1 City Council Presentation Salem Lakes Pedestrian Path DCM Dave Hansen July 3,2012

Transcript of City Council Presentation Salem Lakes Pedestrian Path July ... · 1 City Council Presentation Salem...

Page 1: City Council Presentation Salem Lakes Pedestrian Path July ... · 1 City Council Presentation Salem Lakes Pedestrian Path DCM Dave Hansen July 3,2012

1

City Council Presentation Salem Lakes Pedestrian Path

DCM Dave Hansen July 3,2012

Page 2: City Council Presentation Salem Lakes Pedestrian Path July ... · 1 City Council Presentation Salem Lakes Pedestrian Path DCM Dave Hansen July 3,2012

SALEM LAKES PROPERTY LINES

LANTAN

A CT 1900 - 1999

LANTAN

A CT 1900 - 1999

LANTAN

A CT 1900 - 1999

LANTAN

A CT 1900 - 1999

LANTAN

A CT 1900 - 1999

CENTENNIAL CIR 1922 - 1

931

CENTENNIAL CIR 1922 - 1

931

CENTENNIAL CIR 1922 - 1

931

CENTENNIAL CIR 1922 - 1

931

CENTENNIAL CIR 1922 - 1

931

CO

UG

AR

CT

180

8 - 1

899

CO

UG

AR

CT

180

8 - 1

899

CO

UG

AR

CT

180

8 - 1

899

CO

UG

AR

CT

180

8 - 1

899

CO

UG

AR

CT

180

8 - 1

899

EW

ING

PL

1

800

- 1

823

EW

ING

PL

1

800

- 1

823

EW

ING

PL

1

800

- 1

823

EW

ING

PL

1

800

- 1

823

EW

ING

PL

1

800

- 1

823

EWING PL 1824 - 1899

EWING PL 1824 - 1899

EWING PL 1824 - 1899

EWING PL 1824 - 1899

EWING PL 1824 - 1899

DA

RR

OW

ST

1

700

- 1

799

DA

RR

OW

ST

1

700

- 1

799

DA

RR

OW

ST

1

700

- 1

799

DA

RR

OW

ST

1

700

- 1

799

DA

RR

OW

ST

1

700

- 1

799

HU

EY

CT 3

800 - 3

899

HU

EY

CT 3

800 - 3

899

HU

EY

CT 3

800 - 3

899

HU

EY

CT 3

800 - 3

899

HU

EY

CT 3

800 - 3

899

CENTE

NN

IAL C

IR 1886 - 1907

CENTE

NN

IAL C

IR 1886 - 1907

CENTE

NN

IAL C

IR 1886 - 1907

CENTE

NN

IAL C

IR 1886 - 1907

CENTE

NN

IAL C

IR 1886 - 1907

MO

RNIN

G VIEW D

R 3900 - 3926

MO

RNIN

G VIEW D

R 3900 - 3926

MO

RNIN

G VIEW D

R 3900 - 3926

MO

RNIN

G VIEW D

R 3900 - 3926

MO

RNIN

G VIEW D

R 3900 - 3926JOUSTING ARCH 3800 - 3803

JOUSTING ARCH 3800 - 3803

JOUSTING ARCH 3800 - 3803

JOUSTING ARCH 3800 - 3803

JOUSTING ARCH 3800 - 3803

BIG BEAR CT 3800 - 3899

BIG BEAR CT 3800 - 3899

BIG BEAR CT 3800 - 3899

BIG BEAR CT 3800 - 3899

BIG BEAR CT 3800 - 3899

CARIB

OU

CT 3800 - 3899

CARIB

OU

CT 3800 - 3899

CARIB

OU

CT 3800 - 3899

CARIB

OU

CT 3800 - 3899

CARIB

OU

CT 3800 - 3899

CE

NT

EN

NIA

L C

IR

2119

- 2

19

9

CE

NT

EN

NIA

L C

IR

2119

- 2

19

9

CE

NT

EN

NIA

L C

IR

2119

- 2

19

9

CE

