site and letters to adjoining and nearby owners and occupiers.

As a result of advertising three objections were received, with the grounds of objection being:

Capacity of the site to contain 25 Greyhounds.

Fencing of the site.

Noise and odour emissions.

Proximity of houses to the development site within 500 metres.

No connection to reticulated services.

Impact on native animals.

The objections are discussed below.

Planning Assessment

Animal Keeping and Animal Training Policy/Noise

The basis of this policy is to ensure appropriate siting and design of such developments to ensure the amenity and environmental quality of the surrounding residents, particularly those within 500 metres, is maintained.

There are dwellings within 500 metres of the site and no evidence has been provided relating to noise attenuation methods or acoustic reporting to suggest the development could be compliant. The City’s Environmental Health Department has stated that the proposal will not meet the recommendations within Section 14 (Dog Kennels) of the EPA Noise Control Guidelines.

The applicant has not provided suitable evidence to demonstrate compliance with this policy (despite this information having been requested) nor has an environmental management plan been prepared for the application. There has been no attempt by the applicant to provide any detailed noise attenuation measures. As complaints have already been received regarding the noise emissions from Greyhounds on the site there is no evidence to suggest the applicant could or would comply in the future.

Page 27: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 25

Appropriateness of the Site

The proposed use of the land is classified as animal keeping. Within the Farming Zone, animal keeping is a permissible land use subject to compliance with the Decision Guidelines of the Zone. The relevant Decision Guidelines to this application relate to; compliance with the State and Local Planning Policies; whether the site is suitable for the use or development; whether the proposal is compatible with adjoining land uses; the connection of services to the site.

It has not been demonstrated that the proposal complies with the relevant Local Planning Policy (discussed in detail above) and as there are a number of dwellings within close proximity of the site the proposal is not considered suitable or compatible with the adjoining land uses, particularly in relation to noise emissions.

It has not been demonstrated that the application complies with the purpose or the relevant Decision Guidelines of the Farming Zone.

Conclusion

The applicant has not provided suitable justification as to why the proposal should be supported nor have they provided an adequate response to the Greater Bendigo Planning Scheme.

The proposal does not comply with the City’s Animal Keeping and Animal Training Policy or comply with the Purpose or Decision Guidelines of the Farming Zone.

The proposal should be refused.

Options

Council, acting as the responsible authority, may resolve to approve or refuse to grant a permit.

Attachments

Objections

Page 28: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 26

RECOMMENDATION

Pursuant to section 61 of the Planning and Environment Act (1987), Greater Bendigo City Council resolve to issue a Notice of Refusal for use and development of land for animal keeping and animal training at 269 Booth Road, WOODVALE based on the following grounds:

1. The proposal does not accord with Clause 22.07 Animal Keeping and Animal Training Policy of the Greater Bendigo Planning Scheme due to;(a) Dwellings being within 500 metres of the site;(b) No Environmental Management Plan submitted;(c) No acoustic attenuation measures employed on site.

2. The proposal does not comply with the purpose or the decision guidelines of Clause 35.07 Farming Zone of the Greater Bendigo Planning Scheme due to:(a) Non compliance with the Local Planning Policy;(b) Greyhound training is not compatible with surrounding rural/residential land

uses.

RESOLUTION

Moved Cr Phillips, Seconded Cr Cox.

That the recommendation be adopted.

CARRIED

Page 29: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 27

Page 30: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 28

Existing Illegal Works

Page 31: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 29

Page 32: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 30

2.3 CONSTRUCTION OF TELECOMMUNICATIONS FACILITY - 47 & 67 HOULAHAN STREET, KENNINGTON

Document Information

Author Peter O'Brien, Senior Planner

Responsible Ross Douglas, Acting Director Planning & DevelopmentDirector

Summary/Purpose

Council is required to determine this application owing to the receipt of 58 written objections and a petition containing 125 names which cited a number of concerns including: electromagnetic radiation; visual impact, property devaluation; errors in the planning application documents; planners pre-application advice to the applicant; the existence of more suitable sites and potential for additional antennas being attached to the structure as grounds of objection.

A permit is required for the construction of the facility only, not for the use of the land for a telecommunications facility. The relevant considerations are limited to the matters found in clause 52.19 of the Greater Bendigo Planning Scheme which include the effect of the proposal on adjoining land and the principles contained within the Code of Practice for Telecommunications Facilities in Victoria.

Officer assessment of the proposal against relevant matters including State, Local Policy and clause 52.19 concludes that the facility represents an acceptable planning outcome. This report recommends that Council resolve to issue a Notice of Decision to Grant a Permit.

Policy Context

City of Greater Bendigo Council Plan 2009 – 2013 (updated 2011)

1. Built and Natural EnvironmentStrategic Objectives: Value, conserve and enhance the rich built and natural environment. Achieve high quality outcomes in planning and policy activities. Encourage and foster high quality urban design to create environments that

support public wellbeing and economic success.

Background Information

The subject site is a former Coliban Water Reserve that is Department of Sustainability and Environment Crown Land managed by the City of Greater Bendigo. If successful in gaining planning approval, the permit applicant intends to enter into a lease with the City of Greater Bendigo to lease the part of the site on which the facility is proposed.

Page 33: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 31

It is important to note that whilst the City of Greater Bendigo is both the regulator (in terms of the planning process) and the manager of the land who may end up leasing the site to a third party, these dual functions are and continue to occur independent to each other and are administered by separate service units of the City. Each matter involves separate consideration under separate Acts of Victorian Parliament.

If a planning permit is issued, a further decision is required to be made as to whether Council wishes to lease the portion of land in question for this purpose.

Report

Application No: DP/537/2011

Application Date: 22 July 2011

Applicant: Telstra Corporation Limited

Land: 47 & 67 Houlahan Street, Kennington

Zoning: Public Use Zone 7 - Other Public Use

Overlays: Nil

Subject Site and Surrounds

The subject site is an irregular shaped parcel of 3.5 ha that contains the Brennan Park Swimming Pool. The nearest residences to the site of the proposed tower are approximately 60 metres to the north of the site.

Figure 1: Location map showing subject site. Objectors' properties marked with a star. Note not all objectors/signatories to the petition are shown on the map owing to the proximity of their property in relation to the application site.

Page 34: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 32

The area where the facility is proposed is at the northern end of the Brennan Park car park in a disused, fenced area that housed Coliban Water infrastructure. This part of the site is clear of vegetation. The part of the site where the facility is to be located is within the Public Use Zone, with the balance of the site (and some adjoining land) within the Public Park and Recreation Zone. The abutting land to the north / north west is within a Residential Zone and used for a number of dwellings that front both Houlahan and Hakea Streets.

Proposal

The application proposes the establishment of a telecommunications facility which includes an 18.8 metre high pole with 2.63 metre antennas (total height of 21.43 metres). A pale eucalypt Colorbond equipment shelter of 3.28 x 2.28 metres (and 3 metres high) is proposed and the area proposed to be leased is 6 x 10 metres. The area to beoccupied by the facility will be enclosed by a 2.4 metre high wire mesh fence to prevent unauthorised access to the compound and will be accessed via the Brennan Park Pool Road.

Planning Controls - Greater Bendigo Planning Scheme

Why is a permit required?

A permit is required under clause 52.19, which is the Telecommunications facilities particular provision in all Victorian Planning Schemes. Relevant matters in determining whether to grant a permit include the effect of the proposal on adjoining land and the principles contained within the Code of Practice for Telecommunications Facilities in Victoria.

The following clauses are relevant in the consideration of this proposal:

State Planning Policy Framework

19.03-4 – Telecommunications

Municipal Strategic Statement

21.01 – Municipal Profile

Local Planning Policies

N/A

Other Provisions

36.01 – Public Use Zone Schedule 7 (Other public use) 52.19 – Telecommunications Facilities

Page 35: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 33

Consultation/Communication

The following internal department has been consulted on the proposal:

Department Comment

Building and Property Unit. Provided a letter of consent for Urbis, on behalf of Telstra to make a planning application.

Public Notification

The application was advertised by way of letters directly to 25 adjoining and nearby owners and occupiers within 100 metres of the proposed tower. As a result ofadvertising of 58 written objections and a petition containing 125 names was received, with the grounds of objection being:

Electromagnetic radiation;

Visual impact,

Property devaluation;

Errors in the planning application documents;

Planner's pre-application advice to the applicant;

The existence of more suitable sites and

Potential for additional antennas being attached to the structure as grounds of objection.

All objectors and signatories to the petition were invited to an information session on the application that was conducted on 8 May 2012 at the LaTrobe University Edwards Road Campus.

The session was attended by the Mayor, planning officer, Telstra representatives and their consultants Urbis and an expert in the field of electromagnetic radiation. The information session was an informal opportunity for residents to ask questions and discuss the application with Council and the applicant.

Planning Assessment

Site selection:

The applicant has identified a need to expand the mobile coverage, including broadband/ 3G services to the Kennington and Flora Hills areas and surrounds. Prior to submitting this application, the applicant had evaluated a number of alternate options in the vicinity of the site, which included co-location at: 108 Lowndes Street, Kennington (Telstra) Rooftop facility at Innovation Court, Kennington (Optus) Rooftop facility at 121-129 Edwards Road, Strathdale (Telstra)

Page 36: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 34

Two alternate sites for towers were considered, both were within the LaTrobe University Edwards Road campus. Both alternate options would require higher towers to deliver an equivalent coverage area and neither site provided the screening opportunities that the application site presents.

Ultimately LaTrobe University advised that the locations may be impacted by the Campus master plan hence may be inappropriate.

In terms of the Planning Scheme, the Public Use Zone is a permissive zoning for a telecommunications facility. To use the land for the intended purpose, no planning permission is required. It is only the development aspect of the proposal that requires planning permission.

Code of practice:

It is considered that the design and location of the tower will not compromise the orderly planning of the area; as the telecommunications tower has been assessed as meetingthe principles for the design, siting, construction and operation of a telecommunications facility set out in A Code of Practice for Telecommunications Facilities in Victoria 2004 as follows:

A Telecommunications facility should be sited to minimise visual impact.

The height of the tower at 21.43 metres is the lowest tower in height considered by the City of Greater Bendigo in recent times. Larger towers have been approved by Council (bolded) or at officer level under delegation (italicized) at the following locations:

Site Application Zone Height (m)

1 Averys Road, EAGLEHAWK DP/457/2008 Special Use 35 metres

998 Wellington Street, STRATHFIELDSAYE

DP/685/2009 Public Use Zone 6 35 metres

26 Homer Beacon Road, MAIDEN GULLY

DP/766/2009 Farming Zone 35 metres

43-45 Kinross Street, LONG GULLY

DP/584/2010 Industrial 3 Zone 30 metres

2-10 Holdsworth Road, Long Gully

DP/640/2010 Industrial 3 Zone 30 Metres

75 Beischer Street, East Bendigo

DP/745/2010 Industrial 1 Zone 30 Metres

975 McIvor Highway, Junortoun

DU/48/2011 Low Density Residential Zone

40 metres

135 - 137 Breen Street, GOLDEN SQUARE

DP/356/2011 Business 3 Zone 35 metres

1 Elmore-Raywood Road, ELMORE

DP/566/2011 Public Park &Recreation Zone

35 metres

Page 37: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 35

Site Application Zone Height (m)

CA 97A Manallacks Road, KANGAROO FLAT

DP/619/2011 Industrial 1 Zone 35 metres

34 Herriot Street, HEATHCOTE

DU/755/2011 Industrial 3 Zone 35 metres

In this case the, the tower is lower being 21.43 metres in height; however this must be balanced against the highly elevated position that the facility proposes to occupy.

In terms of recent towers approved, this site compares favourably with others as the presence of mature trees around the tower will assist in screening a large portion of the tower.

There is no dispute that the tower will be visible. To operate efficiently the tower must be high enough to clear visual obstructions such as vegetation or buildings. It is the assessment of officers that the site characteristics do serve to minimise visual impacts. Impacts of the facility can be further mitigated by the painting of the tower in a pale green eucalypt colour (as is proposed by a permit condition).

Telecommunications facilities should be co-located wherever practical.

As has been outlined earlier in this report, the option of co-location on existing infrastructure is always a first preference and a number of opportunities were explored by the applicant, however ultimately the conclusion reached by the applicant was that there was a need for a stand alone facility. It is the planning merits of this facility that are the relevant considerations in determining this application.

Health standards for exposure to radio emissions will be met.

At a distance of 116.95 metres from the site the highest level of electro magnetic energy (EME) output from the facility will occur. The maximum output at this location will emit 0.77% of the allowable limit of EME in accordance with the Federal Government regulatory framework.

Disturbance and risk relating to siting and construction should be minimised. Construction activity and site location should comply with State environment protection policies and best practice environmental management guidelines.

The siting is within a clear portion of the lot surrounded by trees where construction activities will not impact on environmental values and it will be constructed in accordance with best practice. The application documentation states that no vegetation will be impacted as services to the facility will be bored under ground so as to minimise impacts on vegetation. It is appropriate to include a condition on any permit that may issue to ensure this remains the case.

Page 38: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 36

Objections

Impacts of electromagnetic radiation.

Objections relating to radiation and health concerns are not direct planning considerations; however, notwithstanding this the proposal is well within the Commonwealth mandated limits and no credible evidence exists that there is a link between health risks and facilities of this type.

Visual impact.

This matter has been considered in the course of this report. The assessment of officers is that the visual impacts are not unreasonable, subject to a condition requiring the tower and antennas to be colour matched to a pale eucalypt colour.

Property devaluation.

Council and VCAT decisions have consistently held that, without valid evidence property devaluation is not a planning ground to warrant refusal of an application.

Errors in the planning application documents.

