CITY of ALBUQUERQUE TRAFFIC NEWS · CITY of ALBUQUERQUE TRAFFIC NEWS This report does not contain...
Transcript of CITY of ALBUQUERQUE TRAFFIC NEWS · CITY of ALBUQUERQUE TRAFFIC NEWS This report does not contain...
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 08-Jun-18 through 08-Jun-18
All Scheduled Work is Weather Permitting
NORTHEAST North of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2018020821EXC
ACADEMY From LAYTON To EUBANK
Place conduit.
05/23/2018 through 06/19/2018
ADB- Rosemary Garcia, (505) 934-1175Contact :
Project Date(s) :
:Details Eastbound right lane and sidewalk closures on Academy between Layton and Eubank. Trafficwill be maintained in the inside lane.
LANE CLOSURE FROM 7:00 AM to 7:00 PM ONLY
Permit NumberLocationProject
:
:
:
2018021516EXC
ACADEMY and EUBANK INTERSECTION
Place conduit.
06/04/2018 through 06/11/2018
ADB- Rosemary Garcia, (505) 934-1175Contact :
Project Date(s) :
:Details Eastbound right lane closure on Academy east of Eubank.Northbound right turn lane closure on Eubank south of Academy.Traffic will be maintained in the inside lanes on both roads.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Permit NumberLocationProject
:
:
:
2018021680EXC
ACADEMY From WYOMING To TRAMWAY
Retrofit LED fixtures to streetlights.
06/05/2018 through 07/05/2018
BIXBY- Chris Perez, (505) 366-4660Contact :
Project Date(s) :
:Details Eastbound and Westbound right lane and sidewalk closure using Truck Mounted Mobileoperation on Academy between Wyoming and Tramway.Traffic will be maintained in the inside lane in both directions.Closure on both sides of the road simultaneously will not be permitted.Closure at the major intersection will be from 4:00am to 6:00am.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Thu, June 07 2018Page 1 of 25
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 08-Jun-18 through 08-Jun-18
All Scheduled Work is Weather Permitting
NORTHEAST North of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2018021674SU
ALAMEDA From WASHINGTON To BALLOON MUSEUM
Replace manhole ring, cover, and concrete collar.
06/06/2018 through 06/14/2018
ABCWUA- Felimon Martinez, (505) 977-1265Contact :
Project Date(s) :
:Details Westbound right lane closure on Alameda between Washington and past Balloon Museum.
LANE CLOSURE FROM 9:00 AM to 4:00 PM ONLY
Permit NumberLocationProject
:
:
:
2018021713EXC
4221 BALLOON PARK NE
Pull fiber to address.
06/08/2018 through 06/08/2018
KELLY CABLE - James Richardson, (505) 343-1144Contact :
Project Date(s) :
:Details
Permit NumberLocationProject
:
:
:
2018020926EXC
CARLISLE From MONTGOMERY To COMANCHE
Replace sidewalk, drivepads, curb/gutter, and ADA ramps.
05/04/2018 through 06/15/2018
ALBUQUERQUE ASPHALT- Brian W Loughridge, (505) 991-5916Contact :
Project Date(s) :
:Details Phase I (5/4 thru 5/20): Continuous southbound right lane and sidewalk closure, which willincrease to a double right lane closure between 9AM and 4PM. SB traffic will be reduced to onelane.
Phase III (5/21 thru 6/8): Continuous northbound right lane and sidewalk closure, which willincrease to a double right lane closure between 9AM and 4PM. NB traffic will be reduced toone lane.
Various turn and thru lane closures will be in place at each signalized intersection. Traffic flowwill be maintained by a flagging operation.
This traffic control setup includes a flagging operation, use caution and be prepared to stop.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Thu, June 07 2018Page 2 of 25
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 08-Jun-18 through 08-Jun-18
All Scheduled Work is Weather Permitting
NORTHEAST North of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2018021593EXC
2114 CLAREMONT NE
Install anodes.
06/04/2018 through 06/08/2018
NM GAS- Gary Vigil, (505) 697-3121Contact :
Project Date(s) :
:Details Eastbound parking lane and sidewalk closure on Claremont east of Princeton.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Permit NumberLocationProject
:
:
:
2018021380EXC
COMANCHE From CARLISLE To LAFAYETTE
Install landscaping.
05/21/2018 through 06/15/2018
LEE LANDSCAPES - Lee Scott , (505) 822-8722Contact :
Project Date(s) :
:Details Westbound sidewalk closure on Comanche between Tulane and Lafayette.
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Permit NumberLocationProject
:
:
:
2018021588EXC
14124 COPPER NE
Install anodes.