NT

EN

NIA

L C

IR

2119

- 2

19

9

CE

NT

EN

NIA

L C

IR

2119

- 2

19

9

CENTENNIAL CIR 1853 - 1866

CENTENNIAL CIR 1853 - 1866

CENTENNIAL CIR 1853 - 1866

CENTENNIAL CIR 1853 - 1866

CENTENNIAL CIR 1853 - 1866

INCA C

T 200

0 - 2099

INCA C

T 200

0 - 2099

INCA C

T 200

0 - 2099

INCA C

T 200

0 - 2099

INCA C

T 200

0 - 2099

GREY DOVE LN 3771 - 3799GREY DOVE LN 3771 - 3799GREY DOVE LN 3771 - 3799GREY DOVE LN 3771 - 3799GREY DOVE LN 3771 - 3799

EWING CT 3800 - 3

899

EWING CT 3800 - 3

899

EWING CT 3800 - 3

899

EWING CT 3800 - 3

899

EWING CT 3800 - 3

899

AD

OBE

CT 2

000

- 2099

AD

OBE

CT 2

000

- 2099

AD

OBE

CT 2

000

- 2099

AD

OBE

CT 2

000

- 2099

AD

OBE

CT 2

000

- 2099

BUCKHORN PL 3857 - 3899

BUCKHORN PL 3857 - 3899

BUCKHORN PL 3857 - 3899

BUCKHORN PL 3857 - 3899

BUCKHORN PL 3857 - 3899

JOUSTING ARCH 3804 - 3

878

JOUSTING ARCH 3804 - 3

878

JOUSTING ARCH 3804 - 3

878

JOUSTING ARCH 3804 - 3

878

JOUSTING ARCH 3804 - 3

878

LANTANA PL 3900 - 3931

LANTANA PL 3900 - 3931

LANTANA PL 3900 - 3931

LANTANA PL 3900 - 3931

LANTANA PL 3900 - 3931

DAG

AN C

T 3900 - 3999

DAG

AN C

T 3900 - 3999

DAG

AN C

T 3900 - 3999

DAG

AN C

T 3900 - 3999

DAG

AN C

T 3900 - 3999

COYOTE CIR 3800 - 3899

COYOTE CIR 3800 - 3899

COYOTE CIR 3800 - 3899

COYOTE CIR 3800 - 3899

COYOTE CIR 3800 - 3899

CENTE

NN

IAL C

IR 2052 - 2082

CENTE

NN

IAL C

IR 2052 - 2082

CENTE

NN

IAL C

IR 2052 - 2082

CENTE

NN

IAL C

IR 2052 - 2082

CENTE

NN

IAL C

IR 2052 - 2082

GENESEE WAY 1900 - 1913

GENESEE WAY 1900 - 1913

GENESEE WAY 1900 - 1913

GENESEE WAY 1900 - 1913

GENESEE WAY 1900 - 1913

CE

NTE

NN

IAL C

IR

1960

- 1

987

CE

NTE

NN

IAL C

IR

1960

- 1

987

CE

NTE

NN

IAL C

IR

1960

- 1

987

CE

NTE

NN

IAL C

IR

1960

- 1

987

CE

NTE

NN

IAL C

IR

1960

- 1

987

CE

NT

EN

NIA

L C

IR

1908

- 1

92

1

CE

NT

EN

NIA

L C

IR

1908

- 1

92

1

CE

NT

EN

NIA

L C

IR

1908

- 1

92

1

CE

NT

EN

NIA

L C

IR

1908

- 1

92

1

CE

NT

EN

NIA

L C

IR

1908

- 1

92

1

DU

PREE LN

3900 - 3935

DU

PREE LN

3900 - 3935

DU

PREE LN

3900 - 3935

DU

PREE LN

3900 - 3935

DU

PREE LN

3900 - 3935

BUCKHO

RN P

L 3

800

- 385

6

BUCKHO

RN P

L 3

800

- 385

6

BUCKHO

RN P

L 3

800

- 385

6

BUCKHO

RN P

L 3

800

- 385

6

BUCKHO

RN P

L 3

800

- 385

6

SALEM LAKES BLVD 3900 - 3901SALEM LAKES BLVD 3900 - 3901SALEM LAKES BLVD 3900 - 3901SALEM LAKES BLVD 3900 - 3901SALEM LAKES BLVD 3900 - 3901

