ADDENDUM NO. 2
ISSUE DATE: December 21, 2018 IFB. No. 99035 TITLE: CENTERVILLE TURNPIKE BRIDGE REHABILITATION ISSUED BY: Keishla Perez, Procurement Specialist I
City of Chesapeake Purchasing Division 306 Cedar Road 5th Floor Chesapeake, Virginia 23322
DEPARTMENT: Department of Public Works
This addendum consists of _84_ pages, including attachments.
THE ABOVE REFERENCED SOLICITATION IS HEREBY CHANGED AS FOLLOWS:
CONTRACT DOCUMENTS & SPECIAL PROVISIONS:
Section 102 Changed From:
The CITY OF CHESAPEAKE, VIRGINIA will receive sealed Bids for the above titled Project at the office of the
Procurement Administrator in the Purchasing Department, located at 5th Floor, City Hall Building, 306 Cedar Road,
Chesapeake, Virginia 23322, until 2:00 p.m. local time on January 9, 2019, at which time the Bids will be publicly opened
and read aloud. Any Bids received after the specified time and date will not be considered.
Questions regarding this project must be submitted in writing via email to Keishla Perez, ([email protected]),
by 5:00 p.m., Friday, December 21, 2018.
Changed To: The CITY OF CHESAPEAKE, VIRGINIA will receive sealed Bids for the above titled Project at the office of the
Procurement Administrator in the Purchasing Department, located at 5th Floor, City Hall Building, 306 Cedar Road,
Chesapeake, Virginia 23322, until 2:00 p.m. local time on January 16, 2019, at which time the Bids will be publicly
opened and read aloud. Any Bids received after the specified time and date will not be considered.
Questions regarding this project must be submitted in writing via email to Keishla Perez, ([email protected]),
by 5:00 p.m., Thursday, January 3, 2019.
DRAWINGS:
Not Applicable
CLARIFICATIONS:
1. There seems to be some info missing info. Ex: appendix A,B,C Answer: items have been posted.
2. Reference drawings original machinery drawings Answer: drawings available are posted; city does not have any additional drawings available.
Page 1 of 84
ALL INQUIRIES FOR INFORMATION SHOULD BE DIRECTED TO KEISHLA PEREZ, PROCUREMENT SPECIALIST I, PHONE: (757) 382-6359, FAX: (757) 382-6900, Email: [email protected].
3. Appendices A-C are sited in the Special Provisions, however they are not provided. Please provide
Appendix A, B, and C. Answer: appendices A, B and C are posted.
4. The Timber Pile Repairs call for 5,000 PSI Concrete. Could this be replaced with an epoxy grout that meets or exceeds the compressive strength requirement? Answer: Epoxy grout with a minimum 5,000 psi compressive strength may be substituted for the 5,000 psi concrete in the Timber Pile Repairs.
5. Specs state that a Sediment Bond requires a letter from the surety in the amount listed in Section 102. The Erosion and Sediment Control Surety Bond amount value is blank in the proposal. Please identify the bond amount. Answer: the performance/ defect and the r/w bond that will be issued for the project incorporates the E & S items per requirements in the project plans. Therefore, a separate E & S Surety bond is not required.
6. We would like to request that the owner to extend the bid date to February 6, 2019, and the last date for questions to January 18, 2019, for the following reasons:
Movable bridge repairs are highly technical, and require substantial coordination between trades. The advertisement period would be challenging without the holidays occurring in the middle of it.
The owner has allowed only 2 days after the planned site visit to submit questions. We do not feel that this is sufficient time to reconcile the existing conditions found during the site visit with the plans that were issued and submit any necessary questions.
Answer: bid dates have been addressed and will be posted in addendum.
7. What is the linear footage of the pile jackets required for the project? The Plans show the piles requiring encasement (S-13) and how encasement is to be achieved (S-14) including extending the encasement to 2’ below the mud line. But no elevation is given for the mud line or the bottom of the encasement. Answer: Existing mud line at the piles supporting the tender house should be anticipated to be Elev. -9 ft. with a +/- 2 ft. variation in that elevation expected.
8. Note 5 on SD-1 directs the contractor reinstall waterway signs at the end of the project. Note 30 on G-
3 says the owner will reinstall the signs. Please clarify. Answer: Note 5 on Sheet SD-1 should be replaced in its entirety with the following: “UNLESS OTHERWISE DIRECTED BY THE OWNER, REMOVE EXISTING BRIDGE WATERWAY SIGNS ON THE EAST AND WEST SIDES OF THE SWING SPAN AND SALVAGE FOR REINSTALLATION AFTER PAINTING OF THE SWING SPAN IS COMPLETED. REMOVE AND PROPERLY DISPOSE OF EXISTING STEEL SIGN SUPPORTS WELDED TO THE STRUCTURAL STEEL. THE OWNER WILL BE RESPONSIBLE FOR REINSTALLATION OF THE SIGNAGE.”