06/04/2018 through 06/08/2018
NM GAS- Gary Vigil, (505) 697-3121Contact :
Project Date(s) :
:Details Westbound sidewalk closure on Copper east of Jewel.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Permit NumberLocationProject
:
:
:
2018021700EXC
COPPER From WYOMING To GENERAL MARSHALL
Breakout and raise valve.
06/08/2018 through 06/15/2018
ABCWUA - Joshua Doyle, (505) 289-3331Contact :
Project Date(s) :
:Details Westbound left turn lane closure on Copper east of Wyoming.
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Thu, June 07 2018Page 3 of 25
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 08-Jun-18 through 08-Jun-18
All Scheduled Work is Weather Permitting
NORTHEAST North of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2018021684EXC
DOROTHY From LINN To BUENA VENTURA
Bore electric line.
06/06/2018 through 06/11/2018
R.C. Directional Drilling INC- Rodney Chavez, (505) 507-8297Contact :
Project Date(s) :
:Details
Permit NumberLocationProject
:
:
:
2018021673SU
EDITH From FRUIT To MARQUETTE
Replace manhole ring, cover, and collar.
06/06/2018 through 06/14/2018
ABCWUA- Felimon Martinez, (505) 977-1265Contact :
Project Date(s) :
:Details
Permit NumberLocationProject
:
:
:
2018021557EXC
1905 EUBANK NE
Remove sidewalk around hydrant.
05/31/2018 through 06/13/2018
ABCWUA - Jerry Sanchez, (505) 289-3585Contact :
Project Date(s) :
:Details Southbound sidewalk closure on Eubank north of Indian School.
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Permit NumberLocationProject
:
:
:
2018021670EXC
EUBANK From OSUNA To SPAIN
Replace underground cable.
06/06/2018 through 06/14/2018
HIGH 5 NETWORKS Miguel Holguin , (505) 934-2175Contact :
Project Date(s) :
:Details LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Southbound right lane and sidewalk closure on Eubank between Osuna and Spain. Traffic willbe maintained in the inside lane.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Thu, June 07 2018Page 4 of 25
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 08-Jun-18 through 08-Jun-18
All Scheduled Work is Weather Permitting
NORTHEAST North of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2018020923EXC
EUBANK From ACADEMY To SPAIN
Place conduit.
05/23/2018 through 06/15/2018
ADB- Rosemary Garcia, (505) 934-1175Contact :
Project Date(s) :
:Details Southbound right lane and sidewalk closure on Eubank between Academy and Spain. Trafficwill be maintained in the inside lane.
LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.
Permit NumberLocationProject
:
:
:
2018021697EXC
5700 HARPER NE
Emergency leak repair.
06/02/2018 through 06/15/2018
ABCWUA- Fran Smull, (505) 259-3501Contact :
Project Date(s) :
:Details
Permit NumberLocationProject
:
:
:
2018021012EXC
HOLLY From SAN PEDRO To VILLE
Nondescript utility, concrete, and asphalt work.
05/09/2018 through 06/08/2018
CUSTOM GRADING INC- Mario Medina, (505) 897-4225Contact :
Project Date(s) :
:Details Total eastbound closure on Holly between San Pedro and Ville.
Follow detour
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Thu, June 07 2018Page 5 of 25
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 08-Jun-18 through 08-Jun-18
All Scheduled Work is Weather Permitting
NORTHEAST North of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2018021525EXC
JUAN TABO From EUBANK To VILLA
Place conduit.
06/04/2018 through 06/11/2018
ADB- Rosemary Garcia, (505) 934-1175Contact :
Project Date(s) :
:Details Eastbound right lane and sidewalk closure on Juan Tabo between Eubank and Villa. Traffic willbe maintained in the inside lane.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Permit NumberLocationProject
:
:
:
2018021549EXC
2405 JUAN TABO NE
Remove sidewalk.
05/31/2018 through 06/13/2018
ABCWUA - Jerry Sanchez, (505) 289-3585Contact :
Project Date(s) :
:Details Westbound right lane and sidewalk closure on Menaul east and west of Juan Tabo. Traffic willbe maintained in the inside lanes.Southbound right lane and sidewalk closure on Juan Tabo north of Menaul. Traffic will bemaintained in the inside lanes.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Permit NumberLocationProject
:
:
:
2018021747EXC
110 JUAN TABO NE
Emergency - Failed Sewer City Connection
06/06/2018 through 06/08/2018
PLUMBING EXPRESS- Stephen Williams, (505) 417-0993Contact :
Project Date(s) :
:Details Northbound right lane and sidewalk closure on Juan Tabo between Central and Linn. Traffic willbe maintained in the inside lanes.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Thu, June 07 2018Page 6 of 25
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 08-Jun-18 through 08-Jun-18
All Scheduled Work is Weather Permitting
NORTHEAST North of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2018021412EXC
JUAN TABO From LOMAS To CONSTITUTION
Replace sidewalk, drivepads, curb/gutter, and ADA ramps.
