Outline
• Eco-innovative pilot and Market Replication
projectsprojects
• 5 priority areas, incl. Sustainable building
products
• 2012 call in a snapshot
PLACE PARTNER’S LOGO HERE
Eco-innovative pilot and market Eco-innovative pilot and market replication projects
Ecoinnovation : “All forms of innovation reducing environmental impacts and/or optimising the use of resources”
New processes, products, techniques, services
Eco-innovative pilot and Market Replication project s (1)
New processes, products, techniques, services
Pilot and market Replication projects :First application: help eco-innovative ideas reach the market (create the market)Replication: wide market application (enlarge the market)
• Bridge the gap between RDT and commercialisation
SME
Key ideas
Eco-innovative pilot and Market Replication project s (2)
• Focus on private sector and SME (but open to any legal entity)
• Life Cycle Approach
• Leverage factor and replication
What is not funded
• No RTD projects (-> FP7)• No public-oriented projects (-> LIFE+)
Eco-innovative pilot and Market Replication project s (3)
• No public-oriented projects (-> LIFE+)• No energy-focused projects (-> Intelligent Energy Europe)• No awareness-raising or dissemination projects • No mere promotional or marketing activities
5 priority areas5 priority areas
• Materials recycling• Sustainable building products
5 priority areas
5 priorities
• Sustainable building products• Food and Drink• Greening businesses• Water
Background
• Very high raw material and energy consumption
• More than 50% of all materials extracted from earth are transformed into the sector
Sustainable building products (1)
earth are transformed into the sector
• Construction and Demolition Wastes amount to more than 450 m tonnes / year in the EU
What is expected
• Innovative construction products and related processes that reduce consumption of resources, embodied carbon and production of by-product
Sustainable building products (2)
embodied carbon and production of by-product waste (= 2011 text – finetuning in 2012)
• Significant environmental impact in all phases (construction, maintenance, repair, retrofitting or demolition).
Types of ongoing projects
• New construction products/materialse.g. Insulation materials using recycled waste (EAMT, Insulat FH), environmentally
& health friendly materials (ECBP)
Sustainable building products (3)
& health friendly materials (ECBP)
• Innovative water systems (including water
saving and reuse)e.g. System for leakage detection, reuse of grey water for non potable water
demand (AutoLeak, Cyprobell)
INSULATFH
• New process to produce pre-insulated timber
frame panels with cellulose pulp insulation
• Project features:
Sustainable building products (4)
• Project features:
� Processing of waste paper into pulp
� Controlled filling into wall panels
� Delivery of complete panels to the building site
ECBP (Ecolabelled Chemical Building Product)• New product : a wooden floor adhesive that
does away heavy metals and VOC
Sustainable building products (5)
• Project features:
� Increasing/optimising production capacity
� Searching for local distributors in EU
ECO²BUILDING
• Introduction to EU markets of an eco-friendly
construction system for industrial and
commercial buildings
Sustainable building products (6)
commercial buildings
• Project features: � Bringing up together architects, timber construction engineers,
building and sofware engineers
� Building 18 buildings targeting first in Austrian market
� Set up of a franchise system to reach EU market
Check the database of eco - innovativeprojects that have been co -financed :
http://eaci -http://eaci -projects.eu/eco/page/Page.jsp
2012 call in a snapshot2012 call in a snapshot
Indicative Timetable• Call publication: early May 2012EU INFO DAY on 08.05.12 in Brussels : register !
•Deadline for submission: September 2012
• Selected projects will start from May 2013 : costs occurred before that won’t be eligible
• Project duration : maximum 3 years
• 2012 budget ~ 35-40M €
• About 1,4 m € total costs per project
Indicative budget
• 50% co-financing
• 2011: 45/50 projects selected out of 280
• Priority given to SME and private beneficiaries but any legal persons can apply…
Who can apply
• … if established in EU and other countries that have joined the initiative
• No EU partnership required but EU added value, an award criteria