The permit applicant submission to Council did contain some inaccuracies where erroneous reference to the Macedon Ranges Planning Scheme and a different site context were made. These errors were corrected and are ultimately not relevant to consideration of the merits of this proposal.

Planner’s pre-application advice to the applicant.

When the application was publicly advertised, an email pre-dating the lodgement of the planning application from Planning to the Building and Property Unit remained on the file that advised that in earlier discussions on all the candidate sites that the application site was not a preferred option at that time. Ultimately the City’s Building and Property Unit consented to the application being made on the site and the application has been assessed accordingly and determined to meet the requirements of the Planning Scheme.

The existence of more suitable sites.

As was outlined previously, alternate sites at the LaTrobe University Edwards Road Campus and elsewhere were evaluated and whether these sites were ‘more’ suitable is debatable as their suitability must be balanced with the likelihood they would be higher facilities that would not offer the same screening opportunities that the application site delivers.

Potential for additional antennas being attached to the structure.

If approved, potential does exist for another carrier to locate on the tower. As has been outlined previously, co-location of carriers on existing infrastructure (thus limiting the number of new towers) is actively encouraged by both the industry code and Planning Scheme.

Page 39: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 37

Conclusion

The Greater Bendigo Planning Scheme recognises the importance of provision of appropriate levels of telecommunications coverage to many aspects of modern life. The application should be supported as it is consistent with the relevant sections of the State and Local Planning Policy Framework including the Municipal Strategic Statement. The applicant has satisfactorily demonstrated compliance with the performance standards relating to design, siting, construction and operation of the facility as set out in the Scheme.

Options

Council, acting as the responsible authority, may resolve to approve or refuse to grant a permit.

Attachments

Objections & Petitions Planning Report

RECOMMENDATION

Pursuant to section 61 of the Planning and Environment Act (1987), Greater Bendigo City Council resolve to issue a Notice of Decision to Grant a Permit for the construction of a telecommunications facility at 47-67 Houlahan Street, Kennington subject to the following conditions:

1. MODFIED PLAN REQUIREDBefore the development starts, amended plans to the satisfaction of the responsible authority must be submitted to and approved by the responsibleauthority. When approved, the plans will be endorsed and will then form part of the permit. The plans must be drawn to scale with dimensions and three copies must be provided. The plans must be generally in accordance with the plans(Dwg No. V109309 dated 20-05-2011) submitted with the application but modified to show:(a) The tower and antennas colour matched to be a pale green eucalypt

colour.

2. NO LAYOUT ALTERATIONThe development permitted by this permit as shown on the endorsed plans must not be altered or modified (for any reason) except with the prior written consent of the responsible authority.

3. CONSTRUCTION PHASEIf power to the site is to be connected from Houlahan Street, this power must the bored underground. If power is to be connected from an alternative location, the power must avoid any vegetation removal.

Page 40: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 38

4. VEGETATION PROTECTIONDuring both the construction phase and on an ongoing nature, all vegetation within the general vicinity of the leasehold area must be not be debarked, damaged or removed without the consent of the Responsible Authority.

5. REMOVAL OF REDUNDANT FACILITYThe facility approved by this permit shall be completely removed from the land (with the land being reinstated to its natural condition) to the satisfaction of the responsible authority within three (3) months of the telecommunications facility becoming redundant. The responsible authority may approve an extension to this time if an application is received three (3) months prior to the telecommunications facility becoming redundant.

6. EXPIRYThis permit will expire if one of the following circumstances applies: (a) the development is not started within two (2) years of the date of this

permit; (a) the development is not completed within four (4) years of the date of this

permit.

Note:

Noise from and incidental to the construction of the works authorised by this permit must not exceed the noise limits determined in accordance with State Environment Protection Policy N-1.

RESOLUTION

Moved Cr Cox, Seconded Cr Campbell.

That pursuant to Section 61 of the Planning and Environment Act (1987), Greater Bendigo City Council resolve to Refuse a Permit for the Construction of Telecommunications Facility at 47 & 67 Houlahan Street, Kennington, subject to the following grounds:

1. The location, height and design of the tower is inconsistent with the Greater Bendigo Planning Scheme, in particular Clause 21.03-1 – Corporate vision –Strategies due to the visual impact in the natural reserve and highly prominent elevated location of the site.

2. The location of the tower is inconsistent with the Code of Practice for Telecommunications Facilities, Principle 1 (Design and Siting).

3. The proposal is an inappropriate use of public land4. The application is inconsistent with the Decision Guidelines at Clause 65 of the

Scheme, in particular: the orderly planning of the area; and the effect on the amenity of the area.

CARRIED

Page 41: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 39

Page 42: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 40

Page 43: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 41

Page 44: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 42

2.4 DRAFT EAGLEHAWK STRUCTURE PLAN

Document Information

Author Mark Stubbs, Senior Strategic Planner

Responsible Ross Douglas, Acting Director Planning and DevelopmentDirector

Summary/Purpose

This report provides an overview of the Draft Eaglehawk Structure Plan (the Plan) and seeks Council endorsement for the document to be placed on public display. The public display period is an important phase of the project that enables community comment and feedback regarding the Plan’s direction, recommendations, priorities and implementation program.

Policy Context

Council Plan 2009-2013 (Updated 2011) Reference:

Built and Natural Environment:

o Strategy 1.6: ‘Complete and progress local structure plans and development strategies to manage growth’

Action 1.6.1: Prepare and progress Planning Scheme amendments to implement the Eaglehawk Precinct.

Background Information

The process to prepare a Structure Plan for Eaglehawk has reached an important milestone with the recent completion of a Draft Plan for consideration by Council and for subsequent public display to generate community review and comment.

This project began in mid-2011 with an extended period of research, liaison and field investigations to establish a detailed documentation of issues relevant to the Plan. This Stage was completed in October 2011. A number of community engagement activities were carried out to inform the process of formulating the Plan and are explained in context in the following section of the report.

The approach to development of the Plan has been a collaborative one that has drawn on a Governance structure for the project that consists of a Steering Group to provide oversight to the project and a Reference Group building on the existing Eaglehawk Business and Community Network 3556 (BCN3556) is actively involved.

Page 45: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 43

Previous Council Decision Date:

9 November 2011 (endorsement of Project Brief for Stage 2).

Priority/Importance:

High – Preparation of a Structure Plan for Eaglehawk is a current project commitment of the City of Greater Bendigo for the 2011/12 financial year. The Plan will provide a coordinated planning framework to inform Council’s decision-making and investment in support of a long-term vision for Eaglehawk.

Report

Drafting of the Structure Plan

The creation of the Plan is the culmination of an ongoing process of community and stakeholder engagement and collaboration, connected to various stages of research, planning documentation and review, as summarised in Table 1 below.

Table 1. Sequence of Community Engagement and Documentation Leading to the Draft Structure Plan

Activity Purpose Participation Date Background research engagement

Broad liaison to document a comprehensive range of planning issues for Eaglehawk.

Various agencies and Non-Government Organisations (NGOs)

July-Sept 2011

Eaglehawk Structure Plan Background Reports

A series of technical papers providing summary of existing conditions for a wide range of issues to be considered by the Plan.

Various agencies and NGOs, CoGB

Oct 2011

Presentation to BCN3556 Meeting

Project overview. BCN3556 7 Feb 2012

Visioning workshops (afternoon and evening)

Generate a vision for Eaglehawk and identify ideas for the future.

Residents (20) 6 Dec 2011

Developing the Community Concepts Workshop

Refine the community concepts for public display.

Steering Group 19 Dec 2011

Presentation to BCN3556 Meeting

Project update. BCN3556 7 Feb 2012

Initial Concepts and Ideas Plans

Residents, BCN3556, CoGB

Feb 2012

Community Breakfast ‘Have Your Say’

Community feedback and voting on initial concept plans.

Residents (40) 17 Feb 2012

‘Have Your Say’ Street Display and BBQ

Community feedback and voting on initial concept plans.

Residents (250+) 18 Feb 2012

Vision and Concept Structure Plan

Refinement of key issues and ambitions building on

Steering Group, agencies, BCN3556

7-9 Mar 2012

Page 46: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 44

Activity Purpose Participation Date Workshops existing work.

Follow-up circulation for comment.

members

Vision and Concept Structure Plan

Agencies, BCN3556, CoGB

Mar 2012

Presentation to BCN3556 Meeting

Project update. BCN3556 3 Apr 2012

Draft Structure Plan Briefing

Briefing on the Plan and opportunity to give feedback.Follow-up circulation for comment.

Steering Group, agencies, BCN3556 members

10 May 2012

Draft Eaglehawk Structure Plan

As described in this report. Agencies, BCN3556, CoGB

May 2012

Summary of the Plan

The Draft Eaglehawk Structure Plan is a considered and detailed planning document which will guide the major changes to land use, built form and the public realm in Eaglehawk over the next 20-30 years. Although the Plan has the duty to respond to a wide range of planning issues, it has also been devised to purposefully focus on a selection of ‘bigger picture’ initiatives which work together to present an ambitious future vision for Eaglehawk and deliver the greatest potential community benefit.

The Plan builds on a number of existing plans and strategies (e.g. Eaglehawk Township Strategy and Postcode 3556 Eaglehawk and District Community Plan) and so is both a catalyst for refining and advancing previous ideas as well as generating new initiatives.

The main components of the Plan are as follows:

An introductory explanation of the purpose of the Plan and the process of its formulation;

A plan and corresponding strategic directions for the wider Eaglehawk township;

A plan and corresponding concepts for the Town Centre;

An implementation plan (Planning Scheme changes and other non-statutory actions); and

Precinct concept plans showing the conceptual design for changes in three important precincts of Eaglehawk.

The following sections of this report highlight the strategic directions and concepts which relate to Township and to the Town Centre.

Wider Eaglehawk Township Strategic Directions

Nine strategic directions underpin the Plan for the wider Eaglehawk Township. These directions, which are listed below, each have a quite comprehensive range of corresponding strategies, as detailed in Section 3 of the Plan and represented across several corresponding Plans.

Page 47: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 45

1. Connect and enhance existing green spaces within and through the township;

2. Carefully manage former mining sites as they transition over time;

3. Control subdivision of the town's north and western areas affected by fire risk;

4. Improve interfaces between residential areas, open spaces and industrial development;

5. Enhance access to and through the Eaglehawk Township;

6. Grow the local employment potential of the Eaglehawk Township;

7. Support diverse and high quality new residential development within Eaglehawk;

8. Create a civic and community hub and provide other informal spaces for social interaction; and

9. Investigate ways of marking the entries to Eaglehawk and its Town Centre.

Town Centre Concepts

The Town Centre is the where most of Eaglehawk’s activity takes place and where there is the greatest complexity and potential for change. This complexity is reflected by the fifteen concepts which make up the plan for the Town Centre, as summarised below, and which are detailed in Section 5 of the Plan:

1. Town centre consolidation;

2. Centre gateways and entries;

3. Main streets and active frontages;

4. The High Street streetscape;

5. Retail growth opportunities;

6. A civic and community hub;

7. Canterbury Gardens enhancements;

8. A new urban place at Brassey Square;

9. Cross-town green links;

10. Main streets amenities;

11. Public transport integration;

12. Green streets connections;

13. Junction treatments along High Street;

14. A safe pedestrian environment; and

15. Improved laneway connections and parking.

Page 48: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 46

Implementation

The Plan capitalises on Eaglehawk’s significant existing assets and features and provides a catalyst not only for communicating Eaglehawk’s future vision, but also for orchestrating its realisation over time. Further work is needed to bring the Plan’s initiatives into being. Accordingly, the Plan contains an implementation component which sets out a range of both statutory and non-statutory actions for the City of Greater Bendigo in partnership with a range of other agencies and stakeholders. Indicative timeframes are given for implementation actions, and where dependencies exist, these are identified.

Because the range of initiatives is quite vast and also represent considerable future allocations of capital and labour resources, it will be necessary for the City of Greater Bendigo to work closely with agencies and the Eaglehawk community to carefully prioritise its investments. The public display period presents a first important opportunity to begin this process, as discussed below.

Public Display and Next Steps

The Plan is to be placed on public display for a period of four (4) weeks, generally between mid-June and mid-July. The public display of the Plan represents an important opportunity to test, validate and if necessary, review its concepts and ambitions. In addition to the conventional notifications and invitations for public submissions, the display period will have a focus on promotions and engagement opportunities designed to encourage participation and maximise community response. In particular, we will endeavour to gauge relative support for different initiatives and to begin prioritising implementation actions. Following is an overview of the proposed notifications / promotions and engagement activities:

Notification / Promotions

General media release – summarising the Plan, highlighting engagement events and explaining how submissions can be made.

Community bulletin (by mail and email, hard copies available at local venues) – as above, with some additional detail.

Promotional notice in the 3556 magazine (if issue timing permits).

Promotional notice in local school newsletters.

A formal public notice in local newspapers (to meet statutory requirements under the Local Government Act 1989).

Engagement Activities

A weekend, outdoor-format community listening post and BBQ – to be held on a Saturday morning in the Eaglehawk Town Centre and staffed by officers. Participants will have the opportunity to respond to a survey on the Plan and fill out feedback sheets.

An online and hard copy survey to gauge community opinion and preferences related to the Plan.

A summary presentation to the BCN3556 meeting.

Page 49: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 47

The process and outcomes of the public display period will be reported to Council in August. This will include a summary of any written submissions received and an explanation of any resultant changes to the Plan. To assist Council and City of Greater Bendigo in its future decision-making, the report will also discuss findings on the relative community support for proposed initiatives and on the emerging priorities for implementation.

Risk Analysis:

Risk MitigationResidents or other stakeholders who may perceive a lack of consultation or a hold a view that the Plan is now fixed.