05/25/2018 through 06/15/2018
ALBUQUERQUE ASPHALT- Brian W Loughridge, (505) 991-5916Contact :
Project Date(s) :
:Details Phase I: Continuous northbound right lane and sidewalk closure, which will increase to a doubleright lane closure between 9AM and 4PM. NB traffic will be reduced to one lane.Phase II: Continuous southbound right lane and sidewalk closure, which will increase to adouble right lane closure between 9AM and 4PM. SB traffic will be reduced to one lane.Various turn and thru lane closures will be in place at Lomas and Constitution. Traffic flow willbe maintained by a flagging operation.EXPECT DELAYS
Permit NumberLocationProject
:
:
:
2018021701EXC
2201 LOUISIANA NE
Emergency leak repair.
06/01/2018 through 06/14/2018
ABCWUA- Fran Smull, (505) 259-3501Contact :
Project Date(s) :
:Details Southbound right lane closure on Louisiana between Americas Parkway and Uptown. Traffic willbe maintained in the inside lanes.
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Permit NumberLocationProject
:
:
:
2018021679EXC
LOUISIANA From MONTGOMERY To CONSTITUTION
Retrofit LED fixtures to streetlights.
05/31/2018 through 06/29/2018
BIXBY- Daniel Chavez, (505) 842-5384Contact :
Project Date(s) :
:Details Northbound and Southbound right lane and sidewalk closure using Truck Mounted Mobileoperation on Louisiana between Montgomery and Constitution.Traffic per direction will be maintained in the inside laneClosure on both side of the street simultaneously is not permitted.Closure on all major intersection will be from 4:00am to 6:00am.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Thu, June 07 2018Page 7 of 25
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 08-Jun-18 through 08-Jun-18
All Scheduled Work is Weather Permitting
NORTHEAST North of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2018021720EXC
1601 MARTIN LUTHER KING NE
Emergency sewer televising.
06/05/2018 through 06/18/2018
ABCWUA - Nikhil Lucas Kamat, (505) 289-3536Contact :
Project Date(s) :
:Details
Permit NumberLocationProject
:
:
:
2018021545SU
MENAUL From CAMBRIDGE To BEAR DANCER
Replace manhole ring, cover, and collar.
05/30/2018 through 06/08/2018
ABCWUA- Felimon Martinez, (505) 977-1265Contact :
Project Date(s) :
:Details Southbound left turn lane closure on Punta De Vista Dr. north of Menaul.Westbound right lane closure on Menaul at the intersection of Punta De Vista Dr. Traffic will bemaintained in the inside lane.
LANE CLOSURE FROM 9:00 AM to 4:00 PM ONLY
Permit NumberLocationProject
:
:
:
2018021551EXC
MOON From CONSTITUTION To INDIAN SCHOOL
Heater Scarification Hot Mix In Place Recycling
06/05/2018 through 06/09/2018
DUSTROL- Aaron Alshouse, (915) 217-5145Contact :
Project Date(s) :
:Details Phase I: Total northbound closure of Moon St. between Constitution and Indian School.Phase II: Total southbound closure of Moon St. between Constitution and Indian School.FOLLOW DETOUR.
LANE CLOSURE FROM 7 A.M. to 10 P.M. ONLY
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Thu, June 07 2018Page 8 of 25
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 08-Jun-18 through 08-Jun-18
All Scheduled Work is Weather Permitting
NORTHEAST North of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2018021767EXC
SAN MATEO From ACADEMY To PAN AMERICAN
Repair fiber optic cable.
06/07/2018 through 06/11/2018
EL TERRERO CONSTRUCTION- Matt Villalobos, (505) 280-7453Contact :
Project Date(s) :
:Details Eastbound right lane closure on San Mateo between Southbound I25 Frontage road andOsuna. Traffic will be maintained in the inside lane.Lane closure will be in interval of 1600' max.
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Permit NumberLocationProject
:
:
:
2018021532EXC
SAN MATEO and MENAUL INTERSECTION
Bore cable.
06/05/2018 through 06/08/2018
VOLT INC- Danny Padilla, (505) 573-4954Contact :
Project Date(s) :
:Details Eastbound right lane and sidewalk closure on Menaul west of San Mateo. Traffic will bemaintained in the inside lanes.Southbound outside left turn lane closure on San Mateo north of Menaul.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Permit NumberLocationProject
:
:
:
2018021144EXC
SAN MATEO From AZTEC To I25
Retrofit LED fixtures to streetlights.