2

Page 3: City Council Presentation Salem Lakes Pedestrian Path July ... · 1 City Council Presentation Salem Lakes Pedestrian Path DCM Dave Hansen July 3,2012

LAKE/EASEMENT BACKGROUND Aug. 6, 1979 – City Council granted change of zoning to developer, with the

following conditions: • “A public recreation/open space easement should be established at the time of subdivision to cover

the jogging path. The city will assume maintenance responsibility for those areas. HOWEVER, THE CITY WILL NOT ACCEPT MAINTENANCE RESPONSIBILITY FOR THE PROPOSED LAKE.”

• “The 7:1 slope of bank should be established around the lake from the edge of the water to the level area on which the jogging path is proposed. The level area should be at least 15 feet wide with the 6-foot wide jogging path located in the center.”

Sept. – Oct. 1982 – Developer and City executed Subdivision Agreements, all containing:

• “A 15’ wide public pedestrian recreation/open space easement is to be dedicated to the City. A 6’ wide jogging path is to be centered within the 15’ easement.”

1983 – 1984 – 8 plats recorded at various times, each showing the easement area and dedicating the easement to the City by plat note.

3

Page 4: City Council Presentation Salem Lakes Pedestrian Path July ... · 1 City Council Presentation Salem Lakes Pedestrian Path DCM Dave Hansen July 3,2012

RECENT HISTORY

• 2005-10 – Severity of bank collapsing increased – Severity of weather events

– Soil conditions

– Lack of 7:1 slope

• 2009 – Parks & Recreation concerned with being able to maintain easement area for grounds maintenance

• 2010 - City staff conducts initial assessment – Briefed City management & district Council member

– Posted “Use trail with caution” signs

• 2011 - Developing recommended plan of action – Commenced alternatives analysis and cost estimating

– Briefed City management & district Council member

4

Page 5: City Council Presentation Salem Lakes Pedestrian Path July ... · 1 City Council Presentation Salem Lakes Pedestrian Path DCM Dave Hansen July 3,2012

CURRENT SITUATION - 2012

• March – Notified district Council members of urgency to address public safety issues at the path

• April - Initiated survey of pedestrian easement

- Closed path due to increased public safety risk

- Performed alternatives analysis

• May - Police initiate Neighborhood Watch with 40+ residents at meeting

• June 11 - Conducted public information/safety meeting

• July 3 - Brief City Council

5

Page 6: City Council Presentation Salem Lakes Pedestrian Path July ... · 1 City Council Presentation Salem Lakes Pedestrian Path DCM Dave Hansen July 3,2012

Neighborhood Sidewalk

Connectivity

This map shows that there is good pedestrian connectivity in place in Salem Lakes considering sidewalks exist on both sides of Centennial Circle, the main road that surrounds the lakefront lots. The sidewalk network includes other roads connecting in toward the lake off of Centennial Circle. Sidewalk Maintenance - Residents commented that help is needed from the City to cut back lawns that have grown over the sidewalk.

6

Page 7: City Council Presentation Salem Lakes Pedestrian Path July ... · 1 City Council Presentation Salem Lakes Pedestrian Path DCM Dave Hansen July 3,2012

7

Bank Failure

2012

2010 2010

2012

Page 8: City Council Presentation Salem Lakes Pedestrian Path July ... · 1 City Council Presentation Salem Lakes Pedestrian Path DCM Dave Hansen July 3,2012

8

Bank Failure

2010

2012

Page 9: City Council Presentation Salem Lakes Pedestrian Path July ... · 1 City Council Presentation Salem Lakes Pedestrian Path DCM Dave Hansen July 3,2012

9

Bank Failure

2012 2010

Page 10: City Council Presentation Salem Lakes Pedestrian Path July ... · 1 City Council Presentation Salem Lakes Pedestrian Path DCM Dave Hansen July 3,2012

THE PUBLIC EASEMENT All of the lots surrounding the lake are platted to the center of the lake. The City has a 15 foot public easement allowing the public the right to walk along a 6 foot path supposed to be located in the center of the easement. The City has responsibility for the maintenance of the public easement area and the path. The developer was to have created a 7:1 slope from the waters edge to the edge of the public easement. Concerns that the eroding bank has encroached into the public easement because the 6 foot path was portended to be in the middle of the easement. A survey of the public easement and the top of the bank was conducted to determine the location of the path and the degree of encroachment of the bank failure.