Promote participation in the engagement opportunities available to anyone throughout the public display period. Ensure communications are clear about the draft status of the Plan and the potential for changes to be effected by the community response. Explain also that the Plan must also be tested through a subsequent Planning Scheme Amendment process, which includes further avenues for community input.

Conclusion

The Draft Eaglehawk Structure Plan has been prepared as comprehensive guide for major land use, built form and public realm change and initiatives in Eaglehawk over the coming 20-30 year period. The Plan represents a positive ambition for the future that builds on Eaglehawk’s notable attributes and also highlights its tremendous potential. The Plan provides guidance for progressive implementation by the City of Greater Bendigo in partnership with agencies and the Eaglehawk community.

A public display of the Plan to be held between mid-June and mid-July presents the opportunity to test, validate and if necessary, review its concepts and ambitions. A subsequent report will be made to Council in August on the findings of the public display period, including a summary of and response to submissions, and coverage of community support and priorities related to

Resource Implications

The total project budget for the Eaglehawk Structure Plan is $140,000. Stage 1 was completed at a cost of $60,000. The community consultation component of Stage 2 (Part A) was completed within $6,000. Stage 2 (Part 2) will be carried out at a cost of $74,000.

An allocation of additional funding will be necessary to complete a Planning Scheme Amendment (Stage 3) to give statutory effect to Eaglehawk Structure Plan and in particular to implement proposed land use designations.

Page 50: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 48

RECOMMENDATION

That the Greater Bendigo City Council resolves to endorse the Draft Eaglehawk Structure Plan to be placed on public display for a period of at least four (4) weeks to seek community comment and priorities for implementation.

RESOLUTION

Moved Cr Cox, Seconded Cr Fyffe.

That the recommendation be adopted.

CARRIED

Page 51: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 49

2.5 PROPOSED KANGAROO FLAT INDOOR AQUATIC FACILITY - PROVISION OF DESIGN, ENGINEERING AND ALLIED SERVICES TENDER

Document Information

Authors Rachel Lee, Major Projects ManagerStan Liacos, Director City Futures

Responsible Stan Liacos, Director City FuturesDirector

Summary/Purpose

Council recently considered a report on what was required to turn its aspiration of developing a much-needed second indoor aquatic centre in Greater Bendigo into a reality. The next step of this major project was to invite tenders from consortia of well credentialed architects, engineers, cost planners and associated advisors to commence the design of the facility. This process is now complete and the purpose of this report is to recommend that Council approve the appointment of the following consortia:

Peddle Thorp Architects (Architect and Consortia leader) in association with

Bonnaci Group (Structural and Civil Engineers);

Waterman AHW (Building Services);

Hydrautech (Pool Engineering);

Slattery (Cost Planning);

Florenciag Smith (Building Surveyor);

FORMium Landscaping (Landscaping);

Marshall Day (Acoustics);

GTA (Traffic and Parking);

Sustainable Built Environments (ESD);

One Group (Accessibility);and

SK Corp (Catering / Café design).

for the fixed price tendered sum of $1,396,240 (ex GST) and approve the commissioning of stage one (concept / schematic design).

It is important to stress that Council is not at all obliged to commit this level of expenditure. The contract will include numerous stage points and approval to move forward will only be made by Council dependent on client satisfaction, planning approvals and funding commitments.

Page 52: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 50

Policy Context

Council Plan 1.1.4 – Continue the design and development phase for the indoor aquatic facility in Kangaroo Flat

Background Information

At its meeting of 8 February 2012, Council resolved to, among other things, continue planning, design and to commence attracting funding for the development of the proposed Kangaroo Flat Aquatic Centre.

At its meeting of 21 March 2012, Council supported the invitation of tenders from suitably qualified consortia of architects, engineers, cost planners and associated advisors to work with our Aquatic Centre Project Group in progressively moving forward with project design, management and the attraction of project funding.

Reporting to the Project Director, the consortia of design specialists would be commissioned to work sequentially through the following stages:

1. Concept design

2. Design development

3. Contract documentation and tender specification

4. Construction administration

The consortia would be appointed for the duration of the project, but would only becommissioned in distinct stages – i.e. movement to each stage would only occur assuming:

Client satisfaction and Council approvals;

Re-affirmation of Council intent to move forward; and

Funding commitments.

Report

The next step of this major project was to invite tenders from consortia of architects, engineers and cost planners and for one to be appointed to work with the designated Project Group as soon as practically possible.

Due to the specialised nature of the project, the project team decided to move straight to public tender and advertisements were placed on the 24 March 2012 in the Bendigo Advertiser, The Age and electronically on Tenderlink.

Twenty one (21) submissions were formally lodged by the closing date 19 April 2012 from the following architecture-led consortia-leaders:

Page 53: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 51

Y2 Architecture

Henderson & Lodge

BVN Architecture

CH Architects

Cox Richardson

Etch Architectural

H20 Architects

Jackson Architecture

James Millar

K20

ML Design

Mantric Architecture

McGauran Giannini Soon

Mode Design

Peddle Thorp Architects

Philip Lighton

Suter Architects

Tompkins MDA / Woods Bagot

Whitefield McQueen

Williams Boag

Williams Ross

Page 54: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 52

The following selection criteria was used by the panel to evaluate the submissions:

CRITERIA WEIGHTING

A) CAPABILITY

Demonstrated experience in aquatic facility design and development Experience in projects of similar scale and complexity

35%

B) CAPACITY

Project delivery and methodology Project resourcing Professional presentation

25%

C) PRICE/VALUE

Fees40%

D) OH&S WORKCOVER & INSURANCESPass-Fail

TOTAL 100

A multi-disciplinary panel comprising the following people undertook the evaluation:

Stan Liacos Director, City Futures (Project Director)Don Goldsworthy City Architect Rachel Lee Major Projects ManagerPat Jess Manager - RecreationDaniella Theuma CoGB Building and Property Services

Accompanying the panel were two non-scoring participants that assisted the panel and oversaw important probity considerations:

Graeme Stewart Probity Advisor, AFS Accountants and AuditorsRichard Morrison Manager, Contract and Project Coordination

A copy of Graeme Stewart’s letter confirming that all twenty one (21) firms were treated equitably is attached to this report.

The panel unanimously agreed to invite three (3) shortlisted firms to present their detailed submission and introduce face-to-face their project leaders to the evaluation panel on 14 May 2012.

These shortlisted consortia-leader firms were:

Peddle Thorp Architects;

Tompkins MDA / Woods Bagot; and

Suters Architects

After considering any additional material received and/or fee clarifications sought from these three proponents, the panel unanimously concluded that the best placed design consortia team for this particular project was:

Page 55: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 53

Peddle Thorp Architects (Architect and Consortia leader) in association with

Bonnaci Group (Structural and Civil Engineers);

Waterman AHW (Building Services);

Hydrautech (Pool Engineering);

Slattery (Cost Planning);

Florenciag Smith (Building Surveyor);

FORMium Landscaping (Landscaping);

Marshall Day (Acoustics);

GTA (Traffic and Parking);

Sustainable Built Environments (ESD);

One Group (Accessibility);and

SK Corp (Catering / Café design).

Peddle Thorp Architects has over 300 staff in five (5) locations including a specialist group that is responsible for designing and delivering aquatic centre projects based in Melbourne. Recent or major aquatic projects include:

Melbourne Sports and Aquatic Centre (Commonwealth Games); Ringwood Aquatic Centre; Collingwood Leisure Centre; Launceston Regional Aquatic Centre; Leisurelink Aquatic Centre (Waurn Ponds); Croydon Aquatic Centre; Pelican Park Recreation Centre (Hastings); Sunshine Recreation Centre; and South Australian State Aquatic Centre.

Other select landmark Victorian projects include Melbourne Aquarium, Rod Laver Arena, Hisense Arena and the Whitten Oval Redevelopment.

More recently and closer to Bendigo, Peddle Thorp Architects have been the lead firm responsible for the design of the Edward Street Car Park Office Complex. The CoGB team managing this project have been very impressed with the professionalism, commitment and attention to detail from all layers of this quality firm.

Timelines

Concept design and this stage of community consultation will commence in June 2012 and will be completed by the end of the 2012 / 2013 financial year.

Page 56: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 54

Consultation/Communication

Community information and consultation will be required at all stages of this project. This work will be evidenced through:

One or more community reference groups; Regular media engagement and coverage; Periodic community bulletins and database management; Periodic community roadshows and public presentations; and Regular dialogue and engagement with Council, State and Federal Members of

Parliament in our region, relevant public agencies and the Kangaroo Flat Community Enterprise Group.

Resource Implications

There should be adequate funds in the current financial year budget and draft 2012 / 2013 budget to deliver the bulk of the first stage (concept / schematic design) of this project.

As previously stated the consortia would be appointed for the duration of the project but would only be commissioned in distinct sequential stages. The fee components for each stage is as follows:

Concept and schematic design (including community consultation and aa detailed application to Town Planning permit stage $ 242,695Design development $ 314,553Contract documentation $ 443,063Tender phase $ 50,328Construction administration $ 345,601

----------------$1,396,240 (ex gst)

This represents approximately 5.5% of the project build. This is considered better than industry norm. It is a very competitive rate for the professional fees component of such a large project.

Attachments

1. Probity Advisor letter

Page 57: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 55

RECOMMENDATION

That the Greater Bendigo City Council approve the appointment of

Peddle Thorp Architects (Architect and Consortia leader) in association with

Bonnaci Group (Structural and Civil Engineers);

Waterman AHW (Building Services);

Hydrautech (Pool Engineering);

Slattery (Cost Planning);

Florenciag Smith (Building Surveyor);

FORMium Landscaping (Landscaping);

Marshall Day (Acoustics);

GTA (Traffic and Parking);

Sustainable Built Environments (ESD);

One Group (Accessibility);and

SK Corp (Catering / Café design).

for the provision of design, engineering and allied services for the proposed KangarooFlat Indoor Aquatic Facility for the fixed price tendered sum of $1,396,240 (ex GST)subject to provisions of the contract and approve the commissioning of stage one (concept and schematic design).

RESOLUTION

Moved Cr Lyons, Seconded Cr Fyffe.

That the recommendation be adopted.

CARRIED

Page 58: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 56

2.6 RESPONSE TO PETITION: TREE HAZARD ALONG MCGLASHANS ROAD, LOCKWOOD SOUTH

Document Information

Author Andrew Smith, Senior Design and Traffic EngineerRobyn Major, Manager Sustainable Environment

Responsible Darren Fuzzard, Director Presentation and AssetsDirector

Summary/Purpose

The purpose of the report is to respond to the petition presented to Council on 11 April2012 from residents and users of McGlashans Road, Lockwood South.

It is noted that several letters of opposing view to the petition have since been received and this report also attempts to consider and respond to these.

Policy Context

Council Plan Reference:

City of Greater Bendigo Council Plan 2009–2013 (updated 2011)

Built and Natural Environment

Strategy 1.13 Develop a sustainable integrated transport network.

Strategy 1.5 Work to promote, protect, maintain and restore Greater Bendigo's natural heritage.

Strategic Directions - Rural Roadside Conservation 2011-2015

Strategic Objectives

- Provision of safe transportation corridors.

- Protection and enhancement of the quality and viability of our natural biodiversity.

Background Information

A petition has been received from residents and other road users regarding tree hazards along McGlashans Road, Lockwood South, as outlined below:

"Please find attached signatures of the local residents who have an issue with the abovementioned trees from a safety point of view.

1. When entering into McGlashans Road from the side street the line of sight is blocked for clear vision.

Page 59: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 57

2. When there are two cars passing McGlashans Road you can be very close to soft edges or close to trees.

3. The risk of having dead or dying limbs falling from the tree canopy above.

4. As a council owned road the 70km speed limit is something that could be looked at?"

Signatures – 34

Previous Council Decision(s) Date(s):

At the Council meeting on the 11 April 2012, upon accepting the petition, a motion was passed that a report be prepared within two meetings.

Planning approval to remove 34 trees along McGlashans Road for road widening was refused by Council on 18 February 2002.

Background

Prior to 2000, McGlashans Road was a narrow unsealed pavement situated within a 20 metre wide heavily treed road reserve running approximately 2.2 kilometres off the Bendigo-Maldon Road (a sealed State Declared main road).

In 2000, McGlashans Road was upgraded to a 5 metre wide sealed road with markers, guide posts and appropriate regulatory and advisory signage. In recognition of the high conservation value of the roadside the construction standards usually applied were varied to accommodate and retain the biodiversity values. These variations included incorporating the table drains as close as possible to the shoulders to minimise tree removal, installing guide posts at closer than usual intervals, installing signs cautioning motorists of the heavily treed road reserve as well as reducing the clear zone. Twelve mature trees were removed to achieve the clearance for the 5m wide road.

The deviation from the usual standards was not well received by the developer and some residents as they had assumed that the road would be constructed to the 6 metre width discussed during negotiations for the 8 lot subdivision in McGlashans Road. The final agreement included an option of 'or less (road width) subject to Council approval'.

As a consequence of the complaints, CoGB agreed to develop a new design in mid 2001 that would widen the road by 1 metre and improve the table drain formation. This design required 85 trees to be removed and hence required planning approval. The planning application was met with significant resistance from many, including the referral Authority (the then named) Department of Natural Resources and Environment as well as a petition signed by 338 residents.

Once again the road was re-designed with the number of trees required to be removed being reduced to 34. However, at its 18 February 2002 meeting Council decided not to support the planning permit for the removal of the 34 trees, but to advocate for a reduction in the speed limit as an alternative measure to improve safety.