05/10/2018 through 06/08/2018
BIXBY- Chris Perez, (505) 366-4660Contact :
Project Date(s) :
:Details Various short duration north and southbound outside lane and sidewalk closures on San MateoBlvd between Aztec Rd. and I25.
LANE CLOSURE FROM 6 A.M. to 10 P.M. ONLY
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Thu, June 07 2018Page 9 of 25
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 08-Jun-18 through 08-Jun-18
All Scheduled Work is Weather Permitting
NORTHEAST North of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2018021678EXC
SPAIN From WYOMING To TRAMWAY
Retrofit LED fixtures to streetlights.
06/05/2018 through 07/05/2018
BIXBY- Chris Perez, (505) 366-4660Contact :
Project Date(s) :
:Details Eastbound and Westbound right lane and sidewalk closure using Truck Mounted Mobileoperation on Spain between Wyoming and Tramway.Closure on both sides of the road simultaneously not permitted.Work at the intersection will be from 4:00am to 6:00am.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Permit NumberLocationProject
:
:
:
2018021780EXC
COMANCHE From NAPLES To TRACY
Emergency gas line repair.
06/07/2018 through 06/15/2018
NM GAS- Rebecca Krajicek, (505) 697-3127Contact :
Project Date(s) :
:Details Total westbound and center two way left turn lane closure with westbound traffic beingmaintained in the eastbound left lane on Comanche between Chelwood and Naples.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Permit NumberLocationProject
:
:
:
2018021573EXC
INDIAN SCHOOL From ADDRESS To AMERICAS PKWY
Replace underground cable.
06/06/2018 through 06/08/2018
HIGH 5 NETWORKS Miguel Holguin , (505) 934-2175Contact :
Project Date(s) :
:Details Phase 1: Eastbound right lane, bike lane and sidewalk closure on Indian School west ofAmericas Parkway.Phase 2: Westbound lane closure using Truck Mounted Arrow board operation in Indian Schoolwest of Americas Parkway.Eastbound sidewalk closure on Indian School west of Americas Parkway.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Thu, June 07 2018Page 10 of 25
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 08-Jun-18 through 08-Jun-18
All Scheduled Work is Weather Permitting
NORTHEAST North of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2018021562EXC
VENTURA From PASEO DEL NORTE To CARMEL
Nondescript closure.
06/05/2018 through 06/15/2018
WILSON CONST- Ciddo Perez, (503) 349-7697Contact :
Project Date(s) :
:Details Southbound lane closure with southbound traffic being maintained in the center left turn lane onVentura between northern Holly intersection to past Paseo Del Norte.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Intermittent Traffic Control on Paseo Del Norte at its intersection with Ventura(between11:00AM and 4:00PM). Traffic will be held for brief periods of time (no more than 5 minutes).
Permit NumberLocationProject
:
:
:
2018021717EXC
WYOMING From CANDELARIA To AZTEC
Adjust manhole and water valves.
06/08/2018 through 06/09/2018
ALBUQUERQUE ASPHALT- Brian W Loughridge, (505) 991-5916Contact :
Project Date(s) :
:Details Closure of all through and left turn lanes at the intersection of Wyoming and Candelaria.Right turn lanes on all four legs of intersection will be opened.
LANE CLOSURE FROM 8 P.M. TO 6 A.M. ONLY
Follow detour
Permit NumberLocationProject
:
:
:
2018021685EXC
WYOMING From CANDELARIA To MENAUL
Adjust manholes and water valves.
06/04/2018 through 06/08/2018
ALBUQUERQUE ASPHALT- Brian W Loughridge, (505) 991-5916Contact :
Project Date(s) :
:Details Southbound right lane closure on Wyoming between Candelaria and Wyoming. Traffic will bemaintained in the inside lanes.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Thu, June 07 2018Page 11 of 25
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 08-Jun-18 through 08-Jun-18
All Scheduled Work is Weather Permitting
NORTHEAST North of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2018021681EXC
WYOMING From CANDELARIA To ACADEMY
Retrofit LED fixtures to streetlights.
06/05/2018 through 07/05/2018
BIXBY- Chris Perez, (505) 366-4660Contact :
Project Date(s) :
:Details Northbound and southbound right lane and sidewalk closure using Mobile Truck Mountedoperation on Wyoming between Candelaria and Academy. Traffic will be maintained in theinside lane in both directions.Closures on both sides of the road simultaneously not permitted.Closure at major intersections will be from 4:00am to 6:00am.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Thu, June 07 2018Page 12 of 25
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 08-Jun-18 through 08-Jun-18
All Scheduled Work is Weather Permitting
NORTHWEST North of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2018021579EXC
1ST From KINLEY To CONSTITUTION
Install electric pole and transformer.
