    FH250 CIRCULAR LOOM

    OPERATIONAL MANUAL

    Nantong Sentian Fire-Fighting Equipment CO.,LtdAdd: No.10 Yangsha Road, Huilong Industry zone, Qidong City,

    Jiangsu Province,P.R.China P.C: 226200

    Tel: 86-513-83630902 Fax: 86-513-83636150

    Web: http://www.firehose.cn E-mail: [email protected]

    116

  • 8/10/2019 circular loom instruction.pdf

    2/16

    PREFACE

    We are a sino-foreign joint-venture enterprise specialized in manufacturing various specifications and types of fire hose,

    FH250 Circular Loom , Extruders and a complete set of hose vulcanization equipment.

    We have passed the conformity of International Quality System Certification ISO9001-2000 and national CCC

    Certification, and products are manufactured strictly according to the standards to guarantee factory products 100%

    eligible.

    We insist one principle : Continuously innovate and develop to offer customer with the best products.

    We promise that we will offer satisfied service and avoid worry for all consumers.

    We wish to extend our warm welcome to our customers no matter new or old, home or abroad for good cooperation and

    mutual development.

    Nantong Sentian Fire-fighting Equipment co., ltd.

    216

  • 8/10/2019 circular loom instruction.pdf

    3/16

    Operation Instruction for FH250 Circular Loom

    I.

    Brief Introduction

    FH250 Circular Loom is a kind of hose loom which is optimized and developed on the basis of introducing foreign

    similar- equipment and combining with our own experience summarizing from long-term production practice as well.

    1,The host regulates speed by variable frequency. It is convenient and flexible for operation, high security, reliability and

    high efficiency.

    2, Equipped with automatic stop controls breakage of warp yarn and empty weft bobbins and the indication lights show where

    the breakage has occurred or if the weft bobbins are empty. This makes the products quality stable and reduces operators

    work .

    3, Surface of the fabric is even and equal. More than 4 patterns of weave are available .

    4,Hose diameter is from 20mm to 110mm and 250mm can be reached by adding accessories .

    5,Compact structure and cover smaller area .

    II Main Technical Parameters

    1)Shuttle speed : 204 rotation/min (Max) 2)Motor: 5.5KW

    3)Control power : 220V AC 24V DC

    4)Available weave diameter :20mm250mm

    5)Available number of warp ends : 478 single ends or double ends .

    6)Time of automatic stop : approx. 2/3 rotation

    III Installation

    We recommend that the Circular Loom should be installed on a 10m2platform of net height approx. 2500mm. By doing

    this the equal warp tension is obtained easily and site area of each Loom can be reduced. But it is not objected that

    installing the Circular Loom on the same level as the creel . the Loom is required to be horizontally.

    IV Adjustment and operation

    1,Adjustment: All parts of the Circular Loom have been tested and adjusted when leaving the factory. Customers can use

    it directly under normal circumstances except the shuttle gap need certain adjustments during operations, details as

    following :

    a) Dismantle of shuttle-tang and adjust bolts of bracket 634/3

    316

  • 8/10/2019 circular loom instruction.pdf

    4/16

    b) Loosen 613/3 stop screws of eccentric axis of shuttle stop idler

    c) Turn eccentric axis with Hex allen wrench and adjust lengthways gap of shuttles to the best state

    d) Fasten stop screws

    2, Thread: Distributing hose warp yarn which you design to centre of 12 units ,i.e. 478 guiding needles and shuttle bed

    evenly .plain weave intervals 2 levels or multiple of 2, twill weave intervals 3 levels or multiple of 3. It neednt interval if

    the warp yarn design is 478 pcs . Detailes in and .

    3,Traction :lead along the warp yarn upon spring hook and stuck the spring hook in the mouth of warp-stop boardcard ;

    clamp warp-stop board ; distribute warp yarn into 4 to 6 shares and tie to the prepared traction head , details in .

    Note: Wave circular has been installed . Drive the clutch off the traction equipment and force the shaking arm fan-shaped

    gear to occlude with fan-shaped gear of pan axle , Turn handwheel anticlockwise to tighten lead and warp yarn ,exit

    handwheel axis and pull off clutch and making it occlude with pan axle.

    4, Adjustment of fan-shaped board t: Fix the fan-shaped board on shuttle-tang and make adjustment by adjusting screw of

    shuttle-tang.Turn adjusting screw of shuttle-tang when adjusting and it is suitable to adjust fan-shaped board to the

    internal edge of waive circular.

    5, Adjustment of weft density : According to the weft density of your designed products, exchange the weft gear(E) to the

    one meeting requirements ,details in

    6,weave by installing weft bobbins: put the weft bobbins finished according to requirements into shuttles . Note: the weft

    bobbins should be put the correct place. Insert the weft into the thread hole of fan-shaped board and adjust the head of

    shuttles. Press the button after confirmation and make the machine turn slowly ,so that hose will be weaved .

    7,Adjustment of weave diameter : After forming fabrics, if there is tolerance between the diameter of fabric and the

    required, corresponding adjustments can be made,i.e. turning adjusting screws after loosening locking nuts of shuttle-tang

    and adjust corresponding position of fan-shaped board and weave circular ,i.e. daff or furl until satisfaction.

    8,Adjustment of distribution disk : the distribution disk must cooperate with guiding needle correctly ,otherwise ,normal

    weave is not available . When finding the position is not correct , adjust the distribution disk forward or backward one

    case of guiding needle after loosening bolts of distribution disk bracket , then normal weave is available .