Page 60: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 58

VicRoads trialed a 60km/h speed limit for 12 months along the length of road. During the trial, data was undertaken in July 2003 which showed a mean traffic speed of 60km/h with 85% of traffic travelling at 75km/h or less. In February 2003 Council requested VicRoads' approval to install permanent 70km/h speed signs. Approval was gained and in June 2004 permanent 70km/h speed signs were installed.

The turn over of ownership of properties in this area is relatively high and this tension about the balance of protecting vegetation versus road safety has continued to re-emerge. The most recent conversation concerning vegetation on the roadsides came about in late 2010 when a request was made for the assessment of the sight distances at the McGlashans Road and Maldon Road intersection. During the inspection, it was considered that further works were required and trees were marked for removal. A sign informing the road users that these works would occur was erected onsite. This action was met with strong opposition from some community members and support from others. Works were put on hold pending further investigation.

CoGB staff then met with the local Landcare group (Mid Loddon Landcare Network) to verify information about the environmental values of the road and history of community involvement in protecting those values.

Further to this, a meeting was held on 30 March 2012 at the Lockwood South Community Hall with local residents to discuss their concerns.

After the meeting, the referred petition was received. At the meeting, it appeared that large scale removal of vegetation to widen the road was generally not expected. Consequently this option has not been investigated.

Subsequently, several letters were received in support of protecting the vegetation.

According to the traffic count conducted in August 2009, the volumes on McGlashans Road are 410 vehicles per day with approximately 8% commercial vehicles.

There has been one recorded accident (occurring in 2010) on McGlashans Rd. It involved a single vehicle and a kangaroo and occurred in daylight hours in dry conditions.

Report

The Petition

Officer response to the points in the petition:

1. When entering into McGlashans Road from the side street the line of sight is blocked for clear vision.

The sight distance at the intersections of Springvale Road, Nethercraig Road and Wild Cherry Road with McGlashans Road were measured and found to satisfy the requirements for Safe Intersection Sight Distance. Therefore stop signs are not required and the removal of trees is not required. Some removal of recently planted small trees near the intersection of Wild Cherry Road would improve the sight lines.

Page 61: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 59

2. When there are two cars passing McGlashans Road you can be very close to soft edges or close to trees.

When two cars pass, cars do travel close to each other and the side of the road, however it is understood that the majority of road users slow down and allow other vehicles to pass safely. This is the normal procedure in many narrow streets throughout the road network. There is enough seal width to allow a car and truck to pass in several locations however, in some instances, overhanging branches preclude this.

3. The risk of having dead or dying limbs falling from the tree canopy above.

This risk will always be present in McGlashans Road and many other roads. Consideration of this risk is part of CoGB’s normal assessment and maintenance of the trees in any road reserve.

4. As a council owned road the 70km/h speed limit is something that could be looked at?

CoGB can assess the speed limit, but it can only be changed with the approval of VicRoads. Council lobbied VicRoads to have the speed lowered to 70km/h in 2004 after a 12 month trial. VicRoads would be highly unlikely to reduce the speed limit further, given that the 85th percentile speed of traffic in McGlashans Road was recorded as 83km/h in August 2009.

Additional Letters

Since receiving the petition several emails and letters have been received expressing opposing views to that of the petition and a small number expressing support. A wide range of information and perceptions were presented in these letters and this information has been considered in the preparation of the potential options.

Traffic Management Suggestions Provided in the Letters

The traffic management and works suggestions put forward by residents predominantly fall into the broad categories discussed below. More detail is provided in the attached spreadsheet.

Restricting Traffic Access - Closing McGlashans Road to all non-residential traffic would be logistically difficult and banning trucks would require trucks to negotiate the internal subdivision roads, travelling up to an extra 6.7km. While this would remove a percentage of large vehicles off McGlashans Road, garbage trucks and trucks that have business in McGlashans Road would still be allowed access. Therefore, safe clearance would still be required for these vehicles.

Page 62: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 60

Signage - Signs at intersections, driveways or crests are seen as a way to warn or inform road users of the road conditions ahead. However, some of the suggested signage would not achieve the desired outcome as they are only to guide/warning motorists and are not regulatory. Examples of signs that guide motorists include: Local Traffic Only, Road Unsuitable for Trucks, Significant Roadside Corridor. These signs have no penalty for non-compliance, whereas regulatory signs include; Stop, Give way and speed limits have fines as a penalty for non-compliance.

Road Works - A range of road works were suggested including widening McGlashans Road off Maldon Road, sealing the Springvale Road approach to McGlashans Road (this work has been completed recently) and repair to the seal edge (scheduled to occur as routine maintenance). Installing speed humps was suggested but it is not an appropriate option for a rural road with a 70km/h speed limit as they require streetlighting and additional signage.

Reduce Speed limit to 50km/h or 60km/h - As noted in the petition response, VicRoads would be highly unlikely to reduce the speed limit further given that the 85th percentile speed of traffic in McGlashans Road was recorded as 83km/h in August 2009. To promote compliance with the speed limit it was suggested that a police presence be requested. This request has been made.

Biodiversity, Landscape, Aesthetic/Amenity Values

The vegetation along McGlashans Road represents a range of biodiversity, landscape and amenity values to the community. Over the past 15 years residents of the area (supported by their local Landcare group) have lobbied strongly to Council and the State government for these identified and documented values to be protected.

The conservation significance of the vegetation is 'significant', with endangered Grassy woodland communities represented including Woodlands (White Gum and Grey Box). The vegetation is permanent habitat for many species of birds and animals including the endangered Brush-tailed Phascogale (Tuan) which is reliant on nesting hollows only found in old eucalypts. The vegetation also acts as a corridor or biolinks providing the necessary food and habitat for species in transit between remnants within the landscape. It is also part of feeding grounds for species such as the endangered Swifts parrot.

The importance of the landscape values from an ecological perspective has been described above but the social function that these values provide is not as easily articulated. The landscape values are intrinsically linked to how we respond to the whole landscape and ourselves as part of that picture. Many respondents described how the look and feel of the area and in particular the approach (McGlashans Road) to their prospective new home influenced their decision to buy and live within this environment. This response to their surrounding environment has also led to many residents undertaking significant revegetation activities adjacent to the roadside to further enhance the values.

According to the submissions, McGlashans Road is also valued as a wonderful place to walk and ride bicycles as well as interact with nature. It has become known as a place for TAFE students to undertake surveys and observe endangered species first hand.

Page 63: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 61

Determining Future Works

Internal and external consultation, site inspections, review of the history of community and council works and decisions, and consideration of information presented by the community informed the discussion.

It became evident during the site inspections that there are several activities that fall under the heading of routine maintenance and, if these activities are not carried out regularly, the impacts on perceived safety compound. The close proximity of the trees to the road seal and the absence of the usual width of shoulder and table drain that would allow vehicles to move off the seal safely, combined with deteriorating edges to the seal and potholes, all contribute to creating a sense of ‘unease’ within motorists particularly when approaching on-coming traffic.

The following maintenance activities were identified as requiring action as soon as possible:

Remove trees assessed as structurally unsound. Currently there are 4 trees in McGlashans Road that have been assessed by CoGB arborists as structurally unsound and likely to fall on the road. These four trees are not considered significant specimens and when removed, part of the existing trunks will be kept onsite to provide for local species of fauna;

Minor pruning of the road envelope and removal of dead tree limbs;

Repairs to the seal;

Improve the gravel shoulder; and

Install more guide posts at closer intervals (even though they are already closer than normal).

Consider the installation of additional advisory signs at crests and/or intersections.

In addition to the options suggested by residents and considered earlier in the report, an option to establish a uniform envelope clear of vegetation along the entire length of the road was investigated. This would allow a car and truck to pass anywhere along the entire length of the road. As shown below, this would involve creating an area clear of vegetation that is 4.5m high and 0.3m outside the edges of the seal.

Page 64: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 62

This proposal would require the loss of 17 trees plus 3 dead trees and would also require numerous branches to be trimmed. In accordance with the managing native vegetation on roadsides exemptions agreement, a planning permit would not be required. However, given the long history of this matter, for the purposes of transparency it is recommended that if this option is pursued by Council, a planning permit be sought.

The creation of the road envelope by removing 20 trees would allow trucks to move to the edge of the seal without hitting branches or trees and therefore allow a car to pass it at any point. However, the road would still be relatively narrow and vehicles would still need to drive to the conditions and slow down when passing one another. Vehicles would most likely travel along the road at the same speed as they currently do. It is therefore concluded that this option provides very little improvement to the service standard but has considerable impact on environmental values and is not preferred.

Conclusion

This is a complex problem with little opportunity to reach a compromise position satisfying the needs of all parties. It is a balance between addressing concerns about the perceived risks versus protecting the known biodiversity assets valued by many.

If this report had only been about responding to the petition, it would not have revealed the complexity of this matter or the level of involvement of the community over the past 15 years.

While it is appreciated that the road is not constructed to contemporary 'standards', it is considered that the matter of service standard versus environmental value was thoroughly considered at the time of construction in 2000, and the factors influencing the adopted treatment have not substantially changed.

Attachments

1. Road use, maintenance and environmental value concerns gathered from correspondence.

Existing Seal

4.5

m

En

velop

e

0.3mAllowance for lean

0.3mAllowance for lean

Page 65: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 63

RECOMMENDATION

It is recommended that Council:

1. Endorses the following maintenance activities to be completed as soon as possible:

a. Remove the 4 trees assessed as structurally unsound and likely to fall on the road.

b. Undertake minor pruning of the road envelope and removal of dead tree limbs.

c. Repair the seal where potholes and edge breaks have formed.

d. Improve the gravel shoulder.

e. Install more guide posts at closer intervals.

f. Consider the installation of additional advisory signs at crests or intersections.

2. Notify the submitters of the petition and those who wrote to Council of Council's decision.

Page 66: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 64

RESOLUTION

Moved Cr Phillips, Seconded Cr Campbell.

That Council:

1. Endorse the following maintenance activities for McGlashans Road to be completed as soon as possible:

a. Remove the 4 trees assessed as structurally unsound and likely to fall on the road.

b. Undertake minor pruning of the road envelope and removal of dead tree limbs.

c. Repair the seal where potholes and edge breaks have formed.

d. Improve the gravel shoulder.

e. Install more guide posts at closer intervals.

f. Install standard advisory signs at the crest and intersections.

g. Apply and maintain the clearance envelope on the crest, the extent dictated by the overtaking distance criteria

2. Notify the submitters of the petition and those who wrote to Council of Council's decision.

CARRIED

Cr Cox called for a division on the voting for the motion.

FOR VOTE - Cr Campbell, Cr Lyons, Cr Phillips, Cr Reade, Cr Sandner

AGAINST VOTE - Cr Fyffe, Cr Cox, Cr Reynard, Cr Ruffell

Page 67: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 65

ATTACHMENT 1

McGlashans Road - Road use and maintenance concerns gathered from correspondence

Concerns Actions/treatments suggested by community

The range of perceptions and perspectives of community members with respect to the concerns (usually verbatim)

Officer Response

Petition - The risk of having dead or dying limbs falling from the tree canopy above.

Conduct routine maintenance -removing dead or hazardous limbs.

General agreement that routine maintenance particularly after storm events is required.

Question just how dangerous trees are if we haven't acted already.

The risk of having dead or dying limbs falling from the tree canopy above will always be present in McGlashans Road and many other rural roads. Support normal assessment

and maintenance of the trees in the road reserve.

4 trees assessed by CoGB arborist as structurally unsound require removal.

Petition - When there are two cars passing McGlashans Road you can be very close to soft edges or close to trees.

Sight distance at intersections of Springvale Road, Nethercraig Road and Wild Cherry Road with McGlashans Road are considered inadequate.

Widen the first 50-100m of the road off Maldon Road.

'Stop' signs.Mirrors.Seal intersection

(20-50m of Springvale Road onto McGlashans).

Remove vegetation.

Drivers cut the corner when turning off Maldon Road.

Sight lines need clearing.

Slow down and take the time to look reduces the risk.

Drive to the conditions and adopt a safe approach to entering intersections.

The sight distance at the intersections of Springvale Road, Nethercraig Road and Wild Cherry Road with McGlashans Road where measured and found to be above Safe Intersection Sight Distance. McGlashans Road is not wide, but does bell out as it meets the Maldon Road. Therefore stop signs are not required and the removal of trees is not required. Some minor removal of recently planted small trees near the intersection of Wild Cherry Road would improve the sight lines.Mirrors are only used where there is restricted sight distance and the conditions for stop signs are met. Mirrors are not 100% reliable, so should only be used as a last resort.The sealing of 20m into Springvale Road has been programmed.

Petition - When there are two cars passing McGlashans Road you can be very close to soft edges or close to trees.

McGlashans Road too narrow for vehicles to pass safely.

CloseMcGlashans Road to all other users.

Widen road seal.Remove

vegetation.'Local traffic only'

signs.

Access is available via other roads.

Vegetation removal not acceptable to many in the community.

Suggested compromise 'envelope' is not supported by many.

Drive to the conditions.

The road cannot be close to all other users.When two cars pass, cars do become close to each other and the side of the roads. The majority of road users slow down and allow the other vehicles to pass safely. This is the normal procedure in many narrow streets through out the road network.An option has been put forward that would result in the creation

Page 68: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 66

Pull over and let trucks pass.

Cars or car and truck cannot pass safely.

of a road 'envelope' as discussed in report -would allow the safe passage of trucks (individually -not 2 trucks passing). The road would still be narrow, and vehicles would still have to drive to the conditions and slow so that they can pass one another.“Local Traffic Only” signs have no legal recognition. They are a bluff sign. Would not stop trucks driving down the road, as they have business there anyway, eg they are local. “Local Traffic Only” signs are only appropriate when the road is being used as a short cut. This is not the case here.