06/08/2018 through 06/08/2018
WILSON CONST- Ciddo Perez, (503) 349-7697Contact :
Project Date(s) :
:Details Northbound right lane and sidewalk closure with northbound traffic being maintained in thecenter and partially in the southbound lane on 1st St. between Kinley and Constitution.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Permit NumberLocationProject
:
:
:
2018021610EXC
3001 2ND NW
Install new service.
06/07/2018 through 06/08/2018
NM GAS - Steve Baca, (505) 401-7540Contact :
Project Date(s) :
:Details Northbound shoulder lane closure on 2nd St. South of Woodward.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Permit NumberLocationProject
:
:
:
2018021086EXC
2ND and MENAUL INTERSECTION
Replace curb, gutter, replace drivepads and sidewalk.
05/14/2018 through 06/13/2018
GEOMY POHL - Kevin Pohl, (505) 681-0930Contact :
Project Date(s) :
:Details Southbound right lane and sidewalk closure on 2nd St. South of Menaul. Traffic will bemaintained in the inside lane.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Thu, June 07 2018Page 13 of 25
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 08-Jun-18 through 08-Jun-18
All Scheduled Work is Weather Permitting
NORTHWEST North of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2018021381EXC
4TH From ARVADA To MCKNIGHT
Replace pull box and fiber.
06/04/2018 through 06/08/2018
MWI- Christina J. Mahboub, (505) 508-0744Contact :
Project Date(s) :
:Details Northbound and Southbound left lane and left turn lane closures between I-40 East Frontageand I-40 West Frontage. Traffic will be maintained in the right lane in both directions.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Permit NumberLocationProject
:
:
:
2018021487EXC
CANDELARIA and 12TH INTERSECTION
Replace sidewalk.
06/04/2018 through 06/11/2018
CABLECOM- Dennis Esquibel, (505) 702-8789Contact :
Project Date(s) :
:Details Southbound sidewalk closure on 12ht St north of Candelaria only, continuously until complete
Permit NumberLocationProject
:
:
:
2018021274EXC
COPPER From 9TH To 6TH
Directional Drill for Fiber Placement
06/04/2018 through 06/09/2018
RUTHERFORD DIVERSIED INDUSTRIES INC - Jim Crotts , (520) 975-8316Contact :
Project Date(s) :
:Details Total eastbound closure on Copper between 9th and 6th.
Follow detour
LANE CLOSURE FROM 6 A.M. to 10 P.M. ONLY
Permit NumberLocationProject
:
:
:
2018020745EXC
EAGLE RANCH From COORS To CORRALES MAIN CANAL
Multi-use path construction
04/18/2018 through 06/18/2018
STAR PAVING - Don Edwards , (505) 710-7292Contact :
Project Date(s) :
:Details LANE CLOSURE FROM 7:00 AM to 7:00 PM ONLY
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Thu, June 07 2018Page 14 of 25
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 08-Jun-18 through 08-Jun-18
All Scheduled Work is Weather Permitting
NORTHWEST North of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2018021600EXC
GOLF COURSE and PASEO DEL NORTE INTERSECTION
Place conduit and cable.
06/06/2018 through 06/08/2018
LIGHT CONNECTIONS - Steve Litle , (303) 809-7696Contact :
Project Date(s) :
:Details Southbound right lane and sidewalk closure on Golf Course between Paseo Del Norte and LasTerrazas. Traffic will be maintained in the inside lane.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Permit NumberLocationProject
:
:
:
2018021419EXC
INDIAN SCHOOL From 4TH To 2ND
Replace fiber and pull box.
06/08/2018 through 06/15/2018
MWI- Christina J. Mahboub, (505) 508-0744Contact :
Project Date(s) :
:Details Eastbound left lane closure on Indian School between 4th and 2nd. Traffic will be maintained inthe right lane.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Permit NumberLocationProject
:
:
:
2018021660EXC
IRVING From UNIVERSE To GOLF COURSE
Retrofit LED fixtures to streetlights.
06/05/2018 through 06/11/2018
B & D Industries, Inc. - Richard Yardman, (505) 299-4464Contact :
Project Date(s) :
:Details Phase 1: Eastbound right lane, bike lane and sidewalk closure using Truck Mounted Mobileoperation on Irving between Universe and Golf Course.Phase 2:Westbound right lane, bike lane and sidewalk closure using Truck Mounted Mobileoperation on Irving between Golf Course and Universe.Traffic will be maintained in the inside lane in both phases.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Thu, June 07 2018Page 15 of 25
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 08-Jun-18 through 08-Jun-18
All Scheduled Work is Weather Permitting
NORTHWEST North of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2018021179EXC
LADERA From OURAY To ATRISCO
Replace walking path.