9. During the Pre-Bid conference, it was stated that some existing bridge drawings were available. It was my understanding that they were issued as a part of Addendum 1, but, I have not been able to locate them. Please advise where these drawings are located in Addendum 1, or make them available under a separate addendum, whichever is applicable. Answer: These items will be posted.
10. VDOT allows vibratory for installation of pile at the discretion of the engineer. Vibratory hammer can be used to install non-structural timber fender piles. Answer: A vibratory hammer may be used for installation of the timber fender piles. The contractor is responsible for selecting, sizing, and providing the proper hammer for pile installation.
Page 2 of 84
ALL INQUIRIES FOR INFORMATION SHOULD BE DIRECTED TO KEISHLA PEREZ, PROCUREMENT SPECIALIST I, PHONE: (757) 382-6359, FAX: (757) 382-6900, Email: [email protected].
11. On page 110-125 of Addendum 1, Backfill is stated to be Clean, Washed concrete grade sand. On
plan sheet ME-23, Note 5 states that we will backfill with previously excavated material. Which note governs? Answer: The cable trench may be back filled with the previously excavated material. Any additional fill required shall meet the referenced requirements of 60.04 C – Back Fill.
12. Does this Project require all, or any portions of the Project for materials to be sourced as "Buy America?" If portions are required to be "Buy America", then please specify the scope. Answer: Project does not include the Buy America requirements.
13. Are there any drawings associated with any possible north and south end road construction for tis project available? Answer: No road project plans are associated or available with roadway construction on Centerville Turnpike.
14. Is a Virginia GC License required to be this project? Answer: Yes
ATTACHMENTS:
o SPECIFICATIONS: Not Applicable
o DRAWING SHEETS:
Centerville Turnpike Bridge Original (1955) Drawings…………………………….(40 Pages)
Centerville Turnpike Bridge Rehab (1987) Drawings……………………..(41 Pages)
Note: A signed acknowledgment of this addendum must be received at the location indicated on the IFB either prior to the bid date and hour, or attached to your bid. Signature on this addendum does not substitute for your signature on the original bid document. The original bid must be signed.
NAME AND ADDRESS OF FIRM:
___________________________________________________ Date: ________________________________________________
______________________________________________ By: _________________________________________________ (Signature In Ink)
______________________________________________ Name: _______________________________________________ (Please Print)
______________________Zip Code: ___________ Title: ___________________________________________
END OF ADDENDUM NO.2
ALL OTHER TERMS, CONDITIONS AND SPECIFICAIONTS SHALL REMAIN UNCHANGED.
Page 3 of 84
Page 4 of 84
Page 5 of 84
Page 6 of 84
Page 7 of 84
Page 8 of 84
Page 9 of 84
Page 10 of 84
Page 11 of 84
Page 12 of 84
Page 13 of 84
Page 14 of 84
Page 15 of 84
Page 16 of 84
Page 17 of 84
Page 18 of 84
Page 19 of 84
Page 20 of 84
Page 21 of 84
Page 22 of 84
Page 23 of 84
Page 24 of 84
Page 25 of 84
Page 26 of 84
Page 27 of 84
Page 28 of 84
Page 29 of 84
Page 30 of 84
Page 31 of 84
Page 32 of 84
Page 33 of 84
Page 34 of 84
Page 35 of 84
Page 36 of 84
Page 37 of 84
Page 38 of 84
Page 39 of 84
Page 40 of 84
Page 41 of 84
Page 42 of 84
Page 43 of 84
Page 44 of 84
Page 45 of 84
Page 46 of 84
Page 47 of 84
Page 48 of 84
Page 49 of 84
Page 50 of 84
Page 51 of 84
Page 52 of 84
Page 53 of 84
Page 54 of 84
Page 55 of 84
Page 56 of 84
Page 57 of 84
Page 58 of 84
Page 59 of 84
Page 60 of 84
Page 61 of 84
Page 62 of 84
Page 63 of 84
Page 64 of 84
Page 65 of 84
Page 66 of 84
Page 67 of 84
Page 68 of 84
Page 69 of 84
Page 70 of 84
Page 71 of 84
Page 72 of 84
Page 73 of 84
Page 74 of 84
Page 75 of 84
Page 76 of 84
Page 77 of 84
Page 78 of 84
Page 79 of 84
Page 80 of 84
Page 81 of 84
Page 82 of 84
Page 83 of 84
Page 84 of 84