10

Page 11: City Council Presentation Salem Lakes Pedestrian Path July ... · 1 City Council Presentation Salem Lakes Pedestrian Path DCM Dave Hansen July 3,2012

LEGAL IMPLICATIONS OF EASEMENT VACATION

• The public will no longer have the right to travel on the path.

• The City will no longer be responsible for maintenance of the easement area or the asphalt path.

• The City will maintain its right to drainage easements within the lake; may need to establish maintenance easements to access.

11

Page 12: City Council Presentation Salem Lakes Pedestrian Path July ... · 1 City Council Presentation Salem Lakes Pedestrian Path DCM Dave Hansen July 3,2012

LEGAL REQUIREMENTS TO VACATE EASEMENT

• Easement was dedicated by plat; will be vacated pursuant to Va. Code § 15.2-2271, by ordinance of the governing body.

• Notice must be given pursuant to Va. Code § 15.2-2204; advertised once a week for two consecutive weeks; public hearing to be held before Council adoption.

• Draft proposed Ordinance to be presented to City Council – Ordinance to authorize City Manager to execute necessary documents to

vacate easement

• Identify/verify 52 homeowners (to be named in Deeds of Vacation) – Deeds will be recorded to evidence easement has been vacated in chain

of title – Eight (8) separate Deeds to coincide with eight (8) subdivision plats

recorded during neighborhood development

12

Page 13: City Council Presentation Salem Lakes Pedestrian Path July ... · 1 City Council Presentation Salem Lakes Pedestrian Path DCM Dave Hansen July 3,2012

Salem Lakes Neighborhood Path Public Information Meeting

77 citizens signed in 35 were citizens who lived on lakefront property 42 were citizens who lived elsewhere in the Salem Lake neighborhood (not

lakefront) City staff: 2x DCMs, P & R, PW, PD, City Attorney, HNP, Finance/Risk Mgt

13

Page 14: City Council Presentation Salem Lakes Pedestrian Path July ... · 1 City Council Presentation Salem Lakes Pedestrian Path DCM Dave Hansen July 3,2012

Neighborhood Issues From June 11, 2012 Information Meeting

• Nutria – too many, eroding banks, aggressive, need to eliminate (Animal Control) • Residents feeding the wildlife – need them to stop (Animal Control) • Culverts – PW identified three in most need of bank stabilization, need to identify and

assess all other culverts (PW) • Access – need to close the access for safety, possibly use chain link fence (P&R) • Unkempt yards – need City assistance to have owners maintain (Code Enforcement) • Permits for bank stabilization – owners reported they have been told they cannot get

permits, need to work with owners who want to do bank stabilization (Planning) • Illegal dumping – several areas were identified where illegal dumping is occurring (Code

Enforcement and Waste Management) • Neighborhood Watch Program (Police) • Civic League or HOA – HOA is not likely, but there is some interest in starting a civic league

(City Atty) • Illegal activities along path behind houses, disorderly behavior, trash, and graffiti (PD) • Causeway – near unanimous support by attendees to remove (PW; PU will also be

involved because of 10” gravity sanitary sewer line) • Pedestrian path removal (PW)

14

Page 15: City Council Presentation Salem Lakes Pedestrian Path July ... · 1 City Council Presentation Salem Lakes Pedestrian Path DCM Dave Hansen July 3,2012

Housing Code Enforcement Actions

Unkempt yards

• Staff walked the entire pathway and conducted thorough inspections

• Several notices of violation were issued for unkempt properties

• Overgrowth on the banks of the lake are exempt; bushes are exempt from code

• No hazardous trees were found

Illegal Dumping

• Illegal dumping sites are monitored weekly and issues investigated; notices of violation are issued when a responsible party can be located