05/14/2018 through 06/08/2018
FRANKLIN'S- Howard Ross, (505) 884-6947Contact :
Project Date(s) :
:Details Southbound right lane, bike lane and sidewalk closure on Ladera between Artisco and Ouray.Traffic will be maintained in the inside lane.
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Permit NumberLocationProject
:
:
:
2018021434EXC
LADERA From OURAY To ATRISCO
Street Rehabilitation
06/08/2018 through 06/16/2018
DUSTROL- Aaron Alshouse, (915) 217-5145Contact :
Project Date(s) :
:Details Phase 1: Total northbound lane closure on Ladera between Ouray and past St. Joseph.Phase 2 Total southbound lane closure on Ladera between Atrisco and Ouray.
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Follow detour
Permit NumberLocationProject
:
:
:
2018021537EXC
LEAD From 2ND To ARNO
Place polymer deck overlay.
06/04/2018 through 06/15/2018
HASSE CONTRACTING CO- Leroy Molina, (505) 242-9226Contact :
Project Date(s) :
:Details Phase 1: Westbound left lane and left turn lane closure on Lead between Broadway and 2nd.Traffic will be maintained in the right lane.Phase 2: Westbound right lane, bike lane and sidewalk closure on Lead between Broadway and2nd. Traffic will be maintained in the left lane.
LANE CLOSURE FROM 7 A.M. to 10 P.M. ONLY
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Thu, June 07 2018Page 16 of 25
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 08-Jun-18 through 08-Jun-18
All Scheduled Work is Weather Permitting
NORTHWEST North of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2018021313EXC
LOS VOLCANES and UNSER INTERSECTION
Repair inlets.
05/29/2018 through 06/12/2018
GANDYDANCER LLC - Lupita Pena , (505) 873-2222Contact :
Project Date(s) :
:Details Westbound total closure on Los Volcanes with westbound traffic being maintained in the centerleft turn lane.Southbound right turn lane closure on Unser
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Permit NumberLocationProject
:
:
:
2018021472EXC
MONTANO From EDITH To 2ND
Replace turf with gravel.
06/04/2018 through 06/11/2018
COA- Anthony Villanueva, (505) 238-6831Contact :
Project Date(s) :
:Details Eastbound right lane and sidewalk closure on Montano between near 2nd St. to BNSF Railroad.Traffic will be maintained in the inside lane.From BNSF to Edith the location for 2nd St. is not in City Jurisdiction.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Thu, June 07 2018Page 17 of 25
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 08-Jun-18 through 08-Jun-18
All Scheduled Work is Weather Permitting
NORTHWEST North of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2018021496EXC
RIO GRANDE From FLORAL To CANDELARIA
Mill and resurface pavement.
05/25/2018 through 06/29/2018
CUTLER REPAVING - Douglas Cutler , (505) 350-3983Contact :
Project Date(s) :
:Details Phase 1: Southbound total closure with southbound traffic being maintained in the center twoway left turn lane on Rio Grande between Candelaria and Floral.Phase 2: Southbound total closure with southbound traffic being maintained in the center twoway left turn lane on Rio Grande between Floral and I-40 Frontage.Phase 3: Northbound and Southbound inside lanes and center two way left turn lane closureson Rio Grande between Floral and Candelaria. Traffic will be maintained in the outside lanes inboth directions.Phase 4: Northbound and southbound inside lanes and center two way left turn lane closureson Rio Grande between Lilac and past Rose. Traffic will be maintained in the outside lanes inboth directions.Phase 5: Northbound total closure with northbound traffic being maintained in the center twoway left turn lane on Rio Grande between Floral and Candelaria.Phase 6: Northbound right lane closure on Rio Grande between Aspen and Lilac. Traffic will bemaintained in the left lane.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Permit NumberLocationProject
:
:
:
2018021521EXC
9601 TIERRA PINTADA NW
Remove striping.
05/30/2018 through 06/08/2018
FRANKLIN'S EARTHMOVING - Hector Perez , (505) 991-2200Contact :
Project Date(s) :
:Details 5/30-6/6 Northbound left lane closure on Tierra Pintada at Stormcloud.Westbound right lane closure on Arroyo Vista at school entrance west of Tierra Pintada.