    V. Lubrication

    The lubricated part of the Circular Loom adopt the way of centrifugal splash lubrication .Putting approx.1.5kg of

    lubrication into the shuttle-tang and making inspection about it every 2 or 3 months usually or changing the lubrication.

    Gear lubrication of good quality is putting into the traction gear box and change it every 6 months . Pay attention to the

    lubrication quantity and add it in time when it is lower than the required .

    416

  • 8/10/2019 circular loom instruction.pdf

    5/16

    VI Control

    There are 3 buttons fixed on the Circular Loom : the green button is for running ,the yellow one is for spot movement and

    the red one is for stop. Shuttle speed is regulated directly by variable frequency. The textile workers can control the

    rotation speed of shuttles optionally as long as adjusting the knob for shuttle speed on the control cabinet. It is very

    convenient to operate. Breakage of warp yarn and weft automatic stop are both to be controlled by low voltage of 24 V,

    details in circuit diagram.

    VII. Common Faults and exclusion

    Common faults reasons exclusion measures

    Skipping stitch , unevenly

    distribution of thread disk

    the head of guiding shuttle or the position of

    thread take-up lever is not correct;

    distribution disk is too loose or heavy abrasion:

    warp yarn spring is off or stuck:

    Too much yarn ;

    adjust to the best place;

    adjust or changing the distribution

    Onto spring, check and adjust;

    clean out yarn

    breakage of warp yarn, fluff warp tension is too much , bobbins is blocked,

    shuttle wheel is stuck;

    position of needle board is not correct

    There is burr on the tension lever of guiding

    needle or shuttle.

    check and adjust tension, clean out or

    change;

    check and adjust

    check and grind

    Not smooth of surface of

    fabric

    warp ternsion and weft tension is not same ,too

    loose or too tight;

    lever pressed out by weft bobbins is stuck or

    the spring is too loose;

    weft is not in the inside of needle board,

    floating on the surface;

    much time spending on changing weft bobbins;

    abrasion of creel support is too big or creel

    bearing is stuck;

    check and adjust

    check and adjust

    check and adjust

    skilled slowly

    check, clean out and adjust

    belt is slippery, cant be led

    out

    roller spring on the traction is too loose;

    some gear-key on the traction equipment is

    mangled;

    check and adjust ;

    check and change

    distribution disk doesnt work,

    breakage of warp yarn,

    automatic stop doesnt work,

    only can spot move but

    running tension

    position of distribution disk is not correct;

    spring hook is stuck or one of the two pcs of

    warp yarn is broken;

    spring hook falls on the warf-stopping board;

    check and adjust accordingly;

    check and adjust or changing spring

    hook;

    check spring hook and warp tension

    516

  • 8/10/2019 circular loom instruction.pdf

    6/16

    6 / 16

  • 8/10/2019 circular loom instruction.pdf

    7/16

    7 / 16

  • 8/10/2019 circular loom instruction.pdf

    8/16

    81

  • 8/10/2019 circular loom instruction.pdf

    9/16

    916

    o

  • 8/10/2019 circular loom instruction.pdf

    10/16

    Weft Density conversion table of FH250 Circular Loom

    Passive gear 40 46 60

    Active gear weft density/10cm Weft density/10cm weft density/10cm

    E40 31.2 36.3 47.6

    E39 32.2 37.0 48.8

    E38 33.3 38.5 50.0

    E37 33.8 39.2 51.3

    E36 35.0 40.0 52.6

    E35 35.7 40.8 54.0

    E34 37.0 42.5 55.5

    E33 38.4 43.5 57.1

    E32 39.2 45.4 58.8

    E31 40.8 46.5 60.6

    E30 41.6 47.6 62.5

    E29 43.5 50.0 64.5

    E28 44.4 52.6 66.6

    E27 46.5 54.0 70.0

    E26 48.8 55.5 71.4

    E25 50.0 57.1 74.0

    E24 52.6 59.7 78.1

    E23 54.0 62.5 81.3

    E22 57.0 65.3 85.0

    E21 60.6 68.9 89.3

    E20 62.5 72.0 93.9

    1016

  • 8/10/2019 circular loom instruction.pdf

    11/16

    1116

  • 8/10/2019 circular loom instruction.pdf

    12/16

    1216

  • 8/10/2019 circular loom instruction.pdf

    13/16

  • 8/10/2019 circular loom instruction.pdf

    14/16

  • 8/10/2019 circular loom instruction.pdf

    15/16

    FH250 Circular Loom Electrical Standard Parts Schedule

    No. Name Standard Specifications Qty

    (pcs)

    Remarks

    1 Electronic Control Box 1 600X900X380

    2 Transducer 1

    3 Control Transformers BK-50 1

    4 Voltage Regulation Power Supply PCB 220V-DC24V1A 1

    5 Small Relay DC24 4set

    6 Voltage Meter 85C 0-450V 1

    7 Tachometer DC10 1

    8 Indicator Light (white) 220V 1

    9 Indicator Light (red) DC24V 6

    10 Button Switch NP2 3

    11 Start Button (red yellow green) 3 X3

    12 BAR 2A 2CZ82 6

    13 Terminal 3X1.25

    14 Terminal 5X5.5

    15 Groove Track 1 cm 1m

    16 Slots 2cm 2m

    17 Wires 1cm Multi-wire

    18 Wires 4cm Multi-wire

    19 Breaker 380V 40A 1

    20 Breaker 220V 10A 1

    21 Micro-blower 220V 0.14A 2

    22 Potentiometer 2.2KW 1

    1516