• Staff works directly with waste management to have items removed when a responsible party cannot be located

Graffiti

• The Sheriff’s Workforce abated one instance of graffiti along the pathway

• Staff is working to develop an abatement plan for another site which is not readily accessible

15

Page 16: City Council Presentation Salem Lakes Pedestrian Path July ... · 1 City Council Presentation Salem Lakes Pedestrian Path DCM Dave Hansen July 3,2012

Animal Issues

• Responding to the concerns expressed, Animal Control began conducting a Planned Patrol to get a sense of scope and severity of problem

• 11 visits produced 0 observations of any violations

• Animal Control met with Wildlife biologist for Virginia DGIF and a USDA Wildlife Specialist

– There is a colony of approximately 20 nutria

– These nutria are not responsible for the erosion and pose no threat to public safety

– There is a limited natural food source that should keep the population in check

– Eradication via trapping will cost approximately $10,000 (via USDA) & there is no guarantee trapping will eradicate a sufficient number to overcome breeding rate or new migration

– Trapping is not recommended

Page 17: City Council Presentation Salem Lakes Pedestrian Path July ... · 1 City Council Presentation Salem Lakes Pedestrian Path DCM Dave Hansen July 3,2012

Feeding Wildlife

• In 11 visits to the park Animal Enforcement saw 0 cases of feeding. Animal Enforcement will be looking at other locations along the pedestrian path during future visits.

• Waterfowl congregation and the feeding of waterfowl contributes only a small portion to the erosion problems.

• The presence of waterfowl is considered a benefit by many and efforts to eradicate them are often controversial.

• City ordinance Sec. 5-547 prohibits feeding wildlife on public property (parks) and staff is prepared to present an ordinance to this Council if necessary which would prohibit feeding waterfowl on private property in Salem Lakes. – There are several prerequisites to this ordinance including a requirement

the feeding activity is creating a nuisance, signs are posted, and DGIF is notified- a letter from the Manager has been prepared.

Page 18: City Council Presentation Salem Lakes Pedestrian Path July ... · 1 City Council Presentation Salem Lakes Pedestrian Path DCM Dave Hansen July 3,2012

Probable Permitting Requirements For Individual Homeowners To Repair Bank Slopes

Each lot or group of lots must be evaluated to determine the specific permitting requirements and applicable review processes

IF BANK SLOPE AND/OR TOE CONTAIN JURISDICTIONAL WETLANDS – Army Corp Of Engineers Approval Required; Follow ACOE Permit Processes.

IF AREA OF DISTURBANCE IS GREATER THAN 2,500 SQUARE FEET – Land Disturbing Permit Required; Planning/DSC Must Approve Erosion And Sediment Control Plan Prepared By Licensed Professional; Surety and Permit Required

IF FILLING IS NECESSARY WITH THE “FLOODPLAIN SUBJECT TO SPECIAL RESTRICTIONS” - A Floodplain Variance May Be Necessary; Depending On The Extent Of Fill This May Require City Council Approval; Planning/DSC Must Approve Plans And Calculations Prepared By A Licensed Professional

IF ANY STRUCTURES (i.e., BULKHEADS, WALLS, DOCKS) ARE PROPOSED A BUILDING PERMIT IS REQUIRED - Structural Plans Must Be Prepared By a P.E.