Trucks and heavy vehicles can only negotiate the road by staying in the centre of the seal.

Ban trucks.Widen road seal.Remove

vegetation.Signage - 'Road unsuitable for trucks'.- 'No Trucks over 3 (normally) tonnes'.

Vegetation removal not acceptable to many in the community.

Suggested compromise 'envelope' is not supported by many.

Drive to the conditions.

Pull over and let trucks pass.

Cars or car and truck cannot pass safely.

Excellent, safe and wide access is available via Mulberry Lane and Sunrise Crescent.

Banning trucks in McGlashans Road would require trucks to negotiate the internal subdivision roads, travelling up to an extra 6.7km. While this would remove a large percentage of large vehicles off McGlashans Road, garbage trucks and trucks that have business in McGlashans Road would still be able to travel on McGlashans Road. Therefore safe clearance would still be required for these vehicles.

Petition - As a council owned road the 70k speed limit is something that could be looked at?"

Driving in excess of the 70km/hr speed limit.

Reduce Speed limit to 50km or 60km.

Encourage an occasional police presence.

Road is safe if speed limit of 70km is adhered to.

Drivers speed and put themselves and others at risk.

There is a problem with speeding including trucks and delivery vans.

Tree removal clears the way to encourage increased speeding.

Speeding vehicles make walking hazardous.

By drivers speeding suggests that they have assessed the road as safe for 80km/hr.

CoGB can assess the speed limit, but it can only be changed with the approval of VicRoads. CoGB lobbied VicRoads to have the speed lowered to 70km/h in 2004. VicRoads would be highly unlikely to reduce the speed limit further, given that the 85th

percentile speed of traffic in McGlashans Road was recorded as 83km/h in August 2009. CoGB or residents can ask the Police to monitor speeding at anytime.

Drivers not being aware of the road

Warning signs at intersections,

It is the manner in which people drive

The current warning signs are more than adequate.

Page 69: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 67

conditions or unwilling to drive to road conditions.

driveways, crests. Speed humps /

rumble strips.

which is unsafe not the road that is unsafe.

For those with an alternative route -take it and stop complaining.

Driving safely is an inconvenience.

Speed humps not an option when the speed limit is over 60km/h.

Drivers unaware of the ecological significance of the roadside

Significant roadside corridor sign.

Education - change perception.

Signage indicating that the roadside if of high conservation value could be installed. This type of sign is designed to encourage appreciation of the value of the vegetation but would not contribute to changing driver behaviour.

Road seal surface and edges need maintenance works.

Works have been scheduled.

Councils Obligations -

Strategic Directions Rural Roadside Conservation. Section 6.1- Develop Environment Management Plan

Establish standards to which it will maintain all of its roads to and monitor and maintain all roads to those nominated standards - need a standard for high conservation roads.

Implement Roadside Mgt Policy – (policy reference given).

Support Sustainable Land Management principles described in CoGB publications.

The Strategic Directions- Rural Roadside Conservation supported the maintenance of the conservation values of the road and allow biodiversity values to be considered as well as safety. This document also details how works will be conducted to minimise incidental damage to vegetation.

Impacting on Biodiversity, aesthetic and amenity values

Object to the development of a standard road envelope-we should be encouraging roadside veg not depleting it.

Addressed in the table below

Long History -keep having to fight the same battle.

12 year issue Recurring complaints by a few not a view shared by the collective. Thinks that the issue is resolved then it re-emerges.

The history of community action has been considered in determining response.

Consultation Petition was not widely circulated-Lack of consultation.

An onsite meeting was held on 30 March 2012 at the Lockwood South Community Hall with local residents to discuss the latest CoGB proposal. After the meeting a petition was received urging Council to remove trees in McGlashans Road.

Page 70: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Built and Natural Environment - Reports Ordinary Meeting - 13 June 2012

PAGE 68

McGlashans Road – Environmental Values

Value Risk to values

Biodiversity Endangered EVCsBox/Gum Woodlands (including White Gum) and Grey Box Woodlands.

Brush-tailed Phascogale (Tuan) frequents the area and is listed as endangered.

Habitat including nesting hollows.

Swifts parrot feeding ground.Barking Owls recorded.

Removing trees o Reduces the canopy cover leading to

greater exposure to storm damage leading to further vegetation removal for maintenance.

o Reduces a 'stand' of vegetation's ability to withstand the impact of 'edge effects'. (eg fence line clearing, spray drift, pest attack).

o Reduces habitat values including nesting hollows.It takes approximately 80-100 years for a eucalypt to begin to provide hollows.

o Minimises available food sources.o Increases light and heat penetration to the

ground layer thereby altering the composition of the understorey, potentially increasing weediness and inhibiting regeneration opportunities.

The area is susceptible to raising salinity levels with problems re-emerging after the end of the recent drought, vegetation helps to manage groundwater and salinity levels.

Removing vegetation further modifies the landscape reducing aesthetic values.

Including loss of appeal to perspective purchasers - There is a high turnover of properties in this area.

Landscape view

Provides linkages for wildlife to move between vegetated blocks.

Encouraged private property owners adjacent to the roadside corridor to undertake revegetation works to further increase the values of the roadside habitat.

Aesthetics / Amenity

The vegetation is part of the overall landscape and would have been part of the overall appeal enticing prospective purchasers.

Access for education opportunities.

Page 71: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Economic Development - Reports Ordinary Meeting - 13 June 2012

PAGE 69

3. ECONOMIC DEVELOPMENT

Nil.

Page 72: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 70

4. COMMUNITY AND CULTURE

4.1 DRAFT VIOLENCE PREVENTION PLAN 2012-2015

Document Information

Author Romina Lougoon, Social Research and Policy Officer

Responsible Ross Douglas, Acting Director Planning and DevelopmentDirector

Summary/Purpose

This report recommends that Council approve the public release of the draft Violence Prevention Plan for the purpose of inviting community comment, prior to considering adoption of the final Plan.

Policy Context

Council Plan Reference:

The Council Plan 2009-2013 (Updated 2011) under the Goal Area ‘Community and Culture’ has the Strategy ‘work collaboratively to promote community safety and healthy living’. Within this Strategy is the action ‘develop a strategic approach to Violence Prevention and participate in a range of actions to prevent violence against women’.

Strategy Reference:

The Health and Wellbeing Strategy 2009-2013 under the theme ‘healthy lifestyles, incorporating mental health and wellbeing’ is the action ‘in consultation with the Safe Community Forum, partner a process to develop a Violence Prevention Plan for the City of Greater Bendigo (building on the GLOVE Project)’.

Council Policy Reference:

The Greater Bendigo City Council has adopted the position statement “Greater Bendigo City Council say NO to violence against women”.

Background Information

In Australia intimate partner violence is the leading cause of ill health and premature death in women aged 15-44 years. In 2011, there were 21,158 females aged between 15-44 years living in Greater Bendigo. They account for just under 40% of the total female population in the municipality. This means domestic violence can affect many people within our municipality.

Page 73: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 71

At its Council meeting on 20 October 2010, Councillors signed a position statement titled “Greater Bendigo City Council says NO to Violence against Women”. This was an important step for the Council to publicly oppose violence against women and it identified the need to develop a strategic approach to whole of community violence prevention.

The City of Greater Bendigo, Mt Alexander Shire and Macedon Ranges Shire have been successful in obtaining funding from the State Government (an initiative of A Right to Respect: Victoria’s Plan to Prevent Violence against Women 2010-2020) to conduct the “Preventing Violence Against Women in our Community” pilot project in a collaboration across the three municipalities on preventing violence against women.

The Council, at its meeting on 28 September 2011, endorsed the objectives in the project brief for the City of Greater Bendigo (CoGB) Violence Prevention Plan.

Objective 1: The City of Greater Bendigo will offer a range of strategies in partnership with other organisations networks and community members designed to increase awareness and community endorsement for strategies designed to prevent violence, and assist those affected by violence to find the services they require. This is an ‘outward looking’ objective designed to increase community knowledge and capacity to prevent violence.

Objective 2: The City of Greater Bendigo will be a role model in the adoption of organisational strategies to reduce the risk of Violence in the community and which increase staff awareness of services available to provide direct assistance for those affected. This is an ‘inward looking’ objective designed to increase the competency of City of Greater Bendigo staff to prevent, recognise and manage violence against others appropriately.

Previous Council Decision Date:

28 September 2011

Report

Violence is a complex issue and no single factor can be singled out as to why some people behave in a violent manner while others don’t. There can be a number of factors including biological, social, cultural, economic and political factors.

The City's Violence Prevention Plan sets out a clear policy direction on violence prevention:

Greater Bendigo City Council understands violence in any form is a serious and preventable health issue for the Greater Bendigo Community and does not condone the use of violence in any form towards any member of the community.

Working in partnership with the community and key service providers, we can create a municipality that is gender equitable, respectful and inclusive. We can do this as a role model and by raising community awareness, providing information, creating inclusive community settings, and fostering respectful attitudes and relationships.

Page 74: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 72

To ensure the City's Violence Prevention Plan aligns with the State Government’s ‘Preventing Violence against Women and their Children’ Plan, the actions to preventing violence in the draft City of Greater Bendigo Violence Prevention Plan action plan is split between the three key prevention strategies listed in the State Plan. These are:

1. Changing attitudes and behaviours;

2. Fostering organisations, communities and cultures that are gender equitable and non-violent; and

3. Promoting respectful and gender equitable relationships between men and women, boys and girls.

Using the information sourced from the consultation undertaken, the actions were prepared in collaboration with responsible Managers at the City of Greater Bendigo, the Steering Group and Project Reference Group.

Below is a summary of the actions in the draft Plan.

Changing attitudes and behaviours

Undertake a mapping exercise of current services available in relation to violence and develop a Community Engagement Plan that sets out how to disseminate the findings to the community and violence prevention sector.

Investigate community awareness strategies.

Develop a universal ‘slogan’ not condoning violence in any form and promote the slogan.

Work with local media to raise awareness around the issue.

Advocate for the continued operation of the Salvation Army 'Chill Out Space'.

Promote key dates such as White Ribbon Day.

Support the Safe Community Forum and Bendigo Liquor Accord in their community safety work.

Collaborate with key stakeholders who work in violence prevention.

Evaluate, review and renew this Plan.

Fostering organisations, communities and cultures that are gender equitable and non-violent

Newly elected Councillors to sign the ‘Greater Bendigo City Council says NO to violence against women’ position statement.

Develop a Greater Bendigo City Council Family Violence Prevention Policy.

Provide training to staff to build skills in relation to disclosures of family violence.

Gender Equity to be considered in Council Plan values and/or strategic directions.

Investigate ways to ensure gender equity is considered in all forms of community engagement.

Establish a reference group to consider joint action in relation to violence prevention.

Use CPTED (Crime Prevention Through Environmental Design) principles in the review of all City of Greater Bendigo Strategies.

Support the implementation of the Central Victorian Prevention of Violence against Women in our Community (Central Victorian Cluster) Project Plan.

Page 75: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 73

Promoting respectful and gender equitable relationships between men and women, boys and girls

Investigate and implement an effective parent program that has an underlying violence prevention focus.

Investigate and implement a violence prevention workplace policy and programs.

Develop a commitment statement to be signed by key leaders within the community.

Support and advocate resourcing for proven violence prevention programs as and when appropriate.

Investigate the feasibility of developing a City of Greater Bendigo internal White Ribbon Committee and provision of appropriate training.

Budget bid to be made each financial year to support initiatives associated with White Ribbon Day.

Explore the opportunity to include gender equality and respect clauses in the Internal Review of Grants Programs and other forms of financial assistance.

Advocate for the inclusion of school based programs that focus on gender equality and respect.

Ensure continual City representation on the Bendigo Elder Abuse Prevention Network.

In actioning the Violence Prevention Plan 2012-2015, the City of Greater Bendigo will assume many and varied roles. Some activities will require resource allocation through Council’s annual budget process. In addition to progress reports updating Council through the life of the Plan, the action plan will be evaluated at the end of its three year term and form the basis of the review and renewal of the Plan.

The overall implementation of the Plan will be driven by the Community and Cultural Development Unit. Evaluation and reporting will be undertaken by the Strategy Unit as specified in the Plan. Throughout the implementation of the action plan, the City of Greater Bendigo will continue to collaborate with service providers and stakeholders and build partnerships.

Priority/Importance:

Developing the Violence Prevention Plan is of high importance as it is listed as a key action in the Council Plan 2009/13 (updated 2011) action 3.7.2.

Timelines:

The draft Violence Prevention Plan will be out for community comment for a period of one month.

Risk Analysis:

The major risk is not planning to prevent violence in the community and a failure to adequately engage with the community, service providers and all units of the City of Greater Bendigo. Failure to engage sufficiently could result in:

Page 76: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 74

Developing a plan that has little ownership and therefore little energy to drive it forward;

Failing to harness and capitalise on existing strengths and resources from other services and the community;

Developing a Plan that has a limited focus; Missing out on opportunities to identify issues relevant to our community around this

issue; and Violence could continue to increase as shown in recent crime statistics.

The project brief includes two strategies to mitigate this risk. Provide a governance structure for developing the Violence Prevention Plan that

includes a cross section of City of Greater Bendigo staff as well as external input. Ensuring a communication and consultation process that ensures the input of a range

of service providers and community members.

Consultation/Communication

A range of consultation with key internal and external stakeholders, service providers and community members has been undertaken to ensure the Violence Prevention Plan is based on the needs and aspirations of people in Greater Bendigo. These included structured discussions with service providers and City of Greater Bendigo staff and a forum and workshop titled ‘Achieving respect and gender equality in Greater Bendigo’ that was attended by 100 people including service providers, local government and state government representatives, community members, sporting organisations and school children from Catholic College Bendigo. A background report was developed that provides an overview of relevant data and information to support the consultation undertaken.