Northbound and Southbound closure on Tierra Pintada at Stormcloud using Truck MountedMobile operation.Eastbound and Westbound lane closures on Arroyo Vista west of Tierra Pintada using TruckMounted Mobile operation.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
This traffic control setup includes a flagging operation, use caution and be prepared to stop.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Thu, June 07 2018Page 18 of 25
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 08-Jun-18 through 08-Jun-18
All Scheduled Work is Weather Permitting
NORTHWEST North of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2018020736EXC
TIERRA PINTADA From STORMCLOUD To ARROYO VISTA
Install irrigation system, trees, and shrubbery in median and easment.
04/23/2018 through 06/18/2018
WESTWIND LANDSCAPE- Alicia Peterson, (505) 881-8925Contact :
Project Date(s) :
:Details Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Southbound right lane closure on Tierra Pintada between Mirehaven and Arroyo Vista.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Thu, June 07 2018Page 19 of 25
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 08-Jun-18 through 08-Jun-18
All Scheduled Work is Weather Permitting
SOUTHEAST South of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2018021722EXC
2842 ARNO SE
Emergency manhole repair.
06/04/2018 through 06/15/2018
ABCWUA - Arlo Gonzales , (505) 239-0089Contact :
Project Date(s) :
:Details Emergency utility work. Various lanes closed and potential sidewalk closures. Seek alternateroute.
Northbound total closure on Broadway between Wesmeco and Bethel.
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Permit NumberLocationProject
:
:
:
2018019607EXC
CENTRAL From MONTCLAIRE To SIERRA
Pour concrete and place steel.
03/01/2018 through 07/06/2018
KLINGER CONSTRUCTORS - Brent Callahan , (505) 980-1552Contact :
Project Date(s) :
:Details Eastbound lane closure on Central west of Montclaire. Traffic will be maintained in the ART buslane.
LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.
Permit NumberLocationProject
:
:
:
2018021576EXC
1820 CENTRAL SE
Stucco Building - (Building Owner - Murad Hijazi - 505-489-0101 - [email protected])
06/04/2018 through 06/15/2018Project Date(s) :
:Details
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Thu, June 07 2018Page 20 of 25
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 08-Jun-18 through 08-Jun-18
All Scheduled Work is Weather Permitting
SOUTHEAST South of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2018021595EXC
EUBANK From SOUTHERN To LA ENTRADA
Pothole utilities.
06/05/2018 through 06/08/2018
COBB FENDLEY- Freddie Jaramillo, (505) 918-8100Contact :
Project Date(s) :
:Details Phase 1: Northbound left turn lane and inside through lane closure on Eubank south ofSouthern.Eastbound through lane closure on Southern west of Eubank.Phase 2: Northbound right lane and center lane closure on Eubank south of Southern.Traffic will be maintained in the inside left lane.Southbound left turn lane closure on Eubank north of Southern.Phase 3: Westbound inside left turn lane closure on Southern east of Eubank.Phase 4: Westbound right lane closure on Southern east of Eubank. Traffic will be maintained inthe left lane.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Permit NumberLocationProject
:
:
:
2018021563EXC
INDIAN SCHOOL From WYOMING To EUBANK
Seal cracks.
06/04/2018 through 06/08/2018
DISMUKE CONSTRUCTION- Randy Carter, (505) 884-1633Contact :
Project Date(s) :
:Details Phase 1: Eastbound and Westbound right lane and bike lane closures on Indian Schoolbetween Wyoming and Eubank.Traffic will be maintained in the inside lanes in both directions.Phase 2: Eastbound and Westbound inside lane closures on Indian School between Wyomingand Eubank. Traffic will be maintained in the outside lanes in both directions.Closures will be in the increments of 1600' maximum per direction.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Permit NumberLocationProject
:
:
:
2018021620EXC
RHODE ISLAND and ZUNI INTERSECTION
Emergency hydrant repair.
05/29/2018 through 06/08/2018
ABCWUA - Ron Vigil, (505) 289-3583Contact :
Project Date(s) :
:Details
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Thu, June 07 2018Page 21 of 25
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 08-Jun-18 through 08-Jun-18
All Scheduled Work is Weather Permitting
SOUTHEAST South of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2018021683EXC
UNIVERSITY From MENAUL To INDIAN SCHOOL
Replace manhole valves and collars.
06/07/2018 through 06/15/2018
NM UNDERGROUND UTILITIES- Danny Montano, (505) 401-2187Contact :
Project Date(s) :
:Details LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Phase 1: Northbound right lane closure on University between Indian School and Menaul.Traffic will be maintained in the inside lane.Phase 2: Southbound right lane closure on University between Indian School and Menaul.Traffic will be maintained in the inside lane.Phase 3:Northbound and Southbound inside lanes and two way center lane closure onUniversity between Indian School and Menaul. Traffic will be maintained in the outside lane inboth directions.Closure will be at a maximum interval of 1600'.