IF ANY WORK IS PROPOSED IN A PUBLIC EASEMENT – Right Of Way Permit Required; Planning/DSC Must Approve Site Plan Prepared By Licensed Professional; Surety And Permit Required

Recommend that Bank Stabilization be performed on large areas encompassing multiple lots by qualified licensed contractors to achieve expected results

Page 19: City Council Presentation Salem Lakes Pedestrian Path July ... · 1 City Council Presentation Salem Lakes Pedestrian Path DCM Dave Hansen July 3,2012

Damage Since Path Closure

19

Page 20: City Council Presentation Salem Lakes Pedestrian Path July ... · 1 City Council Presentation Salem Lakes Pedestrian Path DCM Dave Hansen July 3,2012

Costs of Vacating Public Path

• Costs for permanently securing access points – Approx. $10,000

• Cost to remove the asphalt path approx. $130,000 – Duration - Three months

including obtaining permits

– Obtain right of entry from homeowners as required to perform the work

20 2012

Page 21: City Council Presentation Salem Lakes Pedestrian Path July ... · 1 City Council Presentation Salem Lakes Pedestrian Path DCM Dave Hansen July 3,2012

Investigation of Various Shoreline Stabilization Alternatives for Parks

• Conditions Assessment

• Wetland Delineation

• Slope Stability, Topographic, and Alternative Analysis

• Prioritized Recommendations includes Environmental Permitting cost estimates: – Alt 1 – Rip Rap = $95,259

– Alt 2 – 3:1 slope/wetland bench = $68,885

– Alt 3 – 3:1 Vegetated Geoweb = $82,274

21

Page 22: City Council Presentation Salem Lakes Pedestrian Path July ... · 1 City Council Presentation Salem Lakes Pedestrian Path DCM Dave Hansen July 3,2012

Investigation of Outfalls

• Three critical areas

o outfalls 4 & 7

o culvert pipe 6

• One high priority at outfall 2

• All other outfalls were

classified as low priority

1 2

3

4

11

6 5

9

10

8

7

Outfall 3 is submerged 22 Outfall 11

Outfall 10 Outfall 9

Outfall 4 Outfall 2 Outfall 7 Outfall 5 Outfall 6 Outfall 8 Outfall 1

Page 23: City Council Presentation Salem Lakes Pedestrian Path July ... · 1 City Council Presentation Salem Lakes Pedestrian Path DCM Dave Hansen July 3,2012

23 Critical Areas Affecting Public Infrastructure

Page 24: City Council Presentation Salem Lakes Pedestrian Path July ... · 1 City Council Presentation Salem Lakes Pedestrian Path DCM Dave Hansen July 3,2012

24

Outfall #4

Page 25: City Council Presentation Salem Lakes Pedestrian Path July ... · 1 City Council Presentation Salem Lakes Pedestrian Path DCM Dave Hansen July 3,2012

Outfall #7

25

Page 26: City Council Presentation Salem Lakes Pedestrian Path July ... · 1 City Council Presentation Salem Lakes Pedestrian Path DCM Dave Hansen July 3,2012

Outfall #2

26

Page 27: City Council Presentation Salem Lakes Pedestrian Path July ... · 1 City Council Presentation Salem Lakes Pedestrian Path DCM Dave Hansen July 3,2012

Bank Failure Adjacent to Pedestrian Easement

• No bank erosion has encroached into the public easement.

• Outfall #4: Top of Bank (TOB) is near edge of easement above storm outfall. Approx 90 linear feet (LF) with TOB within 10 feet of pedestrian easement.

• Outfall #7: Approximately 130 LF with TOB within 6-10 feet of pedestrian easement.

• Outfall #2: Approximately 60 LF with TOB within 7-10 feet of pedestrian easement. Additional 45 LF will be stabilized at outfall.

• Pedestrian crossing/culvert: Approximately 145LF with TOB in easement, however, citizens overwhelmingly want it removed.

• Other areas where TOB is within 10 LF of the pedestrian easement: – Behind 3861, & 3869 Buckhorn Place (Lot 38 & 40) - approx. 95 LF @ 6-10 ft. – Behind 3805 Buckhorn Place (Lot 24)– approx. 20 LF @ 8-10 ft. – Behind 3820 Jousting Arch (Lot 13)– approx. 60 LF @ 7-10 ft. – Behind 3829 & 3825 Buckhorn Place (Lot 30 & 29) - approx. 70 LF @ 6-10 ft 27

Page 28: City Council Presentation Salem Lakes Pedestrian Path July ... · 1 City Council Presentation Salem Lakes Pedestrian Path DCM Dave Hansen July 3,2012