The governance of the project has included a Project Reference Group and Steering Group. The Project Reference Group is made up of service providers who registered their interest to be part of the group. Their main role has been to provide feedback and advice throughout the development of the Plan.

The Steering Group has representatives from the City of Greater Bendigo from areas that will have a direct role in implementing the Plan. The main role of this group is to provide internal direction and feedback throughout the development of the Plan and support the Project Manager. Both groups were also expected to communicate the project development to their respective units/businesses and also to bring information to the group that would help in the development of the Plan.

Internal Consultation:

Internal Steering Group Meetings with key internal staff Meetings with Responsible Managers

External Consultation:

Project Reference Group Meetings with key stakeholders Workshop and Forum with 100 people attending

Page 77: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 75

Consultation will also occur when the draft Plan is out for community comment. The Project Manager will go to various stakeholders to seek their feedback on the Plan.

Resource Implications

The implementation of the City of Greater Bendigo Violence Prevention Plan will need to be resourced.

Budget Allocation in the Current Financial Year: $11,000Projected costs for future financial years: subject to annual budget allocations

Implementation of this Plan will require annual budget consideration each year.

Conclusion

The draft Violence Prevention Plan is now presented to Council for consideration and approval for release for community comment. Any comments received will be reviewed prior to presenting the final Plan to Council for adoption.

Attachments

1. Draft City of Greater Bendigo Violence Prevention Plan 2012-2015

RECOMMENDATION

That the Greater Bendigo City Council resolve to approve the public release of the draft Policy Statement and Violence Prevention Plan for one month for the purpose of inviting community comment, prior to consideration of the final Plan.

RESOLUTION

Moved Cr Reade, Seconded Cr Campbell.

That the recommendation be adopted.

CARRIED FOR VOTE - UNANIMOUSLY

Page 78: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 76

Page 79: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 77

Page 80: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 78

Page 81: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 79

Page 82: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 80

Page 83: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 81

Page 84: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 82

Page 85: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 83

Page 86: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 84

Page 87: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 85

Page 88: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 86

Page 89: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 87

Page 90: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 88

Page 91: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 89

Page 92: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 90

Page 93: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 91

Page 94: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 92

Page 95: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 93

Page 96: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 94

Page 97: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 95

Page 98: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 96

Page 99: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 97

Page 100: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 98

Page 101: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 99

4.2 2012 COUNCIL PLAN REVIEW - FINAL VERSION FOR ADOPTION FOLLOWING PUBLIC EXHIBITION

Author Lyn Talbot, Corporate and Community Planner, Strategy

Responsible Ross Douglas, Acting Director Planning & DevelopmentDirector

Summary/Purpose

This report details the outcomes of community consultation and public submissions after exhibition of the draft 2012 Council Plan. The report summarises the informal submissions made at a range of community consultation sessions and the written submissions received on the penultimate draft of the Council Plan. In each case officer responses are outlined in the report and the recommended changes are noted where appropriate.

The report recommends that the Council Plan 2009-2013 (Revised 2012) be adopted.

Policy Context

In accordance with Section 125 of the Local Government Act 1989 (the Act) an annual review of the Council Plan has been undertaken. Community participation in all aspects of the planning process is essential.

This broad review process ensures that Councils' strategic directions and agreed activities continue to be appropriately reflected in the Council Plan which in turn informsthe formulation of the budget and Directorate work plans for 2012-13.

After preparation of the draft Council Plan 2012 the draft has been used as the basis for community consultation sessions with a range of community groups as set out in the previous report to Council. A total of 134 community members took part in consultations and provided comment on the draft, including 64 years 9 and 10 students. Following Council endorsement of the penultimate draft of the 2012 Council Plan a copy has been made available for written and verbal public submissions. Written submission closed on Monday 4 June and verbal presentations to a committee of Councillors were invited from submitters, at the Council Forum at 5.00pm on June 6th.

Council Plan Reference:

The Vision contained within the Council Plan 2009-2013 (Revised 2012) is:

Greater Bendigo will be the best place to live, work and visit, where: Growth and living standards are managed to sustain and enhance quality of life A regional culture of learning, creativity and innovation allows people to flourish Its rich natural and cultural heritage is conserved for today and tomorrow Resilience, local spirit and identity are proudly celebrated.

Page 102: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 100

Background Information

Under Section 125 of the Act, Victorian local governments are required to prepare a Council Plan every four years. This is one of the most important activities a Council undertakes, as the Council Plan sets the vision and high level strategic objectives for the Council term (4 years), and guides at the highest level every other activity undertaken by the Council during that time. It is also a requirement that the Council Plan must also be reviewed at least annually to ensure it remains consistent with Council’s strategic direction.

To date: Councillors have provided information about emerging issues to be foreshadowed in

the Council Plan and advice about minor revisions needed to make the document more accessible.

City of Greater Bendigo Managers and Directors have added the key actions within their areas to achieve Council’s vision and maintain direction during the coming financial year.

Community members from a range of interest groups have contributed actively to the drafting process.

The draft Council Plan has been exhibited for public submissions for 30 days, and submitters have been provided with an opportunity to speak to their submissions, in accordance with the Local Government Act (1989).

Previous Council Decision Dates:

The City of Greater Bendigo Council Plan 2009-2013 was adopted by Council at its meeting of 17 June 2009.

The Council Plan 2009-2013 (Revised 2011) was adopted by Council at its meeting of 15 June 2011.

At the workshop at the Council Forum on 16 November 2011, Councillors identified a number of emerging issues which warrant a higher profile in Council Planning activities.

At the Council meeting of 4 May 2012, Council endorsed the draft Council Plan 2009-2013 (Revised 2012) for public exhibition and written submissions.

This iterative process of development and refinement is in accordance with the Communications Plan previously presented to the Councillors Forum in March 2012.

Report

After twelve months of use, the review process provides an important opportunity to examine how effectively the Council Plan is articulating and guiding implementation of Council priorities and directions in both a strategic and practical sense.

The revised 2012 Council Plan has been drafted:

Minor editorial changes have been made in order to clarify the policy and intent of the current Council directions.

Page 103: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 101

A range of factors and emerging issues have been presented which are continuing to shape the nature of Greater Bendigo. These include:

1. State and Federal focus on Regional Australia2. Supporting cultural diversity and tolerant neighbourhoods3. Approaches to supporting population behaviour change 4. Climate change adaptation and risk preparedness5. Our City: Planning for growth6. Access to high-speed broadband internet services.

A detailed overview is presented outlining the mechanisms by which community input and information relating to local priorities and population characteristics are brought for consideration into the Council Planning and budget processes.

Information relating to the altered municipal ward boundaries, Councillor representation and forthcoming election processes has been included.

Annual actions have been identified with an aim that they are clear, relevant, specific and measurable over the coming financial year.

Indicator statements have been revised and broadened.

The Financial Resource statements have been updated following detailed budget deliberations and advice from the Finance Manager.

Community consultation sessions have been conducted in accordance with the Community Engagement Strategy and the plan set out in the previous Council Report of 28 March, 2012.

The draft Council Plan 2012 was advertised for formal exhibition for 28 days, from Saturday 5 May, 2012.

Priority/Importance:

The project is high priority due to the statutory, functional and budgetary requirements associated with the Council Plan. In accordance with the Act a revised Council Plan must be adopted by Council prior to 30 June 2012.

Council is asked to formally adopt this revised Council Plan.

Risk Analysis:

It is noted that the combination of statutory timeframes for public exhibition and submission to the Minister, as well as Council meetings cycles can constrain the time for post evaluation of public submissions. While this impact was managed through a quick response to public submissions this year, there is a potential risk to effective reporting of public comment. Project planning for next years new Council Plan has commenced with a focus on continual improvement of process, engagement and outputs.

Page 104: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 102

Consultation/Communication

Internal Consultation:

Considerable internal consultation has occurred and each Manager and Director has been instrumental in assisting in developing the actions. The new actions from the 2012/13 Service Plan for each Unit were added directly into the revised Council Plan for 2012. Since then a process of refinement has been undertaken, including senior staff consideration of the recommendation made by community members during earlier community consultations and formal submissions on the penultimate draft. This final draft has a focus on major and new initiatives and planning activities to be undertaken in the year ahead. This process is also set out in the planning diagram contained in the Council Plan, 2012.

The processes of refining and expanding the range of indicators that are reported has continued. A number of changes have been made to the outcome indicators to be reported in the next cycle in response to changes in the Local Government Community Satisfaction Survey items prepared by the Department of Planning and Community Development. Some of the items are compulsorily reported by all Victorian Councils, and some have been chosen by the City of Greater Bendigo to best reflect the range and effectiveness of the Council Plan actions.

External Consultation:

Informal Community Consultation on the earlier Draft

Feedback on the anticipated Strategies and Actions for 2012-13 in the draft Council Plan has been gained from community members at a series of facilitated sessions which were mostly conducted as a part of community meetings that are already scheduled for another purpose, as set out in the table below.

Community Group Councillor & Staff Community

Bendigo Local Indigenous Council 2 staff 7

Bendigo Tourism Board 4 staff, 1 Councillor 9

Local Settlement Planning Group 2 staff 9

Women’s Health Loddon Mallee 1 staff 6

World Café- public consultation 3 staff, 1 Councillor 6

Catholic College Secondary Students (years 9 and 10)

2 staff 64

Bendigo Business Council 1 staff 9

Showcasing Eaglehawk 3556 event 1 staff 19

Youth Advisory Group 3 staff 5

TOTAL 134

Page 105: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 103

The active engagement by these groups in the development process and participants’ thoughtful responses suggest that targeted engagement strategies such as these provide a greater breadth of participation which are less resource intensive than methods previously used. A number of participants made very positive comments about City of Greater Bendigo major projects, new and ongoing activities and community engagement efforts in addition to the suggestions for change summarised below.

Number of existing actions endorsed = 43

Number of new actions included = 1 (see table below)

Number of additional recommendations supported which have been referred to the relevant directorate for consideration = 20

Number of additional suggestions, (including endorsements, suggested changes to Council directions and suggestions for the future) = 68

Table summarising proposed new action in the Council Plan

What we will do in 2012-2013

Community Feedback Recommendation

4.6 Demonstrate strong corporate governance

World Café

The process of budget prioritising needs to be transparent- major projects should be shown in forward estimates

Proposed major projects should have a clear business plan

Recommend New Action 4.6.2 - The planned activities in this area relating to best value reporting have been made explicit in a new action.

Refer also to Attachment A for a comprehensive table summarising all community feedback and suggested City of Greater Bendigo responses.

Formal Community submissions to the penultimate draft (with or without verbal presentation to Council).

In accordance with the requirements of the Local Government Act 1989, the Council Plan 2009-2013 (Revised 2012) was formally exhibited for 28 days.

Following the community consultation sessions and the period for public submissions all submissions were considered by Directors and Councillors. At a meeting of a Committee of the Council held on 6 June, 2012 at 5pm, June Houlahan and Ted Coleman (via teleconference) spoke to their submissions.

Page 106: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 104

The submissions and recommended actions are summarised in the following table.

Summary of Submission Officer Comments Recommendation

Lesley Burston

Calling for a feasibility study into the establishment of a new ice skating rink in Bendigo.

This is not in the work plan or budget for 2012-2013.

No change.The feedback has been forwarded to the Recreation team for consideration in their future work planning.

Chontel Stephenson

Requesting a purpose built ice sports facility be constructed in Bendigo with a commitment documented in the 2013-2017 Council Plan:

This is not in the work plan or budget for 2012-2013.

No change.

a number of prior submissions have been made; (following the 2010 presentation to Council the submitters were advised that Council decided on no action);

Submitters were advised that there was no change to the 2010 plan.

states a new rink has been promised ‘over a dozen times’;

This is not correct- no ‘promise’ has been made.

the health benefits of ice skating;

Council must balance the need to develop a range of major sporting facilities across the entire population, and account for the cost of their ongoing maintenance.

The feedback has been forwarded to the Recreation team for consideration in their future work planning.

options exist for co-construction at Schweppes Centre and as part of Kangaroo Flat aquatic development;

Potential to use such a facility for other activities in the summer period.

argument made about the link to action 2.1.5 in the Council Plan, and potential of such a facility to attract visitors etc.

Request to discuss these matters with relevant staff

Noted

Page 107: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 105

June Houlahan

No information on salary costs as a proportion of total income.

This information is reported in the Annual Report each year.

No change - continue Annual Report reporting format.

Airport upgrade wasted funds-should have acquired land for a new airport site.

Noted. No change.

Sandhurst Theatre is inappropriate - site should be levelled for expansion of BSSC.

The site is a State Registered Heritage building on Crown Land, so Council has no control. A partnership in funding for the development with schools was possible here which would not have been possible otherwise.

No change.

Move QEO to edge of Bendigo and expand Capital and Art Gallery to this site

QEO is also a State Registered Heritage site.

No change.

Walk Bendigo- Hargreaves Street an expensive mistake.

Walk Bendigo is more than Hargreaves Street and it is effective in its aim to calm traffic.

No change.

Bus interchange at Mitchell Street - crowding and lack of seating.

Improvements to the Mitchell Street interchange are ongoing.

No change -comments will be forwarded.

Library upgrade- lacks vision: will not be big enough to

meet future demands; façade is not in keeping with

Town Hall.

Careful planning based on projected needs, user behaviour and architectural advice has been undertaken.

No change-comments will be forwarded.

Need for increased CoGB staff accommodation: not supported - more

important issues; sufficient Government

buildings are available.