Permit NumberLocationProject
:
:
:
2018021541EXC
YALE From KATHRYN To GIBSON
Street Rehabilitation
06/06/2018 through 06/09/2018
DUSTROL- Aaron Alshouse, (915) 217-5145Contact :
Project Date(s) :
:Details Phase 1: Northbound and Southbound right lane closure on Yale between Kathryn and Gibson.Traffic will be maintained in the inside lane in both directions.Phase 2: Northbound and Southbound inside left lane closure and center two way left turn laneclosure on Yale between Kathryn and Gibson. Traffic will be maintained in the outside lane inboth directions.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Permit NumberLocationProject
:
:
:
2018021394EXC
ZUNI From CENTRAL To SAN MATEO
Adjust manholes.
05/29/2018 through 06/15/2018
FRANKLIN'S- Howard Ross, (505) 884-6947Contact :
Project Date(s) :
:Details Various eastbound, westbound and center lane closures on Zuni between San Mateo andCentral.
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Thu, June 07 2018Page 22 of 25
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 08-Jun-18 through 08-Jun-18
All Scheduled Work is Weather Permitting
SOUTHWEST South of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2018021661EXC
4TH From ASPEN To CONSTITUTION
Place fiber in manholes.
06/06/2018 through 06/08/2018
KELLY CABLE - Dale Lester , (505) 343-1144Contact :
Project Date(s) :
:Details Northbound total closure with northbound traffic being maintained in the southbound left lane on4th St. between Constitution and Aspen.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Permit NumberLocationProject
:
:
:
2018021777EXC
908 4TH SW
Emergency leak repair.
06/06/2018 through 06/19/2018
ABCWUA - Ron Vigil, (505) 289-3583Contact :
Project Date(s) :
:Details Emergency utility work. Various lanes closed and potential sidewalk closures. Seek alternateroute.
Northbound right lane closure on 4th St. between Santa Fe and Atlantic. Traffic will bemaintained in the inside lane.
LANE CLOSURE FROM 8 P.M. TO 6 A.M. ONLY
Permit NumberLocationProject
:
:
:
2018021515EXC
CENTRAL at UNSER SW
Utilities Work On the Eastbound Central in the Right Lane.
05/29/2018 through 07/23/2018
STAR PAVING - Don Edwards , (505) 710-7292Contact :
Project Date(s) :
:Details Eastbound right lane and sidewalk closure on Central between Victory and Unser. EB traffic willbe reduced to one lane.
LANE CLOSURE FROM 7 A.M. TO 4 P.M. ONLY.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Thu, June 07 2018Page 23 of 25
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 08-Jun-18 through 08-Jun-18
All Scheduled Work is Weather Permitting
SOUTHWEST South of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2018021578EXC
COAL From 6TH To 5TH
Place equipment on roof.
06/08/2018 through 06/08/2018
TLC- Celeste Reut, (505) 761-5514Contact :
Project Date(s) :
:Details LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Total street closure on Coal between 6th and 5th. Follow Detour.
Permit NumberLocationProject
:
:
:
2018020592EXC
COAL From 4TH To 5TH
Remove sidewalk.
04/16/2018 through 07/23/2018
CUSTOM GRADING INC - Edward Martinez, (505) 897-4225Contact :
Project Date(s) :
:Details Eastbound sidewalk closure on Coal between 5th and 4th extending south to sidewalk closureon 4th between Coal and alley.Southbound parking lane closure on 4th between Coal and alley to accommodate temporarypedestrian access.
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Permit NumberLocationProject
:
:
:
2018021282EXC
COPPER From 6TH To 3RD
Directional Drilling for Fiber Placement.
06/07/2018 through 06/09/2018
RUTHERFORD DIVERSIED INDUSTRIES INC - Jim Crotts , (520) 975-8316Contact :
Project Date(s) :
:Details Eastbound lane, parking lane and sidewalk closure with eastbound traffic being maintained inthe center of the road on Copper between 6th and 3rd.Westbound parking lane closure on Copper between 3rd and 6th.
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Thu, June 07 2018Page 24 of 25
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 08-Jun-18 through 08-Jun-18
All Scheduled Work is Weather Permitting
SOUTHWEST South of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2018021667EXC
TOWER From UNSER To 98TH
Seal cracks in roadway.
06/04/2018 through 06/08/2018
COA Josh Lucero (Streets), (505) 857-8024Contact :
Project Date(s) :
:Details Eastbound and Westbound single lane closure in each direction on Tower between 98th St. andUnser. Traffic will be maintained in the available lanes.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Thu, June 07 2018Page 25 of 25