Title Sub-title PLACE PARTNER’S LOGO HERE European Commission Enterprise and Industry From idea to project proposal PLACE PARTNER’S LOGO HERE European Commission Enterprise and Industry

Transcript of Cip eco innovation - From idea to proposal

Page 1: Cip eco innovation - From idea to proposal

TitleSub-title

PLACE PARTNER’S LOGO HERE

European CommissionEnterprise and Industry

From idea to project proposal

PLACE PARTNER’S LOGO HERE

European CommissionEnterprise and Industry

Page 2: Cip eco innovation - From idea to proposal

Outline

• Evaluation criteria

• From idea to project proposal• From idea to project proposal

• What can be budgeted?

• Support from NCP Brussels

PLACE PARTNER’S LOGO HERE

Page 3: Cip eco innovation - From idea to proposal

Evaluation criteriaEvaluation criteria

Page 4: Cip eco innovation - From idea to proposal

• Eligibility criteria

• Exclusion criteria

Evaluation process

• Yes/No• Exclusion criteria

• Selection criteria

• Award criteria

• EACI officers

• X/10• Experts

Page 5: Cip eco innovation - From idea to proposal

Award criteria• Relevance of the action (7/10): policy priority area, clearly

innovative, substantial environmental benefits, SMEs

• Quality of the proposed action (6/10): soundness and coherence of project from a technical perspective

• Impact on target audience (6/10): replication during & after • Impact on target audience (6/10): replication during & after the project, exploitation and business approach

• Budget and cost-effectiveness (6/10): appropriate level of efforts per task/partner, justified costs, notably equipment cofinancing

• European added value (6/10): EU dimension of the market barrier, level of EU cooperation, why EU project rather than national ?

Total threshold: 34/50

Page 6: Cip eco innovation - From idea to proposal

Translate idea into project Translate idea into project proposal

Page 7: Cip eco innovation - From idea to proposal

To start, you need

• A good idea matching with the call and EU priorities

-> Get inspired checking out current projects: -> Get inspired checking out current projects: http://ieea.erba.hu/eco/page/Page.jsp?op=home

• A clear understanding of the applicant’s instruction

-> read the application pack: http://ec.europa.eu/environment/eco-innovation/getting-funds/application-packs/index_en.htm

Page 8: Cip eco innovation - From idea to proposal

Ask yourself

• What are the objectives of your project ?� You will need to quantify both the economic and

environmental performance (realistic & ambitious)!� Not only potential : the application/replication of � Not only potential : the application/replication of

the solution must occur during the project !

• How will you achieve it ? � How will you remove the barriers to create/extend

the market for your eco-innovative solution ?� Need to look for partners ? What types ?

Page 9: Cip eco innovation - From idea to proposal

Part B

Work description

Part C -Detailed Budget

Part A

A1: Summary

Annexes++++ ++++ ++++

Letters of

Overview of a proposal

Cost & effortbreakdowns

Work description

+ info on projectteam

Structure set upto provide infoon all awardcriteria

A1: Summary

A2: Participantdata

A3 : Budget

Letters ofintent andlegal documents

Performance indicators

Encode directly in

EPSS

Upload pdf files in EPSS

Page 10: Cip eco innovation - From idea to proposal

Performance indicators (ex/ Insulafth)Objectives Indicators -

General

Indicators - Specific Units of Measure Quantified

Target*

Time frame**

Improved

environmental

performance

Greenhouse gas

emissions

• CO2 emissions t/year saved

t/year saved

t/year saved

103

412

1030

End project

+ 2 years

+ 5 years

Waste

management

• Recycling of waste wood t/average house 3.6 End of life

• Packaging diverted from kg/m2 saved 0.1 End project• Packaging diverted from

landfill

kg/m2 saved

t/year saved

t/year saved

0.1

2

5

End project

+ 2 years

+ 5 years

Better use of

natural resources

Energy

consumption

• Embodied energy in

insulation

MJ/m2 saved

MJ/year saved

MJ/year saved

11.37

220K

550K

End project

+ 2 years

+ 5 years

Final energy

consumption

• Energy loss kWh/year/avg. house

saved

kWh/year/ saved

kWh/year/ saved

963

96300

2408

End project

+ 2 years

+ 5 years

Page 11: Cip eco innovation - From idea to proposal

Work description

• A proposal is made of work packages

� 3 mandatory work packages : management,

exploitation and business plan, dissemination exploitation and business plan, dissemination

activities

� Technical work packages : breakdown activity in

tasks, think of concrete deliverables, duration of

the WP, role and contribution of each participant

etc.

Page 12: Cip eco innovation - From idea to proposal

DO

• Keep in mind the objectives of your project : all WP and task aims to achieve it

• Ensure you have the necessary skills to perform all the tasks

• Explain the choice of partners and subcontractors: their skills is in coherence with planned actions

Page 13: Cip eco innovation - From idea to proposal

DO• Propose a realistic time planning (don’t

forget necessary time for permits/certification)

• Provide answers to all award criteria !• Provide answers to all award criteria !

• Explain how you will measure your impact (include one task for this)

• Have a coherent and complete budget

Page 14: Cip eco innovation - From idea to proposal

DON’T• Let evaluators guess or imagine : your

proposal must be self explanatory

• Be too general : « my project will fight • Be too general : « my project will fight climate change… »

• Underestimate electronic aleas (cf electronic submission): submit your proposal early enough…

Page 15: Cip eco innovation - From idea to proposal

What can be budgeted?What can be budgeted?

Page 16: Cip eco innovation - From idea to proposal

General principles

• Cost-sharing !

� 50% EU co-funding (why EC money instead of

local loan ?)local loan ?)

� In case of co-financing from 3rd party, state the

status of negociation ( state aid ceiling)

� Income generated by selling the solution can be

used as co-financing but NON-PROFIT principle

• Based on actual costs (vs budgeted costs)

Page 17: Cip eco innovation - From idea to proposal

NO PROFIT RULE

17

Page 18: Cip eco innovation - From idea to proposal

Eligible costs• Direct costs

� Staff costs (you will have to prove it with pay slips

and time sheets)

� Equipment and Infrastructure

� Subcontracting (but no core tasks and below 35% of

total eligible costs)

� Meetings and travel (cf internal or EC rules)

� Other specific costs

• Overheads = 7% of the total eligible direct costs

Page 19: Cip eco innovation - From idea to proposal

Equipment infrastructure (ex.)

Page 20: Cip eco innovation - From idea to proposal

Get support from NCP Brussels!

NCP Brussels, votre point de contact officiel pour accéder aux financements européens de recherche et innovation

Retrouvez votre NCP Brussels sur

Page 21: Cip eco innovation - From idea to proposal

Our services (free of charge)

• Preparation of your interview with EACI project officers

• Individual guidance on how to translate project idea into

project proposalproject proposal

• Partner search from EU and beyond

• Answers to any administrative/financial questions

• Proofreading of your proposal and budget

• Support during project negotiation and implementation