Noted: options to meet staff accommodation needs are all being considered.

No change.

Customer service staff are not aware of what has been said in the press.

Extensive customer service staff training is undertaken. Ongoing efforts are being made to enhance internal communication.

No change.

An internal cost-evaluation audit should be undertaken.

An ongoing cycle of financial audits is undertaken

No change.

Page 108: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 106

More lobbying is needed to bring additional manufacturing industry to Bendigo-unemployment of young people is leading to a range of anti-social behaviour.

Extensive lobbying on these and other Bendigo development needs is undertaken by CEO, Executive Staff and Councillors (see action 2.1). The Bendigo Manufacturers Group is partnering with CoGB in a youth employment options project.

No change (see action 2.1).

‘Big Ticket’ items are not enough – emphasis is needed on drainage, transport, employment, law and order:- Councillors are elected to oversee these matters.

Achieving a balance between current and future needs is always a challenge. A number of the matters raised are not the primary responsibility of Council.

Noted.

Ted Coleman

Most actions OK some omissions.

Noted. No change.

The ‘Plan is a Charter between Councillors, staff and community’- the statement is inaccurate.

As staff are responsible for Service Planning and implementing the actions, it mustbe an integrated collaborative process.

No change.

Comment about the lack of ‘match’ between budget and Council Plan.

The Council Plan includes the items that are not routine or day-to-day – thus they are new and unique.

The budget must include ALL activities, thus many routine activities are included in the budget that will not be in the Council Plan

The wording is consistent with the content of the documents and the processes being undertaken, and is in line with Local Government reporting requirements

No change.

Council Plan guides budget development.

Council Plan ‘sets out new and unique actions’.

Budget includes a number of items not listed in the Council Plan.

Strategic indicators:

2012-13 targets not shown. The presentation style is aimed at showing trend over time.

No change.

Some (process) indicators are ‘meaningless’.

Process indicators are an important way to track use of services and demand on service unit staff- they assist with planning and documenting activity.

No change.

Page 109: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 107

Council Plan Strategic indicators do not correlate with Budget Key Strategic Activity statements.

As explained in response above. No change.

Targets are not specific (new measure, equal to or greater than)

Where the wording ‘new measure’ is used this is a new question to be included in the next State government Customer Satisfaction Survey – there is no baseline measure as yet.

Where the wording ‘equal to’ or ‘greater than’ is used, a relevant measure from as previous year(s) is also included.

No change.

Not all actions are ‘new and unique’ –some are continuing.

Where the actions of an adopted Council Strategy are spread over a number of years, the strategy is not new, but it is included in the Plan, to reflect the new actions for the forthcoming year. (This has been carefully audited.)

No change.

Community Consultation – World café was ‘well meaning andpoorly delivered’.

The World Café is a very well recognised and widely used community discussion format. It formed part of an integrated consultation plan which exceeds the legislative requirement.

Noted.

A number of suggested principles (and values) were provided to be used to guide planning (such as equity, transparency, accountability, needs analysis).

Noted: The principles and values are developed and adopted by the Council when they formulate a new 4-year Council Plan.

Noted: These suggestions will be carried forward.

Economic Development ‘is a shocker' (? inference that many industry sectors are not included).

EDU staff work regularly across a range of industry sectors and manufacturers, undertaking a range of advocacy and lobbying activities on behalf of organisations and community members.

No change.

Council Plan 2013 should include provision for an independent external and public review.

Noted: A new Council Plan will be prepared in 2013- this provides an extensive opportunity for detailed internal and external review and renewal.

No change.

Page 110: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Community and Culture - Reports Ordinary Meeting - 13 June 2012

PAGE 108

Conclusion

Development of the Council Plan each year is an iterative process where the priorities of the full range of people affected by it are considered and incorporated where they fit with the stated priorities. These directions, initiatives and actions drive the Council budget.

Community consultation activities have provided a broad range of comments. A number of people taking part in these sessions endorsed current directions or suggested further strengthening of current actions. Many people also made more global comments about long term goals for Greater Bendigo. To make best use of this valuable community engagement in the future, especially because a new Council Plan will be developed next year, it is suggested that the community consultation period be conducted earlier in the development process (such as February 2013) when actions and budget are being developed, rather than when these decisions are almost finalised.

Formal community feedback on the penultimate draft has been conducted in accordance with the requirements of the legislation. Submissions made during this process have been considered in a similar process to that out above.

The final draft Council Plan 2009-2013 (Revised 2012) is now presented to Council for consideration.

Resource Implications

The Council Plan Review has been undertaken using internal staff resources. The advertising, design and printing cost are covered in the current budget.

Attachments

1. Draft Council Plan 2009-2013 (2012 Revision)

RECOMMENDATION

That the Greater Bendigo City Council resolve to adopt the draft Council Plan 2009-2013 (Revised 2012).

RESOLUTION

Moved Cr Fyffe, Seconded Cr Reade.

That the recommendation be adopted.

CARRIED

Page 111: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Our People, Our Processes - Reports Ordinary Meeting - 13 June 2012

PAGE 109

5. OUR PEOPLE, OUR PROCESSES

5.1 ACCOUNTS PAYABLE AND CONTRACTS AWARDED UNDER DELEGATION

Document Information

Author Janet Worthington, Accounts Payable OfficerLeeanne Taig, Administrative Assistant, Contract and Project

Coordination Unit

Responsible Marg Allan, Director Organisation SupportDirector

Summary/Purpose

The purpose of this report is to provide information on accounts payable issued under delegation.

Policy Context

Provide high quality professional services by undertaking responsible business planning to ensure long-term sustainability.

Report

Cheque Nos. 154307 to 154501 $ 1,023,170.33

Electronic Funds Transfer 084085 to 084920 $ 8,787,130.14

The pre-payments as listed above totalling $1,023,170.33 and Electronic Funds Transfer $8,787,130.14 are submitted for the information of Council.

Contracts Awarded under Delegation

The following contracts subject to public tender, have been issued under delegation by the officer as listed (Instrument of Delegation - August 5, 2009):

Page 112: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Our People, Our Processes - Reports Ordinary Meeting - 13 June 2012

PAGE 110

Attachments

1. A listing of the cheques and electronic funds transfer are included in the attachments to the Business Paper.

RECOMMENDATION

That the Delegated Authority for Accounts Payable and Contracts, as outlined in this report, be endorsed by Council.

RESOLUTION

Moved Cr Fyffe, Seconded Cr Reade.

That the recommendation be adopted.

CARRIED

Contract No

ProjectSuccessful Contractor

Value (GST Excl)

Delegated Officer

Date Signed

2554Stage 5 of the Loddon Mallee South Regional Growth Plans (LMS RGP)

The Trustee for Femoy Family Trust T/A Provincial Matters

37,800.00 Craig Niemann 17 May 2012

100003MAV – postbillpay Agreement

Australia PostAs per schedule of rates

Neal Wrigley 25 May 2012

Page 113: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Our People, Our Processes - Reports Ordinary Meeting - 13 June 2012

PAGE 111

5.2 RECORD OF ASSEMBLIES OF COUNCILLORS

Document Information

Author Peter Davies, Manager Executive Services

Responsible Craig Niemann, Chief Executive OfficerOfficer

Summary/Purpose

The purpose of this report is to provide the record of any assembly of Councillors, which has been held since the last Council Meeting, so that it can be recorded in the Minutes of the formal Council Meeting.

Policy Context

An amendment to the Local Government Act 1989, which came into effect on September 24, 2010, requires the record of any assembly of Councillors to be reported to the next practicable Council Meeting and recorded in the Minutes.

Background Information

The Local Government Act provides a definition of an assembly of Councillors where conflicts of interest must be disclosed.

A meeting will be an assembly of Councillors if it considers matters that are likely to be the subject of a Council decision, or, the exercise of a Council delegation and the meeting is:

1. A planned or scheduled meeting that includes at least half the Councillors (5) and a member of Council staff; or

2. an advisory committee of the Council where one or more Councillors are present.

The requirement for reporting provides increased transparency and the opportunity for Councillors to check the record, particularly the declarations of conflict of interest.

Report

Outlined below are the details of assemblies of Councillors held since the last meeting.

Page 114: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Our People, Our Processes - Reports Ordinary Meeting - 13 June 2012

PAGE 112

Meeting InformationMeeting Name/Type

Waste and Resource Management Advisory Committee

Meeting Date Tuesday May 8, 2012Matters discussed 1. Project Manager report

2. Strategy timelines and role of the Advisory Committee3. Stakeholder engagement planning4. Background paper5. Process for appointment of Committee Chair6. Feedback on meeting

Attendees/ApologiesCouncillors Cr Peter Cox

Cr Barry LyonsStaff/Community Representatives

Jeff CumminsRebecca DempseyVeronica HallChris HarringtonNicole HoodVerity LougoonGlenn MorrisonDanny PotterBrian StanmoreDarren FuzzardSusan HayesApology: Don Erskine

Conflict of Interest disclosuresMatter

No.Councillor making disclosure Councillor left meeting

Cr Cox declared a conflict of interest (indirect financial interest) due to his employment with Future Employment Opportunities.

No. This was a general declaration for the duration

of the committee term. Any specific conflicts will

be named as they arise in future meetings.

Page 115: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Our People, Our Processes - Reports Ordinary Meeting - 13 June 2012

PAGE 113

Meeting InformationMeeting Name/Type

Councillors' Forum

Meeting Date Wednesday May 9, 2012Matters discussed 1. Presentation on revaluation

2. Presentation from VATMI3. Parking at Kangaroo Flat Railway Station4. Proposed planning application for Howard Street/Strickland Street, Epsom5. Meeting with Shadow Parliamentary Secretary for Roads and Regional Transport6. Outdoor dining barriers7. Cost of vandalism8. Street signage9. Gaming Policy10. Positive feedback from residents of Mia Mia and Redesdale11. Completion of sewerage work in Heathcote12. Water for Lockwood South Bowling Club13. Supervision of infrastructure works14. Inventor Awards15. Vegetation removal from nature strips and road reserves - Notice of Motion16. Lopping of street trees17. Municipal Charge 2012/2013

Attendees/ApologiesCouncillors Cr Alec Sandner

Cr Rod FyffeCr Rod CampbellCr Peter CoxCr Barry LyonsCr Bruce PhillipsCr James ReadeCr Keith ReynardCr Lisa Ruffell

Staff/Community Representatives

Craig NiemannPauline GordonMarg AllanDarren FuzzardAndrew LyonsAlison CampbellApologies: Peter Davies, Prue Mansfield, Stan Liacos

Conflict of Interest disclosuresMatter

No.Councillor making disclosure Councillor left meeting

Yes / No

Page 116: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Our People, Our Processes - Reports Ordinary Meeting - 13 June 2012

PAGE 114

Meeting InformationMeeting Name/Type

Councillors' Forum

Meeting Date Wednesday May 16, 2012Matters discussed 1. Planning matters

2. General Business Late night food van trading Big Hill Enterprise Job losses at BRiT Bendigo Sustainability Group3. Draft Integrated Fire Management Plan4. Purchase of Third and Final Property required for Bendigo Airport expansion 5. Draft Agenda Review6. Second Tenancy at Edward Street Car Park7. Rate Modelling

Attendees/ApologiesCouncillors Cr Alec Sandner

Cr Rod FyffeCr Rod CampbellCr Peter CoxCr Barry LyonsCr Bruce PhillipsCr Keith ReynardApologies: Cr James Reade, Cr Lisa Ruffell

Staff/Community Representatives

Craig NiemannMarg AllanStan LiacosRoss DouglasRobyn MajorAndrew LyonsAlison CampbellApologies: Peter Davies, Prue Mansfield, Darren Fuzzard, Pauline Gordon

Conflict of Interest disclosuresMatter

No.Councillor making disclosure Councillor left meeting

6. Cr. Sandner Yes

Page 117: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Our People, Our Processes - Reports Ordinary Meeting - 13 June 2012

PAGE 115

Meeting InformationMeeting Name/Type

Heritage Advisory Committee

Meeting Date Thursday May 17, 2012Matters discussed 1. Boundary stones

2. Trade Directory/Promoting the Promoters/Restoring our Heritage3. Heritage Awards4. HAC submissions: - C162 Heritage Policy Citations Review - Gaol Redevelopment5. List of eyesores/buildings in danger6. Applications for demolition7. Applications for Heritage Restoration Loans8. Current amendments9. Archaeology Week

Attendees/ApologiesCouncillors Cr Peter CoxStaff/Community Representatives

Helen AshbyPeter BrooksLaurie BrownEmma BryantElaine DolingJordan GrenfellKay MacGregorDavid MulqueenKatie NolanRod SpittyNorm StimsonDarren WrightApologies: Peter Ellis, Di Smith

Conflict of Interest disclosuresMatter

No.Councillor making disclosure Councillor left meeting

Yes / No

Page 118: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Our People, Our Processes - Reports Ordinary Meeting - 13 June 2012

PAGE 116

Meeting InformationMeeting Name/Type

Planning Consultation Meeting - Liquor Licence for 107-115 Queen Street, Bendigo (Bendigo Cinemas)

Meeting Date Thursday May 24, 2012Matters discussed 1. Issues surrounding external surveillance of the building

and surrounding properties.2. On and off site management for anti-social behaviour.3. On and off site management of cinema rubbish.4. How the cinema is proposed to serve and monitor the service of alcohol.

Attendees/ApologiesCouncillors Cr ReadeStaff/Community Representatives

Bryce KilianAmy HickmanIan MontgomeryRon BolithoRepresentative from Blago on behalf of objectors

Conflict of Interest disclosuresMatter

No.Councillor making disclosure Councillor left meeting

Yes / No

RECOMMENDATION

That Council endorse the record of assemblies of Councillors as outlined in this report.