Shoreline Stabilization Cost Estimates

• Stabilize outfalls 4 & 7: $150,000

• Stabilize outfalls 4 & 7 and culvert bank of lake crossover walkway: $250,000

• Stabilize outfalls 4 & 7 and remove culvert and lake crossover walkway: $300,000

• Stabilize outfall 2 : $50,000

• Stabilize all other outfalls: $150,000

• Reconstruct other shoreline areas with bank eroded to within 10 feet of the public easement area: $150,000

• Reconstruct entire lake shoreline except for Park area: $2,500,000

28

Page 29: City Council Presentation Salem Lakes Pedestrian Path July ... · 1 City Council Presentation Salem Lakes Pedestrian Path DCM Dave Hansen July 3,2012

Considerations

• City has over 400 wet BMPs (Lakes and Ponds).

• Salem Lakes is the only private BMP that has such a public easement and a pedestrian path around the lake.

• Stormwater enterprise does not perform bank stabilization on wet BMPs except to protect stormwater infrastructure.

• Planning figure for bank stabilization is @$600 per linear foot

• Bank erosion on Salem Lake has not encroached into the public easement (closest is outfall #4).

• Stormwater outfalls on Salem Lake require stabilization effort.

• To perform bank stabilization away from Stormwater infrastructure requires considerable private owner and permit approvals.

• Removal of the crossover walkway will not interfere with existing 10 inch sanitary sewer (gravity) crossing (15 feet deep).

29

Page 30: City Council Presentation Salem Lakes Pedestrian Path July ... · 1 City Council Presentation Salem Lakes Pedestrian Path DCM Dave Hansen July 3,2012

Manhole ~15 feet

deep

Sanitary Sewer

Crossing ~15 feet deep

Salem Lakes Walkway 10 – inch Sanitary Sewer Line Crossing (gravity)

Page 31: City Council Presentation Salem Lakes Pedestrian Path July ... · 1 City Council Presentation Salem Lakes Pedestrian Path DCM Dave Hansen July 3,2012

Staff Recommendation

• Initiate procedures to vacate the public easement. • Remove the asphalt pedestrian path, grade and seed

damaged areas and permanently secure access points. ($140,000)

• Design, permit and construct stabilization for the western City Park. ($95,250)

• Negotiate lake access for eastern park • Design, permit and construct stabilization for the City

stormwater outfalls only. ($350,000) • Remove the crossover walkway and culvert and

restore the shoreline. ($150,000)

31

$735,250 + contingency

Page 32: City Council Presentation Salem Lakes Pedestrian Path July ... · 1 City Council Presentation Salem Lakes Pedestrian Path DCM Dave Hansen July 3,2012

NEXT STEPS

• Run first advertisement on Sunday, July 29

• Run second advertisement on Sunday, Aug. 5

• Public Hearing to be held on Tuesday, Aug. 14

• Present Ordinance to Vacate Easement on Tuesday, Aug. 14, following Public Hearing.

• If adopted, prepare Deeds of Vacation, execute and record. Effective upon completing the work.

• Complete design, submit permit applications and order materials for path removal and bank stabilization at City parks and at our stormwater outfalls.

32

Page 33: City Council Presentation Salem Lakes Pedestrian Path July ... · 1 City Council Presentation Salem Lakes Pedestrian Path DCM Dave Hansen July 3,2012

City Council Discussion

& Direction

33

Page 34: City Council Presentation Salem Lakes Pedestrian Path July ... · 1 City Council Presentation Salem Lakes Pedestrian Path DCM Dave Hansen July 3,2012

Public Meeting Agenda

34

• Welcome and Staff Introductions

• Path History Details and Public Safety/Risk

• Bank Failure and Stormwater Outfall, Causeway/Bridge

• Neighborhood Sidewalk Connectivity, Salem Lakes Park

Shoreline Stabilization Project, and Closing of Path/Recent

Damage

• Complete Design of Park Shoreline Work

• Complete Design of Public Works Infrastructure Work

• Identify Funding for Projects

• Neighborhood Watch Program

• Removal of Path and Vacate Easement

• Next steps