RESOLUTION

Moved Cr Reade, Seconded Cr Lyons.

That the recommendation be adopted.

CARRIED

Page 119: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Ordinary Meeting - 13 June 2012

PAGE 117

6. URGENT BUSINESS

Nil.

7. NOTICES OF MOTION

7.1 NOTICE OF MOTION - MAJOR PROJECTS POLICY

CR PETER COX

That it be the policy of this Council when considering all major projects, that Officer reports detail all associated expenditure so that Councillors are aware of total expenditure as a result of the major project.

Officer Comment (Marg Allan, Director Organisation Support):This matter has previously been raised at a Governance Meeting and Councillors were advised that the full cost of projects was being addressed by the organisation in the following way:

New Capital Expenditure (CapEx) process:

Prior to the annual CapEx budget process, a briefing session on Total Cost of Ownership (TCO) is discussed with Directors and Managers, as a key information requirement for projects to be submitted to Council

TCO is highlighted on a CapEx fact sheet for relevant staffNew CapEx bids are required to have a business case that includes project

objectives and scope; stakeholders; assumptions and constraints; social and environmental analysis; economic and financial analysis; risk analysis; procurement strategy; implementation and timing and other supporting documentation. The instructions for the business case document stresses the need for complete details so the Total End Cost (TEC) can be established

The CapEx business case document includes a financial analysis section to capture TCO and TEC information

All submissions are reviewed and the quality of the costing information is assessed/scored prior to the final review by the Executive Management Team and subsequent presentation to Councillors

Page 120: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Ordinary Meeting - 13 June 2012

PAGE 118

Additional Initiatives:

The Project Management Manual is currently being reviewed and will include instructions on this issue

The Building and Property Services Unit in conjunction with the Contract and Project Coordination Unit are working on establishing some standard building works specifications which will be used for both improving CapEx bids and the tendering process

Staff developing the scope for major projects are conscious of the need to be more explicit about all components associated with each project being included in the briefing for Council.

There will be some projects where consequential works will be budgeted separately and identified as an additional project, particularly where works do not have to be undertaken immediately. This is so that works can be staged over several financial years. This is particularly the case where there are major master plans with a range of components that need to be developed over a long period of time.

In all projects, particularly complex major projects, the certainty about total project cost becomes greater as the level of detail is developed. The cost of a project can change as detailed design and planning permits are completed, which further define the project and any additional works. Every effort is being made to factor these considerations at the start of the project planning.

The scope of the policy proposed by this motion would need further discussion to determine what is meant by a 'major project', however, the Total Cost of Ownership is being requested for all capital works projects.

RESOLUTION

Moved Cr Cox, Seconded Cr Campbell.

That it be the policy of this Council when considering all projects, that Officer reports detail all associated expenditure and consequential works so that Councillors are aware of total expenditure as a result of the project.

CARRIED

Page 121: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Ordinary Meeting - 13 June 2012

PAGE 119

7.2 NOTICE OF MOTION - POTENTIAL SALE OF MULTI-STOREY CAR PARKS

CR PETER COX

That the Chief Executive Officer present a comprehensive report to Council on the merits or disadvantages of Council selling its multi-storey car parks and that the recommendation in the report be debated at a Council Meeting.

Officer Comment (Ross Douglas, A/Director, Planning and Development):In 2009, Councillors requested an analysis of the cost benefit of selling the current multi storey car park, (MSCP) in Hargreaves Street, with the intention of using the capital funds released to part fund the proposed new car park. This analysis has concluded that the ongoing income derived from the ownership and operation of the car park, means selling it would be financially disadvantageous to the City. Given the indefinite life and use of the facility provides a long term income stream, any short term financial advantage to the financing of any new facility would be quickly offset.

There was discussion about whether the MSCP should be sold to generate funds for other projects. It was considered that the car park should be retained and funds generated could be used to service loans to fund other projects. The profit from the car park year-to-date, is $206,074, excluding depreciation.

The Council concluded to not sell the MSCP in Hargreaves Street at that time.

With respect to the new car park, any sale is highly premature. The car park needs to be finished, opened and operating before any consideration is given to a potential sale. There are many commercial considerations associated with the Edward Street Car Park.

RESOLUTION

Moved Cr Cox, Seconded Cr Ruffell.

That the motion be adopted.

LOST

Page 122: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Ordinary Meeting - 13 June 2012

PAGE 120

7.3 NOTICE OF MOTION - PRODUCTIVITY AND EFFICIENCY

CR PETER COX

That Council establish a committee to analyse potential improved productivity and efficiency within the 2012/2013 budget and that the committee report back to Council before the end of August 2012 so that consideration can be given to its recommendations before the end of this Council's term in office and that two external representatives be asked to sit on the committee.

Officer Comment (Marg Allan, Director, Organisation Support):

1. The CoGB has already committed to achieving productivity and efficiency improvements in 2012/13. The proposed budget is predicated on achieving $600,000 of efficiencies in order to fund the service and works Council has indicated it intends to deliver. To achieve this, Council staff will be required to review service areas to find savings. An organisational process is currently being established to find these required savings by December 31, 2012.

2. Work has begun to implement a review process to achieve the $600,000 savings through process efficiency. It would be preferable to wait until this initial target was realised following which a more systematic approach should be undertaken.

3. In addition, the suggested timeframe does not allow for proper and transparent process to appoint the independent members, however the Council’s Audit Committee has been appointed through such a process, and may be able to assist in this project.

4. The Audit Committee Charter which was reviewed and adopted by Council on May 23, 2012. The charter includes ‘The main objectives of the Audit Committee are to assist the Councillors, management and staff by providing independent appraisals of:

Internal control systems; The arrangements in place to safeguard assets and resources; The efficiency and cost effectiveness of the use of assets and resources; Compliance with legislative requirements and Council's policies and

procedures; The integrity of information; Organisational effectiveness in terms of program efficiency and economy

against the Corporate Plan; The effectiveness of the internal and external audit functions and the

communication between the external auditor, internal audit, management and the Council; and

Page 123: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Ordinary Meeting - 13 June 2012

PAGE 121

To provide timely advice to Council on any matters which may be referred to it by Council.’

5. Given that the Audit Committee is specifically appointed for the purposes outlined above, which cover efficiency and cost effectiveness of operations it would be appropriate for the Audit Committee to assist in the review.

6. In January, the Council considered a petition regarding a review of the organisation and potential savings. The Council did not support the proposed review because existing reviews and specific independent reviews initiated from time to time were considered adequate.

RESOLUTION

Moved Cr Cox, Seconded Cr Ruffell.

That the motion be adopted.

LOST

Cr Cox called for a division on the voting for the motion.

Those voting in the favour of the motion:Crs Cox and Ruffell

Those opposed to the motion:Crs Sandner, Campbell, Fyffe, Lyons, Phillips, Reade, Reynard

Page 124: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Ordinary Meeting - 13 June 2012

PAGE 122

8. COUNCILLORS' REPORTS

Cr Reade reported on working with a remote Aboriginal community in the Northern Territory; a meeting with La Trobe University planning students; attendance at a meeting of the Foundation of Young Australians.

Cr Reynard reported on his attendance at a meeting at the Strathfieldsaye Primary School; meeting with a student regarding the climate change law; meeting with a resident regarding a planning amendment for a bio-waste facility; attendance at the Natural Environment Advisory Committee meeting; attendance at the Bendigo Manufacturing Group breakfast meeting.

Cr Ruffell reported on the conduct of a Listening Post at the Holdsworth Road Milkbar and her attendance at the Airport Advisory Committee Meeting.

Cr Phillips reported on the official role of opening the 2012 Nara Dreaming Exhibition; a meeting about the Marong Structure Plan; attendance at a meeting of the Rural Support Network; attendance at the opening of an exhibition centre established by the Northern United Farm Forestry Group and a meeting about the Maiden Gully Structure Plan.

Cr Cox reported on an issue raised at the Eaglehawk Listening Post of trucks utilising Lester Street, Eaglehawk; attendance at the Changeover Dinners for the Eaglehawk Lions and Y Service Clubs; attendance at a number of planning consultation meetings; reported on the return of Team 28 from Maubisse; advised of the Truscott Stadium opening in the very near future.

Cr Lyons reported on his attendance at a number of consultation meetings; attendance at the Bendigo Tourism Meeting; attendance at the Bendigo Stadium Meeting; attendance at a Calder Highway meeting; attendance at a meeting of the Kangaroo Flat Community House; attendance at a breakfast meeting of the Bendigo Manufacturers Group; attendance at a meeting at Dower Park.

Cr Fyffe reported on his attendance at a Writers' Festival Meeting; attendance at the launch of the Raw Arts Festival; attendance at a Fire Management Committee meeting; attendance at Chrysler Car exhibition; attendance at a meeting of the 15th Transport Squadron and attendance at the Youth Choir concert at the Capital.

Cr Campbell reported on a meeting of the Barrack Reserve Committee; attendance at the Biggest Morning Tea event at Axedale; attendance at a meeting of the Goldfields Local Learning Employment Network; attendance at the McIvor Mews opening; attendance at the meeting of the Municipal Emergency Management Planning Committee; attendance at the Rural Consultative Committee meeting; conduct of a Listening Post at Heathcote; attendance at the Chrysler Vehicle exhibition; attendance at a meeting at Knowsley and attendance at the opening of the art exhibition at Heathcote.

Page 125: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Ordinary Meeting - 13 June 2012

PAGE 123

9. MAYOR'S REPORT

His Worship the Mayor, Cr Alec Sandner, tabled a report on his attendance at the following meetings and events:

• Attended interviews with Bendigo Advertiser, ABC Radio, WIN News and Phoenix FM. • Met with various residents and groups regarding a range of issues.• Attended the Catholic College Education Conference Dinner.• Participated in media opportunity presentation of Easter Festival donations from 15th

Transport to Legacy and Cancer Council.• Attended the Bendigo TAFE Annual General Meeting. • Attended a morning tea to commemorate 30th participant from region to be enrolled in an

international health ageing study ASPREE (ASPirin In Reducing Events in the Elderly).• Attended a VCAT hearing at the Bendigo Law Courts.• Attended a presentation by Trevor Budge - The Future of Central Victoria: Challenges &

Opportunities.• Greeted the Anglican Archbishop of Melbourne the Most Reverend Dr Philip Freier and

his wife Joy Freier.• Attended the media briefing for the 2012/2013 City of Greater Bendigo budget. • Attended the Reconciliation Week Event at Bendigo Senior Secondary College.• Chaired the Special Meeting of Council (to consider the draft Budget and associated

reports required to facilitate conflicts of interests).• Chaired the Presentation and Strategy Forum. • Attended the Worldwide President of Mothers' Union, guest speaker: Rosemary

Kempsell at The Baptist Centre.• Attended and spoke at the RAW Arts Awards at Dudley House.• Attended the Life Members Dinner - Spring Gully United Soccer Club.• Attended a performance by the Bendigo Youth Choir at The Capital.• Chaired the Loddon Campaspe Councils meeting.• Attended a morning tea and presentation to thank and acknowledge the generous support

of the 2012 Easter Festival Sponsors.• Attended the Farming Consultative Committee meeting. • Attended the launch of the City of Greater Bendigo’s branding video.• Chaired the Planning and Implementation Forum.• Attended the Regional Cities Victoria meeting.• Attended the 150th Year Gala Dinner Sandhurst Football Netball Club Inc.• Attended and participated in the presentations for the Central Victorian Chrysler Car Club.• Attended participated in presentations for the Regional Challenge Cup - Football

Federation Victoria at the Epsom Huntly Recreation Reserve. • Attended the Energy for the Regions Forum held in Melbourne. • Attended an on-site meeting at 193-197 Wattle Street, Bendigo regarding the planning

applications DU 891/2011 proposed Victory College Secondary Campus.

Page 126: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Ordinary Meeting - 13 June 2012

PAGE 124

10. CHIEF EXECUTIVE OFFICER'S REPORT

The Chief Executive Officer, Mr Craig Niemann, tabled a report on his attendance at the following meetings and events:

Attended a meeting of the Youth Partnership Governance Board Attended presentation by Dan Atkins - Managing Director, Shaper Group, regarding

Re-Shaping Business in a Carbon Constrained Economy. Attended meeting of Regional Strategic Plan Leadership Group Attended Community and Candidate Information Session for 2012 Council Election Attended meeting of the Bendigo Trust Board Attended media briefing regarding 2012/2013 City of Greater Bendigo Budget Attended Faith in Fashion Exhibition to meet with Anglican Archbishop The Most

Reverend Dr Philip Freier Attended MAV CEO Forum Participated in a number of radio and media interviews Attended Loddon Mallee South Regional Growth Plan meeting Attended meeting of Loddon Campaspe Councils Attended on site car park meeting Presentation to Department of Planning and Community Development planning

session Attended meeting with Steve Gibbons Attended Regional Development Australia committee meeting Met with Leigh Harry - CEO Tourism Victoria Attended meeting with Minister of Education

11. CONFIDENTIAL (SECTION 89) REPORTS

11.1 Personnel Matter and Contractual Matter

RECOMMENDATION

That the meeting be closed to the public to consider a report in accordance with Section 89(2)(a) and (d) of the Local Government Act 1989, as amended, relating to a personnel and a contractual matter.

RESOLUTION

Moved Cr Reade, seconded Cr Fyffe.

That the recommendation be adopted.

CARRIED

Page 127: City of Greater Bendigo Council Meeting Minutes - 13 June 2012

Ordinary Meeting - 13 June 2012

PAGE 125

There being no further business, the meeting closed at 8:40 pm.

Confirmed: